Dwgs_Package_190457.pdf
PDF 1 MB Posted
- Attached to
- Replace Carpet in CG Suite H1
- Solicitation number
- N4008519R8112
About this file
PDF portfolio with Dwgs/SOW, ACM findings document, and asbestos inspection map
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Submittal_Register_190457.pdf | ||
| RFP_190457.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
SCOPE OF WORK: The contractor shall provide all material, labor, equipment, and supervision required to accomplish the following:
General description – This scope of work is to be accomplished at various locations aboard MCB CAMP LEJEUNE, North Carolina.
The contractor shall REMOVE AND INSTALL NEW FLOORING SURFACES, IAW details listed in drawings.
Detailed Requirements and Specifications: All measurements on the attached sketches are for reference only; the contractor shall take his own field measurements in determining required materials and costs. The contractor shall be certified to install products as listed under the product specifications listed below.
HAZARDOUS MATERIALS:
1. ACM reports attached.
T1
S1
A1
TITLE PAGE
SCOPE OF WORK
FLOOR PLAN; BLDG H1
ENVIRONMENTAL REQUIREMENTS:
1. All materials shall contain low volatile organic compounds (VOC).
2. Disposal and clean-up of materials shall be followed as required by the Material Safety Data Sheet (MSDS) directives.
NOTES:
1. The contractor is responsible for actual field verification prior to bidding, ordering material and during every step of the construction process for existing surfaces, dimensions and conditions.
2. Repair, refinish areas damaged or disturbed by new work to be provided under this contract.
3. Properly remove, haul, and dispose of all debris.
4. The contractor shall not utilize dumpsters provided by Camp Lejeune for the benefit of the occupants of the buildings.
5. Contractors may ONLY use the Camp Lejeune Sanitary Landfill for the disposal of asbestos containing materials, building products with tightly adhered lead containing paint, non-contaminated clean dirt and clean gravel. The hours of operation are 0730-1530 Monday - Thursday and 0730-1430 on Friday. Delivery of acceptable materials (identified above) shall be by appointment only. Appointments made by phone at 910-451-5011 or 910-451-2946.
ALL other contractor generated material shall be weighed through the Base Landfill scales before being removed from the Base. Contractors utilizing the base scales will require Contracting Officer assisted pre-registration with the Landfill Manager.
The Contracting Officer will register the contract via E-mail, with the Base Landfill. All haul vehicles will maintain a secure vehicle placard as a condition to utilize the scale. E-mail the contract information to the Landfill Clerk, including the name on the Prime Contractor, contract number, job name/ description, completion date and whether or not any of the above materials will be delivered to the Landfill.
SUBMITTALS:
1. Contractor shall make electronic copies of all submittals, including the approved transmittal sheets, and provide two (2) CD/DVD's containing all submittals for the project. The CD/DVD's shall be marked "Complete Submittal Package – “H1- 3ES; REPLACE CARPET IN COMMANDING GENERAL SUITE” - Contract # N40085-19-B-0000."
2. AFTER AWARD: The contractor shall furnish the Contracting Officer, material Specifications for selection and approval prior to the ordering and installation of said material.
3. DURING PRECONSTRUCTION MEETING: The contractor shall submit, to the COR, for approval, a detailed schedule identifying proposed phasing in order to complete the project in a timely manner.
CONTACT PERSONNEL:-
CM
ET
PM TIM LEE 910 545 9224
THE FOLLOWING PERSONNEL ARE FOR COORDINATING
CONSTRUCTION ACTIVITES ONLY, PER LOCATION
H1 CPL CORDLE 910 451 6470
MR. CHUCK CALLAHAN 910 451 8070
WORK REQUEST #
4951690
SPECIAL CONDITIONS:
NONE
SPECIAL SCHEDULING AND ACCESS:
1. Access and scheduling to the work area shall be arranged through the Regional Officer In-Charge of Contracting Office
(ROICC).
2. These are occupied Administration Offices / Rooms. Work cannot begin until all materials are on hand to eliminate unnecessary delays or disruptions. ALL MATERIAL SHALL BE
ON HAND AND WORK SHALL BE COMPLETED BETWEEN 15
OCTOBER TO 15 NOVEMBER.
3. Contractor shall be responsible for moving and resetting furniture as needed to complete tasks. Occupants will be responsible to remove and reinstall all personal and government equipment to include computers, telephones, fax machines, copiers, scanners.
H1
MCB CAMP LEJEUNE, NC
BIRCH
A ST.
JULIAN C
SMITH
MARSTON
PAVILION
P A
IN
T
N D
F L O
R
G
B
S
U
M C
E
J
W
Y
X
IM
IT
V
W
K
H
Y
IV
/1
/2
-1
-0
IR
LO
‘C ’ W
IO
(A
(G
Z
(2
-G -S
(G
-X
-X
/3
/6
I
P5
1, “P
I N
O R I N
I O
D G S
F C F C A
I N
O R I N
I O U
G
H H F C A S
I N
O R I N
I O U
G
O M T C G A S
I N
O R I N
I O U
G
O M T C G A S
A S
I N
O R I N
I O U
G
S T T S
I N
O R I N
/3
I N
O R I N
I N
O R I N
R E P L A C
P E
N D I N
E R A
2. FLOORING:
Demolition:
2.1 Remove and properly dispose carpet and other flooring surfaces in the work areas indicated on the attached sketches.
a. Do not dispose of any construction or demo material in any Base owned dumpsters.
2.2 Do not remove wood base.
a. If needed, the contractor may remove the existing base board in a manner that will not damage the base board or wall surface and reinstall after carpet installation.
b. The contractor is responsible for making any repairs to the wall or base board during demo.
2.3 Contractor shall not begin Demo phase until all material submittals have been submitted, approved and material is on hand so as to not disrupt the working Environment of these facilities and its Occupants.
Preparation for flooring installation:
2.4 Examine surfaces on which new flooring is to be installed to ensure that the floor is clean and free of oil , waxy films, paint, dust and substances that prevent adhesion. Leave floor dry and cured, free of residue from curing or cleaning agents.
2.5 Contractor shall correct conditions which will impair proper installation, including trowel marks, pits, dents, protrusions, cracks or joints. Fill cracks, joints depressions, and other irregularities in substrate with leveling compound. Do not use adhesive for filling or leveling purposes.
2.6 The contractor shall clear away debris from substrate and “resilient vacuum Clean”.
2.7 The contractor shall take precautions to remove existing adhesive, as recommended by manufacturer, to ensure proper application of new adhesive, to include wet scrapping and applying a primer/sealer to substrate, in accordance to manufacturer’s instructions.
Installation of Flooring:
2.8 Installation of flooring surfaces shall be IAW manufacturer’s instructions.
2.9 Secure the new carpet padding and floor coverings to the sub-floor with a pressure sensitive adhesive, as recommended by manufacturer. If existing flooring adhesive is not compatible with new adhesive, contractor is responsible for applying a primer / sealer recommended by flooring manufacturer in order for the new adhesive to adhere the new flooring as designed.
2.10 Follow carpet manufacturer's recommendations for matching pattern and texture directions. Flooring of the same color shall be from the same manufacturing run to ensure color match.
2.11 Existing transitions (wood) shall be removed and reinstalled during carpet demo and installation.
2.12 The contractor is responsible for making any alterations necessary to the existing doors created by installing the new flooring systems, to allow for the proper opening and closing of these doors.
2.13 Prior to final acceptance, contractor shall remove waste, fasteners and other cuttings from carpet floors and vacuum all new carpet.
BROADLOOM CARPET:
(BASIS OF DESIGN: MAINSTREET BY PHILADELPHIA,
EMPHATIC II 36, MOUNTIAN PINE AND CATHEDRIAL RED)
a. Surface Appearance: Cut Pile
b. Yarn content:
a. General: BCF Premium Nylon
i. 100% piece dyed.
ii. Sentry Soil Protection
c. Primary Backing: Synthetic, Classicbac
d. Face Weight: 36oz
e. Bonding Agent: Premium Vinyl
f. Size: Broadloom, 12ft Roll
g. Passes ADA requirements
h. Static Propensity: AATCC 134: 3.5 KV or less
i. Flooring Radiant Panel: ASTM E-648 NFPA Class 1 (Glue Down)
j. Antimicrobials: Antimicrobials are an EPA registered pesticide. If Antimicrobials are utilized in the product, the manufacturer must submit 3rd party certification seal Indicating no health hazard to the end user or occupants. Test ASTM E 2471 05 should indicate NEGATIVE for antimicrobials. Adhesives are exempt from this section.
k. WARRANTY: Flooring contractor shall provide a 5-year warranty for defects in materials and workmanship.
Flooring manufacturer shall provide a 25 year non-prorated limited warranty against excessive surface wear and static, de-lamination, edge ravel, zippering, and backing resiliency loss.
REMOVE / INSTALL FLOORING IN VARIOUS
BLDGS- H-23, 423, HP-57, 762, FC500, M107,
BB86, 54, AS148
USMC CAMP LEJEUNE
DRAWN
BY
MAXIMO PAGE TITLE REV
A1 4542701
3ES, COMMAND GENERAL SUITE
FINAL
LEE, TIMOTHY M CIV DATE 6/12/2014 CONTRACT # N40085-14B-XXXX SHEET 3 OF 3
REMOVE / INSTALL FLOORING IN BLDG-
FC500
4594034
BA256, BA257, BA264
4623955
8/25/2015 CONTRACT # N40085-16B-XXXX
BA256, BA257, BA264, 858, H1, 524, 59
4623955
9/4/2015
BA256, BA257, BA264, 858, 524, 59, 312,
AS3905, 223
11/3/2015
BA256, BA257, BA264, 59, 223, 307, 312, 317,
524, 858
11/24/2015
524, 858, 1933
524, 858, 1933, H1, 8
12/8/2015
4621689
REMOVE / INSTALL FLOORING IN BLDG- 59,
223, 307, 312, 317, 524, 858, 1933, H1, 8
12/21/2015 CONTRACT # N40085-16B-0419
PAINT AND REPLACE FLOORING IN VARIOUS BLDGS; H1,
1023, 1201 AST, 1202 AST, 521 AST, HP5 AST, FC280 AST,
FC420 AST TT42 AST, BB250, BB54, 59, 223, 307, 312, 317,
524, 858, 1933, 8
4608614
1/21/2016 CONTRACT # N40085-15B-0461
4951690
8/15/2019 CONTRACT # N40085-19B-XXXX
H1- 3ES; REPLACE CARPET IN
COMMANDING GENERAL SUITE
WOMEN MEN
VAULT
STAIRS
TOILET
JANITOR
MECH
ROOM
35'
' 46'
21' 22' 28' 20'
13'
6'14'
9'
24'
50'
1A
1B
11'
REMOVE EXISTING CARET AND PADDING. INSTALL NEW CARPET WITH
ATTACHED OR GLUE DOWN PADDING. COLOR TO BE COMPARABLE TO
PHILADELPHIA, MAINSTREET, EMPHATIC II 36, MOUNTIAN PINE 56366.
REMOVE EXISTING CARET AND PADDING. INSTALL NEW CARPET WITH
ATTACHED OR GLUE DOWN PADDING. COLOR TO BE COMPARABLE TO
PHILADELPHIA, MAINSTREET, EMPHATIC II 36, CATHEDRIAL RED 54256.
REPAIR EXISTING CARPET SEAMS.
WORK LIMIT
APPROX
LOCATION OF
SEAM
(TYPICAL
4 LOCATIONS)
19-xxxx P&C _DWG- DRAFT.vsd
TITLE PAGE
S-1 SOW
A-1 HI; 3ES
SURVEY FINDINGS Building: H1
Friable ACM identified
DESCRIPTION LOCATION Date Quantity
PIPE INSULATION 4,000 LFWITHIN WALLS AT COLUMNS,
PRIMARILY CORNERS OF MECHANCIAL
WINGS;
SECOND AND THIRD FLOOR SOUTH
OFFICES;
CRAWLSPACES, ALONG PERIMETER AT
VERTICAL CHASES AND MAIN CHASE
AT MECHANICAL WING; DEBRIS FIELDS
IN CRAWLSPACE
1/26/2009
PIPE INSULATION 3,500 SFWITHIN WALLS AT COLUMNS,
AT MECHANICAL WING;
DEBRIS FIELDS IN CRAWLSPACE
FIBROUS DEBRIS 1,250 SFCRAWLSPACE; BASEMENT
MECHANICAL
1/28/2009
12/2/2014
FIBROUS DEBRIS 1,800 SFCRAWLSPACE; BASEMENT
Thursday, August 15, 2019 Page 1 of 10
7/21/2000
FIBROUS DEBRIS 1,400 SFCRAWLSPACE AT VERTICAL CHASE
AREAS AT PERIMETER
4/11/2011
12/12/2012
FIBROUS DEBRIS 1,800 SFCRAWLSPACE; BASEMENT
3/6/2018
FIBROUS DEBRIS 2,000 SFCRAWLSPACE; BASEMENT
Thursday, August 15, 2019 Page 2 of 10
Non-friable ACM identified
9" GREEN FLOOR TILE AND ADHESIVE 1,000 SFE1 SOUTH, EAST SIDE BOTTOM/ MIDDLE
LAYER TILE
4/1/2009
GASKET MATERIAL 100 LFCRAWLPACE DEBRIS (SEWER LINE
PACKING);
VALVE FLANGES, MAIN UTILITY
TUNNEL
4/2/2009
EXTERIOR CAULKING, 480 LFEXTERIOR WING WALL (BRICK)
EXPANSION JOINTS, TYPICALLY
BEHIND DOWNSPOUTS (SEE ALSO
HM171)
3/31/2009
TAR SEALANT 1,500 SFPLASTER LATHE BEHIND WALL/BRICK;
CAPS AT VENTS ON WALLS, PRIMARILY
FOUND IN MECHANICAL ROOMS BUT
MAY BE PRESENT AROUND ENTIRE
PERIMETER (see also 156)
12" BEIGE w/TAN FLOOR TILE AND
ADHESIVE
500 SFCOMMON UPPER TILE THROUGHOUT,
TYPICALY OVER OTHER [ACM] TILE
MISCELLANEOUS FLOOR COVERINGS, 50 LFMIXED USE THROUGHOUT, TYPICALY
AT TILE TO CONCRETE TRANSITIONS;
STAIRWELLS, JANITOR CLOSETS,
MECHANICAL ROOMS
TAR SEALANT 60 LFEXTERIOR WING WALL (BRICK)
HM172)
FLOOR TILE AND ADHESIVE, UNDER OTHER 111,640 SFTHROUGHOUT BUILDING, TYPICALLY
UNDER 1-2 OTHER LAYERS, EXPOSED IN
SOME CLOSETS/ STORAGE AREAS
(REFER TO DRAWINGS FOR SPECIFIC
LOCATIONS)
12,000 SFCOMMON TOP/ MIDDLE TILE LAYER
THROUGHOUT
20,160 SFCOMMON TOP/ UPPER LAYER OF TILE
DOWN MAIN CENTRAL CORRIDOR
TRANSITE PANEL MATERIAL 360 SFATTIC GABLE VENTS/ DORMERS
(LIMITED ACCESSIBLITY); ATTIC
DEBRIS (LIMITED)
12" TAN w/BROWN FLOOR TILE AND
1,500 SFMIXED USE THROUGHOUT; UNDER 124
TILES, OVER 110 ACM TILES
2,000 SFPATCH/ MIXED USE TILE, TOP LAYER J,
G, E WINGS
1/27/2009
Thursday, August 15, 2019 Page 3 of 10
12" TAN FLOOR TILE AND ADHESIVE 8,000 SFSANDWICH TILE D1 SOUTH BETWEEN
HM104 (TOP) AND HM110 (BOTTOM)
12" CREAM FLOOR TILE AND ADHESIVE 1,250 SFPATCH TILE; B WING FOYER, A/B 1 HALL 3/13/2009
GASKET MATERIAL 100 SFTHROUGHOUT BUILDING ON PIIPING
SYSTEMS, NOT ACCESSIBLE FOR
SAMPLING
1/30/2009
INSULATION 50 LFCONDENSATE VALVES ON HVAC UNITS 3/9/2009
RESIDUAL MASTIC 7,500 SFREMNANTS FROM PREVIOUS ACM TILE
AND MASTIC LOCATIONS, UNDER NEW
OR OTHER NON ACM TILES IN MOST
AREAS
9/24/2014
11,500 SF1C, E, F, J; 2H:
COMMON TOP/ MIDDLE TILE LAYER
1,250 SFMIXED USE THROUGHOUT; UNDER 124
INSULATION 50 LFCONDENSATE VALVES ON HVAC UNITS 12/2/2014
12" CREAM FLOOR TILE AND ADHESIVE 1,250 SFPATCH TILE; B WING FOYER, A/B 1 HALL 12/2/2014
Thursday, August 15, 2019 Page 4 of 10
PERIMETER
500 SFFIRST AND THIRD FLOOR E:
COMMON UPPER TILE THROUGHOUT,
MISCELLANEOUS FLOOR COVERINGS, 50 LFFIRST FLOOR C, D, E, F:
MIXED USE THROUGHOUT, TYPICALY
FLOOR TILE AND ADHESIVE, UNDER OTHER 96,450 SFTHROUGHOUT BUILDING, TYPICALLY
MISCELLANEOUS FLOOR COVERINGS, 50 LFMIXED USE THROUGHOUT, TYPICALY
FLOOR TILE AND ADHESIVE, UNDER OTHER 102,815 SFTHROUGHOUT BUILDING, TYPICALLY
11,500 SFCOMMON TOP/ MIDDLE TILE LAYER
THROUGHOUT; REPLACEMENT FOR
HM104 TILES REMOVED IN 2011
12" CREAM FLOOR TILE AND ADHESIVE 1,250 SFPATCH TILE; B WING FOYER, A/B 1
HALL (w/HM115)
1,250 SFMIXED USE THROUGHOUT; UNDER 124
TILES, OVER 110 ACMB TILES
Thursday, August 15, 2019 Page 5 of 10
INSULATION 50 LFCONDENSATE VALVES ON HVAC UNITS 12/12/2012
500 SFCOMMON UPPER TILE THROUGHOUT,
MISCELLANEOUS FLOOR COVERINGS, 50 LFFIRST FLOOR C, D, E, F:
MIXED USE THROUGHOUT, TYPICALY
FLOOR TILE AND ADHESIVE, UNDER OTHER 93,225 SFTHROUGHOUT BUILDING, TYPICALLY
12,000 SFCOMMON TOP/ MIDDLE TILE LAYER
1,500 SFMIXED USE THROUGHOUT; UNDER 124
Thursday, August 15, 2019 Page 6 of 10
Tested Non ACM or REMOVED Materials
RESIDUAL MASTIC 7,500 SFREMNANTS FROM PREVIOUS ACM TILE
AND MASTIC LOCATIONS, UNDER NEW
OR OTHER NON ACM TILES IN MOST
AREAS (see also all floor tiles and HM104)
GASKET MATERIAL 95 SFTHROUGHOUT BUILDING ON PIIPING
INSULATION 50 LFCONDENSATE VALVES ON HVAC UNITS 3/6/2018
12" CREAM FLOOR TILE AND ADHESIVE 1,250 SFPATCH TILE; B WING FOYER, A/B 1 HALL 3/6/2018
12" GRAY FLOOR TILE AND ADHESIVE E1 SOUTH STAIRWELL 4/1/2009
12" ACOUSTICAL TILE E SOUTH LOBBY 4/1/2009
DOOR KICKPLATE MATERIAL THROUGHOUT BUILDING 4/1/2009
DRYWALL AND JOINT MATERIAL WALLS AND LOCAL AREA CEILINGS
INTERIOR CAULKING, METAL CRAWLSPACE ENTRY DOOR 4/1/2009
2'x4' CEILING TILE, PATCHES THROUGHOUT, NOT 1/26/2009
BASE COVE/MASTIC, MIXED LIMITED PATCHES
FIBERGLASS INSULATION SEALANT THROUGHOUT BUILDING ON HVAC
AND PIPING SYSTEMS
Thursday, August 15, 2019 Page 7 of 10
2'x4' CEILING TILE, LIMITED PATCHES THROUGHOUT 1/26/2009
1'x2' CEILING TILE, PATCHES OF OLD CEILING;
J1 NORTH
PLASTER MATERIAL THROUGHOUT STRUCTURE, WALLS
AND CEILINGS (EXCEPT RENOVATION
REBUILDS)
MISCELLANEOUS SEALANT WALL AND CEILING PENETRATIONS
THROUGHOUT, PRIMARILY AT CABLE
CONDUITS
MISCELLANEOUS SEALANT HVAC DUCT SEAMS THROUGHOUT,
PRIMARILY MECHANICAL ROOMS
INSULATION HEATER FLOOR PENETRATION, H1S 1/26/2009
12" ACOUSTICAL TILE LIMITED PATCHES: J1 SOUTH; B WING
FOYER; E3N FOYER; F2 SOUTH; C1
NORTH and SOUTH; D1 NORTH and
SOUTH
MISCELLANEOUS SEALANT PATCHES FOUND ON WALLS, RANDOM 1/26/2009
2'x2' CEILING TILE, LIMITED USE PATCH, J WING 1/26/2009
WINDOW GLAZING MATERIAL WOOD WINDOWS THROUGHOUT,
METAL WINDOWS OF CRAWLSPACE/
MECHANICAL AREAS
12" WHITE FLOOR TILE AND ADHESIVE UPPER/ TOP LAYER TILE; F2 NORTH
AND SOUTH, H1 NORTH, A1 NORTH AND
1/29/2009
BASE COVE/MASTIC, MIXED USE THROUGHOUT 1/26/2009
INTERIOR CAULKING, LIMITED MIXED USE, LIMITED AREAS 1/27/2009
BASE COVE/MASTIC, MIXED USE THROUGHOUT 1/27/2009
VAPOR BARRIER ROOFING PAPER THROUGHOUT, WALL
VAPOR BARRIER THROUGHOUT, AND
FLOOR COVERING E NORTH WING
MISCELLANEOUS SEALANT PIPE JOINT SEALANT, SEWER PACKING
DEBRIS
2'x2' CEILING TILE, G WING, LIMITED PATCH TILE 1/27/2009
EXTERIOR CAULKING, METAL DOOR, BASEMENT 3/9/2009
12" WHITE FLOOR TILE AND ADHESIVE E2N LOBBY 3/10/2009
ELECTRICAL WRAPPED WIRING ABANDONED LINES, PRESUMED
THROUGHOUT STRUCTURE
FLOOR LEVELING COMPOUND MIXED USE THROUGHOUT (NOT
ACCESSIBLE TO IDENTIFY)
CARPET ADHESIVE MIXED USE THROUGHOUT 1/26/2009
MISCELLANEOUS SEALANT VARIOUS ELECTRICAL PIPES; HVAC
DUCT TAPE/PUTTY
2'x2' CEILING TILE, PATCH/ SECONDARY TILE USED
12" WHITE w/ GRAY FLOOR TILE AND
TOP LAYER IN HALLS, E SOUTH WING 1/28/2009
2'x4' CEILING TILE, PATCH TILE, E2 SOUTH 1/28/2009
Thursday, August 15, 2019 Page 8 of 10
12" GRAY w/ GRAY FLOOR TILE AND
REPLACEMENT/ RENOVATED AREA
TILE;
B1, B2 NORTH AND SOUTH, E2 NORTH
LOBBY
2'x2' CEILING TILE, LIMITED USE E2 SOUTH CG WING 1/28/2009
SINK UNDERCOATING, E2 SOUTH CG WING 1/28/2009
CLOTH LAGGING MATERIAL MECHANICAL PIPING SYSTEMS;
PRIMARILY BASEMENT MECHANICAL
AND STEAM TUNNEL, SOME PATCHES
INSIDE STRUCTURE
ROOFING SEALANT, BLACK J1 SOUTH ATTIC 1/27/2009
ASPHALT SHINGLE AND TAR PAPER J1 SOUTH ATTIC 1/27/2009
12" WHITE FLOOR TILE AND ADHESIVE PATCH TILE, D WING 3/13/2009
EXTERIOR CAULKING, METAL DOORS AND DOOR TRIM 3/31/2009
MISCELLANEOUS SEALANT DEBRIS, H2 SOUTH MECHANICAL ROOM 3/10/2009
12" WHITE FLOOR TILE AND ADHESIVE F1 SOUTH 3/11/2009
SINK UNDERCOATING, F1 SOUTH (DENTAL CLINIC) 3/11/2009
INTERIOR CAULKING, CEILING PATCH, C1 SOUTH CORRIDOR 3/13/2009
2'x2' CEILING TILE, F2 NORTH CONFERENCE ROOM 1/29/2009
FIREWALL MATERIAL, SOFT PLASTER ATTIC AREAS; E NORTH MECHANICAL 1/29/2009
RENOVATED AREA TILE;
B1, B2 NORTH AND SOUTH,
BLACK VINYL BASE AND ADHESIVE, 4" RENOVATED AREAS;
B1, B2 NORTH AND SOUTH, F2 NORTH
AND SOUTH
1/29/2009
2'x2' CEILING TILE, MIXED USE THROUGHOUT 1/26/2009
CEILING TILE CEILING TILES THROUGHOUT 3/9/2009
INTERIOR CAULKING, VAIRIET LIMITED USE, PATCHING;
SAMPLED WHERE IDENTIFIED
3/9/2009
EXTERIOR CAULKING, NEW WINDOWS 3/31/2009
EXTERIOR CAULKING, OLD (WOOD) WINDOWS (770), OLD
VENTS
CLOTH EXPANSION JOINT MATERIAL, THIN MECHANICAL ROOMS (LIMITED) 3/9/2009
TANK INSULATION BASEMENT MECHANICAL ROOM HOT
WATER TANKS
MISCELLANEOUS SEALANT ABANDONED HVAC UNIT, E3N
MECHANICAL ROOM
INSULATION ABANDONED HVAC UNIT, E3N
MECHANICAL ROOM
ROOFING SEALANT, BLACK E WING PATIO, RESIDUAL MATERIAL 12/2/2014
INTERIOR CAULKING, METAL CRAWLSPACE ENTRY DOOR 12/2/2014
PLASTER MATERIAL THROUGHOUT STRUCTURE, WALLS
AND CEILINGS (EXCEPT RENOVATION
REBUILDS)
Thursday, August 15, 2019 Page 9 of 10
12" WHITE FLOOR TILE AND ADHESIVE UPPER/ TOP LAYER TILE; F2 NORTH
AND SOUTH, H1 NORTH, A1 NORTH AND
RENOVATED AREA TILE;
B1, B2 NORTH AND SOUTH,
WINDOW GLAZING MATERIAL WOOD WINDOWS THROUGHOUT,
METAL WINDOWS OF CRAWLSPACE/
MECHANICAL AREAS
FLOOR LEVELING COMPOUND MIXED USE THROUGHOUT (NOT
ACCESSIBLE TO IDENTIFY)
INTERIOR CAULKING, METAL CRAWLSPACE ENTRY DOOR 12/12/2012
COMMON UPPER TILE THROUGHOUT,
Thursday, August 15, 2019 Page 10 of 10