UNPriced__ELINs__1502000__Facility__Investment__ver__2.4.19R9037.xls
XLS spreadsheet 405 KB Posted
- Solicitation number
- N4008519R9037
About this file
UNPriced__ELINs__1502000__Facility__Investment__ver__2.4.19R9037.xls
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_001_Solicitation__N40085-19-R-9037.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| FACILITY INVESTMENT | ||
| CLIN 0001 | CLIN 0002 | |
| CLIN 0003 | CLIN 0004 | |
| CLIN 0005 | CLIN 0006 | |
| CLIN 0007 | CLIN 0008 | |
| CLIN 0009 | CLIN 0010 | |
| Total RP | Total NRP | |
| Est. Total |
Recurring-Base Period
| ATTACHMENT J-0200000-15 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION/CONTRACT N40085-19-R-9037 | |||||
| EXHIBIT B - CLIN 9000 | |||||
| Line Item 0001 Recurring Price - Base Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs A001 through A012 | |||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Extended Price |
| A001 | NNSY (CNRMA) | ||||
| A001AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA | ||
| A001AB | Urgent Service Orders, Spec Item 3.1.2 | 30 | EA | ||
| A001AC | Routine Service Orders, Spec Item 3.1.3 | 30 | EA | ||
| A001AD | PM Program, Electric VTE Spec Item 3.2.2 | 9 | EA | ||
| A001AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 14 | EA | ||
| A001AF | PM Program, Electric CLE Spec Item 3.2.2 | 3 | EA | ||
| A001AG | PM Program, Electric PL Spec Item 3.2.2 | 1 | EA | ||
| A001AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 9 | EA | ||
| A001AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 14 | EA | ||
| A001AK | Inspection, Testing, and Certification Program, CLE Spec Item 3.3.1 | 3 | EA | ||
| A001AL | Inspection, Testing, and Certification Program, Electric PL Spec Item 3.3.1 | 1 | EA | ||
| A002 | Facility Management 1501000 | ||||
| A002AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| NNSY CNRMA Subtotal | |||||
| A003 | NNSY | ||||
| A003AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA | ||
| A003AB | Urgent Service Orders, Spec Item 3.1.2 | 30 | EA | ||
| A003AC | Routine Service Orders, Spec Item 3.1.3 | 30 | EA | ||
| A003AD | PM Program, Electric VTE Spec Item 3.2.2 | 32 | EA | ||
| A003AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 11 | EA | ||
| A003AF | Dumbwaiter Hydraulic Spec Item 3.2.2 | 1 | EA | ||
| A003AG | Dry Dock # 8 (VCR # 53 & Elevator # 54 ) Spec Item 3.2.1 | 2 | EA | ||
| A003AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 32 | EA | ||
| A003AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 11 | EA | ||
| A004 | Facility Management 1501000 | ||||
| A004AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| NNSY Subtotal | |||||
| A005 | UTILITY | ||||
| A005AA | Emergency Service Orders, Spec Item 3.1.1 | 2 | EA | ||
| A005AB | Urgent Service Orders, Spec Item 3.1.2 | 2 | EA | ||
| A005AC | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | ||
| A005AD | PM Program, Hydraulic VTE Spec Item 3.2.2 | 1 | EA | ||
| A005AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 1 | EA | ||
| A006 | Facility Management 1501000 | ||||
| A006AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| UTILITY Subtotal | |||||
| A007 | Little Creek (CRNMA) | ||||
| A007AA | Emergency Service Orders, Spec Item 3.1.1 | 5 | EA | ||
| A007AB | Urgent Service Orders, Spec Item 3.1.2 | 25 | EA | ||
| A007AC | Routine Service Orders, Spec Item 3.1.3 | 26 | EA | ||
| A007AD | PM Program, Escalator Spec Item 3.2.2 | 2 | EA | ||
| A007AE | Inspection, Testing, and Certification Program, Escalator Spec Item 3.3.1 | 2 | EA | ||
| A008 | Facility Management 1501000 | ||||
| A008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Little Creek Subtotal | |||||
| A009 | Norfolk (CNRMA) | ||||
| A009AA | Emergency Service Orders, Spec Item 3.1.1 | 38 | EA | ||
| A009AB | Urgent Service Orders, Spec Item 3.1.2 | 38 | EA | ||
| A009AC | Routine Service Orders, Spec Item 3.1.3 | 38 | |||
| A009AD | PM Program, Escalators Spec Item 3.2.2 | 3 | EA | ||
| A009AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 4 | EA | ||
| A009AF | Inspection, Testing, and Certification Program, Escalators Spec Item 3.3.1 | 3 | EA | ||
| A009AG | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 4 | EA | ||
| A010 | Facility Management 1501000 | ||||
| A010AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Norfolk Subtotal | |||||
| A011 | Dam Neck (CNRMA) | ||||
| A011AA | Emergency Service Orders, Spec Item 3.1.1 | 20 | EA | ||
| A011AB | Urgent Service Orders, Spec Item 3.1.2 | 20 | EA | ||
| A011AC | Routine Service Orders, Spec Item 3.1.3 | 20 | EA | ||
| A011AD | PM Program, Hydraulic VTE Spec Item 3.2 | 3 | EA | ||
| A011AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3 | 3 | EA | ||
| A012 | Facility Management 1501000 | ||||
| A012AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Dam Neck Subtotal | |||||
| TOTAL RECURRING LINE ITEMS |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
Non-Recurring-Base Period
| ATTACHMENT J-0200000-15 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT N40085-19-R-9037 | ||||||
| EXHIBIT E - CLIN 9000 | ||||||
| Line Item 0002 Non-Recurring Price - Base Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs A700 through A705 | ||||||
| ELIN | Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Special Maintenance and inspection for elevator # 54 and VRC # 53 at NNSY Dry Dock # 8 | These elevators shall have this inspection performed before elevators are put back in service after every flooding of the Dry Dock. The contractor shall start work within 1 hour of dry dock being pumped down during regular work hours/days and within 2 hours after regular work hours and weekends. | 20 | EA | ||
| A701 | Five Year Inspection, Testing, and Certification Program | The contractor shall prepare, inspect, test and operate VTE Systems to support Government Certification. This work shall be accomplished during regular working hours. Building 1500 elevators will be tested after normal working hours | 28 | EA | ||
| A702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 225 | HR | ||
| A703 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. | 75 | HR | ||
| A704 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 32,000 | LS | ||
| A705 | Engineering Studies - MUST BE NEGOTIATED BY KO | The Contractor shall provide an engineering study of an existing condition or proposed situation, e.g., installation traffic, land use, alternative site investigation, and AICUZ, as requested by an internal or external customer. Services shall include research of applicable regulations, site investigation, and preparation of a written report indicating background, findings, and recommendation(s), complete with supporting graphics, e.g., sketches and drawings, and a detailed cost estimate of the recommended maintenance, repair or construction work. Necessary copies of a pre-final report shall be provided to the requestor and any impacted customers for review and comment incorporation prior to distribution of the final copy. All services shall be completed within the time specified in the task order. | 50 | HR | ||
| TOTAL NON-RECURRING QUANTITY PRICE |
Recurring-1st Opt Period
| ATTACHMENT J-0200000-15 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION/CONTRACT N40085-19-R-9037 | |||||
| EXHIBIT B - CLIN 9000 | |||||
| Line Item 0003 Recurring Price - First Opt Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs B001 through B012 | |||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Extended Price |
| B001 | NNSY (CNRMA) | ||||
| B001AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA | ||
| B001AB | Urgent Service Orders, Spec Item 3.1.2 | 30 | EA | ||
| B001AC | Routine Service Orders, Spec Item 3.1.3 | 30 | EA | ||
| B001AD | PM Program, Electric VTE Spec Item 3.2.2 | 9 | EA | ||
| B001AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 14 | EA | ||
| B001AF | PM Program, Electric CLE Spec Item 3.2.2 | 3 | EA | ||
| B001AG | PM Program, Electric PL Spec Item 3.2.2 | 1 | EA | ||
| B001AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 9 | EA | ||
| B001AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 14 | EA | ||
| B001AK | Inspection, Testing, and Certification Program, CLE Spec Item 3.3.1 | 3 | EA | ||
| B001AL | Inspection, Testing, and Certification Program, Electric PL Spec Item 3.3.1 | 1 | EA | ||
| B002 | Facility Management 1501000 | ||||
| B002AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| NNSY CNRMA Subtotal | |||||
| B003 | NNSY | ||||
| B003AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA | ||
| B003AB | Urgent Service Orders, Spec Item 3.1.2 | 30 | EA | ||
| B003AC | Routine Service Orders, Spec Item 3.1.3 | 30 | EA | ||
| B003AD | PM Program, Electric VTE Spec Item 3.2.2 | 32 | EA | ||
| B003AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 11 | EA | ||
| B003AF | Dumbwaiter Hydraulic Spec Item 3.2.2 | 1 | EA | ||
| B003AG | Dry Dock # 8 (VCR # 53 & Elevator # 54 ) Spec Item 3.2.1 | 2 | EA | ||
| B003AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 32 | EA | ||
| B003AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 11 | EA | ||
| B004 | Facility Management 1501000 | ||||
| B004AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| NNSY Subtotal | |||||
| B005 | UTILITY | ||||
| B005AA | Emergency Service Orders, Spec Item 3.1.1 | 2 | EA | ||
| B005AB | Urgent Service Orders, Spec Item 3.1.2 | 2 | EA | ||
| B005AC | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | ||
| B005AD | PM Program, Hydraulic VTE Spec Item 3.2.2 | 1 | EA | ||
| B005AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 1 | EA | ||
| B006 | Facility Management 1501000 | ||||
| B006AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| UTILITY Subtotal | |||||
| B007 | Little Creek (CRNMA) | ||||
| B007AA | Emergency Service Orders, Spec Item 3.1.1 | 5 | EA | ||
| B007AB | Urgent Service Orders, Spec Item 3.1.2 | 25 | EA | ||
| B007AC | Routine Service Orders, Spec Item 3.1.3 | 26 | EA | ||
| B007AD | PM Program, Escalator Spec Item 3.2.2 | 2 | EA | ||
| B007AE | Inspection, Testing, and Certification Program, Escalator Spec Item 3.3.1 | 2 | EA | ||
| B008 | Facility Management 1501000 | ||||
| B008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Little Creek Subtotal | |||||
| B009 | Norfolk (CNRMA) | ||||
| B009AA | Emergency Service Orders, Spec Item 3.1.1 | 38 | EA | ||
| B009AB | Urgent Service Orders, Spec Item 3.1.2 | 38 | EA | ||
| B009AC | Routine Service Orders, Spec Item 3.1.3 | 38 | EA | ||
| B009AD | PM Program, Escalators Spec Item 3.2.2 | 3 | EA | ||
| B009AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 4 | EA | ||
| B009AF | Inspection, Testing, and Certification Program, Escalators Spec Item 3.3.1 | 3 | EA | ||
| B009AG | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 4 | EA | ||
| B010 | Facility Management 1501000 | ||||
| B010AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Norfolk Subtotal | |||||
| B011 | Dam Neck (CNRMA) | ||||
| B011AA | Emergency Service Orders, Spec Item 3.1.1 | 20 | EA | ||
| B011AB | Urgent Service Orders, Spec Item 3.1.2 | 20 | EA | ||
| B011AC | Routine Service Orders, Spec Item 3.1.3 | 20 | EA | ||
| B011AD | PM Program, Hydraulic VTE Spec Item 3.2 | 3 | EA | ||
| B011AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3 | 3 | EA | ||
| B012 | Facility Management 1501000 | ||||
| B012AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Dam Neck Subtotal | |||||
| TOTAL RECURRING LINE ITEMS |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
Non-Recurri-1ST Opt Period
| ATTACHMENT J-0200000-15 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT N40085-19-R-9037 | ||||||
| EXHIBIT E - CLIN 9000 | ||||||
| Line Item 0004 Non-Recurring Price - First Opt Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs B700 through B704 | ||||||
| ELIN | Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Special Maintenance and inspection for elevator # 54 and VRC # 53 at NNSY Dry Dock # 8 | These elevators shall have this inspection performed before elevators are put back in service after every flooding of the Dry Dock. The contractor shall start work within 1 hour of dry dock being pumped down during regular work hours/days and within 2 hours after regular work hours and weekends. | 20 | EA | ||
| B701 | Five Year Inspection, Testing, and Certification Program | The contractor shall prepare, inspect, test and operate VTE Systems to support Government Certification. This work shall be accomplished during regular working hours. Building 1500 elevators will be tested after normal working hours | 28 | EA | ||
| B702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 225 | HR | ||
| B703 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. | 75 | HR | ||
| B704 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 32,000 | LS | ||
| B705 | Engineering Studies - MUST BE NEGOTIATED BY KO | The Contractor shall provide an engineering study of an existing condition or proposed situation, e.g., installation traffic, land use, alternative site investigation, and AICUZ, as requested by an internal or external customer. Services shall include research of applicable regulations, site investigation, and preparation of a written report indicating background, findings, and recommendation(s), complete with supporting graphics, e.g., sketches and drawings, and a detailed cost estimate of the recommended maintenance, repair or construction work. Necessary copies of a pre-final report shall be provided to the requestor and any impacted customers for review and comment incorporation prior to distribution of the final copy. All services shall be completed within the time specified in the task order. | 50 | HR | ||
| TOTAL NON-RECURRING QUANTITY PRICE |
Recurring-2nd Opt Period
| ATTACHMENT J-0200000-15 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION/CONTRACT N40085-19-R-9037 | |||||
| EXHIBIT B - CLIN 9000 | |||||
| Line Item 0005 Recurring Price - Second Opt Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs C001 through C012 | |||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Extended Price |
| C001 | NNSY (CNRMA) | ||||
| C001AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA | ||
| C001AB | Urgent Service Orders, Spec Item 3.1.2 | 30 | EA | ||
| C001AC | Routine Service Orders, Spec Item 3.1.3 | 30 | EA | ||
| C001AD | PM Program, Electric VTE Spec Item 3.2.2 | 9 | EA | ||
| C001AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 14 | EA | ||
| C001AF | PM Program, Electric CLE Spec Item 3.2.2 | 3 | EA | ||
| C001AG | PM Program, Electric PL Spec Item 3.2.2 | 1 | EA | ||
| C001AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 9 | EA | ||
| C001AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 14 | EA | ||
| C001AK | Inspection, Testing, and Certification Program, CLE Spec Item 3.3.1 | 3 | EA | ||
| C001AL | Inspection, Testing, and Certification Program, Electric PL Spec Item 3.3.1 | 1 | EA | ||
| C002 | Facility Management 1501000 | ||||
| C002AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| NNSY CNRMA Subtotal | |||||
| C003 | NNSY | ||||
| C003AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA | ||
| C003AB | Urgent Service Orders, Spec Item 3.1.2 | 30 | EA | ||
| C003AC | Routine Service Orders, Spec Item 3.1.3 | 30 | EA | ||
| C003AD | PM Program, Electric VTE Spec Item 3.2.2 | 32 | EA | ||
| C003AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 11 | EA | ||
| C003AF | Dumbwaiter Hydraulic Spec Item 3.2.2 | 1 | EA | ||
| C003AG | Dry Dock # 8 (VCR # 53 & Elevator # 54 ) Spec Item 3.2.1 | 2 | EA | ||
| C003AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 32 | EA | ||
| C003AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 11 | EA | ||
| C004 | Facility Management 1501000 | ||||
| C004AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| NNSY Subtotal | |||||
| C005 | UTILITY | ||||
| C005AA | Emergency Service Orders, Spec Item 3.1.1 | 2 | EA | ||
| C005AB | Urgent Service Orders, Spec Item 3.1.2 | 2 | EA | ||
| C005AC | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | ||
| C005AD | PM Program, Hydraulic VTE Spec Item 3.2.2 | 1 | EA | ||
| C005AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 1 | EA | ||
| C006 | Facility Management 1501000 | ||||
| C006AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| UTILITY Subtotal | |||||
| C007 | Little Creek (CRNMA) | ||||
| C007AA | Emergency Service Orders, Spec Item 3.1.1 | 5 | EA | ||
| C007AB | Urgent Service Orders, Spec Item 3.1.2 | 25 | EA | ||
| C007AC | Routine Service Orders, Spec Item 3.1.3 | 26 | EA | ||
| C007AD | PM Program, Escalator Spec Item 3.2.2 | 2 | EA | ||
| C007AE | Inspection, Testing, and Certification Program, Escalator Spec Item 3.3.1 | 2 | EA | ||
| C008 | Facility Management 1501000 | ||||
| C008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Little Creek Subtotal | |||||
| C009 | Norfolk (CNRMA) | ||||
| C009AA | Emergency Service Orders, Spec Item 3.1.1 | 38 | EA | ||
| C009AB | Urgent Service Orders, Spec Item 3.1.2 | 38 | EA | ||
| C009AC | Routine Service Orders, Spec Item 3.1.3 | 38 | EA | ||
| C009AD | PM Program, Escalators Spec Item 3.2.2 | 3 | EA | ||
| C009AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 4 | EA | ||
| C009AF | Inspection, Testing, and Certification Program, Escalators Spec Item 3.3.1 | 3 | EA | ||
| C009AG | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 4 | EA | ||
| C010 | Facility Management 1501000 | ||||
| C010AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Norfolk Subtotal | |||||
| C011 | Dam Neck (CNRMA) | ||||
| C011AA | Emergency Service Orders, Spec Item 3.1.1 | 20 | EA | ||
| C011AB | Urgent Service Orders, Spec Item 3.1.2 | 20 | EA | ||
| C011AC | Routine Service Orders, Spec Item 3.1.3 | 20 | EA | ||
| C011AD | PM Program, Hydraulic VTE Spec Item 3.2 | 3 | EA | ||
| C011AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3 | 3 | EA | ||
| C012 | Facility Management 1501000 | ||||
| C012AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Dam Neck Subtotal | |||||
| TOTAL RECURRING LINE ITEMS |
Non-Recurring-2nd Opt Period
| ATTACHMENT J-0200000-15 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT N40085-19-R-9037 | ||||||
| EXHIBIT E - CLIN 9000 | ||||||
| Line Item 0006 Non-Recurring Price - Second Opt Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs C700 through C704 | ||||||
| ELIN | Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| C700 | Special Maintenance and inspection for elevator # 54 and VRC # 53 at NNSY Dry Dock # 8 | These elevators shall have this inspection performed before elevators are put back in service after every flooding of the Dry Dock. The contractor shall start work within 1 hour of dry dock being pumped down during regular work hours/days and within 2 hours after regular work hours and weekends. | 20 | EA | ||
| C701 | Five Year Inspection, Testing, and Certification Program | The contractor shall prepare, inspect, test and operate VTE Systems to support Government Certification. This work shall be accomplished during regular working hours. Building 1500 elevators will be tested after normal working hours | 28 | EA | ||
| C702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 225 | HR | ||
| C703 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. | 75 | HR | ||
| C704 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 32,000 | LS | ||
| C705 | Engineering Studies - MUST BE NEGOTIATED BY KO | The Contractor shall provide an engineering study of an existing condition or proposed situation, e.g., installation traffic, land use, alternative site investigation, and AICUZ, as requested by an internal or external customer. Services shall include research of applicable regulations, site investigation, and preparation of a written report indicating background, findings, and recommendation(s), complete with supporting graphics, e.g., sketches and drawings, and a detailed cost estimate of the recommended maintenance, repair or construction work. Necessary copies of a pre-final report shall be provided to the requestor and any impacted customers for review and comment incorporation prior to distribution of the final copy. All services shall be completed within the time specified in the task order. | 50 | HR | ||
| TOTAL NON-RECURRING QUANTITY PRICE |
Recurring-3rd Opt Period
| ATTACHMENT J-0200000-15 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION/CONTRACT N40085-19-R-9037 | |||||
| EXHIBIT B - CLIN 9000 | |||||
| Line Item 0007 Recurring Price - Third Opt Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs D001 through D012 | |||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Extended Price |
| D001 | NNSY (CNRMA) | ||||
| D001AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA | ||
| D001AB | Urgent Service Orders, Spec Item 3.1.2 | 30 | EA | ||
| D001AC | Routine Service Orders, Spec Item 3.1.3 | 30 | EA | ||
| D001AD | PM Program, Electric VTE Spec Item 3.2.2 | 9 | EA | ||
| D001AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 14 | EA | ||
| D001AF | PM Program, Electric CLE Spec Item 3.2.2 | 3 | EA | ||
| D001AG | PM Program, Electric PL Spec Item 3.2.2 | 1 | EA | ||
| D001AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 9 | EA | ||
| D001AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 14 | EA | ||
| D001AK | Inspection, Testing, and Certification Program, CLE Spec Item 3.3.1 | 3 | EA | ||
| D001AL | Inspection, Testing, and Certification Program, Electric PL Spec Item 3.3.1 | 1 | EA | ||
| D002 | Facility Management 1501000 | ||||
| D002AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| NNSY CNRMA Subtotal | |||||
| D003 | NNSY | ||||
| D003AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA | ||
| D003AB | Urgent Service Orders, Spec Item 3.1.2 | 30 | EA | ||
| D003AC | Routine Service Orders, Spec Item 3.1.3 | 30 | EA | ||
| D003AD | PM Program, Electric VTE Spec Item 3.2.2 | 32 | EA | ||
| D003AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 11 | EA | ||
| D003AF | Dumbwaiter Hydraulic Spec Item 3.2.2 | 1 | EA | ||
| D003AG | Dry Dock # 8 (VCR # 53 & Elevator # 54 ) Spec Item 3.2.1 | 2 | EA | ||
| D003AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 32 | EA | ||
| D003AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 11 | EA | ||
| D004 | Facility Management 1501000 | ||||
| D004AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| NNSY Subtotal | |||||
| D005 | UTILITY | ||||
| D005AA | Emergency Service Orders, Spec Item 3.1.1 | 2 | EA | ||
| D005AB | Urgent Service Orders, Spec Item 3.1.2 | 2 | EA | ||
| D005AC | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | ||
| D005AD | PM Program, Hydraulic VTE Spec Item 3.2.2 | 1 | EA | ||
| D005AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 1 | EA | ||
| D006 | Facility Management 1501000 | ||||
| D006AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| UTILITY Subtotal | |||||
| D007 | Little Creek (CRNMA) | ||||
| D007AA | Emergency Service Orders, Spec Item 3.1.1 | 5 | EA | ||
| D007AB | Urgent Service Orders, Spec Item 3.1.2 | 25 | EA | ||
| D007AC | Routine Service Orders, Spec Item 3.1.3 | 26 | EA | ||
| D007AD | PM Program, Escalator Spec Item 3.2.2 | 2 | EA | ||
| D007AE | Inspection, Testing, and Certification Program, Escalator Spec Item 3.3.1 | 2 | EA | ||
| D008 | Facility Management 1501000 | ||||
| D008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Little Creek Subtotal | |||||
| D009 | Norfolk (CNRMA) | ||||
| D009AA | Emergency Service Orders, Spec Item 3.1.1 | 38 | EA | ||
| D009AB | Urgent Service Orders, Spec Item 3.1.2 | 38 | EA | ||
| D009AC | Routine Service Orders, Spec Item 3.1.3 | 38 | EA | ||
| D009AD | PM Program, Escalators Spec Item 3.2.2 | 3 | EA | ||
| D009AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 4 | EA | ||
| D009AF | Inspection, Testing, and Certification Program, Escalators Spec Item 3.3.1 | 3 | EA | ||
| D009AG | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 4 | EA | ||
| D010 | Facility Management 1501000 | ||||
| D010AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Norfolk Subtotal | |||||
| D011 | Dam Neck (CNRMA) | ||||
| D011AA | Emergency Service Orders, Spec Item 3.1.1 | 20 | EA | ||
| D011AB | Urgent Service Orders, Spec Item 3.1.2 | 20 | EA | ||
| D011AC | Routine Service Orders, Spec Item 3.1.3 | 20 | EA | ||
| D011AD | PM Program, Hydraulic VTE Spec Item 3.2 | 3 | EA | ||
| D011AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3 | 3 | EA | ||
| D012 | Facility Management 1501000 | ||||
| D012AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Dam Neck Subtotal | |||||
| TOTAL RECURRING LINE ITEMS |
Non-Recurring-3rd Opt Period
| ATTACHMENT J-0200000-15 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT N40085-19-R-9037 | ||||||
| EXHIBIT E - CLIN 9000 | ||||||
| Line Item 0008 Non-Recurring Price - Third Opt Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs D700 through D704 | ||||||
| ELIN | Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| D700 | Special Maintenance and inspection for elevator # 54 and VRC # 53 at NNSY Dry Dock # 8 | These elevators shall have this inspection performed before elevators are put back in service after every flooding of the Dry Dock. The contractor shall start work within 1 hour of dry dock being pumped down during regular work hours/days and within 2 hours after regular work hours and weekends. | 20 | EA | ||
| D701 | Five Year Inspection, Testing, and Certification Program | The contractor shall prepare, inspect, test and operate VTE Systems to support Government Certification. This work shall be accomplished during regular working hours. Building 1500 elevators will be tested after normal working hours | 28 | EA | ||
| D702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 225 | HR | ||
| D703 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. | 75 | HR | ||
| D704 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 32,000 | LS | ||
| D705 | Engineering Studies - MUST BE NEGOTIATED BY KO | The Contractor shall provide an engineering study of an existing condition or proposed situation, e.g., installation traffic, land use, alternative site investigation, and AICUZ, as requested by an internal or external customer. Services shall include research of applicable regulations, site investigation, and preparation of a written report indicating background, findings, and recommendation(s), complete with supporting graphics, e.g., sketches and drawings, and a detailed cost estimate of the recommended maintenance, repair or construction work. Necessary copies of a pre-final report shall be provided to the requestor and any impacted customers for review and comment incorporation prior to distribution of the final copy. All services shall be completed within the time specified in the task order. | 50 | HR | ||
| TOTAL NON-RECURRING QUANTITY PRICE |
Recurring-4th Opt Period
| ATTACHMENT J-0200000-15 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION/CONTRACT N40085-19-R-9037 | |||||
| EXHIBIT B - CLIN 9000 | |||||
| Line Item 0009 Recurring Price - Fourth Opt Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs E001 through E012 | |||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Extended Price |
| E001 | NNSY (CNRMA) | ||||
| E001AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA | ||
| E001AB | Urgent Service Orders, Spec Item 3.1.2 | 30 | EA | ||
| E001AC | Routine Service Orders, Spec Item 3.1.3 | 30 | EA | ||
| E001AD | PM Program, Electric VTE Spec Item 3.2.2 | 9 | EA | ||
| E001AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 14 | EA | ||
| E001AF | PM Program, Electric CLE Spec Item 3.2.2 | 3 | EA | ||
| E001AG | PM Program, Electric PL Spec Item 3.2.2 | 1 | EA | ||
| E001AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 9 | EA | ||
| E001AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 14 | EA | ||
| E001AK | Inspection, Testing, and Certification Program, CLE Spec Item 3.3.1 | 3 | EA | ||
| E001AL | Inspection, Testing, and Certification Program, Electric PL Spec Item 3.3.1 | 1 | EA | ||
| E002 | Facility Management 1501000 | ||||
| E002AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| NNSY CNRMA Subtotal | |||||
| E003 | NNSY | ||||
| E003AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA | ||
| E003AB | Urgent Service Orders, Spec Item 3.1.2 | 30 | EA | ||
| E003AC | Routine Service Orders, Spec Item 3.1.3 | 30 | EA | ||
| E003AD | PM Program, Electric VTE Spec Item 3.2.2 | 32 | EA | ||
| E003AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 11 | EA | ||
| E003AF | Dumbwaiter Hydraulic Spec Item 3.2.2 | 1 | EA | ||
| E003AG | Dry Dock # 8 (VCR # 53 & Elevator # 54 ) Spec Item 3.2.1 | 2 | EA | ||
| E003AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 32 | EA | ||
| E003AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 11 | EA | ||
| E004 | Facility Management 1501000 | ||||
| E004AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| NNSY Subtotal | |||||
| E005 | UTILITY | ||||
| E005AA | Emergency Service Orders, Spec Item 3.1.1 | 2 | EA | ||
| E005AB | Urgent Service Orders, Spec Item 3.1.2 | 2 | EA | ||
| E005AC | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | ||
| E005AD | PM Program, Hydraulic VTE Spec Item 3.2.2 | 1 | EA | ||
| E005AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 1 | EA | ||
| E006 | Facility Management 1501000 | ||||
| E006AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| UTILITY Subtotal | |||||
| E007 | Little Creek (CRNMA) | ||||
| E007AA | Emergency Service Orders, Spec Item 3.1.1 | 5 | EA | ||
| E007AB | Urgent Service Orders, Spec Item 3.1.2 | 25 | EA | ||
| E007AC | Routine Service Orders, Spec Item 3.1.3 | 26 | EA | ||
| E007AD | PM Program, Escalator Spec Item 3.2.2 | 2 | EA | ||
| E007AE | Inspection, Testing, and Certification Program, Escalator Spec Item 3.3.1 | 2 | EA | ||
| E008 | Facility Management 1501000 | ||||
| E008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Little Creek Subtotal | |||||
| E009 | Norfolk (CNRMA) | ||||
| E009AA | Emergency Service Orders, Spec Item 3.1.1 | 38 | EA | ||
| E009AB | Urgent Service Orders, Spec Item 3.1.2 | 38 | EA | ||
| E009AC | Routine Service Orders, Spec Item 3.1.3 | 38 | EA | ||
| E009AD | PM Program, Escalators Spec Item 3.2.2 | 3 | EA | ||
| E009AE | PM Program, Hydraulic VTE Spec Item 3.2.2 | 4 | EA | ||
| E009AF | Inspection, Testing, and Certification Program, Escalators Spec Item 3.3.1 | 3 | EA | ||
| E009AG | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 4 | EA | ||
| E010 | Facility Management 1501000 | ||||
| E010AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Norfolk Subtotal | |||||
| E011 | Dam Neck (CNRMA) | ||||
| E011AA | Emergency Service Orders, Spec Item 3.1.1 | 20 | EA | ||
| E011AB | Urgent Service Orders, Spec Item 3.1.2 | 20 | EA | ||
| E011AC | Routine Service Orders, Spec Item 3.1.3 | 20 | EA | ||
| E011AD | PM Program, Hydraulic VTE Spec Item 3.2 | 3 | EA | ||
| E011AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3 | 3 | EA | ||
| E012 | Facility Management 1501000 | ||||
| E012AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | ||
| Dam Neck Subtotal | |||||
| TOTAL RECURRING LINE ITEMS |
Non-Recurring-4th Opt Period
| ATTACHMENT J-0200000-15 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT N40085-19-R-9037 | ||||||
| EXHIBIT E - CLIN 9000 | ||||||
| Line Item 0010 Non-Recurring Price - Fourth Opt Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs E700 through E704 | ||||||
| ELIN | Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| E700 | Special Maintenance and inspection for elevator # 54 and VRC # 53 at NNSY Dry Dock # 8 | These elevators shall have this inspection performed before elevators are put back in service after every flooding of the Dry Dock. The contractor shall start work within 1 hour of dry dock being pumped down during regular work hours/days and within 2 hours after regular work hours and weekends. | 20 | EA | ||
| E701 | Five Year Inspection, Testing, and Certification Program | The contractor shall prepare, inspect, test and operate VTE Systems to support Government Certification. This work shall be accomplished during regular working hours. Building 1500 elevators will be tested after normal working hours | 28 | EA | ||
| E702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 225 | HR | ||
| E703 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. | 75 | HR | ||
| E704 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 32,000 | LS | ||
| E705 | Engineering Studies - MUST BE NEGOTIATED BY KO | The Contractor shall provide an engineering study of an existing condition or proposed situation, e.g., installation traffic, land use, alternative site investigation, and AICUZ, as requested by an internal or external customer. Services shall include research of applicable regulations, site investigation, and preparation of a written report indicating background, findings, and recommendation(s), complete with supporting graphics, e.g., sketches and drawings, and a detailed cost estimate of the recommended maintenance, repair or construction work. Necessary copies of a pre-final report shall be provided to the requestor and any impacted customers for review and comment incorporation prior to distribution of the final copy. All services shall be completed within the time specified in the task order. | 50 | HR | ||
| TOTAL NON-RECURRING QUANTITY PRICE |
File details come from the government source that posted it.