This solicitation package seeks proposals for an Indefinite Delivery Indefinite Quantity Multiple Award Construction contract for small-scale design-bid-build construction projects at the U.S. Marine Corps Air Station in Iwakuni, Japan. Offerors must submit proposals by March 15, 2024 responding to requirements for construction experience, past performance, safety records, and price. The government will award multiple ID/IQ contracts for firm-fixed-price task orders ranging from $3,000 to $25,000,000 Japanese yen equivalent. An amendment provides responses to offeror questions, extends the proposal deadline, and modifies evaluation criteria and order limitations. The Department of the Navy, Naval Facilities Engineering Command Far East will administer any resulting awards.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR SMALL MAGNITUDE SIZE DEISGN-BID-BUILD (DBB) PROJECTS FOR THE U.S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Mar-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008424R0074

X 9B. DATED (SEE ITEM 11)

24-Jan-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Mar-2024

CODE

NAVFAC FAR EAST

CORE EXECUTION TEAM

PSC 473 BOX 13

FPO AP 96349-0013

N40084 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008424R0074

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

AMENDMENT 0003 is to accomplish the following.

1. Provided Government response to Offeror’s inquiries question No. 1 through No. 23.

2. Extended the proposal due from 02:30 PM, 11 March 2024 to 02:30 PM, 15 March 2024, Japanese Standard Time.

3. Revised under Section 00 21 16 - Instructions to Proposers, replace paragraph L. PROPOSAL SUBMISSION – INSTRUCTIONS as shown below.

4. Revised under Section 00 21 16 - Instructions to Proposers, replace paragraph O. EVALUATION FACTORS FOR AWARD for O. 3. (b) Non-cost/price Factors: Factor 1, Corporate Experience (1) Solicitation Submittal Requirements and (2) Basis of Evaluation as shown below.

5. Revised 52.216-19 ORDER LIMITATIONS (b)(1) Maximum order as shown below.

6. Added 252.225-7966 PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS OPERATIONS – REPRESENTATION and 252.225-7967 PROHIBITION REGARDING RUSSIAN

FOSSIL FUEL BUSINESS OPERATIONS.

7. All other terms and conditions remain unchanged.

No. REFERENCE QUESTION GOVERNMENT

RESPONSE Page Section Para

1. RFP

P.16

N/A O.3.(a).(1).iv.a This paragraph states that the 'Offeror Letter' should include, at a minimum, the System for Award Management (SAM) Unique Entity ID and the Commercial and Government Entity (CAGE) Code.

Is the first 'Commercial and Government Entity ID' a duplicate, or does it differ from the CAGE Code?

Unique Entity ID, and Commercial and Government Entity ID are different.

Commercial and Government Entity ID means CAGE.

Unique Entity ID is related to System for Award Management

(SAM).

Therefore, it is not duplicate.

2. RFP

P.18

N/A O.(b).(1) This paragraph states that, for the purposes of this evaluation, a relevant construction project is further defined as meeting all three criteria: a construction project with a total contract value (size) of at

Use the FY24 Budget Exchange Rate of

139.1635 JPY /

$1.00. Refer to Amendment 0003 for revision to Factor 1, least $1,000,000 U.S. Dollars or the Japanese equivalent. Is this 'Japanese equivalent' based on the FY24 Budget Rate (BER) of

139.1635 JPY / $1.00, as specified

on page 4 of the RFP?

As the Budget Exchange Rate (BER) changes each year, for projects performed in the past, can the contractor use the BER at the time of the completion, or should the contractor use the FY24 BER, or any other applicable rate?

Corporate Experience.

3. RFP

P.48

N/A 52.216-19 (b).(1) FAR 52.216-19 ORDER

LIMITATIONS (OCT 1995),

described in this RFP, states that '(b) Maximum order. The contractor is not obligated to honor

- (1) Any order for a single item in excess of $3,000 or the Japanese Yen equivalent.' However, this statement does not match the stated order range of between $3,000 and $25,000,000 described on Page 7 of the RFP. What is the correct value for the maximum order limitation? Additionally, if the maximum order limitation changes, does the requirement for contract value for Corporate Experience also change?

The maximum order limitation is $25,000,000 or Japanese Yen equivalent. The contractor is not obligated to honor any order for a single item in excess of $25,000,000 or the Japanese Yen equivalent. Refer to Amendment 0003 for revision to FAR clause 52.216-19 paragraph (b)(1).

The contract value in the definition of a relevant construction project in Factor 1 Corporate Experience remains unchanged;

however, refer to Amendment 0003 for clarification.

4. Solicitation and Supporting Documents

Solicitation documents states requirement is a “MACC for small magnitude size DBB projects”, and Attachment 2 includes specifications for “Iwakuni Mini- MACC”, yet Section 00 10 00 (B)(4) states Task Orders will have a range of up to $25,000,000 of yen equivalent (about 3,400,000,000 JPY). Confirm this requirement is a “Mini-MACC” solicitation and listed Task Order range is correct?

Section 00 10 00 B.

DESCRIPTION OF

ACQUISITION

paragraph 4 states that "The anticipated task orders will be firm-fixed-price (FFP) ranging from $3,000 to $25, 000,000 or Japanese Yen equivalent". The Attachment 2 for seed project is in the range of that task order specified.

5. FAR 52.216-19 Solicitation “Order Limitations” states “The contractor is not obligated to honor – Any order for a single item in excess of $3,000 or Japan Yen equivalent”. Is this statement correct?

No. Refer to Inquiry No.3 and Amendment 0003.

6. P74 of

Solicitation Solicitation Page 74 of 77, Section B, states if a MACC Contractor does not intend to submit a proposal in response to Task Order RFP, the MACC Contractor shall notify the Contracting Office in writing, within two (2) days of receiving the Task Order RFP.

Contractors require receipt of RFPs, review of RFPs, attendance at Site Visit, submission of PPIs and government responses to PPIs, followed by discussions with supporting resources and suppliers before a contractor can determine their intent to provide a proposal or not. Confirm notification to the government of intent to not provide a proposal can be submitted at anytime during the solicitation period prior to bid?

As Solicitation Page 74 of 77, Section B states, the MACC Contractor shall notify the Contracting Office in writing, within two

(2) days of receiving the Task Order RFP if MACC Contractor does not intend to submit a proposal in response to Task Order RFP.

Contractor notification to not provide a proposal can be submitted anytime during the solicitation period prior to bid.

7. Main Spec 01 11 00 Specification states “All "metal items" to be removed shall be vested in the Government Property and delivered to Bldg.7725 (Facilities Recycle Center) in accordance with the following regulations”. Confirm is this is “All Metal” for all Task Orders, or when identified by Task Order to be applicable?

MCAS Iwakuni has Marine Corps Air Station Order of "Qualified Recycling Program (QRP)."

This program must be applied to all scrap metals generated from the construction site. All Task Order must follow this program and each Task Order describes the detailed requirements as necessary.

8. Main Spec 01 14 00 Specification states regular working hours are 8-1/2 hour period between 8:00 am and 4:30 pm, Monday thru Friday. Regular working hours as stated are not practical nor consistent with known past MACC contract actual work hours performed. It is believed that Regular Work Hours should be defined as 0700-1800, Monday through Saturday, which is consistent with normal practice, No, specification remains unchanged.

and will also reduce contract documentation processes for both government and contractor by reducing requests and approvals for work outside regular work hours. Confirm regular work hours can be amended to more practical hours?

9. Main Spec 01 35 26 Specification states “The SSHO must have completed the NAVFAC Far East 24-hour EM 385-1-1 Awareness Course for Contractors within 6 months of award of contract”; however, government has not scheduled classes frequently or consistently enough to accommodate this requirement. Will government be providing and or increasing the training cycles for this requirement?

Contractors should contact NAVFAC Far East for course schedules. However, FEAD Iwakuni Contract Manager (CM) will request for

NAVFAC FE

designated office to provide a training as frequently as possible.

10. Main Spec 01 45 00.00 20 Specification states “the QC Manager must have completed the course entitled “Construction Quality Management (CQM) for Contractors,’ training which is “periodically provided by the government”; however, government has not scheduled classes frequently or consistently enough to accommodate this requirement. Will government be providing and or increasing the training cycles for this requirement?

Contractors should contact FEAD Iwakuni for course schedules.

This CQM course training will be conducted by FEAD Iwakuni locally, per FEAD CM. It will be scheduled flexibly depended on the number of contractor’s participation.

11. Specs & Dwgs

Government Specifications and Drawings have been signed and approved by multiple government Designer of Record Engineers for Quality Control, including a Professional Engineer (PE), as well as Government Engineers for Quality Assurance. Confirm there are no conflicts between government provided design drawings and government provided design specifications?

All Task Orders are subject to the terms and conditions of the base MACC contract. In the event of conflict between a Task Order and this contract, the Task Order will take precedence, except as otherwise noted in the contract documents.

Per DFARS Clause 252.236-7001, the Contractor shall (1) Check all drawings furnished immediately upon receipt; (2) Compare all drawings and verify the figures before laying out the work; (3) Promptly notify the Contracting Officer of any discrepancies; (4) Be responsible for any errors that might have been avoided by complying with this paragraph; and (5) Reproduce and print contract drawings and specifications as needed.

Furthermore, omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work.

The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

12. Specs & Dwgs

Confirmed government Designer of Record is liable for design errors and omissions in accordance with FAR Part 36?

Same response as No.

11.

13. General Verify if ACM / LBP / Cadmium / Chromium / PCB / etc., Testing or Abatement is or is not included in the Scope of Work for this Seed

ACM / LBP /

Cadmium / Chromium / PCB testing or abatement

Project: Replace Underground Steam Double Pipe between SP1- 1-3 and B#6010 is not required in this project.

14. General What is the percentage of companies that participate in the bidding process after the Task Order is issued for reference?

This information is not available. Each MACC awardee is required to submit a reasonable number of good faith proposals for proposed Task Orders. Failure to provide notification and explanation for not submitting a proposal may impact future consideration for task orders or exercise of an option.

15. General Could you please provide disclosure of past orders for reference.

Those past/historical orders were related projects written in 1st paragraph of 1.2.1 General Requirements (page

3) under Basic Spec.

16. General Please confirm whether unit price changes due to goods and material price increases are possible or not, and whether it is included in the contract.

Not possible.

17. 1 01 00 00 1.3.1 b Although the SPEC states that "steam supply interruption will be limited to maximum ten days", It will not be possible to complete the reconnection (cut the steam pipe and connect the new pipe) and flushing of the two steam pipes within 10 days.

Steam blowing is used to flush the pipes, but it usually takes about 7 days. Is it OK not to perform flushing?

No, specification remains unchanged.

18. 00 10 00 Factor 3 (2)Basis of Evaluation Is it possible to submit copy of our CPARS evaluation instead of

EXHIBIT-C?

Please see Amend 0002 for the revision of Factor 3 - Past Performance under

SECTION 00 21.

19. 11 L proposal submission-instructions

On page 12 subimission is allowed by using solicitation module in PIEE but on page 13 only Hand-delivered and mailed prposal are allowed. Please clarify what way is correct.

Proposals may be submitted electronically through the Solicitation Module in PIEE or hand-delivered.

20. 15 N 6 Is exchange rate of price proposal and past perofomance price range

139.1635 JPY/$1.00?

Yes

21. 26 52.204-8 As per Representations and Certifications, is it required to submitt from 52.204-8 to 252.204- 7017 all the way through page 26 to 39?

As specified Section 00 21 16 - Instructions to Proposers paragraph

M PROPOSAL

SUBMISSION -

FORMAT (2) Price Proposal Tab 4E- Representations and Certifications, it is needed.

22. FAR

Clauses

Per Federal Acquisition Regulations (FAR) 16.203-2, the Economic Price Adjustment FAR 52.216-4 can be added to Firm Fixed Price contracts, particularly when market costs are very volatile and fluid. Given the current economic state of market costs for both materials and labor, will the government be including FAR 52.216-4 to this solicitation to become part of the awarded contract?

No.

23. Seed Project Spec. , p.1-2

01 00 00 1.3.1, b It says, "To minimize the impact to air conditioning for bldg. No.

6010, steam supply interruption will be limited to maximum ten days and must include no air conditioning term"; however, Contractor consider it is too short for the piping work, including demolition through tie-in of the new piping to the existing line.

Will Government accept longer work period if proposed?

No, specification remains unchanged.

Section 00 21 16 - Instructions to Proposers

L. PROPOSAL SUBMISSION - INSTRUCTIONS

All proposals (with all required supporting documentation) shall be electronically submitted through the Department of Defense (DoD) Solicitation Module in the Procurement Integrated Enterprise Environment (PIEE) or hand copy (hand-delivered or mailed on a CD-ROM) so that they are received by the date and time specified in Block 8 of the Standard Form (SF) 1442. If electronic submission to the Solicitation Module in PIEE is not possible due to technical issues with the website (i.e. solicitation could not be located), proposals may be submitted through DoD SAFE. Email proposals will not be accepted.

Proposals shall be submitted in English in the format described in M. PROPOSAL SUBMISSION - FORMAT.

Proposal Submission using DoD SAFE

This method may only be permitted if electronic submission to PIEE is not possible due to technical issues.

1. Submit an email request to the Contract Specialist requesting a link to upload proposal through DoD SAFE. Provide the email address or addresses of where the link should be sent to.

2. Follow the instructions on the DoD SAFE system-generated email to upload your electronic proposal.

It is the Offerors responsibility to ensure that the Government receives proposals by the deadline stated in the solicitation. As a result, it is highly recommended that Offerors submit the email request at least two (2) business days prior to the proposal deadline to ensure that the Government receives the email request, that the DoD SAFE system-generated email is sent to the Offeror, that the Offeror has sufficient time to upload files to DoD SAFE, and to allow the Government to confirm receipt.

Proposal Submission using Solicitation Module in PIEE

In order to submit a proposal through the Solicitation Module in PIEE, you must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.

To upload the proposal in Solicitation module in PIEE:

1. Ensure you have an active role as with the Proposal Manager in PIEE.

2. Log into PIEE at https://piee.eb.mil/ to access the Solicitation Module or go directly to the Solicitation Module at the following link: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml.

3. Select Solicitation icon.

4. At the Home screen of the Solicitation Module, select the Search link to find the solicitation you intend to post an offer against.

5. In the Solicitation Search Criteria filter by entering the complete solicitation number and for Status, select Open, then click Search.

6. When search results display, select the solicitation number link to open the solicitation.

7. The solicitation displays, with information as view only.

8. To post the offer, click the Offer tab.

9. Click the Add button to add an offer to the solicitation.

10. Select the applicable CAGE Code for which you are submitting the offer. The list is pre-filtered based on the CAGEs in the Proposal Manager’s profile.

11. Click on the Choose Files link to upload attachments that comprise your offer.

12. Enter Signature Date and click Signature button after entering all necessary information.

13. Sign Document pop-up will be displayed requiring the user to enter a Digital Pin and OTP. Click the Sign and Submit button to continue.

14. After successfully adding the Offer a success message of the submission will be displayed providing confirmation of on-time/late proposal receipt.

Additional information is available at:

https://pacific.navfac.navy.mil/Facilities-Engineering-Commands/NAVFAC-Far-East/About-Us/Contractors- Information/

Offerors are responsible for submitting files in the format specified consistent with requirements stated elsewhere in this solicitation. Offerors should mark all electronic files with the solicitation number and should keep the file name as short as possible (i.e., under 40 characters) so that the files are accessible on Government share drives. Files with longer names may become corrupt or inaccessible. Files that cannot be opened, or are otherwise missing the required content are the responsibility of Offerors.

It is an Offeror’s responsibility, when transmitting its proposal electronically, to ensure the proposal’s timely delivery by transmitting the proposal sufficiently in advance of the time set for receipt of proposals to allow for timely receipt by the Government no later than the date and time stated in the solicitation. Offerors shall allow adequate time to upload files, which may be slower for non-DoD users, and to avoid other technical difficulties that may be encountered. An Offeror risks the late receipt and rejection of a proposal where it delays transmitting its proposal until the last few minutes before the time set for receipt of proposals. It is the responsibility of the Offeror to confirm receipt of proposals. Proposals that are received after the stated date and time in the solicitation shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR).

Offerors shall ensure that proposals (with all required supporting documentation) are received electronically no later than the date and time stated in Block 13A of the Standard Form (SF) 1442 “Solicitation, Offer, and Award (Construction, Alteration, or Repair)”, unless revised by a formal amendment. Proposals not received by the date and time specified shall be treated in accordance with FAR 52.215-1 “Instruction to Offerors – Competitive Acquisitions” and may be rejected. Ultimately, it is the Offeror’s responsibility to ensure timely proposal submission. An Offeror risks the late receipt and rejection of a proposal where it delays submitting its proposal until the last few minutes before the time set for receipt of proposals.

Proposal Submission Hand-Delivered or Mailed

Hand-delivered or mailed proposals shall arrive, and be accepted, at Naval Base Yokosuka, Building 1828, prior to the time set for proposal closing date stated in this Request for Proposal (RFP). Use of Japan Postal Service is not recommended. Any proposal delivered by email, DoD Safe, or fax will be non-responsive and not considered for award.

Any offerors who do not have gate access for Naval Base Yokosuka may send their proposal via mail, base authorized courier, or base authorized contractor representative, to be delivered prior to the proposal due date.

Proposals shall be sent to the following address:

NAVAL FACILITIES ENGINEERING COMMAND FAR EAST

ATTN: MS. EMIKO UYAMA, CONTRACTING DEPARTMENT

BUILDING 1828, 1ST FLOOR, ROOM 101

TOMARIO-CHO, YOKOSUKA-SHI, KANAGAWA-KEN 238-0001, JAPAN

O. EVALUATION FACTORS FOR AWARD

3. Basis of Evaluation and Submittal Requirements for Each Factor.

(b) Non-cost/price Factors:

Factor 1, Corporate Experience:

(1) Solicitation Submittal Requirements:

The Offeror shall submit the following information to demonstrate construction experience using Exhibit A – Construction Experience Project Data Sheet:

Submit a maximum of five (5) recent and relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the Request for Proposal

(RFP).

For purposes of this evaluation, a recent construction project is defined as a construction project completed within the past seven (7) years of the date of issuance of this RFP.

For purposes of this evaluation, a relevant construction project is further defined as meeting all of the three areas:

o A construction project with a total contract value (size) of at least $1,000,000 U.S. Dollars or 139,163,500

JPY using FY24 Budget Exchange Rate of 139.1635 JPY/ $1.00; and o A construction project involving new construction of infrastructure or renovation, alteration, or repair of existing infrastructure (scope); and o A construction project with at least one of the following characteristics (complexity):

� Construction or renovation, alteration, or repair of multi-unit residential living facility, such as Bachelor Quarters, dormitory, condominium or apartment building;

� Installation, improvement and/or replacement of critical power realignment, shore to ship power systems, electrical distribution loop systems, emergency generators, and other electrical distribution systems;

� Structural work on airfields, roadways, and supporting facilities;

� Structural waterfront work on piers, wharves, caissons, dry docks and other shoreline structures;

� Installation and/or repair of fire suppression systems;

� Installation and/or repair of Packaged Terminal Air Conditioner (PTAC) systems, Heating

Ventilation and Air Conditioning (HVAC) systems or Dehumidification systems;

� Installation and/or repair of plumbing or mechanical or electrical systems;

� Roof construction, replacement, recoating and/or repair; or � Removal and disposal of asbestos containing material.

A project is defined as a construction project performed under a single task order or contract. For indefinite delivery type contracts, the contract as a whole shall not be submitted as a project; rather Offeror(s) shall submit the work performed under a task order as a project.

The Offeror(s) shall submit all project information using Exhibit A – Construction Project Data Sheet for each construction project. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods).

If the Offeror(s) is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. If a project was performed by a JV, and not all partners from that JV are on the JV proposed for this contract, the Offeror(s) shall clearly demonstrate what portion of the work was performed by the JV member offering on this contract and shall not include work performed by the JV as a whole. The JV member proposed for this contract shall specifically address field work performed by that JV member including field staffing and direct field work oversight. The JV member proposed for this contract shall also address home office management performed by that JV member including the number/percentage of employees provided for the overall contract by the JV members as well as the overall percentage of work performed by the JV member. The Offeror(s) shall also submit a SIGNED copy of the Joint Venture agreement indicating the proposed participation of each Joint Venture member. Offeror(s) are still limited to a total of five (5) projects combined.

If an Offeror(s) is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract. The proposal shall state specific commitments of technical resources (e.g. personnel, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the Offeror in performance of the contract. The Offeror MAY NOT utilize experience of a subcontractor to demonstrate construction experience under this evaluation factor unless specialized subcontractor experience is stated as acceptable. Failure to submit this information may result in lower rating.

(2) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing recent and relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s recent and relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects for construction. Any projects submitted in excess of the five (5) for Construction Experience will not be considered.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 11-Mar-2024 02:30 PM to 15-Mar-2024 02:30 PM.

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS

The following have been added by reference:

252.225-7966 (Dev) Prohibition Regarding Russian Fossil Fuel Business

Operations - Representation (Deviation 2024-O0006).

FEB 2024

252.225-7967 (Dev) Prohibition Regarding Russian Fossil Fuel Business Operations (Deviation 2024-O0006).

FEB 2024

The following have been modified:

52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $3,000 or Japanese Yen equivalent, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor -

(1) Any order for a single item in excess of $25,000,000 or Japanese Yen equivalent;

(2) Any order for a combination of items in excess of $50,000,000 or Japanese Yen equivalent; or

(3) A series of orders from the same ordering office within 30 calendar days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within two (2) business days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause) (End of Summary of Changes)