Text version

N4008518R9760

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53 243

FACILITY INVESTMENTS SERVICES FOR MAINTENANCE AND REPAIR OF RAILROAD TRACKAGE AT THE NAVAL WEAPONS STATION (NWS) EARLE, COLTS NECK, NEW JERSEY AND NAVAL SUPPORT ACTIVITY (NSA), MECHANICSBURG, PENNSYLVANIA AND OTHER

AREAS OF RESPONSIBILITY (AOR)

This Amendment is issued to incorporate the site visit log-in sheet and a revised Section A, B, F and M. Also, to respost Attachment J-15020000-07 - Maintenance Requirements, Turnout.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R9760

X 9B. DATED (SEE ITEM 11)

16-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Sep-2018

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

COVER SHEET

COMMANDER

NAVAL FACILITIES ENGINEERING COMMAND

MID-ATLANTIC DIVISION

NORTHEAST IPT

NORFOLK, VIRGINIA 23511-3095

NOTICE: NAVFAC

Proposals to be submitted by 2:00 P.M. SPECIFICATION At the office of No. 05-18-9760 CDR Mid-Atlantic Division RFP NUMBER N40085-18-R-9760 Naval Facilities Engineering Command Facility Support Contract, Building Z-140, Suite 9324 Virginia Avenue Norfolk, Virginia 23511-3095

FACILITY INVESTMENTS SERVICES FOR

MAINTENANCE AND REPAIR OF RAILROAD TRACKAGE

AT THE NAVAL WEAPONS STATION (NWS) EARLE, COLTS NECK, NEW JERSEY

AND NAVAL SUPPORT ACTIVITY (NSA), MECHANICSBURG, PENNSYLVANIA

AND OTHER AREAS OF RESPONSIBILITY (AOR)

NOTICE

All inquiries concerning any phase of the specification, prior to the proposal due date shall be made to the Commander, Naval Facilities Engineering Command, Mid-Atlantic Division, Acquisition ACQ32, located at 9324 Virginia Avenue, Norfolk, Virginia 23511, telephone (757) 341-1971, Attn: LeeArjetta W. Hamilton.

Contracts or purchase order to be awarded as a result of this contract shall be assigned (as Appropriate for specific procurement), DO-S1 rating in accordance with the provisions of DPA Regulation 1 and/or DMS Regulation 1.

SECTION B - SUPPLIES OR SERVICES AND PRICES

GENERAL INFORMATION

B.1 Contract Title: Facility Investment Services for Maintenance and Repair of Railroad Trackage at the Naval

Weapons Station (NWS) Earle, Colts Neck, New Jersey and Naval Support Activity (NSA), Mechanicsburg, Pennsylvania and Other Areas of Responsibility (AOR).

B.2 Type of Contract: This is a combination Firm Fixed Price/Indefinite Delivery-Indefinite Quantity type contract as noted in Section L, Instructions, Conditions, and Notices to Offeror.

B.3 Minimum Guarantee: The Firm Fixed Price portion of the base year only is the minimum guarantee for this contract. It can be paid in either the base year or over the entire term of the contract. Refer to Section H, Special Contract Requirements, 5252.216-9313 Maximum Quantities.

B.4 Competition Requirements: Full and Open/Unrestricted Competitive Procurement.

B.5 NAICS Code: The NAICS Code assigned to this procurement is 237990 with size standard of

$36,500,000.00. Refer to On-Line Representations and Certifications Application (ORCA) via System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM .

B.6 Wage Determination (Service)/Wage Decision (Construction): Service Contract Act (SCA), Wage Rate

Requirements Construction (Formerly Davis-Bacon) and Collective Bargaining Agrrement (CBA) are included in this solicitation. Refer to Section J, Attachments.

SCA (Wage Determination No. 2015-5799 Rev. 4) shall be used for wage rates and fringe benefits for FSC services that are not covered in the current CBA.

Wage Rate Requirements Construction (General Decision Number: SC20160015 3/31/2017) shall be used for construction wage rates and fringe for services not covered in the current CBA.

CBA (CBA-2017-10510 ) shall be used for wage rates and fringe benefits for services set forth in the current Collective Bargaining Agrrement and any modified extension agreement(s).

WAGE RATE REQUIREMENTS CONSTRUCTION IN FACILITY SUPPORT CONTRACTS

INCLUDING CONSTRUCTION

This contract contains only one Wage Rate Requirement Construction General Decision which shall be in effect for the life of the contract. The contractor may include in the offered price for the option years any increase needed for wages or benefits for construction work under the contract. The contractor warrants that the prices in the option years of this contract do not include any allowance for any contingency to cover increased cost for which adjustment is provided under FAR clause 52.217- 43, Fair Labor Standards Act and Service Contract Act - Price Adjustment. Offerors are required to segregate Davis-Bacon hours and wages and SCA hours and wages in the payroll records.

B.7 Bid Guarantee/Bonding Requirements: Performance and Payment bonds shall be provided by the contractor when applicable for IDIQ task orders containing construction services.

B.8 Contract Term: This contract contains provisions for a Base Period with four (4) Option Periods, not to exceed a total of five (5) years. The Government has the option to extend the term of the contract in accordance with Section I, Contract Clauses, 52.217-9, Option to Extend the Term of the Contract-Services

(Mar 2000). In the option periods, the Government will adjust the prices, if applicable, based on the new Department of Labor Wage Determination.

B.9 Period of Performance: The period of performance will be determined at the time of award.

B.10 Evaluation of Proposal: Proposers shall submit a lump sum price for Section B, CLINs 0001 through 0010 and unit prices for Exhibit A through Exhibit E, referenced in Section J. For purposes of evaluating offers for award, the Government will utilize the pricing submitted for the base year and all option periods. Refer to Section M, FAR 52.217-5, Evaluation of Options (JUL 1990).

In order to permit efficient competition, the Navy will utilize the following methodology: Proposals will initially be screened for price and placed in order of price (lowest priced to highest price). The Navy will then evaluate the technical factors of the three (3) lowest priced proposals. The Navy will make award to the lowest priced technically acceptable proposal from among the three (3) lowest priced proposals. However, if no proposals are found to be technically acceptable within the first group of proposals, the Navy, at its sole discretion, reserves the right to increase the number of proposals it will review, until the Government identifies a technically acceptable proposal.

Accordingly, under this methodology, the technical factors of some proposals may not be evaluated by the Navy. If discussions are deemed necessary by the Contracting Officer, all proposals will be evaluated (both technical and price) for the purpose of establishing a competitive range.

B.11 Contract Line Items And Contract Exhibit Line Items

a. Proposers shall enter unit prices and amounts for Contract Line Items (CLINs) and Contract Exhibit line items (ELINs) as indicated in the schedules and accompanying exhibits.

b. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid and the total of the CLIN, the ELIN will be recomputed accordingly. The CLIN will also be recomputed to take into account the change in the contract ELINs. If the offeror provides a total amount for an ELIN, but fails to enter the unit price, the total amount divided by the ELIN quantity will be held to be the intended unit price.

c. The Schedule of Firm Fixed Price Work (CLIN 0001, 0003, 0005, 0007 and 0009) and the Schedule of Indefinite Quantity Work (CLIN 0002, 0004, 0006, 0008 and 0010) will be used as the basis for deductions in accordance with FAC Clause 52.246-4, "INSPECTION OF SERVICES-FIXED PRICE" Section E.

B.12 Unit Price Adjustments In Option Periods

This contract incorporates the Service Contract Act (SCA), Wage Rate Requirements Construction (formerly Davis-Bacon) and a Collective Bargaining Agreement (CBA). The SCA Wage Determination incorporated in Section J is for the Base Year performance period only. The latest Wage Determination available at the time for each option exercise will be incorporated into the contract and the unit prices will be adjusted in accordance with FAR Clauses 52.222-43, Fair Labor Standards Act and Service Contract Act – Price Adjustment. The contractor warrants, by submission of his proposal that the price does not include any contingency for future wage increases.

B.13 Indefinite Quantity Individual Contract Line Item Quantities

Once the estimated quantities for individual line items shown in the Schedule have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.

B.14 Unit Prices For Labor

a. A portion of the work included in the scope of this contract cannot be identified in advance in sufficient detail to be as a Unit Price Task in this contract. Labor for this work will be ordered and paid for based on unit prices for labor proposed by the Contractor listed in the Schedule of Indefinite Quantity Work.

b. Estimated hours in the Schedule are a forecast of future requirements. These estimated hours are for performing "Indefinite Quantity Work” accomplished in the time period shown.

c. The Contractor shall enter, in the unit price bid space, the unit price for performing composite labor.

The composite labor price shall include all direct and indirect costs associated with performing an hour of work. The composite labor price should be the Contractor's hourly craft wage adjusted to allow for the offerors work force productivity (i.e., the Contractor's estimate of how its’ work force will perform in relation to the Means Facilities Cost Data and/or the Engineered Performance Standards). The Composite Labor Rate shall include all costs for preparation of the cost proposal, job preparation, travel, pre- expended bin materials and supplies, ordering and stockpiling job material, additional material handling, items of equipment necessary to perform work (i.e. bucket truck, lifting equipment, staging, etc.), equipment set up time, lift time, craft delay allowance, profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc.

B.15 Period Of Performance – Less than One Year

Offer shall be submitted for the performance of work for a period of one year. The contractor is cautioned to recognize that the initial term of the contract may be for a period of less than one year in accordance with the “Term of Contract” clause in Section F. In the event that the period of performance is less than one year, the Government will reduce the individual line item quantities to reflect work remaining in the contract term and no other adjustments to the pro-rated contract price will be made.

B.16 Government Purchase Card

Indefinite quantity work may be ordered at the prices offered by two ways: 1) by the issuing activity using a DD Form 1155 “Order for Supplies and Services”; 2) by an authorized Government user via a Government Purchase Card (GPC). When receiving GPC orders against Section B, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.

B.17 Contractor Support Of Electronic Facilities Support Contracting (e-FSC)

This procurement allows for the use of DoD FedMall (formerly DOD EMALL) for issuing orders. Refer to Section H, Special Contract Requirement.

B.18 Contractor’s Payment Schedule

Contractors are required to submit a Contractor’s Payment Schedule with the proposal. Refer to Section L, Contractor’s Payment Schedule.

B.19 Incorporation of Technical Proposal

a. The Contractor’s technical proposal, including revisions and amendments made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels, and trade backgrounds set forth in the technical proposal.

b. In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (i) the contract (excluding the technical proposal), and then (ii) the technical proposal.

B.20 Request For Proposals (RFP) Information/Clarification Questions

Contractors are required to review the entire solicitation package before submitting questions. All questions must be submitted at least 10 days before proposals are due, either by email to leearjetta.hamilton@navy.mil or fax to: 757-341-0079. This is the most efficient way to ensure all questions are addressed in a timely manner.

B.21 Request for Proposal (RFP) Files:

Solicitations are posted to the NECO website (https://www.neco.navy.mil ) as mandated by our Agency. By necessity, these files are protected to prevent unauthorized editing.

It is the sole responsibility of the offeror to obtain the RFP files, along with any amendments, from this website.

Unprotected editable file copies of the RFP documents including: Word, Excel and/or .pdf files (Adobe Acrobat Files) will not be provided. Please plan accordingly.

B.22 Solicitation

This solicitation incorporates by reference a Performance Work Statement (PWS) developed by using NAVFAC performance-based specifications. The PWS consists of Annexes 1, 2, and 15. The contractor will be required to meet the specifications in those Annexes as if they were set forth in Section C.

B.23 Notice to Offerors:

Proposers are required to submit Section B, Bid Schedule, and Section J, Exhibit Line Items (ELINs) with their proposal. The total of the CLIN is equal to the sum of the ELINs as shown below:

CLINS ELINs CLINs ELINs 0001 A001 0006 C700 - C784 and C800 – C891 0002 A700 - A784 and A800 – A891 0007 D001 0003 B001 0008 D700 - D784 and D800 – D891 0004 B700 – B784 and B800 – B891 0009 E001 0005 C001 0010 E700 – E784 and E800 – E891

B.24 Proposal Delivery

NOTICE TO PROPOSER

DBIDS INFORMATION:

Access to Installation: All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS).

The Contractor shall provide the KO with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS.

DBIDS Program: DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.

The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

DBIDS Credentials: Contractor employees shall furnish a completed copy of the SECNAV 5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at:

https://www.cnic.navy.mil/om/dbids.html.

The Contractor may initiate the adjudication process when a background screen failure results in disqualification from participation in DBIDS and the Contractor employees do not agree with the reason for disqualification. The Contractor may also apply for a waiver when a background screening failure results in disqualification from participation in DBIDS.

The Commanding Officer will be the final waiver determination authority.

The Contractor shall immediately collect employee DBIDS credentials and notify the KO in writing:

(1) That an employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) That there is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.

DBIDS Paper Passes: In the event that a visitor, vendor, or Contractor employee elects not to participate in DBIDS, the individual will be issued DBIDS paper pass from the Base Pass and Identification Office in order to access to the installation. The time standard for the validity of a pass to access an installation will be not more than thirty (30) days and may be further restricted based on local policy or by Federal, DOD, Navy, and CNIC guidance.

The Government will not be responsible for any cost or lost time associated with obtaining paper passes or added vetting or inspections incurred by non-participants in the DBIDS credentialing process.

Submitting Your Proposal

Proposals that are sent via the United States Postal Service or a commercial carrier, such as Federal Express, shall be addressed to:

NAVFAC MID-LANT Acquisition ACQ32 Attn: LeeArjetta W. Hamilton 9324 Virginia Avenue Building Z-140¸ Room 216 Norfolk, Virginia 23511

Proposals that are hand carried excluding commercial carriers noted above shall be delivered to the Contracts Office in Building Z-140, 2nd Floor, Suite 216, locatd at 9324 Virginia Avenue, Norfolk, VA 23511 (Norfolk Naval Station).

SECTION F - DELIVERIES OR PERFORMANCE

The following have been modified:

F.2 PERFORMANCE PERIOD OF CONTRACT

The contract term shall be for a period of 12 months commencing within 30 days after notice/date of award. The Government has the option to extend the term of the contract in accordance with "OPTION TO EXTEND THE TERM OF THE CONTRACT - SERVICES" (FAR 52.217-9) (MAR 2000) clause, Section I. The total term of the contract shall not exceed 60 months. In the option periods the Government will adjust the prices, as required, based on new Department of Labor Wage Rate Determinations. Work subject to the Department of Labor Davis-Bacon Act Wage Decision is not entitled to adjustment since only one wage decision is in effect for the life of the contract.

SECTION M - EVALUATION FACTORS FOR AWARD

BASIS OF AWARD

M.1 Basis for Award

a. The Government will select the lowest-price technically acceptable offer at a reasonable cost to the Government.

M.2 Evaluation Factors

a. The solicitation requires the evaluation of price and the following non-price factors:

Factor 1– Technical Approach/Management Factor 2 – Corporate Experience Factor 3 – Safety Factor 4 – Past Performance

In order to permit efficient competition, the Navy will utilize the following methodology: Proposals will initially be screened for price and placed in order of price (lowest priced to highest price). The Navy will then evaluate the technical factors of the three (3) lowest priced proposals. The Navy will make award to the lowest priced technically acceptable proposal from among the three (3) lowest priced proposals. However, if no proposals are found to be technically acceptable within the first group of proposals, the Navy, at its sole discretion, reserves the right to increase the number of proposals it will review, until the Government identifies a technically acceptable proposal. Accordingly, under this methodology, the technical factors of some proposals may not be evaluated by the Navy. If discussions are deemed necessary by the Contracting Officer, all proposals will be evaluated (both technical and price) for the purpose of establishing a competitive range.

NOTE: An overall non-price factors rating must be at least “ACCEPTABLE” in order to be eligible for award. An “UNACCEPTABLE” rating in any factor results in the overall non-price factors proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price factors rating of “UNACCEPTABLE” makes a proposal ineligible for award.

b. Technical proposals will be evaluated to ensure the offeror understands the requirements of the solicitation in accordance with the following descriptions of each evaluation factor.

(1) Factor 1 - Technical Approach/Managemenat:

(i) Solicitation Submittal Requirements: The offeror shall submit a narrative response that clearly demonstrates its understanding of and approach to accomplishing the complexity and magnitude of service requirements set forth in the performance objectives and standards of the Performance Work Statement. Each of the topics below must be included in the narrative, tabbed in the technical proposal, and discussed separately.

a. Phase-In Transition Plan. Describe what you will do to "start-up'' for performance of this contract. The phase-in transition period is 30 days as per F.2 of the RFP. Include a schedule of key events, personnel actions, identification of key personnel and their responsibilities.

b. Workforce Management.

(1) Describe the lines of management authority, supervision, span of control and accountability, including the relationship between overall management (corporate and on-site), administration, and subcontractors.

(2) Provide an Organizational chart of your proposed organization and a workforce project management plan.

(3) Demonstrate your ability to provide and maintain a qualified workforce.

c. Quality Management. Provide a two page summary of your “Quality Management System” i.e. the Quality Processes (Practices, Resources and Activities) and minimum controls that will be used to ensure full compliance with all performance objectives and standards as described in Section 0200000 – Management and Administration. Include the methodology to be implemented to accomplish the performance requirements and detail how the proposed approach will effectively achieve each performance objective and standard.

(ii) Basis of Evaluation: This factor shall be evaluated considering some or all of the following criteria:

a. The proposal demonstrates an acceptable understanding of the performance objectives and standards.

b. The proposal demonstrates a thorough plan for having equipment and personnel in place to commence work on the contract start date.

c. The proposal provides a feasible technical approach with the capability to, at least, meet solicitation performance objectives and standards.

d. The proposal offers a low to moderate performance risk to the Government.

(2) Factor 2- Corporate Experience:

(i) Solicitation Submittal Requirements: Offerors shall submit the following information:

Submit a minimum of one (1) and a maximum of five (5) relevant projects (as the prime contractor) that are similar in size, scope, and complexity to the work requirements specified in the solicitation. Size, scope, and complexity are further defined as follows:

Size: A railroad trackage maintenance service contract with a yearly value of at least $2M or greater per year for recurring services. Individual Indefinite Quantity / Indefinite Delivery task orders for infrequent work will not be considered similar in size.

Scope: Demonstrate the ability to provide maintenance and repair services of railroad trackage, including, but not limited to, roads and paved surfaces and waterfront and main station railroads, or other similar services as defined by the RFP. Demonstrate the ability to perform various miscellaneous services including, but not limited to, vegetation control, debris removal and ditch maintenance, and other services that may be typical of a railroad maintenance contract.

Complexity: Demonstrate the ability to respond simultaneously to service call and maintenance requirements for repair, alteration, demolition and minor construction at various locations and buildings throughout the installation and supporting annexes. Demonstrate the ability to manage competing priorities in order to support customer demands.

Projects submitted for the offeror shall be completed within the past five (5) years of the date of issuance of the solicitation.

The attached Corporate Experience Form (Attachment J-0200000-09) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded;

however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP as it relates to size, scope, and complexity.

If the Offeror is a Joint Venture (JV), relevant project experience shall be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. For a JV, the offeror shall provide the signed U.S. Small Business Administration (SBA)-approved Joint Venture Agreement or an SBA-approved Mentor-Protégé Agreement as part of this Factor. Failure to submit an SBA-approved Agreement will result in the relationship being considered as Prime/Subcontractor, and the prime contractor will not be found acceptable on the basis of the subcontractor’s experience only. Offerors are still limited to a total of five (5) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF33), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. As noted above, to be deemed acceptable under this factor, the offeror must be the prime contractor on at least one (1) relevant project (similar size, scope and complexity as the current requirement). The prime contractor will not be found acceptable on the basis of its subcontractor’s experience. Additionally, the prime contractor’s experience as a subcontractor will not be considered.

(ii) Basis of Evaluation:

The basis of evaluation will include the offeror’s demonstrated experience and depth of experience in performing relevant projects as defined in the solicitation submittal requirements above. The assessment of the offeror’s relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the RFP. The Government will only review the first five projects submitted. Any projects submitted in excess of the five (5) for this factor will not be considered.

(3) Factor 3- Safety:

(i) Solicitation Submittal Requirements: The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR, DART and TRC Rates shall not be submitted for subcontractors.)

(1) Experience Modification Rate (EMR): Include three previous complete calendar years’ worth of data. This rate compares company’s annual losses in insurance claims against its policy premiums. The offeror may submit an insurance company-provided equivalent rate if no EMR exists. If the offeror has no EMR or premium, for any year, the offeror shall affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends m be addressed as part of the factor submission.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART)

Rate and Total Recordable Case (TRC) Rate: Submit three previous complete calendar years’ worth of data. If an offeror cannot submit an OSHA DART and TRC rates, for any year, the offeror shall affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA, DART, and TRC rate data negatively must be addressed as part of this factor submission.

(3) Technical Approach for Safety:

Describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors.

The offeror shall submit a narrative that fully describes the safety management system that they will use to oversee the safety compliance and performance of self-performed and subcontractor performed work.

The offeror will describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels.

Additionally, the contactor will describe their methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. The technical approach to safety narrative shall be limited to two pages.

(ii) Basis of Evaluation: The evaluation will collectively consider the following:

- Experience Modification Rate (EMR)

- OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) and Total Recordable Case (TRC) Rates

- Offeror Technical Approach to Safety

- Other sources of information available to the Government

(1) Experience Modification Rate (EMR): For the three previous complete calendar years the offeror will submit EMR. If no EMR exists, the offeror may submit an insurance company-provided equivalent rate explaining why not. If an insurance company-provided equivalent rate is provided, it will be treated the same as an EMR. Any extenuating circumstances that affected the EMR and negative trends should be addressed as part of this selection factor. The board will evaluate the EMR to determine if the offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer

(DART) and Total Recordable Case (TRC) Rates: For the three previous complete calendar years, the offeror must submit their OSHA DART and TRC, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If unable to submit OSHA DART and TRC rates, the offeror shall affirmatively state so, and an explanation must be provided. Any extenuating circumstances that affected the OSHA DART and TRC rate data and negative trends should be addressed as part of this element. The board will evaluate the OSHA DART and TRC rates to determine if the offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.

(3) Technical Approach to Safety: The offeror will describe their plan to evaluate their safety performance and that of potential subcontractors.

Also, describe any innovative methods that the offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety Narrative shall be limited to two pages. The board will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The board will evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement and validate the contractor has addressed methodology to be used in the execution of an effective program that facilitates sound mishap prevention techniques/processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. Those offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.

(4) Other Sources of Information Available to the Government: Other sources for safety may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS) in Enterprise Safety Applications Management System (ESAMS), Contractor Performance Assessment Reporting System (CPARS) and other related databases.

(c) Factor 4- Past Performance:

(i) Solicitation Submittal Requirements: Offerors shall clearly demonstrate a history of successful performance within the past five (5) years of the date of issuance of the contract. The offeror shall be the prime contractor on a minimum of one (1) up to a maximum of five (5) relevant contracts of similar size, scope and complexity to the RFP as defined in Factor 2, Corporate Experience. The prime contractor will not be found acceptable on the basis of the subcontractor’s past performance. Additionally, the prime contractor’s experience as a subcontractor will not be considered.

IF A COMPLETED CPARS EVALUATION IS AVAILABLE, IT SHALL BE

SUBMITTED WITH THE PROPOSAL. IF THERE IS NOT A COMPLETED

CPARS EVALUATION, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 2, Corporate Experience.

AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS

AVAILABLE.

IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror must complete and submit with the proposal the first page of the PPQ (Attachment J- 0200000-10), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, LeeArjetta W. Hamilton, via email at leearjetta.hamilton@navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Also include performance recognition documents received within the last (5) years from the date of issuance of the solicitation, such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.

A copy of the blank Past Performance Questionnaire to be used for requesting client references is included in Section J.

(ii) Basis of Evaluation: The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering some or all of the following:

- A pattern of successful completion of tasks;

- A pattern of deliverables that are timely and of good quality;

- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and

- Recency of tasks performed that are identical to, similar to, or related to the task at hand

Price:

(1) Solicitation Submittal Requirements: Offerors shall submit one (1) original and one (1) copy of the price proposal, in a separate three ring binder, that shall include the following:

Signed Solicitation, Offer and Award Forms (SF 33), including Section B (CLINs 0001 through 0010), with all amendments acknowledged.

Exhibits A through E (Section J) Submit a Small Business Subcontracting Plan for this project in the format provided in Attachment J-0200000-11.

Copy of Representations and Certifications and proof of registration in

System of Award Management (SAM).

Confirm submission of the most recent Vets 4212 Report.

Provide name of financial institution, point of contract, telephone number and email address. Provide a signed statement of release giving the reference permission to release the information to the Navy.

In addition to providing hard copies of the price proposal (original and copy), offerors shall also provide one (1) non-rewritable CD with pricing information. Offerors are advised that in the event of a discrepancy between the original, copy, and CD, the original hard copy will govern.

The price proposal shall be submitted separately but at the same time as the technical proposal. Any non-price information in the price proposal will not be considered.

Likewise, any price information in the non-price proposal will not be considered.

(2) Basis of Evaluation: The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items (see Section B of the solicitation). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section M of the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the options. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

(i) Comparison of proposed prices received in response to the RFP.

(ii) Comparison of proposed prices with the IGCE.

(iii) Comparison of proposed prices with available historical information.

(iv) Comparison of market survey results.

Proposals will be evaluated for completeness and reasonableness as follows:

(1) Completeness. All pricing information required by the solicitation has been provided, all mathematic computations are correct and the pricing application understood, prices are on an “all or none” basis, and failure to submit a price on an item or a number of items may cause this factor and the entire offer to be determined Unacceptable.

(2) Reasonableness. Price analysis comparisons indicate the offered price to be fair and reasonable, balanced across option years, and balanced between fixed-price and IDIQ items.

Unreasonable, unbalanced, or incomplete pricing may cause a proposal to be determined unacceptable.

(End of Summary of Changes)

Name DEPT/Company Phone Email Address Sam Caparso Railroad Construction Company Matt Lawson Railroad Construction Company Ryan Chinn Railroad Construction Company of South Jersey Dave Luvara Rhinehart Railroad Construction Mike Baldasari NWS Earle, NAVFAC, FSC, PAW Wayne Kolb NWS Earle, NAVFAC, FSC, ET Alex House NWS Earle, NAVFAC, PM&E, Supervisory ET

NWS Earle Sight Visit Sign-In Sheet M&R of Railroad Trackage N40085-18-R-9760

Date of visit: 8/22/18 Time: 0930-1100

Additional requirements to those listed in the specification.

ATTACHMENT J-1502000-07

MAINTENANCE REQUIREMENTS, TURNOUTS

1. Pier and Trestle Switch Maintenance Requirements

a. Pier & Trestle Switch Maintenance Requirements. The Contractor shall clean the switches by removing all dirt, trash, debris, water, ice and snow and other foreign material from the switch box, between switch points, and running rails, around all operation parts including operation rods and levers, clevis springs, base plates, cranks, segment gears and unclog drain lines. Also clean along flangeways and a minimum of two rail lengths past heel of frog and also one rail length ahead of switch point. To adequately clean the switches as specified above, the contractor shall use an air compressor or vacuum to remove loose material, metal spade/scraper and wire brush for hard to remove materials and mechanical snake for drainage conduit clean out as approved by the OIC. The area around switches shall be policed and all dirt, trash, debris, ice and snow and other material removed from switches while cleaning, shall be picked up and disposed of off Government property.

b. The Contractor shall lubricate switches by applying a graphite coat of DYLON GRADE SP‐MS SWITCHPLATE LUBRICANT in accordance with ASTM D1310, D1189 & D88 requirements or equal as approved by the OIC or his representative. This must be applied to all operation gear and moving parts including pins, bolts, threads, clevises, sliding surfaces, springs, crank, segment gears, operation rods and other fretting surfaces. After lubricant has been applied, operate switch several times to distribute lubricant and ensure ease of operation. Switches shall not be lubricated until they are thoroughly clean and dry.

c. The work also includes the removal, grinding of any bead (metal flow) through the complete switch turnout gate sides of each rail. It is anticipated that no more than 25 percent of switch turnouts during any quarterly service period shall require removal, by grinding, of any bead (metal flow). Building up of switch points and frogs by welding will be required for pier and trestle switches. Maximum space between switch point and stock rail shall not exceed 1/16 inch. Horizontal misalignment between switch closure rails shall not exceed 1/16 inch.

d. During the maintenance of switches in the winter months the contractor will use the graphite and an approved deicer, to prevent pier and trestle switch freeze ups. Maintenance of the pier switches shall be done with graphite and deicer during the winter months of December, January, February and March. Remaining switches during the year will just use graphite.

2. Landside Switch Maintenance Requirements

a. The area around switches shall be policed and all dirt, trash, debris, ice and snow and other material removed from switches while cleaning, shall be picked up and disposed of off Government property.

b. The contractor shall graphite switches by applying a graphite coat of DYLON GRADE SP‐MSCOAT SWITCHPLATE LUBRICANT in accordance with ASTM D1310, D1189, & D88 requirements or equal as approved by the OIC or his representative. This must be applied to all operation gear and moving parts including pins, bolts, threads, clevises, sliding surfaces, springs, crank, segment gears, operation rods and other fretting surfaces.

After lubricant has been applied, operate switch several times to distribute lubricant and ensure ease of operation. Switches shall not be lubricated until they are thoroughly clean and dry.

c. The work also includes the removal, by grinding, of any bead (metal flow) through the complete switch turnout from the gate sides of each rail. It is anticipated that no more than 25 percent of switch turnouts during any quarterly service period shall require; 1 removal, by grinding, of any bead (metal flow), and 2 build up, by welding, of any worn switch points and frogs. Stock rails shall be securely seated in switch plates. Each switch point must fit its stock rail, with the switch stand in either of its closed positions to allow wheels to pass the switch point. Maximum space between switch point and stock rail shall not exceed 1/16 inch. Horizontal misalignment between switch closure rails shall not exceed 1/16 inch. All bolts shall be tight. And any cotter pins missing throughout switch will be replaced if missing. Switch plates and hook plates shall be inspected. Where replacement of any material is needed, this work will be performed during the PMS but ordered as a separate line item under the indefinite quantity portion of the contract. Likewise, any need for additional work or adjustment shall be reported to the OIC's representative.

d. All bolts throughout switch turnouts shall be tight with lock washers and cotter pins, replace washers or cotter pins if missing or broken, also all loose spikes will be removed and plugged and replaced, and all high spikes will be driven to proper depth. This Item also includes the build‐up of switch points and frogs by welding where required. All switches, frog points and turnouts must be machine lined and gauged, surfaced and tamped and regulated and dressed, after maintenance operations are completed. Machine tamping will consist of tamping 78' past the heel of the frog, and 50' ahead of switch point. Any need for adjustment shall be noted and reported to the Contracting Officer's representative. Switches shall not be lubricated until they are thoroughly clean and dry. To adequately clean the switches as specified above the contractor shall use an air compressor to remove loose material; metal spade/scraper and wire brush for hard to remove materials as approved by the Contracting Officer.

During the winter months, the contractor will use an approved deicer during ice and snow conditions to prevent landside switch freeze ups. This maintenance of switches will be done semi‐annually.

e. All switch turnouts shall be lined, gauged, surfaced and tamped, and regulated and dressed, upon the completion of all switch turnout preventive maintenance work performed under proper Line item. A vibrating tamping machine subject to approval by the government shall be used. Machine work will only be done during first and third quarters. Tamping and dressing will be performed from 50' ahead of switch point and 78 ' beyond heel of frog.

f. Maintenance of the landside switches shall be done semi‐annually.