NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC

ACQUISITION CORE (ACQ21)

9324 VIRGINIA AVE, BLDG Z140, RM 225

NAVAL STATION NORFOLK, NORFOLK, VA 23511

POC: Crystal Chatmon, (757) 341-1999, crystal.chatmon@navy.mil

HUBZONE DESIGN-BUILD (DB), DESIGN-BID-BUILD (DBB) INDEFINITE DELIVERY,

INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT

(MACC) FOR FACILITIES IN THE NORTH INTEGRATED PRODUCT TEAM (IPT) AREA

OF RESPONSIBILITY (AOR) TO INCLUDE CONNECTICUT, DELAWARE, ILLINOIS,

INDIANA, MAINE, MARYLAND, MASSACHUSETTS, NEW HAMPSHIRE, NEW JERSEY,

NEW YORK, PENNSYLVANIA, RHODE ISLAND, AND VERMONT

PROPOSED TASK ORDER:

DESIGN-BUILD, P-135 ELECTRIC FEEDER DUCTBANK, MARINE CORPS

RESERVE CENTER, BROOKLYN, NEW YORK

DATE OF SOLICITATION: 16 August 2018

HUBZONE MACC CONTRACT HOLDERS:

N40085-17-D-5038

The Oak Group Inc.

200 Federal Street, Suite 224

Camden, New Jersey 08103

POC: Eduard Eichen

Phone: (856) 377-0060

Email: eje@oakgroup.net

N40085-17-D-5039 Pontiac Drywall Systems, Inc.

20 W. Huron Street

Pontiac, Michigan 48342

POC: LaVonte Travis

Phone: (248) 332-3011

Email: lavontetravis@pdsicontractors.com

N40085-17-D-5040

QBS, Inc.

1548 Linden Avenue

Alliance, Ohio 44601

POC: James Franks

Phone: (330) 806-1022

Email: jim@qbsinc.com

N40085-17-D-5041 Smart ATI/KMK Joint Venture

16 Whitehall Road, Suite 2

Rochester, New Hampshire 03867

POC: Lori Smart

Phone: (603) 330-3533

Email: lori@smartati.com mailto:eje@oakgroup.net mailto:lavontetravis@pdsicontractors.com mailto:jim@qbsinc.com mailto:lori@smartati.com

P-135 Electric Feeder Ductbank Solicitation No.: N40085-17-R-0623

Marine Corps Reserve Center, Brooklyn, New York

GENERAL REQUIREMENTS

NAVFAC Solicitation No.: N40085-18-R-0623

NAVFAC Specification Work Order No.: 1304114

NAVFAC Drawing Nos.: N/A

Title: P-135 Electric Feeder Ductbank

Location of the Work: Marine Corps Reserve Center, Brooklyn, New York

Description of the Work: The project provides a new dedicated electrical service from the local utility, Consolidated Edison (ConEd), enabling the Marine Corps Reserve Center (MCRC)

Facility a reliable source of power, while allowing flexibility for future expansions/additions.

The replacement new service would consist of constructing a new ductbank and service feeders from the ConEd point of connection onto the MCRC Facility substation. This distance is approximately 2,600 linear feet. The ductbank would consist of underground high voltage electric utility feeder circuit in a concrete encased conduit. Manholes/handholes would also need to be constructed at several points along the ductbank electric utility feeder route.

Estimated Budget Amount or Price Range: In accordance with FAR 36.204 Disclosure of the

Magnitude of Construction Projects, the estimated price range for this project is between

$1,000,000 and $5,000,000.

Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and

Completion of Work, the Government desires completion of construction within 380 calendar days after award (includes 15 calendar days for submission and approval of bonds and insurance).

Wage Rate Requirements: Department of Labor (DoL) General Decision Number NY180003

07/27/2018 NY3 applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated at the time of award.

Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages – Construction, liquidated damages, at the time of award, will be based upon the liquidated damages for the base price, plus any option or combination of options exercised. If an option(s) is exercised within the timeframe allowed after award, the liquidated damages will be increased based upon the liquidated damages for that option.

CLIN 0001 $900.00

Utilities: In accordance with FAC 5252.236-9305 Availability of Utilities, when available, the

Government will provide reasonable amounts of electric, water and compressed air for the work to be performed under this contract at no cost to the contractor.

Brooklyn, New York

Record Shop Drawings: In accordance with FAR 52.236.21 Specifications and Drawings for

Construction and FAC 5252.236-9310 Record Drawings, record shop drawings are required.

Reproducible copies of these record drawings are also required.

Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR

16.505 ordering procedures. The basis for award will be low price.

Bond Requirements: In accordance with FAC 5252.228-9302 Bid Guarantee, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least

20 percent of the largest amount for which award can be made under the offer submitted, but in no case to exceed $3,000,000. In accordance with FAC 5252.228-9305 Notice of Bonding

Requirements, Performance and Payment Bonds are required from the awardee ten (10) calendar days after date of award.

Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers.

OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF

FUNDS ARE NOT AVAILABLE, NO AWARD WILL BE MADE AS A RESULT OF THIS

SOLICITATION. OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR

PROPOSAL COSTS RESULTING FROM THIS SOLICITATION.

Site Visit: Site visit is scheduled for Thursday 30 August 2018 at 1:00 pm EST. All visitors should submit their request to Crystal Chatmon at crystal.chatmon@navy.mil using the attached

MARFORRES Visit Request Excel sheet no later than 23 August 2018. There will only be one

Government sponsored site visit.

Location:

Marine Corps Reserve Center Brooklyn

1 AVIATION RD, FLOYD BENNETT FIELD

BROOKLYN, NY 11234

POC: Douglas Reimann; douglas.reimann@navy.mil

Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form (Attachment C). All inquiries shall be submitted via email to Crystal Chatmon at crystal.chatmon@navy.mil no later than 06 September 2018. Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment.

Proposal Due Date: Tuesday, 18 September 2018 no later than 2:00 pm (EDT). LATE

PROPOSALS WILL NOT BE CONSIDERED.

mailto:crystal.chatmon@navy.mil

Brooklyn, New York

Proposal Delivery Information: Proposals should be sent via email to:

crystal.chatmon@navy.mil and crystal.godwin@navy.mil. All required proposal documents shall be submitted in accordance with FAR 15.208.

Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not restated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue please contact Crystal Chatmon at (757) 341-1999, or email at crystal.chatmon@navy.mil.

Fair Opportunity:

This request is conducted under the fair opportunity guidelines of FAR 16.505(b), which outlines the ordering procedures for orders issued under multiple-award contracts. Award will be based on a determination of best value to the government, price and other factors considered. “Best value” means the expected outcome of an acquisition that, in the government’s estimation, provides the greatest overall benefit in response to the requirement. Best value evaluation is, in and of itself, a subjective assessment by the government of the proposed solution that provides the optimal results to the government.

This method does not use any aspects of FAR subpart 15.3. The use of this fair opportunity process does not obligate the government to determine a competitive range, conduct discussion with any contractors, solicit proposals or revisions thereto, or use any other source selection techniques associated with FAR subpart 15.3.

Basis for Award:

1. The proposed task order will be awarded to the responsible offeror offering the best value to the Government. For this order, the best value is expected to result from selection of the proposal with the lowest evaluated price. To make a determination of best value, the

Government shall evaluate each offeror on price only.

2. Submittal Requirements and Basis of Evaluation.

(a) Price:

(1) Solicitation Submittal Requirements: Offeror shall submit the following:

Cover page that includes:

- Solicitation Number & Title

- Prime Contractor Name, Address, Phone Number, DUNS, and

Cage Code

- Point of Contact Name, Phone Number, and Email

Price Proposal Form

Amendments Acknowledged (if applicable)

Bid Bond mailto:crystal.chatmon@navy.mil

(2) Basis of Evaluation: The government will evaluate price based on the lump sum price. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

a. Comparison of proposed prices received in response to the RFP.

b. Comparison of proposed prices with the Independent Government Cost

Estimate (IGCE).

Evaluation

1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the lowest price proposal.

2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

ATTACHMENTS:

ATTACHMENT A – Price Proposal Form

ATTACHMENT B – Wage Determination NY180003 07/27/2018 NY3

ATTACHMENT C – Pre-Proposal Inquiry Form

ATTACHMENT D – MARFORRES Visit Request Form

Brooklyn, New York

ATTACHMENT A

PRICE PROPOSAL FORM

P135 Electric Feeder Duct Bank, Marine Corps Reserve Center, Brooklyn, New York

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) lump sum price for the following items:

CLIN 0001 – BASE PRICE – Price includes the following:

0001AA: Price for the entire work, complete in accordance with the drawings and specifications, but excluding work described in Bid Items 0001AB, 0001AC and 0001AD.

CLIN ITEM TOTAL PRICE FOR

CLIN 0001AA

0001AA All base bid work excluding CLIN 0001AB, 0001AC, and 0001AD

0001AB - Primary electrical service provided by trenching and concrete encasement, including but not limited to associated archaeological oversight and site restoration:

CLIN ITEM UNIT UNIT

PRICE

NO

UNITS

TOTAL PRICE

FOR CLIN

0001AB

0001AB Primary electrical service LF $ 0 $

0001AC - Primary electrical service provided by horizontal directional boring, including but not limited to associated archaeological oversight and site restoration:

CLIN ITEM UNIT UNIT

PRICE

NO

UNITS

TOTAL PRICE

FOR CLIN

0001AC

0001AC Primary electrical service LF $ 2700 $

0001AD - Price for the entire work provided by Consolidated Edison:

CLIN ITEM TOTAL PRICE FOR

CLIN 0001AD

0001AD Price for the entire work provided by

Consolidated Edison

Total Price for CLIN 0001(0001AA through 0001AD) $__________________________

CONTRACT LINE ITEM NOTES

General

1. Award will be made on the total sum of Items 0001AA, 0001AB, 0001AC & 0001AD.

2. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

3. For Items 0001AB and 0001AC, Offerors are to bid some combination of CLIN 0001AB and

CLIN 0001AC, providing a cumulative number of units that constitute the total length of run.

The project may be bid entirely as CLIN 0001AC, but it may not be bid entirely as CLIN

0001AB, as open trenching is not permitted where directional boring is required at certain locations indicated in the RFP.

4. The quantities shown in Items 0001AB and 0001AC are an ESTIMATE ONLY. Should the actual quantity of the item required to complete the work vary from that estimate, the unit price will be adjusted in accordance with the CONTRACT CLAUSE entitled: “Variation in Estimated

Quantity”. This solicitation contains the provision of: FAR 52.211-18, Variation in Estimated

Quantity. If the quantity of a unit priced item in this contract is an estimated quantity and the actual quantity of the unit-priced items varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase of decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the

Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment of extending the completion date as, in the judgment of the Contracting Officer is justified.

Amendments Acknowledged

Amendment No. Date Amendment

No.

Date Amendment

No.

Date

Submitted By:

Offeror: _________________________________

Signature: _________________________________

Brooklyn, New York

ATTACHMENT B

WAGE DETERMINATION

General Decision Number: NY180003 07/27/2018 NY3

Superseded General Decision Number: NY20170003

State: New York

Construction Types: Building, Heavy, Highway and Residential

Counties: Bronx, Kings, New York, Queens and Richmond

Counties in New York.

BUILDING & RESIDENTIAL CONSTRUCTION PROJECTS (includes single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/05/2018

1 01/12/2018

2 01/19/2018

3 02/09/2018

4 02/16/2018

5 04/06/2018

6 04/20/2018

7 05/18/2018

Brooklyn, New York

8 05/25/2018

9 06/29/2018

10 07/27/2018

ASBE0012-001 01/01/2018

Rates Fringes

Asbestos Workers/Insulator

Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.....................$ 70.47 35.25

HAZARDOUS MATERIAL HANDLER.......$ 39.00 12.75

BOIL0005-001 01/01/2017

BOILERMAKER......................$ 55.23 33%+24.12+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial

Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

BRNY0001-001 07/01/2017

BRICKLAYER.......................$ 60.18 26.84

MASON - STONE....................$ 62.67 30.59

BRNY0001-002 07/01/2017

Pointer, cleaner and caulker.....$ 52.62 26.12

BRNY0004-001 01/01/2018

MARBLE MASON.....................$ 58.53 36.22

BRNY0007-001 07/01/2017

TERRAZZO FINISHER................$ 53.03 34.26

TERRAZZO WORKER/SETTER...........$ 54.63 34.28

BRNY0020-001 01/01/2018

MARBLE FINISHER..................$ 46.66 34.03

BRNY0024-001 01/01/2018

BRICKLAYER

MARBLE POLISHERS............$ 40.89 26.69

BRNY0052-001 06/05/2017

Tile Layer.......................$ 49.97 26.96

BRNY0088-001 01/01/2018

TILE FINISHER....................$ 53.45 34.77

CARP0001-009 07/01/2016

CARPENTER

Carpenters..................$ 52.50 45.58

Soft Floor Layers...........$ 50.50 45.18

* CARP0740-001 07/01/2018

MILLWRIGHT.......................$ 52.70 52.61

* CARP1556-006 07/01/2018

Dock Builder & Piledrivermen

DOCKBUILDERS................$ 53.63 50.07

* CARP1556-007 07/01/2018

Diver Tender.....................$ 48.24 50.07

Diver............................$ 67.94 50.07

* CARP1556-011 07/01/2018

Carpenters:

TIMBERMEN...................$ 49.10 49.37

ELEC0003-001 05/10/2017

ELECTRICIAN

Electricians................$ 56.00 70.718%+14.75+a

Jobbing, and maintenance and repair work.............$ 28.50 51.243%+7.50+a

PAID HOLIDAYS:

a. New Years Day, Martin Luther King, Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Thanksgiving Day, the day after Thanksgiving Day, and Christmas Day

ELEC1049-001 04/02/2017

QUEENS COUNTY

Line Construction (Substation and Switching structures pipe type cable installation and maintenance jobs or projects;

Railroad electrical distribution/transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment)

Groundman...................$ 32.31 21.94

Brooklyn, New York

Heavy Equipment Operator....$ 43.08 25.27

Lineman and Cable Splicer...$ 53.85 28.62

Tree Trimmer................$ 30.09 14.12

ELEV0001-002 03/17/2018

ELEVATOR MECHANIC

Elevator Constructor........$ 64.48 42.103+a+b

Modernization and Repair....$ 50.49 40.399+a+b

a. PAID HOLIDAYS: New Year's Day, Good Friday, President's

Day, Memorial Day, Independence Day, Labor Day, Columbus

Day, Veteran's Day, Thanksgiving Day, Friday after

Thanksgiving, and Christmas Day.

b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;

an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.

ENGI0014-001 07/01/2016

POWER EQUIPMENT OPERATOR

(HEAVY & HIGHWAY)

GROUP 1....................$ 92.76 31.15

GROUP 2....................$ 76.51 31.15

GROUP 3....................$ 78.96 31.15

GROUP 4....................$ 77.07 31.15

GROUP 5....................$ 75.55 31.15

GROUP 6....................$ 72.53 31.15

GROUP 7....................$ 73.90 31.15

GROUP 8....................$ 71.78 31.15

GROUP 9....................$ 70.24 31.15

GROUP 10....................$ 67.16 31.15

GROUP 11....................$ 62.73 31.15

GROUP 12....................$ 64.13 31.15

GROUP 13....................$ 64.63 31.15

GROUP 14....................$ 48.73 31.15

GROUP 15....................$ 45.27 31.15

Brooklyn, New York

(PAVEMENT-HEAVY & HIGHWAY)

Asphalt Plants..............$ 59.14 31.15+a

Asphalt roller..............$ 69.91 31.15+a

Asphalt spreader............$ 71.78 31.15+a

POWER EQUIPMENT OPERATOR

(STEEL ERECTION)

Compressors, Welding

Machines....................$ 45.34 31.15

Cranes, Hydraulic Cranes, 2 drum derricks, Forklifts, Boom Trucks......$ 76.43 31.15

Three drum derricks.........$ 79.54 31.15

POWER EQUIPMENT OPERATOR

(UTILITY)

Horizontal Boring Rig.......$ 68.25 31.15

Off shift compressors.......$ 56.70 31.15

Utility Compressors.........$ 44.98 31.15

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Tower crane

GROUP 2: Rubber Tire Backhoes over 37,000 lbs, Track

Backhoes, power shovel, Hydraulic clam shells, moles and machines of a similar type

GROUP 3: Mine hoists and crane, etc. used as mine hoists

GROUP 4: Gradalls, keystones, cranes (with digging buckets), bridge cranes, trenching machines, vermeer cutter and machines of a similar nature

GROUP 5: Piledrivers, derrick boats, tunnel shovels

GROUP 6: All drills, and machines of a similar nature

GROUP 7: Back filling machines, cranes, mucking machines, dual drum pavers

GROUP 8: Mixers (concrete w/loading attachments), concrete pavers, cableways, land derricks, power house (low pressure units), concrete pumps

GROUP 9: Concrete plants, well drilling machines, stone crushers double drum hoist, power house (other than above)

GROUP 10: Concrete mixers

GROUP 11: Elevators

GROUP 12: Concrete breaking machine, Hoists (single drum), load masters, locomotive and dinkies over 10 tons

GROUP 13: Vibratory console

GROUP 14: Compressors (portable 3 or more in battery), tugger machine (caissons), well point pumps, chum drill

GROUP 15: Boilers, (high pressure, compressors (portable, single, or 2 in battery, not over 100' apart), pumps (river cofferdam and welding machines (except where arc is operated by members of local 15) push button machines, all engines irrespective of power (power pac) used to drive auxilliary equipment, air, hydraulic etc.

PREMIUMS ON CRANES (Crawler or Truck):

100' to 149' boom - add .50

150' to 249' boom - add .75

250' to 349' boom - add 1.00

350' to 450' boom - add 1.50

Premiums for Cranes on Steel Erection:

100' to 149' boom - add 1.75

150' to 249' boom - add 2.00

250' to 349' boom - add 2.25

350' to 450' boom - add 2.75

Tower crane - add 2.00

a. Paid Holidays: New Year's Day; Lincoln's Birthday;

Washington's Birthday; Memorial Day; Independence Day;

Labor Day; Veterans Day; Columbus Day; Election Day;

Thanksgiving Day; and Christmas Day; provided the employee works one day the payroll week in which the holiday occurs.

ENGI0014-002 07/01/2016

Power Equipment Operator

BUILDING & RESIDENTIAL

GROUP 1....................$ 71.85 31.15+a

GROUP 2....................$ 76.12 31.15+a

GROUP 3....................$ 69.39 31.15+a

GROUP 4....................$ 63.12 31.15+a

GROUP 5....................$ 47.26 31.15+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Double drum

Brooklyn, New York

GROUP 2: Stone derrick, cranes, hydraulic cranes, boom trucks

GROUP 3: 4 pole Hoist, Single Drum Hoists

GROUP 4: Fork lift, house cars, plaster (platform machine), plaster bucket, concrete pump and all other equipment used for hoisting material

GROUP 5: Compressors, welding machines (cutting concrete work), paint spraying, sand blasting, pumps (with the exclusion of concrete pumps), house car (settlement basis only), all engines irrespective of power (power pac) used to drive auxiliary equipment, air, hydraulic, etc., boilers

Premiums for Cranes:

100'-149' boom - add 1.75

150'-249' boom - add 2.00

250'-349' boom - add 2.25

350'-450' boom - add 2.75

Tower cranes add 2.00

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas

Day, provided the employee works one day in the payroll week in which the holiday occurs

ENGI0015-001 07/01/2016

HEAVY AND HIGHWAY

GROUP 1....................$ 65.94 32.95

GROUP 2....................$ 63.98 32.95

GROUP 3....................$ 60.69 32.95

GROUP 4....................$ 57.42 32.95

GROUP 5....................$ 39.70 32.95

GROUP 1: Cherrypickers 20 tons and over and loaders

(rubber-tired and/or tractor type with a manfufacturer's rated capacity of six cubic yards and over

GROUP 2: Rubber Tire Backhoes up to and including 37,000 lbs, Basin Machines, Groover, Mechanical Sweepers, Bobcat, Boom

Truck, Barrier Transport (Barrier Mover) and machines of a

Brooklyn, New York similar nature, Boat Captains, Boat Operators, operation of

Churn Drills and machines of a similar nature, Stetco

Silent Hoist and machines of a similar nature, Vac-alls, Meyers Machines, John Beam and machines of a similar nature, Ross Carriers and Travel Lifts and machines of a similar nature, Bulldozers, Scrapers, and Turn-a Pulls, Tugger Hoist (used exclusively for handling excavated material), Tractors with attachments, Hyster and Roustabout

Cranes, Cherrypickers, Austin Western, Grove and machines of a similar nature, Scoopmobiles, Monorails, Conveyors, Trenchers, Loaders- Rubber-tired and Tractor, Barber

Greene, Eimco Loaders and Eimco Backhoes, Mighty Midget and similar breakers and tampers, Curb and Gutter Pavers and

Motor Patrol, Motor Graders and all machines of a similar nature, Locomotives ten (10) tons or under, Mini-Max, Break-Tech and machines of a similar nature, Milling

Machines, robotic and demolition machines and machines of a similar nature including Bobcat, Pile Rig Rubber-tired

Excavator (37,000 lbs. and under), 2 man auger

GROUP 3: Minor Equipment such as Tractors, Post Hole Diggers and Drivers, Ditch Witch (Walk Behind), Road Finishing

Machines, Rollers (five (5) tons and under), Tugger Hoists, Dual Purpose Trucks, Fork Lifts and Dempsey Dumpsters

GROUP 4: Oilers for the following equipment: (all gasoline, electric, diesel, or air operated) gradalls and concrete pumps or similarly equipment manned by two-men

GROUP 5: Oilers for the following equipment: (all gasoline, electric, diesel, or air operated) shovels, cranes

(draglines), backhoes, pavers, trenching machines, gunite machines, compressors (3 or more in battery)

Premiums for Cranes:

100'-149' boom - add 1.75

150'-249' boom - add 2.00

250'-349' boom - add 2.25

350'-450' boom - add 2.75

Tower cranes add 2.00

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas

ENGI0015-002 07/01/2016

BUILDING

GROUP 1....................$ 65.94 32.95

GROUP 2....................$ 63.98 32.95

GROUP 3....................$ 57.42 32.95

GROUP 1: Oiler

GROUP 2: Oilers on Crawler Cranes, Backhoes, Trenching machines, Gunite machines, Compressors (3 or more in

Battery)

GROUP 3: Gradalls: Concrete Pumps, Power Houses - All equipment in same is manned by two (2) men only, Driving

Truck Cranes

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas

IRON0040-002 07/01/2017

BRONX, NEW YORK, RICHMOND

IRONWORKER, STRUCTURAL...........$ 50.05 72.53

IRON0046-003 07/01/2017

IRONWORKER

METALLIC LATHERS AND

REINFORCING IRONWORKERS.....$ 56.28 20.62

IRON0197-001 07/01/2017

IRONWORKER

STONE DERRICKMAN............$ 48.17 38.95

IRON0361-002 07/01/2017

KINGS, QUEENS

Ironworkers:

(STRUCTURAL)................$ 50.05 72.53

IRON0580-001 01/01/2017

IRONWORKER, ORNAMENTAL...........$ 44.00 50.57

LABO0006-001 07/01/2016

LABORER (Cement and Concrete

Workers).........................$ 42.48 17.35

LABO0029-001 07/01/2017

Laborers:

Heavy

Blasters (hydraulic trac drill).....................$ 47.15 35.49

Blasters...................$ 46.27 35.49

Hydraulic Trac Drill.......$ 41.29 35.49

Jackhammers, Chippers, Spaders, Concrete

Breakers, All Other

Pneumatic Tools, Walk

Behind Self-Propelled

Hydraulic Asphalt and

Concrete Breaker...........$ 39.34 35.49

Powder Carriers............$ 35.17 35.49

LABO0078-001 12/01/2016

LABORERS BUILDING CONSTRUCTION

ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &

HAZARDOUS WASTE LABORERS

(Hazardous Waste, Hazardous Materials, Biochemical and Mold

Remediation, HVAC, Duct

Cleaning, Re-spray

Brooklyn, New York

Fireproofing, etc).........$ 36.00 16.20

LABO0079-001 07/01/2017

Laborers Building Construction

Common or General Laborer...$ 40.15 28.34

Demolition Laborers

Tier A.....................$ 38.48 26.17

Tier B.....................$ 27.06 19.38

Mason Tenders...............$ 39.80 27.30

CLASSIFICATIONS

TIER A: Responsible for the removal of all interior petitions and structural petitions that can consist of sheet rock, block or masonry. Also, all structural slab openings for ducts, mechanical, shafts, elevators, slab openings and exterior walls where the building is not being completely demolitioned.

TIER B: Responsible for shoveling of debris into containers, pushing containers from the inside to the outside of the building.

LABO0147-001 07/01/2016

LABORERS (FREE AIR & TUNNEL).....$ 72.67 47.72

Maintenance Men, Inside Muck Lock Tenders, Pump Men, Electricians, Cement Finishers, Caulkers, Hydraulic Men, Shield Men, Monorail Operators, Motor Men, Conveyor Men, Powder Carriers, Pan Men, Riggers, Chuck Tenders, Track Men

Painters, Nippers, Brakemen, Cable Men, Hose Men, Grout

Men, Gravel Men, Form Workers, Concrete Workers, Tunnel

Laborers, Mole Nipper (one (1) Mole Sipper per Working

Shaft per Shift for up to and including Two (2) Moles

LABO0731-001 07/01/2016

LABORER

Building, Heavy and

Residential Construction

LABORER: (Asbestos, Lead, Brooklyn, New York

Hazardous Waste Removal

(including soil)/CEMENT/CONCRETE......$ 41.00 38.53

UTILITY LABORER............$ 40.85 38.53

Paid Holidays: Labor Day and Thanksgiving Day

* LABO1010-001 07/01/2018

Laborers:

HIGHWAY CONSTRUCTION

Fence Installer & Repairer.$ 42.48 42.21

FORMSETTERS................$ 46.35 42.21

LABORERS...................$ 42.48 42.21

Landscape Planting &

Maintenance................$ 42.48 42.21

Maintenance Safety Surface.$ 42.48 42.21

Slurry/Sealcoater/Play

Equipment Installer........$ 42.48 42.21

Small Equipment Operator

(Not Operating Engineer)...$ 42.48 42.21

Small Power Tools Operator.$ 42.48 42.21

FOOTNOTES:

a. PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day, Columbus Day, Election Day and Thanksgiving Day, provided the employee has worked one (1) day in the calendar week in which the said holiday occurs.

* LABO1010-002 07/01/2018

Laborers-Asphalt Construction:

Micro Paver.................$ 46.95 42.21

Raker.......................$ 46.35 42.21

Screedperson................$ 46.95 42.21

Shoveler (Production

Paving Only)................$ 42.48 42.21

Small Equipment Operator

(Asphalt)...................$ 42.48 42.21

PAIN0009-001 05/01/2018

GLAZIER..........................$ 29.05 18.88

Brooklyn, New York

PAINTER

Painters, Drywall

Finishers, Lead Abatement

Worker......................$ 45.70 27.67

Spray, Scaffold and

Sandblasting................$ 48.70 27.67

PAIN0806-001 10/01/2017

Painters:

Structural Steel and Bridge.$ 49.50 38.93

PAIN1974-001 06/28/2018

Painters:

Drywall Tapers/Pointers.....$ 47.82 25.21

PLAS0262-001 08/01/2017

PLASTERER........................$ 45.58 25.87

PLAS0262-002 08/01/2017

KINGS AND QUEENS COUNTIES

PLASTERER........................$ 45.58 25.87

PLAS0780-001 07/01/2017

CEMENT MASON/CONCRETE FINISHER...$ 50.97 39.56

PLUM0001-001 07/01/2016

PLUMBER

MECHANICAL EQUIPMENT AND

SERVICE

Any repair and/or replacement of the present plumbing system

Brooklyn, New York that does not change the existing roughing..........$ 39.92 14.41

PLUMBERS:...................$ 67.25 29.30

PLUM0638-001 12/28/2016

PLUMBER

SERVICE FITTERS.............$ 26.30 2.55

SPRINKLER FITTERS,

STEAMFITTERS................$ 61.81 48.30

Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.

ROOF0008-003 07/01/2017

ROOFER...........................$ 41.50 32.37

SHEE0028-002 07/31/2014

SHEET METAL WORKER

BUILDING CONSTRUCTION.......$ 50.91 36.70

RESIDENTIAL CONSTRUCTION....$ 27.22 16.48

TEAM0282-001 07/01/2017

TRUCK DRIVER

Asphalt.....................$ 42.68 46.9025+a

Euclids & Turnapulls........$ 42.78 46.9025+a

High Rise...................$ 50.36 46.0925+a

FOOTNOTES:

PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day, Day after

Thanksgiving and Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), Brooklyn, New York a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in

Brooklyn, New York the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION