Attach 2 24Q0801C Schedule of Price ELINs_.xlsx
XLSX spreadsheet 46 KB Posted
- Solicitation number
- N4008424Q0801
About this file
This document is a Schedule of Prices and Exhibits for a federal contract opportunity issued by the Department of the Navy, Naval Facilities Engineering Command. The requirement is for an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract to provide a Preventive Maintenance Program and Service Orders for Septic Tank Systems at the Yokohama City Area in the U.S. Commander Fleet Activities Yokosuka (CFAY), Japan. The contract includes one base period and four one-year option periods, with both recurring and non-recurring contract line items. The recurring items cover preventive maintenance and inspections, while the non-recurring items cover major repair work. Pricing is provided for each contract period, with the base period non-recurring work priced at $1,600,000 and the option period non-recurring work priced at $600,000 per period. The contract also includes pricing for additional services such as fence repairs, removals, and temporary fencing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site visit map.pdf.pdf | ||
| Attach 3 24Q0801 Notice.pdf | ||
| 24Q0801A.pdf | ||
| Attach 1 SPEC_SKETCH.pdf | ||
| 24Q0801D Site visit RQ form.pdf | ||
| Attach 4 24Q0801E Inquiry Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KTR,SOP-Rw&Nrw
| SCHEDULE OF PRICE | ||||
| Date: | #DD/MM/YYYY | |||
| NAME OF OFFEROR OR CONTRACTOR: | ||||
| LINE ITEM | ITEM | Q'TY | UNIT | AMOUNT |
| NO. |
| Item 0001 | Recurring, Base Period | 1 | LS | ¥ |
| Provide Preventive Maintenance Program and Service Orders | ||||
| for Septic Tank Systems at Yokohama City Area in the CFAY | ||||
| From 1 December 2024 through 30 November 2025. |
| Item 0002 | Non-Recurring, Base Period | 1 | LS | ¥ 1,600,000 |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| From 1 December 2024 through 30 November 2025. |
| Item 0003 | Recurring, First Option Period | 1 | LS | ¥ |
| Provide Preventive Maintenance Program and Service Orders | ||||
| for Septic Tank Systems at Yokohama City Area in the CFAY | ||||
| From 1 December 2025 through 30 November 2026. |
| Item 0004 | Non-Recurring, First Option Period | 1 | LS | ¥ 600,000 |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| From 1 December 2025 through 30 November 2026. |
| Item 0005 | Recurring, Second Option Period | 1 | LS | ¥ |
| Provide Preventive Maintenance Program and Service Orders | ||||
| for Septic Tank Systems at Yokohama City Area in the CFAY | ||||
| From 1 December 2026 through 30 November 2027. |
| Item 0006 | Non-Recurring, Second Option Period | 1 | LS | ¥ 600,000 |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| From 1 December 2026 through 30 November 2027. |
| Item 0007 | Recurring, Third Option Period | 1 | LS | ¥ |
| Provide Preventive Maintenance Program and Service Orders | ||||
| for Septic Tank Systems at Yokohama City Area in the CFAY | ||||
| From 1 December 2027 through 30 November 2028. |
| Item 0008 | Non-Recurring, Third Option Period | 1 | LS | ¥ 600,000 |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| From 1 December 2027 through 30 November 2028. |
| Item 0009 | Recurring, Fourth Option Period | 1 | LS | ¥ |
| Provide Preventive Maintenance Program and Service Orders | ||||
| for Septic Tank Systems at Yokohama City Area in the CFAY | ||||
| From 1 December 2028 through 30 November 2029. |
| Item 0010 | Non-Recurring, Fourth Option Period | 1 | LS | ¥ 600,000 |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| From 1 December 2028 through 30 November 2029. |
TOTAL: (LINE ITEM 0001 through 0010) ¥ 4,000,000
CLIN 9000 Exhibit A (Base Period)
CLIN 9001 Exhibit B (First Option Period)
CLIN 9002 Exhibit C (Second Option Period)
CLIN 9003 Exhibit D (Third Option Period)
CLIN 9004 Exhibit E (Fourth Option Period)
| NOTE: | The number of Placeholders established depends on the maximum number of lines |
| of accounting anticipated on an individual task order. |
Detail line items for task order is located in Attachment J-0200000-14
| CLIN = CONTRACT LINE ITEM |
| LS = LUMP SUM |
| NTE = NOT-TO-EXCEED |
| Q'TY = QUANTITY |
&"Times New Roman,Regular"CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] &K00+000B-&P&K000000 Page &P of &N CUI // FEDCON [when filled in]
KTR-ELIN-ABCDE-Rw
| SOLICITATION/CONTRACT # |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Recurring Price - Base Period |
| Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs A001 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| Facility Investment Service of the Septic Tanks Systems, Spec Item 3 | ||||||
| A001 | CNIC | 1 | LO | ¥ | ¥ |
TOTAL RECURRING LINE ITEMS ¥
| MO = | Monthly |
| SA = | Semi-Annual |
| Q = | Quarterly |
| A = | Annual |
| LO = | Lot |
| SOLICITATION/CONTRACT # |
| EXHIBIT B - CLIN 9001 |
| Line Item 0003 Recurring Price - First Option Period |
| Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs B001 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| Facility Investment Service of the Septic Tanks Systems, Spec Item 3 | ||||||
| B001 | CNIC | 1 | LO | ¥ | ¥ |
TOTAL RECURRING LINE ITEMS ¥
| MO = | Monthly |
| SA = | Semi-Annual |
| Q = | Quarterly |
| A = | Annual |
| LO = | Lot |
| SOLICITATION/CONTRACT # |
| EXHIBIT C - CLIN 9002 |
| Line Item 0005 Recurring Price - Second Option Period |
| Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs C001 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| Facility Investment Service of the Septic Tanks Systems, Spec Item 3 | ||||||
| C001 | CNIC | 1 | LO | ¥ | ¥ |
TOTAL RECURRING LINE ITEMS ¥
| MO = | Monthly |
| SA = | Semi-Annual |
| Q = | Quarterly |
| A = | Annual |
| LO = | Lot |
| SOLICITATION/CONTRACT # |
| EXHIBIT D - CLIN 9003 |
| Line Item 0007 Recurring Price - Third Option Period |
| Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs D001 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| Facility Investment Service of the Septic Tanks Systems, Spec Item 3 | ||||||
| D001 | CNIC | 1 | LO | ¥ | ¥ |
TOTAL RECURRING LINE ITEMS ¥
| MO = | Monthly |
| SA = | Semi-Annual |
| Q = | Quarterly |
| A = | Annual |
| LO = | Lot |
| SOLICITATION/CONTRACT # |
| EXHIBIT E - CLIN 9004 |
| Line Item x0009 Recurring Price - xFourth Option Period |
| Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs E001 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| Facility Investment Service of the Septic Tanks Systems, Spec Item 3 | ||||||
| E001 | CNIC | 1 | LO | ¥ | ¥ |
TOTAL RECURRING LINE ITEMS ¥
| MO = | Monthly |
| SA = | Semi-Annual |
| Q = | Quarterly |
| A = | Annual |
| LO = | Lot |
&"Times New Roman,Regular"&K000000CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]&U
&UAttachment J-0200000-14 Exhibit Line Item Numbers (ELINS)
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] Page &P of &N
CUI // FEDCON [when filled in]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
KTR-ELIN-ABCDE-Nrw
| SOLICITATION/CONTRACT # |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Non-Recurring Price - Base Period |
| Provide Prices For Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Non-Recurring - In Accordance With Section C, Spec Item 4 |
| ELINs A700 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Repair services of Septic Tanks System | ||||||
| A700 | Major Repair Work (Negotiated) | Major Repair Work consists of direct labor cost, direct material cost, and indirect costs such as transportation, disposal, report and overhead profit used in Non-Recurring (IDIQ) work. Performance of specific maintenance, repair, and alteration work that exceeds the recurring work limitations of a service order or PM repair. Task order completion times will be specified in the task order. | 1 | LS | ¥ 1,600,000 | ¥ 1,600,000 |
| TOTAL NON-RECUURRING PRICE | ¥ 1,600,000 | ||
| HR = | Hour | ||
| LS = | Lump Sum | ||
| EA = | Each |
| SOLICITATION/CONTRACT # |
| EXHIBIT B - CLIN 9001 |
| Line Item 0004 Non-Recurring Price - First Option Period |
| Provide Prices For Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Non-Recurring - In Accordance With Section C, Spec Item 4 |
| ELINs B700 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| B700 | Repair services of Septic Tanks System | ||||||
| B700 | Major Repair Work (Negotiated) | Major Repair Work consists of direct labor cost, direct material cost, and indirect costs such as transportation, disposal, report and overhead profit used in Non-Recurring (IDIQ) work. Performance of specific maintenance, repair, and alteration work that exceeds the recurring work limitations of a service order or PM repair. Task order completion times will be specified in the task order. | 1 | LS | ¥ 600,000 | ¥ 600,000 |
| TOTAL NON-RECUURRING PRICE | ¥ 600,000 | ||
| HR = | Hour | ||
| LS = | Lump Sum | ||
| EA = | Each |
| SOLICITATION/CONTRACT # |
| EXHIBIT C - CLIN 9002 |
| Line Item 0006 Non-Recurring Price - Second Option Period |
| Provide Prices For Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Non-Recurring - In Accordance With Section C, Spec Item 4 |
| ELINs C700 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| C700 | Repair services of Septic Tanks System | ||||||
| C700 | Major Repair Work (Negotiated) | Major Repair Work consists of direct labor cost, direct material cost, and indirect costs such as transportation, disposal, report and overhead profit used in Non-Recurring (IDIQ) work. Performance of specific maintenance, repair, and alteration work that exceeds the recurring work limitations of a service order or PM repair. Task order completion times will be specified in the task order. | 1 | LS | ¥ 600,000 | ¥ 600,000 |
| TOTAL NON-RECUURRING PRICE | ¥ 600,000 | ||
| HR = | Hour | ||
| LS = | Lump Sum | ||
| EA = | Each |
| SOLICITATION/CONTRACT # |
| EXHIBIT D - CLIN 9003 |
| Line Item 0008 Non-Recurring Price - Third Option Period |
| Provide Prices For Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Non-Recurring - In Accordance With Section C, Spec Item 4 |
| ELINs D700 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| D700 | Repair services of Septic Tanks System | ||||||
| D700 | Major Repair Work (Negotiated) | Major Repair Work consists of direct labor cost, direct material cost, and indirect costs such as transportation, disposal, report and overhead profit used in Non-Recurring (IDIQ) work. Performance of specific maintenance, repair, and alteration work that exceeds the recurring work limitations of a service order or PM repair. Task order completion times will be specified in the task order. | 1 | LS | ¥ 600,000 | ¥ 600,000 |
| TOTAL NON-RECUURRING PRICE | ¥ 600,000 | ||
| HR = | Hour | ||
| LS = | Lump Sum | ||
| EA = | Each |
| SOLICITATION/CONTRACT # |
| EXHIBIT E - CLIN 9004 |
| Line Item 0010 Non-Recurring Price - Fourth Option Period |
| Provide Prices For Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Non-Recurring - In Accordance With Section C, Spec Item 4 |
| ELINs E700 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| E700 | Repair services of Septic Tanks System | ||||||
| E700 | Major Repair Work (Negotiated) | Major Repair Work consists of direct labor cost, direct material cost, and indirect costs such as transportation, disposal, report and overhead profit used in Non-Recurring (IDIQ) work. Performance of specific maintenance, repair, and alteration work that exceeds the recurring work limitations of a service order or PM repair. Task order completion times will be specified in the task order. | 1 | LS | ¥ 600,000 | ¥ 600,000 |
| TOTAL NON-RECUURRING PRICE | ¥ 600,000 | ||
| HR = | Hour | ||
| LS = | Lump Sum | ||
| EA = | Each |
&"Times New Roman,Regular"&K000000CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]&U
&UAttachment J-0200000-14 Exhibit Line Item Numbers (ELINS)
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] Page &P of &N
CUI // FEDCON [when filled in]
J-04-RwList
| Fund Source | Custmer Activity | Location, Building # & Names, Septic Tank Type | Type of Service | Septic Tank QTY | Minimum Service Frequency | Base Period, Service QTY | 1st OP Period, Service QTY | 2nd OP Period, Service QTY | 3rd OP Period, Service QTY | 4th OP Period, Service QTY | Base Period Unit Prices | Base Period Prices | 1st Option Unit Prices | 1st Option Period Prices | 2nd Option Unit Prices | 2nd Option Period Prices | 3rd Option Unit Prices | 3rd Option Period Prices | 4th Option Unit Prices | 4th Option Period Prices |
| CNIC | CFAY | All of PMI for Septic Tank within the CNIC | Service Order (Lot) | 1 | Year-round | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | TSURUMI OU1, 33, Type 1, | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | TSURUMI OU1, S39 & 41 Septic tank Type 1 | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | TSURUMI OU1, 4200174 Septic tank Type 1 | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | TSURUMI OU1, 4200152-A Septic tank Type 1 | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | TSURUMI OU1, 4200152-B, Septic tank Type 1 | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | TSURUMI OU1, S242, Septic tank Type 1 | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | TSURUMI OU2, S216, Septic tank Type 1 | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | TSURUMI OU2, 227, Septic tank Type 1 | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Annual | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | TSURUMI OU2, 4300407, Septic tank Type 1 | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | TSURUMI OU2, 4300424, New Fire Station, Septic tank Type 1 | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | NDK-124, Septic tank Type 1, | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | NDK-100134, Septic tank Type 1 | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | NDK-100135, Septic tank Type 1 | Routine PM | 1 | Quarterly | 4 | 4 | 4 | 4 | 4 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | NDK-106, FMC-Yokohama, Septic tank Type 2 | Routine PM | 1 | Weekly | 52 | 52 | 52 | 52 | 52 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Cleaning Tank | 1 | Semi-Annual | 2 | 2 | 2 | 2 | 2 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| CNIC | CFAY | Ditto | Periodic Inspection | 1 | Once a Year | 1 | 1 | 1 | 1 | 1 | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ | ¥ |
| ¥ | ¥ | ¥ | ¥ | ¥ | |||
| 21 ~ 50 | = The Goverment Estimated Number of people to be treated for All septic tanks per each. | ||||||
| Septic tank Type 1 | = Separation contact vacuum systems, Anaerobic filter bed contact vacuum systems, or Denitrification filter bed contact vacuum systems. | << Note to KTR, Fill-in price within yellow highligt cells. | |||||
| << Note to CS, DO NOT to Plot Out right side from this cell. | |||||||
| Septic tank Type 2 | = Rotating plate contact method, contact aeration method, or water spray filter bed method. |
| QTY | = Quantity | ||
| Routine PM | = Routine Inspection and Maintenance | OP Period | = Option Period |
| Cleaning Tank | = Cleaning of Septic Tanks | ||
| Periodic Inspection | = Periodic Inspection of Septic Tanks | ||
| Details of the above services are described in the J-1502000-03. |
| CNIC | CNIC | ¥ | ¥ | ¥ | ¥ | ¥ |
| DECA | DECA | ¥ | ¥ | ¥ | ¥ | ¥ |
| DLA | DLA | ¥ | ¥ | ¥ | ¥ | ¥ |
| DoDEA | DoDEA | ¥ | ¥ | ¥ | ¥ | ¥ |
| HSG | HSG | ¥ | ¥ | ¥ | ¥ | ¥ |
| Navy Lodge | Navy Lodge | ¥ | ¥ | ¥ | ¥ | ¥ |
| SRF | SRF | ¥ | ¥ | ¥ | ¥ | ¥ |
| USNH | USNH | ¥ | ¥ | ¥ | ¥ | ¥ |
&"Times New Roman,Regular"CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]
Attachment J-15020000-04 Contract Recurring Work Services List
&"Times New Roman,Regular"SENSITIVE--See FAR 2.101 and 3.104 [when filled in] Page &P of &N&K000000
CUI // FEDCON [when filled in]
File details come from the government source that posted it. Updated .