N4008519R9022_Flyer.pdf
PDF 254 KB Posted
- Solicitation number
- N4008519R9022
About this file
N4008519R9022_Flyer.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008519R9022_p310_list_1.pdf | ||
| N4008519R9022_Amendment_to_Industry_Day_Flyer.pdf | ||
| N4008519R9022_Local_Visitor_Request_Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Industry Day — FY19 MILCONs at PNSY P-310 — Dry Dock #1 Superflood Basin
P-1074 — Extend Portal Crane Rail Portsmouth Naval Shipyard, Kittery, ME
When: January 17, 2019 Where: The Rega a Room, Elliot, ME Who: Contractors with appropriate experience with construc on, repair, and/or renova on of large waterfront structures.
What: At this industry day event, NAVFA invites contractors to learn, ask ques ons, and provide feedback regarding the two proposed Military Con-struc on Projects (MILCON) located at the Portsmouth Naval Shipyard in Ki ery, ME. Naval Facili es Engineering Command (NAVFAC) is currently evalua ng the Pre-Final Design of the two projects for execu on this fiscal year in support of NAVSEA’s Submarine Maintenance Mission at Dry Dock No. 1.
Project Descrip on P‐310: Constructs a new 150,000SF superflood basin outside of exis ng Dry Dock #1, modifies an exis ng caisson to serve as the superflood basin gate, and constructs new portal crane and railroad rails along Berths 1 and 2.
Project Descrip on P‐1074: Constructs addi onal portal crane rails at Berths 1 and 2 to support load tes ng and heavy-li capabili es along with various u lity improvements to support enhanced LA Class maintenance and overhaul capabili es at Dry Dock #1.
P-1074 — Extend Portal Crane Rail Portsmouth Naval Shipyard, Kittery, ME
SECURITY REQUIREMENTS
1. There will not be a limit to the number of personnel that can a end the presenta on at the Rega a Room. A maximum of two personnel per company can a end the site visit.
2. Provide a ached Local Visitor Request Form to John Bishop, NAVFAC Contract Specialist for all personnel that will a end the site visit to Ports-mouth Naval Shipyard.
3. Submit Local Visitor Request Form by January 11th.
4. All a endees are required to be US Ci zens.
P-1074 — Extend Portal Crane Rail Portsmouth Naval Shipyard, Kittery, ME
AGENDA
Date: January 17, 2019 Loca on: The Rega a Room Elliot, ME
0900 - 0905 Introduc ons NAVFAC Contract Specialist
0905 - 0920 Opening Remarks
NAVFAC PWD ME
0920 - 1000 Project Presenta on – Technical NAVFAC Design Team
1000 - 1100 Ques on and Answer NAVFAC Design Team
1100 - 1115 Prepare for Site Visit (Depart parking lot at 1115 for PNSY)
1115 - 1215 Site Visit to Project Area (Note: Site Visit will be limited to a bus ride through the proposed construc on areas. A endees will not be able to walk around the site. Each com-pany will be limited to two personnel for the site visit.)
File details come from the government source that posted it.