- RAILROAD MAINTENANCE AND REPAIR SERVICES
- Solicitation number
- N4008518R1608
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REVISED_AMENDMENT_0002_EXHIBIT_LINE_ITEMS.xls | XLS spreadsheet | |
| Amend_0002_RailroadMaintRepair.pdf | ||
| Amend_0001_N4008518R1601_Railroad_Maint_Repair.pdf | ||
| EXHIBIT_LINE_ITEMS.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5506355
Railroad Maintenance and Repairs at the Naval Support Activity Crane, Indiana.
Provide necessary labor, transportation, materials, supplies, equipment, and supervision to perform maintenance and repairs on railroad trackage. This includes, but is not limited to replacement of rails, ties, crossings and accessories, surfacing, alignment, dressing of ballast, ditch maintenance, and incidental related w ork.
The proposed solicitation w ill contain provisions for a 12-month base period plus three 12-month option periods, to be exercised at the Government’s discretion. The contract maximum w ill be $10 million or 48 months, w hichever comes f irst.
The solicitation is issued as an Unrestricted procurement, NAICS code 237990 and size standard 33.5 million.
R. A. TAYLOR 812-854-2673
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
07-Nov-2018
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC MID ATLANTIC
PWD CRANE FEAD
300 HIGHWAY 361
NSA BLDG 2516
CRANE IN 47522
N40085
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N4008518R1608 63
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N4008518R1608
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 Each
RAILROAD MAINTENANCE AND REPAIR
FFP
Provide necessary labor, transportation, materials, supplies, equipment, and supervision to perform maintenance and repairs on railroad trackage. This includes but is not limited to replacement of rails, ties, crossings and accessories, surfacing, alignment, dressing of ballast, ditch maintenance, and incidental related work at the Naval Support Activity , Crane, Indiana. All work shall be in accordance with the Statement of Work and ELINS. EXHIBIT A, B, C, AND D contain pre-price line items that will be utilized when issuing task orders under this CLIN for the base year and each Option year that is exercised. The contract is a base year plus 3 option years, the maximum for this contract is 48 months or $10,000,000.00 whichever comes first. Task order will be issued electronically.
BASE PERIOD $______________________EXHIBIT A
OPTION ONE $_______________________EXHIBIT B
OPTION TWO $______________________EXHIBIT C
OPTION THREE $ ____________________EXHIBIT D
FOB: Destination
PURCHASE REQUEST NUMBER: ACQR5506355
ESTIMATED
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
RR MAINTENANCE AND REPAIR SECTION 00 41 00 BID SCHEDULE N4008518R1608
UNIT OF UNIT EXTENDED
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
A001 Contractor Furnished and Installed, New Wood Grade Ties 7"x9"x8'6" including spikes. Ref. Para. 2.4 800 Each -$
A002 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x9' including spikes. Ref. Para. 2.5 30 Each -$
A003 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x10' including spikes. Ref. Para. 2.5 30 Each -$
A004 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x11' including spikes. Ref. Para. 2.5 12 Each -$
A005 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x12' including spikes. Ref. Para. 2.5 12 Each -$
A006 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x13' including spikes. Ref. Para. 2.5 14 Each -$
A007 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x14' including spikes. Ref. Para. 2.5 28 Each -$
A008 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x15' including spikes. Ref. Para. 2.5 6 Each -$
A009 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x16' including spikes. Ref. Para. 2.5 6 Each -$
A010 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x20' including spikes. Ref. Para. 2.5 1 Each -$
A011 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x22' including spikes. Ref. Para. 2.5 1 Each -$
A012 Contractor Furnished and Installed, New Composite Grade Ties 7"x9"x8'6" including spikes. Ref. Para. 2.6 510 Each -$
A013 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x9' including spikes. Ref. Para. 2.7 20 Each -$
A014 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x10' including spikes. Ref. Para. 2.7 13 Each -$
A015 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x11' including spikes. Ref. Para. 2.7 8 Each -$
A016 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x12' including spikes. Ref. Para. 2.7 7 Each -$
A017 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x13' including spikes. Ref. Para. 2.7 8 Each -$
A018 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x14' including spikes. Ref. Para. 2.7 16 Each -$
A019 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x15' including spikes. Ref. Para. 2.7 5 Each -$
A020 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x16' including spikes. Ref. Para. 2.7 4 Each -$
A021 Realignment or Respacing of Existing Grade Ties including excavation.
Ref. Para. 2.8 50 Each -$
A022 Realignment or Respacing of Existing Switch Ties including excavation.
Ref. Para. 2.8 5 Each -$
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
A023 Contractor Furnished and Installed New No. 4 ballast (AREMA specification). Ref. Para. 2.9 4,000 Ton -$
A024 Contractor Furnished and Installed New No. 2 crushed stone (IDOH specification). Ref. Para. 2.9 20 Ton -$
A025 Contractor Furnished and Installed New No. 53 crushed stone (IDOH specification). Ref. Para. 2.9 40 Ton -$
A026 Contractor Furnished and Installed New No. 11 crushed stone (IDOH specification). Ref. Para. 2.9 20 Ton -$
A027 Contractor Furnished and Installed New Graded Rriprap (IDOH specificaion). Ref. Para. 2.9 160 Ton -$
A028 Surface and Align Track, and Dress Ballast. Ref. Para. 2.10 30,000
Linear Track Foot -$
A029 Surface and Align No. 6 or 7 Turnout, and Dress Ballast. Ref. Para. 2.11 10 Each -$
A030 Surface and Align No. 8 or 10 Turnout, and Dress Ballast. Ref. Para. 2.11 30 Each -$
A031 Regulate and Dress Ballast Only. (Surfacing and alignment not included) Ref. Para. 2.12 100
Linear Track Foot -$
A032 Gaging - Measured by Centerline of Track. Ref. Para. 2.13
Linear Track Foot -$
A033 Excavation of Mud Cribs. Ref. Para. 2.14 20 Each -$
A034 Ditch Maintenance. Ref. Para. 2.15 200 Linear Foot -$
A035 Contractor Furnished and Installed New Crosstie/Cable Bumping Post. Ref.
Para. 2.16 1 Each -$
A036 Stone Road Surface Removal. Ref. Para. 2.17 25 Cubic Yard -$
A037 Asphalt Road Surface Removal. Ref. Para. 2.17 15 Cubic Yard -$
A038 Asphalt Road Surface Milling. Ref. Para. 2.17 5 Cubic Yard -$
A039 Removal of Existing Crossing Panel. Ref. Para. 2.18 9 Each -$
A040 Government Furnished, Contractor Installed Crossing Panel. Ref. Para. 2.18 1 Each -$
A041 Excavation. Ref. Para. 2.19 150 Cubic Yard -$
A042 Contractor Furnished and Installed New Geogrid. Ref. Para. 2.20 100 Linear Foot -$
A043 Contractor Furnished and Installed New 6" dia. Subdrain. Ref. Para. 2.21 100 Linear Foot -$
A044 Contractor Furnished and Installed New Molded Rubber Flange Guard for asphalt crossing. Ref. Para. 2.22 50
Linear Track Foot -$
A045 Asphalt Paving of Highway Crossing. Ref. Para. 2.23 45 Ton -$
A046 Contractor Furnished and Installed New Compromise Joint Bars. Ref. Para.
2.24 1 Pair -$
A047 Contractor Furnished and Installed New 7/8" O.D. Switch Bolts with Square Nut and Spring Lockwasher. Ref. Para. 2.25 5 Each -$
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
A048 Contractor Furnished and Installed New 1" O.D. Switch Bolts with Square Nut and Spring Lockwasher. Ref. Para. 2.25 5 Each -$
A049 Contractor Furnished and Installed New 1 1/8" O.D. Switch Bolts with Square Nut and Spring Lockwasher. Ref. Para. 2.25 2 Each -$
A050 Contractor Furnished and Installed New 1 1/4" O.D. Switch Bolts with Square Nut and Spring Lockwasher. Ref. Para. 2.25 2 Each -$
A051 Contractor Furnished and Installed New 3/4" O.D. Track Bolts, with Square Nut and Spring Lockwasher. Ref.Para. 2.25 45 Each -$
A052 Contractor Furnished and Installed New 7/8" O.D. Track Bolts, with Square Nut and Spring Lockwasher. Ref.Para. 2.25 50 Each -$
A053 Contractor Furnished and Installed New 1" O.D. Track Bolts, with Square Nut and Spring Lockwasher. Ref.Para. 2.25 200 Each -$
A054 Contractor Furnished and Installed New Thermoweld for various rail sizes.
Ref. Para. 2.26 2 Each -$
A055 Contractor Furnished and Installed New Insulated Joint Bars. Ref. Para.
2.27 2 Pair -$
A056 Contractor Furnished and Installed New Thermite Joint Bond with 3/16" stranded copper wire. Ref. Para. 2.28 4 Each -$
A057 Contractor Furnished and Installed New Thermite Web Bond for Rail Joint (including 1 AWG Stranded Copper Wire). Ref. Para. 2.28 6 Each -$
A058 Contractor Furnished and Installed New Thermite Track Cross Bond (including 1 AWG Stranded Copper Wire). Ref. Para. 2.28 3 Each -$
A059 Contractor Furnished and Installed New Single Action, Heavy Duty, Gage Rod. Ref. Para. 2.29 5 Each -$
A060 Contractor Furnished and Installed New Double Action Gage Rod. Ref.
Para. 2.29 2 Each -$
A061 Contractor Furnished and Installed New Single Action, Insulated, Gage Rod. Ref. Para. 2.29 2 Each -$
A062 Contractor Furnished and Installed New 9/16" x 5 1/2" Spikes. Ref. Para.
2.30 100 Each -$
A063 Government Furnished, Contractor Installed Grade Ties, includling Spikes.
Ref. Para. 2.31 100 Each -$
A064 Government Furnished, Contractor Installed Switch ties (9' - 16'), including Spikes. Ref. Para. 2.31 5 Each -$
A065 Government Furnished, Contractor Installed Rail, size varies from 60# to 115#, including alignment and gaging. Ref. Para. 2.32 500 Linear Foot -$
A066 Government Furnished and Contractor Installed Joint Bars. Ref. Para. 2.33 2 Pair -$
A067 Government Furnished and Contractor Installed Compromise Joint Bars.
Ref. Para. 2.34 2 Pair -$
A068 Government Furnished and Contractor Installed Switch Plates, including braces. Ref. 2.35 6 Each -$
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
A069 Government Furnished and Contractor Installed Tie Plates. Ref. Para. 2.35 20 Each -$
A070 Government Furnished and Contractor Installed Hook Plates. Ref. Para.
2.35 6 Each -$
A071 Government Furnished and Contractor Installed Rail Anchors. Ref. Para.
2.36 250 Each -$
A072 Government Furnished and Contractor Installed Switch Stand. Ref. Para.
2.37 1 Each -$
A073 Government Furnished and Contractor Installed Switch Point. Ref. Para.
2.38 2 Each -$
A074 Government Furnished and Contractor Installed Frog. Ref. Para. 2.39 1 Each -$
A075 Government Furnished and Contractor Installed Frog Guardrail. Ref. Para.
2.40 2 Each -$
A076 Government Furnished and Contractor Installed Switch Heel Block. Ref.
Para. 2.41 1 Each -$
A077 Contractor Furnished and Installed Welding Repair to Switch Point to include mobilization charge. Ref. Para. 2.42 6 Each -$
A078 Contractor Furnished and Installed Welding Repair to Frog to include mobilization charge. Ref. Para. 2.42 3 Each -$
A079 Contractor Furnished and Installed Welding Repair to Rail to include mobilization charge. Ref. Para. 2.42 3 Each -$
A080 Mobilization for Trouble Calls less than $3,500.00, including equipment.
Ref. Para. 2.43 20 Each -$
A081 Contractor Furnished and Installed New Rail Anchors. Ref. Para 2.44 12 Each -$
A082 Contractor Furnished and Installed Tie Plates (Relay quality). Ref. Para.
2.45 12 Each -$
A083 Contractor Furnished and Installed New 36", 6 Hole Joint Bar for 115RE Rail. Ref. Para. 2.46 2 Pair -$
A084 Contractor Furnished and Installed New Rail, 39'. 115RE. Ref. Para. 2.47 39 Linear Foot -$
A085 Contractor Furnished and Installed New Rail, 80', 115RE. Ref. Para. 2.47 80 Linear Foot -$
A086 Contractor Furnished and Installed New Racor 22E Switch Stand Ref. Para.
2.48 2 Each -$
A087 Contractor Furnished and Installed New Outside Point Guard Ref. Para.
2.49 2 Each -$
A088 Slot Grind Joint Ref. Para. 2.50 10 Each -$
A089 Contractor Furnished and Installed Culvert Pipe Liner 10.75" OD. Ref. Para.
2.51 45 Linear Foot -$
A090 Contractor Furnished and Installed Culvert Pipe Liner 12.75" OD. Ref. Para.
2.51 45 Linear Foot -$
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
A091 Contractor Furnished and Installed Culvert Pipe Liner 14" OD. Ref. Para.
2.51 45 Linear Foot -$
A092 Contractor Furnished and Installed Culvert Pipe Liner 16" OD. Ref. Para.
2.51 45 Linear Foot -$
A093 Contractor Furnished and Installed Culvert Pipe Liner 18" OD. Ref. Para.
2.51 45 Linear Foot -$
A094 Contractor Furnished and Installed Culvert Pipe Liner 20" OD. Ref. Para.
2.51 45 Linear Foot -$
A095 Contractor Furnished and Installed Culvert Pipe Liner 22" OD. Ref. Para.
2.51 45 Linear Foot -$
A096 Contractor Furnished and Installed Culvert Pipe Liner 24" OD. Ref. Para.
2.51 45 Linear Foot -$
A097 Contractor Furnished and Installed Culvert Pipe Liner 26" OD. Ref. Para.
2.51 45 Linear Foot -$
A098 Contractor Furnished and Installed Culvert Pipe Liner 28" OD. Ref. Para.
2.51 45 Linear Foot -$
A099 Contractor Furnished and Installed Culvert Pipe Liner 30" OD. Ref. Para.
2.51 45 Linear Foot -$
A100 Contractor Furnished and Installed Culvert Pipe Liner 32" OD. Ref. Para.
2.51 45 Linear Foot -$
A101 Contractor Furnished and Installed Culvert Pipe Liner 36" OD. Ref. Para.
2.51 45 Linear Foot -$
A102 Contractor Furnished and Installed Culvert Pipe Liner 42" OD. Ref. Para.
2.51 45 Linear Foot -$
A103 Contractor Furnished and Installed Culvert Pipe Liner 48" OD. Ref. Para.
2.51 45 Linear Foot -$
A104 Contractor Furnished and Installed Culvert Pipe Liner 54" OD. Ref. Para.
2.51 45 Linear Foot -$
A105 Contractor Furnished and Installed Culvert Pipe Liner 63" OD. Ref. Para.
2.51 45 Linear Foot -$
A106 Contractor Furnished and Installed Grout. Ref. Para. 2.52 32 Cubic Yard -$
A107 Contractor Furnished and Installed Concrete Headwall. Ref. Para. 2.53 12 Cubic Yard -$
A108 Contractor Furnished and Installed New Ground Rod. Ref. Para. 2.54 1 Each -$
A109 Contractor Furnished and Installed New 1/0 Awg Flexible Bare Copper Stranded Cable. Ref. Para. 2.55 12 Linear Foot -$
A110 Locate and Paint Mark Clearance Point. Ref. Para. 2.56 6 Each -$
A111 Contractor Furnished and Installed New Double End, Hinged Derailer. Ref.
Para. 2.57 1 Each -$
A112 Track Demolition. Ref. Para. 2.58
Linear Track Foot -$
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
Additional work required in conjunction with but not itemized in ELINS A001 - A112. Additional reference paragraphs are found in Division 01.
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
A113 Hourly Rate for Additional Work that is required in conjunction with (but not included in) the other ELINS Items during normal work hours. Ref.
Para. 2.59 50 Labor Hour -$
A114 Material Required In Performance of Additional Work that is required in conjunction with (but not included in) the other ELINS. Ref. Para. 2.60 and the following explanation. 5,000.00$ Percent 5,000.00$
(TOTAL ELINS A001 - A114) 5,000.00$
Outside Normal Work Hours & Emergency Work Requirements
A115 Work Outside Normal Working Hours 5,000.00$ Percent -$ For proposal purposes only, assume the total of all applicable ELINS 0001 - 1115 to be performed outside of normal working hours is $5,000.00
EX: if the percent mark up is 10% then $5,000 x .10 = 500.00. Thus work outside normal working hours premium is an additional charge of $500.00 for those task on a particular task order that total $5,000.00 and will be performed outside of normal working hours.
EMERGENCY BASIS
A116 Percent of increase in unit prices for ELINS A001 - A114, 5,000.00$ Percent -$ when the work is ordered on an Emergency basis with an immediate response. Ref Para 2.62
A117 NDT of Rail. Ref. Para 2.63 1.0 Mile -$
SUB-TOTAL 5,000.00$
A118 Payment & Performance Bond for each task order $35k & over. 5,000.00$ -$ Ref Para. 2.64 BOND PREMIUM Bonding or Consent of Surety For proposal purposes only, assume the value of all applicable ELINS A001 to A117 is $25,000.00.
To calculate the amount for ELIN A118 multiply $25,000.00 by the bond premium For example if the bond premium is 2% the $25,000.00 x .02 = $500.00 which is entered in ELIN A118
5,000.00$ (Total of Sub-Line Items A001 - A118)
TOTAL ESTIMATED CONTRACT BID AMOUNT
To calculate the amount for 114 multiply $5,000.00 by the percent mark-up + 100%
For example if the fixed burden rate is 10% then $5,000.00 x 1.10 = $5,500.00 which is entered in
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
B001 Contractor Furnished and Installed, New Wood Grade Ties 7"x9"x8'6" including spikes. Ref. Para. 2.4 800 Each -$
B002 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x9' including spikes. Ref. Para. 2.5 30 Each -$
B003 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x10' including spikes. Ref. Para. 2.5 30 Each -$
B004 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x11' including spikes. Ref. Para. 2.5 12 Each -$
B005 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x12' including spikes. Ref. Para. 2.5 12 Each -$
B006 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x13' including spikes. Ref. Para. 2.5 14 Each -$
B007 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x14' including spikes. Ref. Para. 2.5 28 Each -$
B008 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x15' including spikes. Ref. Para. 2.5 6 Each -$
B009 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x16' including spikes. Ref. Para. 2.5 6 Each -$
B010 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x20' including spikes. Ref. Para. 2.5 1 Each -$
B011 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x22' including spikes. Ref. Para. 2.5 1 Each -$
B012 Contractor Furnished and Installed, New Composite Grade Ties 7"x9"x8'6" including spikes. Ref. Para. 2.6 510 Each -$
B013 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x9' including spikes. Ref. Para. 2.7 20 Each -$
B014 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x10' including spikes. Ref. Para. 2.7 13 Each -$
B015 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x11' including spikes. Ref. Para. 2.7 8 Each -$
B016 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x12' including spikes. Ref. Para. 2.7 7 Each -$
B017 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x13' including spikes. Ref. Para. 2.7 8 Each -$
B018 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x14' including spikes. Ref. Para. 2.7 16 Each -$
B019 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x15' including spikes. Ref. Para. 2.7 5 Each -$
B020 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x16' including spikes. Ref. Para. 2.7 4 Each -$
B021 Realignment or Respacing of Existing Grade Ties including excavation.
Ref. Para. 2.8 50 Each -$
B022 Realignment or Respacing of Existing Switch Ties including excavation.
Ref. Para. 2.8 5 Each -$
Note the Reference Paragraph numbers given are for Section 01 22
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
B023 Contractor Furnished and Installed New No. 4 ballast (AREMA specification). Ref. Para. 2.9 4,000 Ton -$
B024 Contractor Furnished and Installed New No. 2 crushed stone (IDOH specification). Ref. Para. 2.9 20 Ton -$
B025 Contractor Furnished and Installed New No. 53 crushed stone (IDOH specification). Ref. Para. 2.9 40 Ton -$
B026 Contractor Furnished and Installed New No. 11 crushed stone (IDOH specification). Ref. Para. 2.9 20 Ton -$
B027 Contractor Furnished and Installed New Graded Rriprap (IDOH specificaion). Ref. Para. 2.9 160 Ton -$
B028 Surface and Align Track, and Dress Ballast. Ref. Para. 2.10 30,000
Linear Track Foot -$
B029 Surface and Align No. 6 or 7 Turnout, and Dress Ballast. Ref. Para. 2.11 10 Each -$
B030 Surface and Align No. 8 or 10 Turnout, and Dress Ballast. Ref. Para. 2.11 30 Each -$
B031 Regulate and Dress Ballast Only. (Surfacing and alignment not included) Ref. Para. 2.12 100
Linear Track Foot -$
B032 Gaging - Measured by Centerline of Track. Ref. Para. 2.13
Linear Track Foot -$
B033 Excavation of Mud Cribs. Ref. Para. 2.14 20 Each -$
B034 Ditch Maintenance. Ref. Para. 2.15 200 Linear Foot -$
B035 Contractor Furnished and Installed New Crosstie/Cable Bumping Post. Ref.
Para. 2.16 1 Each -$
B036 Stone Road Surface Removal. Ref. Para. 2.17 25 Cubic Yard -$
B037 Asphalt Road Surface Removal. Ref. Para. 2.17 15 Cubic Yard -$
B038 Asphalt Road Surface Milling. Ref. Para. 2.17 5 Cubic Yard -$
B039 Removal of Existing Crossing Panel. Ref. Para. 2.18 9 Each -$
B040 Government Furnished, Contractor Installed Crossing Panel. Ref. Para. 2.18 1 Each -$
B041 Excavation. Ref. Para. 2.19 150 Cubic Yard -$
B042 Contractor Furnished and Installed New Geogrid. Ref. Para. 2.20 100 Linear Foot -$
B043 Contractor Furnished and Installed New 6" dia. Subdrain. Ref. Para. 2.21 100 Linear Foot -$
B044 Contractor Furnished and Installed New Molded Rubber Flange Guard for asphalt crossing. Ref. Para. 2.22 50
Linear Track Foot -$
B045 Asphalt Paving of Highway Crossing. Ref. Para. 2.23 45 Ton -$
B046 Contractor Furnished and Installed New Compromise Joint Bars. Ref. Para.
2.24 1 Pair -$
B047 Contractor Furnished and Installed New 7/8" O.D. Switch Bolts with Square
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
B048 Contractor Furnished and Installed New 1" O.D. Switch Bolts with Square Nut and Spring Lockwasher. Ref. Para. 2.25 5 Each -$
B049 Contractor Furnished and Installed New 1 1/8" O.D. Switch Bolts with Square Nut and Spring Lockwasher. Ref. Para. 2.25 2 Each -$
B050 Contractor Furnished and Installed New 1 1/4" O.D. Switch Bolts with Square Nut and Spring Lockwasher. Ref. Para. 2.25 2 Each -$
B051 Contractor Furnished and Installed New 3/4" O.D. Track Bolts, with Square Nut and Spring Lockwasher. Ref.Para. 2.25 45 Each -$
B052 Contractor Furnished and Installed New 7/8" O.D. Track Bolts, with Square Nut and Spring Lockwasher. Ref.Para. 2.25 50 Each -$
B053 Contractor Furnished and Installed New 1" O.D. Track Bolts, with Square Nut and Spring Lockwasher. Ref.Para. 2.25 200 Each -$
B054 Contractor Furnished and Installed New Thermoweld for various rail sizes.
Ref. Para. 2.26 2 Each -$
B055 Contractor Furnished and Installed New Insulated Joint Bars. Ref. Para.
2.27 2 Pair -$
B056 Contractor Furnished and Installed New Thermite Joint Bond with 3/16" stranded copper wire. Ref. Para. 2.28 4 Each -$
B057 Contractor Furnished and Installed New Thermite Web Bond for Rail Joint (including 1 AWG Stranded Copper Wire). Ref. Para. 2.28 6 Each -$
B058 Contractor Furnished and Installed New Thermite Track Cross Bond (including 1 AWG Stranded Copper Wire). Ref. Para. 2.28 3 Each -$
B059 Contractor Furnished and Installed New Single Action, Heavy Duty, Gage Rod. Ref. Para. 2.29 5 Each -$
B060 Contractor Furnished and Installed New Double Action Gage Rod. Ref.
Para. 2.29 2 Each -$
B061 Contractor Furnished and Installed New Single Action, Insulated, Gage Rod. Ref. Para. 2.29 2 Each -$
B062 Contractor Furnished and Installed New 9/16" x 5 1/2" Spikes. Ref. Para.
2.30 100 Each -$
B063 Government Furnished, Contractor Installed Grade Ties, includling Spikes.
Ref. Para. 2.31 100 Each -$
B064 Government Furnished, Contractor Installed Switch ties (9' - 16'), including Spikes. Ref. Para. 2.31 5 Each -$
B065 Government Furnished, Contractor Installed Rail, size varies from 60# to 115#, including alignment and gaging. Ref. Para. 2.32 500 Linear Foot -$
B066 Government Furnished and Contractor Installed Joint Bars. Ref. Para. 2.33 2 Pair -$
B067 Government Furnished and Contractor Installed Compromise Joint Bars.
Ref. Para. 2.34 2 Pair -$
B068 Government Furnished and Contractor Installed Switch Plates, including
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
B069 Government Furnished and Contractor Installed Tie Plates. Ref. Para. 2.35 20 Each -$
B070 Government Furnished and Contractor Installed Hook Plates. Ref. Para.
2.35 6 Each -$
B071 Government Furnished and Contractor Installed Rail Anchors. Ref. Para.
2.36 250 Each -$
B072 Government Furnished and Contractor Installed Switch Stand. Ref. Para.
2.37 1 Each -$
B073 Government Furnished and Contractor Installed Switch Point. Ref. Para.
2.38 2 Each -$
B074 Government Furnished and Contractor Installed Frog. Ref. Para. 2.39 1 Each -$
B075 Government Furnished and Contractor Installed Frog Guardrail. Ref. Para.
2.40 2 Each -$
B076 Government Furnished and Contractor Installed Switch Heel Block. Ref.
Para. 2.41 1 Each -$
B077 Contractor Furnished and Installed Welding Repair to Switch Point to include mobilization charge. Ref. Para. 2.42 6 Each -$
B078 Contractor Furnished and Installed Welding Repair to Frog to include mobilization charge. Ref. Para. 2.42 3 Each -$
B079 Contractor Furnished and Installed Welding Repair to Rail to include mobilization charge. Ref. Para. 2.42 3 Each -$
B080 Mobilization for Trouble Calls less than $3,500.00, including equipment.
Ref. Para. 2.43 20 Each -$
B081 Contractor Furnished and Installed New Rail Anchors. Ref. Para 2.44 12 Each -$
B082 Contractor Furnished and Installed Tie Plates (Relay quality). Ref. Para.
2.45 12 Each -$
B083 Contractor Furnished and Installed New 36", 6 Hole Joint Bar for 115RE Rail. Ref. Para. 2.46 2 Pair -$
B084 Contractor Furnished and Installed New Rail, 39'. 115RE. Ref. Para. 2.47 39 Linear Foot -$
B085 Contractor Furnished and Installed New Rail, 80', 115RE. Ref. Para. 2.47 80 Linear Foot -$
B086 Contractor Furnished and Installed New Racor 22E Switch Stand Ref. Para.
2.48 2 Each -$
B087 Contractor Furnished and Installed New Outside Point Guard Ref. Para.
2.49 2 Each -$
B088 Slot Grind Joint Ref. Para. 2.50 10 Each -$
B089 Contractor Furnished and Installed Culvert Pipe Liner 10.75" OD. Ref. Para.
2.51 45 Linear Foot -$
B090 Contractor Furnished and Installed Culvert Pipe Liner 12.75" OD. Ref. Para.
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
B091 Contractor Furnished and Installed Culvert Pipe Liner 14" OD. Ref. Para.
2.51 45 Linear Foot -$
B092 Contractor Furnished and Installed Culvert Pipe Liner 16" OD. Ref. Para.
2.51 45 Linear Foot -$
B093 Contractor Furnished and Installed Culvert Pipe Liner 18" OD. Ref. Para.
2.51 45 Linear Foot -$
B094 Contractor Furnished and Installed Culvert Pipe Liner 20" OD. Ref. Para.
2.51 45 Linear Foot -$
B095 Contractor Furnished and Installed Culvert Pipe Liner 22" OD. Ref. Para.
2.51 45 Linear Foot -$
B096 Contractor Furnished and Installed Culvert Pipe Liner 24" OD. Ref. Para.
2.51 45 Linear Foot -$
B097 Contractor Furnished and Installed Culvert Pipe Liner 26" OD. Ref. Para.
2.51 45 Linear Foot -$
B098 Contractor Furnished and Installed Culvert Pipe Liner 28" OD. Ref. Para.
2.51 45 Linear Foot -$
B099 Contractor Furnished and Installed Culvert Pipe Liner 30" OD. Ref. Para.
2.51 45 Linear Foot -$
B100 Contractor Furnished and Installed Culvert Pipe Liner 32" OD. Ref. Para.
2.51 45 Linear Foot -$
B101 Contractor Furnished and Installed Culvert Pipe Liner 36" OD. Ref. Para.
2.51 45 Linear Foot -$
B102 Contractor Furnished and Installed Culvert Pipe Liner 42" OD. Ref. Para.
2.51 45 Linear Foot -$
B103 Contractor Furnished and Installed Culvert Pipe Liner 48" OD. Ref. Para.
2.51 45 Linear Foot -$
B104 Contractor Furnished and Installed Culvert Pipe Liner 54" OD. Ref. Para.
2.51 45 Linear Foot -$
B105 Contractor Furnished and Installed Culvert Pipe Liner 63" OD. Ref. Para.
2.51 45 Linear Foot -$
B106 Contractor Furnished and Installed Grout. Ref. Para. 2.52 32 Cubic Yard -$
B107 Contractor Furnished and Installed Concrete Headwall. Ref. Para. 2.53 12 Cubic Yard -$
B108 Contractor Furnished and Installed New Ground Rod. Ref. Para. 2.54 1 Each -$
B109 Contractor Furnished and Installed New 1/0 Awg Flexible Bare Copper Stranded Cable. Ref. Para. 2.55 12 Linear Foot -$
B110 Locate and Paint Mark Clearance Point. Ref. Para. 2.56 6 Each -$
B111 Contractor Furnished and Installed New Double End, Hinged Derailer. Ref.
Para. 2.57 1 Each -$
B112 Track Demolition. Ref. Para. 2.58
Linear Track
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
Additional work required in conjunction with but not itemized in ELINS B001 - B112. Additional reference paragraphs are found in
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
B113 Hourly Rate for Additional Work that is required in conjunction with (but not included in) the other ELINS Items during normal work hours. Ref.
Para. 2.59 50 Labor Hour -$
B114 Material Required In Performance of Additional Work that is required in conjunction with (but not included in) the other ELINS. Ref. Para. 2.60 and the following explanation. 5,000.00$ Percent 5,000.00$
(TOTAL ELINS B001 - B114) 5,000.00$
Outside Normal Work Hours & Emergency Work Requirements
B115 Work Outside Normal Working Hours 5,000.00$ Percent -$ For proposal purposes only, assume the total of all applicable ELINS 0001 - 1115 to be performed outside of normal working hours is $5,000.00
EX: if the percent mark up is 10% then $5,000 x .10 = 500.00. Thus work outside normal working hours premium is an additional charge of $500.00 for those task on a particular task order that total $5,000.00 and will be performed outside of normal working hours.
EMERGENCY BASIS
B116 Percent of increase in unit prices for ELINS B001 - B114, 5,000.00$ Percent -$ when the work is ordered on an Emergency basis with an immediate response. Ref Para 2.62
B117 NDT of Rail. Ref. Para 2.63 1.0 Mile
SUB-TOTAL 5,000.00$
B118 Payment & Performance Bond for each task order $35k & over. 5,000.00$ -$ Ref Para. 2.64 BOND PREMIUM Bonding or Consent of Surety For proposal purposes only, assume the value of all applicable ELINS B001 to B117 is $25,000.00.
To calculate the amount for ELIN B118 multiply $25,000.00 by the bond premium For example if the bond premium is 2% the $25,000.00 x .02 = $500.00 which is entered in ELIN B118
5,000.00$ (Total of Sub-Line Items B001 - B118)
To calculate the amount for 114 multiply $5,000.00 by the percent mark-up + 100%
For example if the fixed burden rate is 10% then $5,000.00 x 1.10 = $5,500.00 which is entered in
TOTAL ESTIMATED CONTRACT BID AMOUNT
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
C001 Contractor Furnished and Installed, New Wood Grade Ties 7"x9"x8'6" including spikes. Ref. Para. 2.4 800 Each -$
C002 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x9' including spikes. Ref. Para. 2.5 30 Each -$
C003 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x10' including spikes. Ref. Para. 2.5 30 Each -$
C004 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x11' including spikes. Ref. Para. 2.5 12 Each -$
C005 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x12' including spikes. Ref. Para. 2.5 12 Each -$
C006 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x13' including spikes. Ref. Para. 2.5 14 Each -$
C007 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x14' including spikes. Ref. Para. 2.5 28 Each -$
C008 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x15' including spikes. Ref. Para. 2.5 6 Each -$
C009 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x16' including spikes. Ref. Para. 2.5 6 Each -$
C010 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x20' including spikes. Ref. Para. 2.5 1 Each -$
C011 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x22' including spikes. Ref. Para. 2.5 1 Each -$
C012 Contractor Furnished and Installed, New Composite Grade Ties 7"x9"x8'6" including spikes. Ref. Para. 2.6 510 Each -$
C013 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x9' including spikes. Ref. Para. 2.7 20 Each -$
C014 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x10' including spikes. Ref. Para. 2.7 13 Each -$
C015 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x11' including spikes. Ref. Para. 2.7 8 Each -$
C016 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x12' including spikes. Ref. Para. 2.7 7 Each -$
C017 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x13' including spikes. Ref. Para. 2.7 8 Each -$
C018 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x14' including spikes. Ref. Para. 2.7 16 Each -$
C019 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x15' including spikes. Ref. Para. 2.7 5 Each -$
C020 Contractor Furnished and Installed, New Composite Switch Ties 7"x9"x16' including spikes. Ref. Para. 2.7 4 Each -$
C021 Realignment or Respacing of Existing Grade Ties including excavation.
Ref. Para. 2.8 50 Each -$
C022 Realignment or Respacing of Existing Switch Ties including excavation.
Ref. Para. 2.8 5 Each -$
Note the Reference Paragraph numbers given are for Section 01 22
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
C023 Contractor Furnished and Installed New No. 4 ballast (AREMA specification). Ref. Para. 2.9 4,000 Ton -$
C024 Contractor Furnished and Installed New No. 2 crushed stone (IDOH specification). Ref. Para. 2.9 20 Ton -$
C025 Contractor Furnished and Installed New No. 53 crushed stone (IDOH specification). Ref. Para. 2.9 40 Ton -$
C026 Contractor Furnished and Installed New No. 11 crushed stone (IDOH specification). Ref. Para. 2.9 20 Ton -$
C027 Contractor Furnished and Installed New Graded Rriprap (IDOH specificaion). Ref. Para. 2.9 160 Ton -$
C028 Surface and Align Track, and Dress Ballast. Ref. Para. 2.10 30,000
Linear Track Foot -$
C029 Surface and Align No. 6 or 7 Turnout, and Dress Ballast. Ref. Para. 2.11 10 Each -$
C030 Surface and Align No. 8 or 10 Turnout, and Dress Ballast. Ref. Para. 2.11 30 Each -$
C031 Regulate and Dress Ballast Only. (Surfacing and alignment not included) Ref. Para. 2.12 100
Linear Track Foot -$
C032 Gaging - Measured by Centerline of Track. Ref. Para. 2.13
Linear Track Foot -$
C033 Excavation of Mud Cribs. Ref. Para. 2.14 20 Each -$
C034 Ditch Maintenance. Ref. Para. 2.15 200 Linear Foot -$
C035 Contractor Furnished and Installed New Crosstie/Cable Bumping Post. Ref.
Para. 2.16 1 Each -$
C036 Stone Road Surface Removal. Ref. Para. 2.17 25 Cubic Yard -$
C037 Asphalt Road Surface Removal. Ref. Para. 2.17 15 Cubic Yard -$
C038 Asphalt Road Surface Milling. Ref. Para. 2.17 5 Cubic Yard -$
C039 Removal of Existing Crossing Panel. Ref. Para. 2.18 9 Each -$
C040 Government Furnished, Contractor Installed Crossing Panel. Ref. Para. 2.18 1 Each -$
C041 Excavation. Ref. Para. 2.19 150 Cubic Yard -$
C042 Contractor Furnished and Installed New Geogrid. Ref. Para. 2.20 100 Linear Foot -$
C043 Contractor Furnished and Installed New 6" dia. Subdrain. Ref. Para. 2.21 100 Linear Foot -$
C044 Contractor Furnished and Installed New Molded Rubber Flange Guard for asphalt crossing. Ref. Para. 2.22 50
Linear Track Foot -$
C045 Asphalt Paving of Highway Crossing. Ref. Para. 2.23 45 Ton -$
C046 Contractor Furnished and Installed New Compromise Joint Bars. Ref. Para.
2.24 1 Pair -$
C047 Contractor Furnished and Installed New 7/8" O.D. Switch Bolts with Square
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
C048 Contractor Furnished and Installed New 1" O.D. Switch Bolts with Square Nut and Spring Lockwasher. Ref. Para. 2.25 5 Each -$
C049 Contractor Furnished and Installed New 1 1/8" O.D. Switch Bolts with Square Nut and Spring Lockwasher. Ref. Para. 2.25 2 Each -$
C050 Contractor Furnished and Installed New 1 1/4" O.D. Switch Bolts with Square Nut and Spring Lockwasher. Ref. Para. 2.25 2 Each -$
C051 Contractor Furnished and Installed New 3/4" O.D. Track Bolts, with Square Nut and Spring Lockwasher. Ref.Para. 2.25 45 Each -$
C052 Contractor Furnished and Installed New 7/8" O.D. Track Bolts, with Square Nut and Spring Lockwasher. Ref.Para. 2.25 50 Each -$
C053 Contractor Furnished and Installed New 1" O.D. Track Bolts, with Square Nut and Spring Lockwasher. Ref.Para. 2.25 200 Each -$
C054 Contractor Furnished and Installed New Thermoweld for various rail sizes.
Ref. Para. 2.26 2 Each -$
C055 Contractor Furnished and Installed New Insulated Joint Bars. Ref. Para.
2.27 2 Pair -$
C056 Contractor Furnished and Installed New Thermite Joint Bond with 3/16" stranded copper wire. Ref. Para. 2.28 4 Each -$
C057 Contractor Furnished and Installed New Thermite Web Bond for Rail Joint (including 1 AWG Stranded Copper Wire). Ref. Para. 2.28 6 Each -$
C058 Contractor Furnished and Installed New Thermite Track Cross Bond (including 1 AWG Stranded Copper Wire). Ref. Para. 2.28 3 Each -$
C059 Contractor Furnished and Installed New Single Action, Heavy Duty, Gage Rod. Ref. Para. 2.29 5 Each -$
C060 Contractor Furnished and Installed New Double Action Gage Rod. Ref.
Para. 2.29 2 Each -$
C061 Contractor Furnished and Installed New Single Action, Insulated, Gage Rod. Ref. Para. 2.29 2 Each -$
C062 Contractor Furnished and Installed New 9/16" x 5 1/2" Spikes. Ref. Para.
2.30 100 Each -$
C063 Government Furnished, Contractor Installed Grade Ties, includling Spikes.
Ref. Para. 2.31 100 Each -$
C064 Government Furnished, Contractor Installed Switch ties (9' - 16'), including Spikes. Ref. Para. 2.31 5 Each -$
C065 Government Furnished, Contractor Installed Rail, size varies from 60# to 115#, including alignment and gaging. Ref. Para. 2.32 500 Linear Foot -$
C066 Government Furnished and Contractor Installed Joint Bars. Ref. Para. 2.33 2 Pair -$
C067 Government Furnished and Contractor Installed Compromise Joint Bars.
Ref. Para. 2.34 2 Pair -$
C068 Government Furnished and Contractor Installed Switch Plates, including
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
C069 Government Furnished and Contractor Installed Tie Plates. Ref. Para. 2.35 20 Each -$
C070 Government Furnished and Contractor Installed Hook Plates. Ref. Para.
2.35 6 Each -$
C071 Government Furnished and Contractor Installed Rail Anchors. Ref. Para.
2.36 250 Each -$
C072 Government Furnished and Contractor Installed Switch Stand. Ref. Para.
2.37 1 Each -$
C073 Government Furnished and Contractor Installed Switch Point. Ref. Para.
2.38 2 Each -$
C074 Government Furnished and Contractor Installed Frog. Ref. Para. 2.39 1 Each -$
C075 Government Furnished and Contractor Installed Frog Guardrail. Ref. Para.
2.40 2 Each -$
C076 Government Furnished and Contractor Installed Switch Heel Block. Ref.
Para. 2.41 1 Each -$
C077 Contractor Furnished and Installed Welding Repair to Switch Point to include mobilization charge. Ref. Para. 2.42 6 Each -$
C078 Contractor Furnished and Installed Welding Repair to Frog to include mobilization charge. Ref. Para. 2.42 3 Each -$
C079 Contractor Furnished and Installed Welding Repair to Rail to include mobilization charge. Ref. Para. 2.42 3 Each -$
C080 Mobilization for Trouble Calls less than $3,500.00, including equipment.
Ref. Para. 2.43 20 Each -$
C081 Contractor Furnished and Installed New Rail Anchors. Ref. Para 2.44 12 Each -$
C082 Contractor Furnished and Installed Tie Plates (Relay quality). Ref. Para.
2.45 12 Each -$
C083 Contractor Furnished and Installed New 36", 6 Hole Joint Bar for 115RE Rail. Ref. Para. 2.46 2 Pair -$
C084 Contractor Furnished and Installed New Rail, 39'. 115RE. Ref. Para. 2.47 39 Linear Foot -$
C085 Contractor Furnished and Installed New Rail, 80', 115RE. Ref. Para. 2.47 80 Linear Foot -$
C086 Contractor Furnished and Installed New Racor 22E Switch Stand Ref. Para.
2.48 2 Each -$
C087 Contractor Furnished and Installed New Outside Point Guard Ref. Para.
2.49 2 Each -$
C088 Slot Grind Joint Ref. Para. 2.50 10 Each -$
C089 Contractor Furnished and Installed Culvert Pipe Liner 10.75" OD. Ref. Para.
2.51 45 Linear Foot -$
C090 Contractor Furnished and Installed Culvert Pipe Liner 12.75" OD. Ref. Para.
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
C091 Contractor Furnished and Installed Culvert Pipe Liner 14" OD. Ref. Para.
2.51 45 Linear Foot -$
C092 Contractor Furnished and Installed Culvert Pipe Liner 16" OD. Ref. Para.
2.51 45 Linear Foot -$
C093 Contractor Furnished and Installed Culvert Pipe Liner 18" OD. Ref. Para.
2.51 45 Linear Foot -$
C094 Contractor Furnished and Installed Culvert Pipe Liner 20" OD. Ref. Para.
2.51 45 Linear Foot -$
C095 Contractor Furnished and Installed Culvert Pipe Liner 22" OD. Ref. Para.
2.51 45 Linear Foot -$
C096 Contractor Furnished and Installed Culvert Pipe Liner 24" OD. Ref. Para.
2.51 45 Linear Foot -$
C097 Contractor Furnished and Installed Culvert Pipe Liner 26" OD. Ref. Para.
2.51 45 Linear Foot -$
C098 Contractor Furnished and Installed Culvert Pipe Liner 28" OD. Ref. Para.
2.51 45 Linear Foot -$
C099 Contractor Furnished and Installed Culvert Pipe Liner 30" OD. Ref. Para.
2.51 45 Linear Foot -$
C100 Contractor Furnished and Installed Culvert Pipe Liner 32" OD. Ref. Para.
2.51 45 Linear Foot -$
C101 Contractor Furnished and Installed Culvert Pipe Liner 36" OD. Ref. Para.
2.51 45 Linear Foot -$
C102 Contractor Furnished and Installed Culvert Pipe Liner 42" OD. Ref. Para.
2.51 45 Linear Foot -$
C103 Contractor Furnished and Installed Culvert Pipe Liner 48" OD. Ref. Para.
2.51 45 Linear Foot -$
C104 Contractor Furnished and Installed Culvert Pipe Liner 54" OD. Ref. Para.
2.51 45 Linear Foot -$
C105 Contractor Furnished and Installed Culvert Pipe Liner 63" OD. Ref. Para.
2.51 45 Linear Foot -$
C106 Contractor Furnished and Installed Grout. Ref. Para. 2.52 32 Cubic Yard -$
C107 Contractor Furnished and Installed Concrete Headwall. Ref. Para. 2.53 12 Cubic Yard -$
C108 Contractor Furnished and Installed New Ground Rod. Ref. Para. 2.54 1 Each -$
C109 Contractor Furnished and Installed New 1/0 Awg Flexible Bare Copper Stranded Cable. Ref. Para. 2.55 12 Linear Foot -$
C110 Locate and Paint Mark Clearance Point. Ref. Para. 2.56 6 Each -$
C111 Contractor Furnished and Installed New Double End, Hinged Derailer. Ref.
Para. 2.57 1 Each -$
C112 Track Demolition. Ref. Para. 2.58
Linear Track
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
Additional work required in conjunction with but not itemized in ELINS C001 - C112. Additional reference paragraphs are found in
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
Note the Reference Paragraph numbers given are for Section 01 22
00.00 10 Measurement & Payment
C113 Hourly Rate for Additional Work that is required in conjunction with (but not included in) the other ELINS Items during normal work hours. Ref.
Para. 2.59 50 Labor Hour -$
C114 Material Required In Performance of Additional Work that is required in conjunction with (but not included in) the other ELINS. Ref. Para. 2.60 and the following explanation. 5,000.00$ Percent 5,000.00$
(TOTAL ELINS C001 - C114) 5,000.00$
Outside Normal Work Hours & Emergency Work Requirements
C115 Work Outside Normal Working Hours 5,000.00$ Percent -$ For proposal purposes only, assume the total of all applicable ELINS 0001 - 1115 to be performed outside of normal working hours is $5,000.00
EX: if the percent mark up is 10% then $5,000 x .10 = 500.00. Thus work outside normal working hours premium is an additional charge of $500.00 for those task on a particular task order that total $5,000.00 and will be performed outside of normal working hours.
EMERGENCY BASIS
C116 Percent of increase in unit prices for ELINS C001 - C114, 5,000.00$ Percent -$ when the work is ordered on an Emergency basis with an immediate response. Ref Para 2.62
C117 NDT of Rail. Ref. Para 2.63 1.0 Mile -$
SUB-TOTAL 5,000.00$
C118 Payment & Performance Bond for each task order $35k & over. 5,000.00$ -$ Ref Para. 2.64 BOND PREMIUM Bonding or Consent of Surety For proposal purposes only, assume the value of all applicable ELINS C001 to C117 is $25,000.00.
To calculate the amount for ELIN C118 multiply $25,000.00 by the bond premium For example if the bond premium is 2% the $25,000.00 x .02 = $500.00 which is entered in ELIN C118
5,000.00$ (Total of Sub-Line Items C001 - C118)
To calculate the amount for 114 multiply $5,000.00 by the percent mark-up + 100%
For example if the fixed burden rate is 10% then $5,000.00 x 1.10 = $5,500.00 which is entered in
ELIN ITEM DESCRIPTION QUANTITY ISSUE PRICE AMOUNT
D001 Contractor Furnished and Installed, New Wood Grade Ties 7"x9"x8'6" including spikes. Ref. Para. 2.4 800 Each -$
D002 Contractor Furnished and Installed, New Wood Switch Ties 7"x9"x9' including spikes. Ref. Para. 2.5 30 Each -$
D003 Contractor Furnished and…