19-0411_Boat_Power_Pedestals_SBB344-SOW.pdf

PDF 121 KB Posted

Attached to
Boat Power Pedestals SBB344
Solicitation number
N40085-19-R-8100
Issued by

About this file

Statement of work

View the file

Other files

File Type Posted
Amend0002.pdf PDF
Amend0001.pdf PDF
19-0411_Boat_Power_Pedestals_SBB344-Sketch.pdf PDF
RFP_198100.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT#:

PROJECT#: 19M003MZ

MACC #: 19-0411

MAXIMO#: 4880742

TITLE: SBB344 BOAT POWER PEDESTALS

ATTACHMENTS: (a) Sketch

SCOPE OF WORK: The contractor shall provide all material, labor, equipment and supervision required to accomplish the following:

General description – Install electrical service and receptacles for boat power at SBB344

Clinton Street in the Courthouse Bay area aboard Marine Corps Base Camp Lejeune, North Carolina.

ELECTRICAL WORK:

CONSTRUCTION:

New Electrical Service-

1. Install 100 amp 240/120 volt single phase MCB NEMA 3R panel on the existing pole with the camera equipment. The panel shall be labeled Panel BP.

2. Install 1 ½ inch rigid metal conduit (RMC) and weather head with 3ea #1 awg

THHN/THWN conductors up the pole leaving 3ft of free conductor at weather head for termination. Grounding and bonding shall be in accordance with Article

250 of NFPA 70 (NEC).

3. Install 6ea 4” x 4” treated posts at the indicated locations.

4. Install 6ea ½ inch RMC from Panel BP to the 4” x 4” posts and terminate in a single gang FD box.

5. Install 3ea #10 THHN/THWN conductors from Panel BP to the FD boxes. Install

30 amp 125 volt NEMA L5-30 receptacle with HBL77CM74WO marine cover.

6. Install 6ea 30 amp single pole circuit breakers as indicated.

7. Terminate all conductors, label electrical equipment, and update panel directories as required.

Existing Electrical Service-

1. Install 2ea 4” x 4” treated posts at the indicated locations.

2. Install 2ea ½ inch RMC from Panel BP to the 4” x 4” posts and terminate in a single gang FD box.

3. Install 3ea #10 THHN/THWN conductors from electrical panel to the FD boxes.

Install 30 amp 125 volt NEMA L5-30 receptacle with HBL77CM74WO marine cover.

4. Install 2ea 30 amp single pole circuit breakers.

5. Terminate all conductors, label electrical equipment, and update panel directories as required.

GENERAL REQUIREMENTS: None Identified

SUBMITTALS: None Identified

SPECIAL SCHEDULING AND ACCESS: Mr. Brandon Blakley shall be the point of contact for access to the site, brandon.blakley.ctr@navy.mil phone- (910) 440-6282.

SPECIAL CONDITIONS: None Identified

HAZARDOUS MATERIALS: None Identified

ENVIRONMENTAL REQUIREMENTS: None Identified mailto:brandon.blakley.ctr@navy.mil