AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to issue Government Responses to RFIs, correct various items within the solicitation document, provide the updated wage determination that will apply to this contract and to extend the bid due date to Friday, 1 February 2019 at 2:00 PM local time.

Bidders are reminded to acknow ledge this and all amendments w ithin their bid when submitted.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519B3608

X 9B. DATED (SEE ITEM 11)

24-Dec-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Jan-2019

CODE

NAVFAC MID ATLANTIC

PWD MAINE - FEAD PORTSMOUTH

PORTSMOUTH NAVAL SHIPYARD

BLDG 59

PORTSMOUTH NH 03801-2032

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008519B3608

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

RFI RESPONSES

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been added by reference:

52.203-3 52.203-6 52.203-7 52.203-8 52.203-10 52.203-12 52.232-40 52.236-14 52.249-10 252.204-7012

The following have been added by full text:

UPDATED WAGE DETERMINATION

General Decision Number: ME190019 01/25/2019 ME19

Superseded General Decision Number: ME20180095

State: Maine

Construction Type: Building

County: York County in Maine.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above‐mentioned types of contracts entered into by the federal government that are subject to the Davis‐Bacon Act itself, but it does not apply to contracts subject only to the Davis‐Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)‐(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 01/18/2019 2 01/25/2019

CARP1996‐006 04/01/2017

Rates Fringes

CARPENTER (Includes Drywall Hanging, Form Work, and Metal Stud Installation)............... $ 23.00 18.94

* ELEC0490‐009 01/01/2019

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring).................. $ 29.45 20.03

ELEV0004‐006 01/01/2019

Rates Fringes

ELEVATOR MECHANIC................ $ 59.47 33.705

IRON0007‐034 09/16/2018

Rates Fringes

IRONWORKER (ORNAMENTAL AND

REINFORCING)..................... $ 25.71 22.12

LABO0976‐007 06/01/2018

Rates Fringes

LABORER: Common or General (Industrial Work Only)........... $ 21.01 17.57

PLUM0131‐002 06/01/2016

Rates Fringes

PLUMBER (Includes HVAC Pipe Installation).................... $ 31.20 21.30

SUME2014‐028 01/31/2017

Rates Fringes

BRICKLAYER....................... $ 30.42 2.94

CEMENT MASON/CONCRETE FINISHER...$ 17.65 5.01

INSULATOR ‐ MECHANICAL

(Duct, Pipe & Mechanical System Insulation)............... $ 20.14 2.29

IRONWORKER, STRUCTURAL........... $ 24.16 17.25

LABORER: Common or General...... $ 15.29 4.67

LABORER: Demolition............. $ 18.20 5.05

LABORER: Mason Tender ‐ Brick... $ 19.16 3.56

MILLWRIGHT....................... $ 22.17 7.75

OPERATOR:

Backhoe/Excavator/Trackhoe....... $ 39.38 8.55

OPERATOR: Crane................. $ 23.33 0.00

PAINTER (Brush and Roller)....... $ 15.38 2.95

PAINTER: Spray.................. $ 17.47 2.22

ROOFER........................... $ 20.22 2.09

SHEET METAL WORKER, Includes HVAC Duct Installation........... $ 17.30 2.35

WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health‐related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health‐related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198‐005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non‐union rates. Example: SULA2012‐007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG‐OH‐0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division

U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

RFIs on Repair Steam and Condensate Project ‐ Government Response

1. Scope of work item1.1.12 lists multiple manholes that may require significant repair. Scope item 1.1.14 provides manhole requirements per UFC 3‐430‐01FA. Where we were unable to inspect the manholes during the site visit, can the Navy provide more information in regards to existing condition of each manhole to better determine a means to competitively quote the required scope of work. Clarification items are as follows:

a. Estimated extent of concrete repairs. Can the Navy provide an estimated square foot unit per manhole of concrete repairs along with estimated depth.

b. Estimated manhole dimensions and depth

c. Manholes that currently have ladders and condition of ladders as to whether we need to include replacing.

d. Manholes that currently have sump pumps with associated electrical and discharge piping to storm drain, and whether any of the components need to be replaced. If existing and modifications and/or replacement are required, can the Navy indicate where the power feeds come from and where the discharge piping currently ties into the storm drain.

Response(s) 1a. & b. – by manhole

MH 171A ‐ Dimensions: 50"49"x50", Condition: Poor, Recommendation: Replace steel rim, cover, and framing. Replace or repair concrete walls

MH 172 ‐ Dimensions: 42"x52"x42", Condition: Very Poor, Recommendation: Replace steel rim and framing. Replace or repair concrete collar and walls

MH 174 ‐ No longer in use, to be filled

MH 176 ‐ Estimated Dimensions: 50"49"x50", Condition: Poor, Recommendation: Replace roof, cover and rim

MH 184 ‐ Dimensions: 48"x25"x24", Condition: Very Poor, Recommendation: Replace roof, cover and rim

MH 192 ‐ Dimensions: Unknown, Condition: Good, Recommendation: Minor repairs as needed

MH 201 ‐ Dimensions: Unknown, Condition: Good, Recommendation: Minor repairs as needed

MH 203 ‐ Dimensions: Unknown, Condition: Good, Recommendation: Minor repairs as needed

MH 204 ‐ Dimensions: Unknown, Condition: Good, Recommendation: Minor repairs as needed

MH 204A ‐ Dimensions: Unknown, Condition: Good, Recommendation: Minor repairs as needed

Response ‐ 1c. Assume ladders in all manholes that are in poor condition or worse need to be replaced.

Response ‐ 1d. Currently no known sump pits or pumps are present in MH locations included in this project.

i. For manholes requiring new sump pumps, can the Navy provide an estimated gallons per minute or day the pumps need to be sized for? Are they just for rain infiltration in the manhole, or is there ground water infiltration as well?

Response – see 1d. above. No sump pumps are anticipated necessary for this project.

2. Is it acceptable to remove all trench covers within scope of work and cover area’s not currently working with steel plates.

Response ‐ No, the contractor shall only remove trench covers in the area of work being done and plate as needed in the immediate area.

3. Is the site super and SSHO/QCM required to be at the work site during all work activities, or is it acceptable that 1 or both are on base elsewhere from the work site, periodically checking in on work activities.

Response ‐ Site Super and SSHO/QCM must be dedicated to the worksite. The worksite shall be all areas within dashed lines on Plan M101

4. Does the site super and SSHO/QCM need to be dedicated to this project solely, or can they perform their duties on another project as well.

Response ‐ Site Super and SSHO/QCM must be dedicated to this project solely.

5. Will the Navy require a dedicated non‐working fire watch for all hot work activities, or is the fire watch able to perform scopes of work that don’t take their attention off their fire watch requirements.

Response ‐ Yes, a dedicated non‐working fire watch for all hot work activities is required. Contractor must follow EM 385 and Division 1 specifications

6. Scope of work item 11.1 indicates requirements in the event archeological resources are identified.

Please clarify whether an archeologist needs to be present during all excavation work scopes.

Response ‐ No, a dedicated archeologist is not required to be present during all excavation.

52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

(a) The Contractor shall make the following notifications in writing:

(1) When the Contractor becomes aware that a change in its ownership has occurred, or is certain to occur, that could result in changes in the valuation of its capitalized assets in the accounting records, the Contractor shall notify the Administrative Contracting Officer (ACO) within 30 days.

(2) The Contractor shall also notify the ACO within 30 days whenever changes to asset valuations or any other cost changes have occurred or are certain to occur as a result of a change in ownership.

(b) The Contractor shall--

(1) Maintain current, accurate, and complete inventory records of assets and their costs;

(2) Provide the ACO or designated representative ready access to the records upon request;

(3) Ensure that all individual and grouped assets, their capitalized values, accumulated depreciation or amortization, and remaining useful lives are identified accurately before and after each of the Contractor's ownership changes; and

(4) Retain and continue to maintain depreciation and amortization schedules based on the asset records maintained before each Contractor ownership change.

The Contractor shall include the substance of this clause in all subcontracts under this contract that meet the applicability requirement of FAR 15.408(k).

(End of clause)

5252.236-9310 Record Drawings ALT II (OCT 2004)

As prescribed in 36.5100(g)(1), when a Design-Built contract is used replace with the following:

“Upon completion of the work, both sets of the marked up prints shall be certified as correct, signed by the Contractor, and delivered to the Contracting Officer for his approval before acceptance. Requests for partial payments will not be approved if the marked prints are not kept current, and request for final payment will not be approved until the marked prints are delivered to the Contracting Officer.”

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the contract award, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 222 calendar days after contract award. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 million, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

5252.236-9301 SPECIAL WORKING CONDITIONS AND ENTRY TO WORK AREA (OCT 2004)

The Government under certain circumstances may require denial of entry to the work areas under this contract where the Contractor’s work or presence would constitute a safety or security hazard to ordance storage or handling operations. Restrictions covering entry to and availability of the work areas are as follows:

(a) Entry. Entry to work areas located within the special Security Limited areas, defined as those work areas located within the existing security fence, can be granted subject to special personnel requirements as specified herein and to other normal security and safety requirements. Complete denial of entry to the Limited Area may be required during brief periods of one to two hours (normally) and on rare occasions of two to four hours. For bidding purposes, the Contractor shall assume denial of entry to the work areas in the Limited Area of six 2-hour denials and one 4-hour denial per month.

(b) Vehicle Delay. The Contractor shall also assume for bidding purposes that, in addition to site denial, each vehicle and/or unit of construction equipment will be delayed during each movement through the security gate, both entering and leaving the limited area. Delays will average _45 minutes_.

(b) Operational Considerations. To reduce delay time while preserving required security, the following points should be considered in operational planning:

(1) Vehicle Search. Security regulations required that all vehicles, when authorized to enter the Limited Area be thoroughly searched by guard force personnel. Such a search will be required for all vehicle/ construction equipment. Accordingly, once a vehicle or unit of construction equipment has been cleared, it may be left in the Limited Area after initial entry has been made. For the period of time authorized the vehicle/equipment left in the Limited Area will be assigned parking areas by the Contracting Officer. The vehicle/equipment must be secured as specified in paragraph entitled "SECURITY REQUIREMENTS." The intent is to reduce the Contractor loss of time at the security gate. No private vehicles will be allowed to enter the Limited Area.

(2) Delivery Vehicles. Guard force personnel will inspect vehicles delivering construction materials while the driver is being processed for entry into the Limited Area.. A Security Escort will then escort the driver and vehicle in the Limited Area. To provide this service, delivery schedules should be promulgated in advance and vendors made aware that a reasonable delay can be expected if delivery is other than the time specified. Deliveries after 1600 hours will not be allowed entry into the Limited Area without prior approval of the Physical Security Officer.

The following were previously included by reference and are now included by full text:

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (DEC 2013)

(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.

(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.

(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.

(End of clause)

52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)

(a) If the Contractor refuses or fails to prosecute the work or any separable part, with the diligence that will insure its completion within the time specified in this contract including any extension, or fails to complete the work within this time, the Government may, by written notice to the Contractor, terminate the right to proceed with the work (or the separable part of the work) that has been delayed. In this event, the Government may take over the work and complete it by contract or otherwise, and may take possession of and use any materials, appliances, and plant on the work site necessary for completing the work. The Contractor and its sureties shall be liable for any damage to the Government resulting from the Contractor’s refusal or failure to complete the work within the specified time, whether or not the Contractor’s right to proceed with the work is terminated. This liability includes any increased costs incurred by the Government in completing the work.

(b) The Contractor’s right to proceed shall not be terminated nor the Contractor charged with damages under this clause, if—

(1) The delay in completing the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor. Examples of such causes include—

(i) Acts of God or of the public enemy,

(ii) Acts of the Government in either its sovereign or contractual capacity,

(iii) Acts of another Contractor in the performance of a contract with the Government,

(iv) Fires,

(v) Floods,

(vi) Epidemics,

(vii) Quarantine restrictions,

(viii) Strikes,

(ix) Freight embargoes,

(x) Unusually severe weather, or

(xi) Delays of subcontractors or suppliers at any tier arising from unforeseeable causes beyond the control and without the fault or negligence of both the Contractor and the subcontractors or suppliers; and

(2) The Contractor, within 10 days from the beginning of any delay (unless extended by the Contracting Officer), notifies the Contracting Officer in writing of the causes of delay. The Contracting Officer shall ascertain the facts and the extent of delay. If, in the judgment of the Contracting Officer, the findings of fact warrant such action, the time for completing the work shall be extended. The findings of the Contracting Officer shall be final and conclusive on the parties, but subject to appeal under the Disputes clause.

(c) If, after termination of the Contractor’s right to proceed, it is determined that the Contractor was not in default, or that the delay was excusable, the rights and obligations of the parties will be the same as if the termination had been issued for the convenience of the Government.

(d) The rights and remedies of the Government in this clause are in addition to any other rights and remedies provided by law or under this contract.

(End of clause)

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

(a) "Definition. Contracting officer's representative" means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.

(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.

(End of clause)

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been deleted:

252.201-7000

(End of Summary of Changes)