N4008519R9048_Contractor_Information_Form.docx

DOCX document 21 KB Posted

Attached to
MODIFY THE RESPONSE DATE FOR SOURCES SOUGHT TO NOVEMBER 16, 2018
Solicitation number
N4008519R9048
Issued by

About this file

This document contains a sources sought notice and contractor information form for a design-build/design-bid-build multiple award construction contract. The Naval Facilities Engineering Command, Mid-Atlantic is seeking small businesses capable of performing design and construction services for facilities projects at Marine Corps Base Camp Lejeune, Marine Corps Air Station Cherry Point, and Marine Corps Air Station New River. Interested firms should demonstrate experience with new construction and renovation projects over $15 million, including at least one project over $35 million. Responses are due by November 16, 2018 and should include the contractor information form and details on three to five relevant past projects using the provided forms. Up to six contracts may be awarded for projects between $15-50 million over a five-year period not exceeding $975 million total.

N4008519R9048_Contractor_Information_Form.docx

View the file

Other files

File Type Posted
N4008519R9048_Project_Information_Form.docx DOCX document
N4008519R9048_Project_Matrix.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT – CONTRACTOR INFORMATION FORM

Use this form to provide contractor’s general information. Please limit response to one page. The box at the bottom of this form may be used to clarify any requested information.

1. Contractor Information:
DUNS:
CAGE Code:
Firm Name:
Address:
Name of POC for firm:
Phone Number of POC:
Email of POC:

2. Type of Business: (check all that apply)

|_| SBA certified 8(a) firm
|_| SBA certified HUBZone Small Business

|_| Service-Disabled Veteran-Owned Small Business

|_| Veteran Owned Small Business

|_| Woman Owned Small Business

|_| Economically Disadvantaged Women-Owned |_| Small Business Small Business

3. Bonding Capacity:

Surety Name:
Maximum bonding capacity per project:
$
Aggregate maximum bonding capacity:
$

4. This space may be used to provide any additional information to clarify the above items only:

Please DO NOT change content of the form

File details come from the government source that posted it. Updated .