Government_Response_to_RFI_2_for_Blowdown_Tank_Replacement.pdf

PDF 751 KB Posted

Attached to
B72 Replace Blowdown and Flash Tanks Federal contract opportunity
Solicitation number
N4008518B9548
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

Government_Response_to_RFI_2_for_Blowdown_Tank_Replacement.pdf

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Government Response to RFI #2

1. Scope item 1.2 – Demo of existing chemical feed equipment:

The new chemical feed system is tied into the abandoned system. Please clarify intent of demo.

i. If demo only includes to existing isolation valves, once pumps are removed, there will be piping left in place that connected to the existing pumps a few feet above the grating and could potentially create a break in the system if struck.

ii. Should we only demo to isolation valves, leave existing piping in place and add supports to piping.

iii. Should we re‐work piping in a manner to remove branches to pumps to be demoed and consolidate either overhead or along floor to neaten up the installation?

Government Response to question 1:

The new chemical feed system is tied into the abandoned system, allowing the operators to slowly fill / add chemically treated feed water to idle boilers during lay‐up. The operators wish to preserve this capability, but current layout which passes feed water through the old treatment lines will be abandoned and demolished and the new lines shall be routed in the overhead (to the west of the area being demolished). The contractors shall demo the old chemical feed area, removing all associated tanks, equipment, piping, conduit, and wiring as per the SOW, but shall reconfigure the idle boiler chemical lay‐up feeds as shown in Attachment (1).

The new runs of piping shall be run in the overhead, on the western edge boundary of the old chemical feed area and shall be supported in accordance with MSS SP‐58. New piping and fittings shall be socket welded 1” schedule 40 304 stainless steel or better. All piping shall be seamless.

2. Scope item 1.13 & 1.14 – Excavation of existing sanitary drain:

For bidding purposes, can we assume the limits of excavation to accommodate the new sanitary line tie in will not extend into or beyond the equipment and equipment pads in the vicinity of the softeners.

Government Response to question 2:

For bidding purposes, the contractors shall assume the limits of excavation to accommodate the new sanitary sewer line tie‐in extend to the eastern wall adjacent to the water softeners. This line may pass beneath the water softeners.

3. Scope item 1.20 – Demo of flash tank:

Is it acceptable to demolish the three flash tank walls and roof remains that abut the main building, fill pit with gravel, and provide concrete pad as finished surface. It doesn’t appear the existing walls are attached to the main building other than with some caulking. Otherwise, a section of the gas relief piping will need to be removed and re‐installed to accommodate the removal of the flash tank.

Government Response to question 3:

It is acceptable for the contractor to demolish the three walls and roof of the flash tank enclosure, provided that the contractor:

a. Demolish existing roof in accordance with contract documents.

b. Seismically brace the vertical riser of the natural gas vent line (currently braced from the south wall of the flash tank enclosure) using the support detailed in Attachment (2) to this RFI response. Disconnect existing gas main vent pipe support located on west flask tank wall.

c. Demolish the three flash tank brick walls and associated man doors. The contractor shall also demo all of the conduit, conductors, and electrical fixtures in the space, pulling back and terminating the conductors to the nearest junction box or panel in the Plant. The demolition plan must be submitted for government review prior to doing this work. The plan shall detail how existing gas vent pipe that runs up west wall and over the roof of the flash tank room will be protected during demolition.

d. Remove flash tank concrete foundation walls to 1’ below grade of surrounding asphalt.

Core/hammer a minimum of two holes (3” diameter) in the floor of the flash tank pit floor.

e. Fill pit with MEDOT Type D gravel in 12” lifts compacted to 95% to an elevation of 12” below existing asphalt grade.

f. Repave area to match pavement grades in accordance with CIA paving detail, included as

Attachment (3).

g. Extend the chain link fencing to the wall of the Power Plant, closing the new gap left in the fence by the removal of the south wall of the enclosure. The new fencing shall match the existing height and materials of the existing fence.

Existing Gate Valve

Existing Gate Valve

Existing Gate Valve

Existing Gate Valve

Existing Check Valve

Existing Ball Valve

Existing Needle Valve

Existing Needle Valve

HRSG #1

Feedwater

Existing Needle Valve

HRSG #2

Feedwater

Existing Needle Valve

Boiler #3 Feedwater

Existing Needle Valve

Boiler #4 Feedwater

Existing Needle Valve

HRSG #2

Existing Needle Valve

Boiler #3

Existing Needle Valve

Boiler #4

Existing Y Strainer

Existing Y Strainer

Existing Ball Valve

Existing Ball Valve

Existing Needle Valve

Existing Needle Valve

Boiler #4

Existing Needle Valve

Boiler #3

Existing Needle Valve

HRSG #2

Existing Needle Valve

HRSG #1

Existing Needle Valve

Existing Needle Valve

HRSG #1

Fe e d w at e r

Existing Gate Valve

Feedwater

SO

O xy ge n

Sc av en ge r

HRSG #1

HRSG #2

Continuous Flow Feed Water to Drain

Boiler #3

Boiler #4

O

H p

H St ab ili ze r

Ex is ti n g

P ip e

Existing 3/8" Stainless Tubing

N e w

St ai n le ss

S ch e d u le

P ip e in O ve rh ea d

New 1" Stainless Schedule 80 Pipe in Overhead

New 1" Stainless Schedule 80 Pipe in Overhead

New 1" Stainless Schedule 80 Pipe in Overhead

Ex is ti n g

/8

St ai n le ss T u b in g

Ex is ti n g

/8

St ai n le ss T u b in g

Ex is ti n g

/8

St ai n le ss T u b in g

Ex is ti n g

/8

St ai n le ss T u b in g

Existing 3/8" Stainless Tubing

Existing 3/8" Stainless Tubing

Existing 3/8" Stainless Tubing

Existing 3/8" Stainless Tubing

Existing 3/8" Stainless Tubing

Existing 3/8" Stainless Tubing

Existing 3/8" Stainless Tubing

Existing 3/8" Stainless Tubing

Existing Stainless Pipe in Overhead

Tie new piping into the existing ¾” stainless steel piping.

Existing Stainless Pipe in Overhead, Tie in south of Tee Leading to Abandoned Pumps

Existing 3/8" Stainless Tubing

Existing Boiler Layup Manifold

Existing Boiler Layup Manifold

Existing Boiler Layup Manifold

Existing Boiler Layup Manifold

Existin g B o iler

Layu p

M an ifo ld

Existing Boiler Layup Manifold

Ex is ti n g B o ile r La yu p

M an if o ld

Ex is ti n g B o ile r La yu p

M an if o ld

Existing Boiler Layup Manifold

Attachment (1) - New Configuration of Idle Boiler Lay-up Piping and Valves in Old Chemical Treatment AreaRFI #2 Response Page 1 of 1

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

A101 FAC-YR-NUM

PWD-MAINE

IN HOUSE DESIGNN

O T

FO

R

C O

N S

TR

U

C

TI

O N

P R

E L

IM

IN

A

R Y

1ELEVATION LOOKING NORTH2ELEVATION LOOKING WEST

BASEPLATE DETAIL

RFI #2 Response Attachment (2) Page 1 of 1

AutoCAD SHX Text

B72 WALL

AutoCAD SHX Text

KWIK BOLT 3 HDG 3/8" THICK MIN EMBEDMENT 3-1/2" (TYP ALL)

AutoCAD SHX Text

NEW 3-1/2"X 3-1/2"X 1/4"

AutoCAD SHX Text

TUBE STEEL (TYP 3)

AutoCAD SHX Text

8"X 8"X 1/2" BASE PLATE

AutoCAD SHX Text

8"X 8"X 1/2" BASE PLATE

AutoCAD SHX Text

U-BOLT LOOSE

AutoCAD SHX Text

EXISTING NATURAL GAS LINE RELIEF

AutoCAD SHX Text 3/16"

AutoCAD SHX Text 3/16"

AutoCAD SHX Text 3/16"

AutoCAD SHX Text

TYP

AutoCAD SHX Text

EXISTING NATURAL GAS SAFETY VENT

AutoCAD SHX Text

B72 BEHIND

AutoCAD SHX Text

NEW 3-1/2"X 3-1/2"X 1/4" TUBE STEEL (TYP ALL)

AutoCAD SHX Text

HSS 3-1/2"X 3-1/2"X 1/4" 'KICKER' BACK TO WALL

AutoCAD SHX Text

HSS 3-1/2"X 3-1/2"X 1/4" 'KICKER' BACK TO WALL

AutoCAD SHX Text

8"X 8"X 1/2" BASE PLATE (TYP 3)

AutoCAD SHX Text

SHIMS AS REQUIRED

AutoCAD SHX Text

ALL STEEL SHALL BE HOT DIPPED GALVANIZED

AutoCAD SHX Text

KWIK BOLT 3 HDG 3/8" MIN EMBED 3-1/2"

AutoCAD SHX Text

1/2" THICK BASEPLATE

AutoCAD SHX Text

HSS 3-1/2"X 3-1/2"X 1/4"

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

DRAWFORM REVISION: 10 OCTOBER 2014

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

PUBLIC WORKS DEPARTMENT - MAINE

AutoCAD SHX Text

NAVAL SHIPYARD - PORTSMOUTH, NH

AutoCAD SHX Text

DESIGN MANAGER

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

FEAD/PM&E

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

PIPING FOUNDATION ELEVATIONS & DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EPROJECTS

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

AutoCAD SHX Text

XX%%% SUBMISSION

AutoCAD SHX Text

MM/DD/YYYY

AutoCAD SHX Text

DM

AutoCAD SHX Text

PORTSMOUTH NAVAL SHIPYARD

AutoCAD SHX Text

KITTERY, MAINE

AutoCAD SHX Text

BUILDING 72 PIPING FOUNDATION ASSEMBLY

AutoCAD SHX Text

AutoCAD SHX Text

LOUIS DITOMASSO

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

XXX

AutoCAD SHX Text

AMIN BAHROUR

AutoCAD SHX Text

XXX

AutoCAD SHX Text

XXX

AutoCAD SHX Text

XXX

AutoCAD SHX Text

XXX

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text A-101

AutoCAD SHX Text

SCALE: N.T.S.

AutoCAD SHX Text A-101

AutoCAD SHX Text

SCALE: N.T.S.

AutoCAD SHX Text A

AutoCAD SHX Text A-101

AutoCAD SHX Text

SCALE: N.T.S.

AutoCAD SHX Text A1

AutoCAD SHX Text A-101

AutoCAD SHX Text A

AutoCAD SHX Text A-101

RFI #2 Response Attachment (3) - CIA Paving Detail Page 1 of 1

Attachment (2) - RFI #2 Response - Seismic Support for Gas Vent Riser at B72.pdf
Sheets and Views
piping foundation-A101

File details come from the government source that posted it.