A B C D E F G

Page Section Paragraph ANSWERS

TST 02/06/18 1 PWS Task 3 Task 3 indicates that a technical proposal is to be submitted. Is this to be submitted with the Price proposal or after award? The General Requirements don't indicate that a Technical Factor is required. Yes, please submit technical proposal with the price proposal.

TST 02/06/18 1 AMD 0001 n/a

Task 1 of the Performance Work Statement (PWS) indicates that we are only installing 1900lf that consists of a mix of 4-inch HDPE and PVC. However, Amendment 0001 indicates "stranded conduit cable" which we're not clear on what the Govt is asking for. Can you please confirm we are to bid per the PWS and disregard the note on Page 3 of attachment "F" Drawings?

Please disregard the last sentence in block 14 of Amendment 1 DESCRIPTION OF AMENDMENT/MODIFICATION; and disregard the note on page 3 of Attachment F Drawings follow the PWS.

TST 02/06/18 1 Attachment F n/a The Performance Work Statement (PWS) indicates that we are installing 1900lf that consists of a mix of 4-inch HDPE and PVC, however, page 1 of the drawings provides lengths of conduit that only totals 1030lf. Please clarify which is correct?

Please refer to Task 4 of the PWS and section 4 Requirements: - paragraph a.

Planning:. All distances/measuresments provided by Government are approximate lengths. The purpose of the site survey was for contractors to confirm measurements. It's my understanding none of the contractors took measurements during the site visit.

Date Submitted

Pre-Proposal Inquiry Submission Form N40085-18-R-6706 INSTALLATION OF

Question Reference

Submitted By

PPI Submission Form

File details come from the government source that posted it.