N4008519R9102_Project_Information_Form_19R9102.docx
DOCX document 24 KB Posted
- Solicitation number
- N4008519R9102
About this file
This document is a sources sought notice for design-build construction services for a CH-53K Cargo Loading Trainer facility at Marine Corps Air Station New River in North Carolina. The Naval Facilities Engineering Command, Mid-Atlantic is seeking eligible small businesses capable of performing the project, which includes a 9,795 square foot reinforced concrete and CMU structure with high-bay, office, and trainer spaces. Interested SDVOSB, VOSB, HUBZone, 8(a), women-owned, economically disadvantaged women-owned, and small businesses are encouraged to respond by March 28, 2019 with a capabilities statement not exceeding 15 pages demonstrating relevant experience on projects 9,000 square feet and $7 million or greater in size and scope, such as new construction of military open-bay facilities with administrative and operational spaces. A minimum of two and maximum of five project profiles using the attached form should be provided from the past five years. Award is anticipated in February 2020.
N4008519R9102_Project_Information_Form_19R9102.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008519R9102_Matrix_19R9102.xlsx | XLSX spreadsheet | |
| N4008519R9102_Contractor_Information_Form_19R9102.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – PROJECT INFORMATION FORM
Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.
| 1. |
| Contractor Name: |
| 2. | ||||
| Project No. (check one): | ||||
| |_| 1 | |_| 2 | |_| 3 | |_| 4 | |_| 5 |
| 3. |
| Contract Number: |
| Delivery/Task Order No.: |
| Project Number: |
| Title: |
| Location: |
| 4. |
| Award Date (mm/dd/yy): |
| 5. |
| Final Contract Price: |
| $ |
| Completion Date (mm/dd/yy): |
| (includes all options and mods) |
| Project is % complete (as of submission due date) |
| This is the |_| total project |_| subcontract price. |
| 6. | ||
| Type of work: | ||
| |_| New Construction | |_| Repair | |_| Renovation |
| 7. |
| Customer/Owner Name: |
| Point of Contact Name/Title: (person with project knowledge) |
| POC Phone Number: |
| POC Email Address: |
| 8. | |
| Were you the Prime contractor for this project? | |
| |_| Yes | |_| No |
| Were you a subcontractor for this project? | |
| |_| Yes | |_| No |
| If subcontractor, who was the Prime contractor? |
| 9. |
| Type of Contract (check all that apply): |
|_| Design-Build |_| Design-Bid-Build (fully designed project)
| |_| Other (explain): |
| If Design-Build, provide the following information: |
| |_| Design accomplished in-house |
| Lead design firm name: |
| Years working together: |
| Address: |
10. Provide a detailed description of the project:
11. Percentage of work you self-performed on this project: %.
Provide a detailed description of the work your firm self-performed on this project:
Form may be expanded. Please DO NOT change content of the form
File details come from the government source that posted it. Updated .