About this file

This document is a Schedule of Prices and Exhibits for a federal contract opportunity issued by the Department of the Navy, Naval Facilities Engineering Command. The requirement is for an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract to provide a Preventive Maintenance Program and Service Orders for Septic Tank Systems at the Yokohama City Area in the U.S. Commander Fleet Activities Yokosuka (CFAY), Japan. The contract includes one base period and four one-year option periods, with both recurring and non-recurring contract line items. The recurring items cover preventive maintenance and inspections, while the non-recurring items cover major repair work. Pricing is provided for each contract period, with the base period non-recurring work priced at $1,600,000 and the option period non-recurring work priced at $600,000 per period. The contract also includes pricing for additional services such as fence repairs, removals, and temporary fencing.

View the file

Other files

File Type Posted
Site visit map.pdf.pdf PDF
Attach 3 24Q0801 Notice.pdf PDF
24Q0801A.pdf PDF
Attach 1 SPEC_SKETCH.pdf PDF
24Q0801D Site visit RQ form.pdf PDF
Attach 4 24Q0801E Inquiry Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KTR,SOP-Rw&Nrw

SCHEDULE OF PRICE
Date:#DD/MM/YYYY
NAME OF OFFEROR OR CONTRACTOR:
LINE ITEMITEMQ'TYUNITAMOUNT
NO.
Item 0001Recurring, Base Period1LS¥
Provide Preventive Maintenance Program and Service Orders
for Septic Tank Systems at Yokohama City Area in the CFAY
From 1 December 2024 through 30 November 2025.
Item 0002Non-Recurring, Base Period1LS¥ 1,600,000
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 1 December 2024 through 30 November 2025.
Item 0003Recurring, First Option Period1LS¥
Provide Preventive Maintenance Program and Service Orders
for Septic Tank Systems at Yokohama City Area in the CFAY
From 1 December 2025 through 30 November 2026.
Item 0004Non-Recurring, First Option Period1LS¥ 600,000
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 1 December 2025 through 30 November 2026.
Item 0005Recurring, Second Option Period1LS¥
Provide Preventive Maintenance Program and Service Orders
for Septic Tank Systems at Yokohama City Area in the CFAY
From 1 December 2026 through 30 November 2027.
Item 0006Non-Recurring, Second Option Period1LS¥ 600,000
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 1 December 2026 through 30 November 2027.
Item 0007Recurring, Third Option Period1LS¥
Provide Preventive Maintenance Program and Service Orders
for Septic Tank Systems at Yokohama City Area in the CFAY
From 1 December 2027 through 30 November 2028.
Item 0008Non-Recurring, Third Option Period1LS¥ 600,000
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 1 December 2027 through 30 November 2028.
Item 0009Recurring, Fourth Option Period1LS¥
Provide Preventive Maintenance Program and Service Orders
for Septic Tank Systems at Yokohama City Area in the CFAY
From 1 December 2028 through 30 November 2029.
Item 0010Non-Recurring, Fourth Option Period1LS¥ 600,000
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 1 December 2028 through 30 November 2029.

TOTAL: (LINE ITEM 0001 through 0010) ¥ 4,000,000

CLIN 9000 Exhibit A (Base Period)

CLIN 9001 Exhibit B (First Option Period)

CLIN 9002 Exhibit C (Second Option Period)

CLIN 9003 Exhibit D (Third Option Period)

CLIN 9004 Exhibit E (Fourth Option Period)

NOTE:The number of Placeholders established depends on the maximum number of lines
of accounting anticipated on an individual task order.

Detail line items for task order is located in Attachment J-0200000-14

CLIN = CONTRACT LINE ITEM
LS = LUMP SUM
NTE = NOT-TO-EXCEED
Q'TY = QUANTITY

&"Times New Roman,Regular"CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] &K00+000B-&P&K000000 Page &P of &N CUI // FEDCON [when filled in]

KTR-ELIN-ABCDE-Rw

SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0001 Recurring Price - Base Period
Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Recurring - In Accordance With Section C, Spec Item 3
ELINs A001
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
Facility Investment Service of the Septic Tanks Systems, Spec Item 3
A001CNIC1LO¥¥

TOTAL RECURRING LINE ITEMS ¥

MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual
LO =Lot
SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0003 Recurring Price - First Option Period
Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Recurring - In Accordance With Section C, Spec Item 3
ELINs B001
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
Facility Investment Service of the Septic Tanks Systems, Spec Item 3
B001CNIC1LO¥¥

TOTAL RECURRING LINE ITEMS ¥

MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual
LO =Lot
SOLICITATION/CONTRACT #
EXHIBIT C - CLIN 9002
Line Item 0005 Recurring Price - Second Option Period
Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Recurring - In Accordance With Section C, Spec Item 3
ELINs C001
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
Facility Investment Service of the Septic Tanks Systems, Spec Item 3
C001CNIC1LO¥¥

TOTAL RECURRING LINE ITEMS ¥

MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual
LO =Lot
SOLICITATION/CONTRACT #
EXHIBIT D - CLIN 9003
Line Item 0007 Recurring Price - Third Option Period
Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Recurring - In Accordance With Section C, Spec Item 3
ELINs D001
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
Facility Investment Service of the Septic Tanks Systems, Spec Item 3
D001CNIC1LO¥¥

TOTAL RECURRING LINE ITEMS ¥

MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual
LO =Lot
SOLICITATION/CONTRACT #
EXHIBIT E - CLIN 9004
Line Item x0009 Recurring Price - xFourth Option Period
Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Recurring - In Accordance With Section C, Spec Item 3
ELINs E001
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
Facility Investment Service of the Septic Tanks Systems, Spec Item 3
E001CNIC1LO¥¥

TOTAL RECURRING LINE ITEMS ¥

MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual
LO =Lot

&"Times New Roman,Regular"&K000000CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]&U

&UAttachment J-0200000-14 Exhibit Line Item Numbers (ELINS)

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] Page &P of &N

CUI // FEDCON [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

KTR-ELIN-ABCDE-Nrw

SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0002 Non-Recurring Price - Base Period
Provide Prices For Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs A700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
A700Repair services of Septic Tanks System
A700Major Repair Work (Negotiated)Major Repair Work consists of direct labor cost, direct material cost, and indirect costs such as transportation, disposal, report and overhead profit used in Non-Recurring (IDIQ) work. Performance of specific maintenance, repair, and alteration work that exceeds the recurring work limitations of a service order or PM repair. Task order completion times will be specified in the task order.1LS¥ 1,600,000¥ 1,600,000
TOTAL NON-RECUURRING PRICE¥ 1,600,000
HR =Hour
LS =Lump Sum
EA =Each
SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0004 Non-Recurring Price - First Option Period
Provide Prices For Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs B700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
B700Repair services of Septic Tanks System
B700Major Repair Work (Negotiated)Major Repair Work consists of direct labor cost, direct material cost, and indirect costs such as transportation, disposal, report and overhead profit used in Non-Recurring (IDIQ) work. Performance of specific maintenance, repair, and alteration work that exceeds the recurring work limitations of a service order or PM repair. Task order completion times will be specified in the task order.1LS¥ 600,000¥ 600,000
TOTAL NON-RECUURRING PRICE¥ 600,000
HR =Hour
LS =Lump Sum
EA =Each
SOLICITATION/CONTRACT #
EXHIBIT C - CLIN 9002
Line Item 0006 Non-Recurring Price - Second Option Period
Provide Prices For Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs C700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
C700Repair services of Septic Tanks System
C700Major Repair Work (Negotiated)Major Repair Work consists of direct labor cost, direct material cost, and indirect costs such as transportation, disposal, report and overhead profit used in Non-Recurring (IDIQ) work. Performance of specific maintenance, repair, and alteration work that exceeds the recurring work limitations of a service order or PM repair. Task order completion times will be specified in the task order.1LS¥ 600,000¥ 600,000
TOTAL NON-RECUURRING PRICE¥ 600,000
HR =Hour
LS =Lump Sum
EA =Each
SOLICITATION/CONTRACT #
EXHIBIT D - CLIN 9003
Line Item 0008 Non-Recurring Price - Third Option Period
Provide Prices For Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs D700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
D700Repair services of Septic Tanks System
D700Major Repair Work (Negotiated)Major Repair Work consists of direct labor cost, direct material cost, and indirect costs such as transportation, disposal, report and overhead profit used in Non-Recurring (IDIQ) work. Performance of specific maintenance, repair, and alteration work that exceeds the recurring work limitations of a service order or PM repair. Task order completion times will be specified in the task order.1LS¥ 600,000¥ 600,000
TOTAL NON-RECUURRING PRICE¥ 600,000
HR =Hour
LS =Lump Sum
EA =Each
SOLICITATION/CONTRACT #
EXHIBIT E - CLIN 9004
Line Item 0010 Non-Recurring Price - Fourth Option Period
Provide Prices For Provide Prices For Facility Investment (FI) Service of the Septic Tank Systems - Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs E700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
E700Repair services of Septic Tanks System
E700Major Repair Work (Negotiated)Major Repair Work consists of direct labor cost, direct material cost, and indirect costs such as transportation, disposal, report and overhead profit used in Non-Recurring (IDIQ) work. Performance of specific maintenance, repair, and alteration work that exceeds the recurring work limitations of a service order or PM repair. Task order completion times will be specified in the task order.1LS¥ 600,000¥ 600,000
TOTAL NON-RECUURRING PRICE¥ 600,000
HR =Hour
LS =Lump Sum
EA =Each

&"Times New Roman,Regular"&K000000CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]&U

&UAttachment J-0200000-14 Exhibit Line Item Numbers (ELINS)

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] Page &P of &N

CUI // FEDCON [when filled in]

J-04-RwList

Fund SourceCustmer ActivityLocation, Building # & Names, Septic Tank TypeType of ServiceSeptic Tank QTYMinimum Service FrequencyBase Period, Service QTY1st OP Period, Service QTY2nd OP Period, Service QTY3rd OP Period, Service QTY4th OP Period, Service QTYBase Period Unit PricesBase Period Prices1st Option Unit Prices1st Option Period Prices2nd Option Unit Prices2nd Option Period Prices3rd Option Unit Prices3rd Option Period Prices4th Option Unit Prices4th Option Period Prices
CNICCFAYAll of PMI for Septic Tank within the CNICService Order (Lot)1Year-round11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYTSURUMI OU1, 33, Type 1,Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYTSURUMI OU1, S39 & 41 Septic tank Type 1Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYTSURUMI OU1, 4200174 Septic tank Type 1Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYTSURUMI OU1, 4200152-A Septic tank Type 1Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYTSURUMI OU1, 4200152-B, Septic tank Type 1Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYTSURUMI OU1, S242, Septic tank Type 1Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYTSURUMI OU2, S216, Septic tank Type 1Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYTSURUMI OU2, 227, Septic tank Type 1Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Annual11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYTSURUMI OU2, 4300407, Septic tank Type 1Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYTSURUMI OU2, 4300424, New Fire Station, Septic tank Type 1Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYNDK-124, Septic tank Type 1,Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYNDK-100134, Septic tank Type 1Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYNDK-100135, Septic tank Type 1Routine PM1Quarterly44444¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
CNICCFAYNDK-106, FMC-Yokohama, Septic tank Type 2Routine PM1Weekly5252525252¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoCleaning Tank1Semi-Annual22222¥¥¥¥¥¥¥¥¥¥
CNICCFAYDittoPeriodic Inspection1Once a Year11111¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥
21 ~ 50= The Goverment Estimated Number of people to be treated for All septic tanks per each.
Septic tank Type 1= Separation contact vacuum systems, Anaerobic filter bed contact vacuum systems, or Denitrification filter bed contact vacuum systems.<< Note to KTR, Fill-in price within yellow highligt cells.
<< Note to CS, DO NOT to Plot Out right side from this cell.
Septic tank Type 2= Rotating plate contact method, contact aeration method, or water spray filter bed method.
QTY= Quantity
Routine PM= Routine Inspection and MaintenanceOP Period= Option Period
Cleaning Tank= Cleaning of Septic Tanks
Periodic Inspection= Periodic Inspection of Septic Tanks
Details of the above services are described in the J-1502000-03.
CNICCNIC¥¥¥¥¥
DECADECA¥¥¥¥¥
DLADLA¥¥¥¥¥
DoDEADoDEA¥¥¥¥¥
HSGHSG¥¥¥¥¥
Navy LodgeNavy Lodge¥¥¥¥¥
SRFSRF¥¥¥¥¥
USNHUSNH¥¥¥¥¥

&"Times New Roman,Regular"CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]

Attachment J-15020000-04 Contract Recurring Work Services List

&"Times New Roman,Regular"SENSITIVE--See FAR 2.101 and 3.104 [when filled in] Page &P of &N&K000000

CUI // FEDCON [when filled in]

File details come from the government source that posted it. Updated .