23B0415 (SDs) ELINs in Excel SS.xlsx
XLSX spreadsheet 86 KB Posted
- Solicitation number
- N4008423B0415
About this file
This is a schedule of prices for a federal contract solicitation seeking delivery, installation, lease, and removal services of relocatable facilities in Japan. The solicitation involves providing modular buildings and related equipment on an IDIQ basis to the Naval Facilities Engineering Command. Services include delivering and installing relocatable units for six-month leases, with options to extend leases monthly or annually. Required equipment comprises items like restrooms, showers, kitchens, stairs, generators, coolers, furniture, and optional upgrades. Pricing is provided for non-recurring and recurring costs over multiple option periods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD0001.pdf | ||
| 23B0415A (SF1449).pdf | ||
| 23B0415B (SDs).pdf | ||
| 23B0415C (NOTICE).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sche of Price
| SCHEDULE OF PRICE | ||||
| Date: | 31-Jul-2023 | |||
| NAME OF OFFEROR OR CONTRACTOR: | ||||
| LINE ITEM | ITEM | Q'TY | UNIT | AMOUNT |
| NO. |
| Item 0001 | Non-Recurring, Base Period | 1 | LS | ¥ |
| Provide Delivery, Install, Lease and Removal Services of | ||||
| Relocatable Facility and Related Eqipments | ||||
| One year from the date of award. |
| Item 0002 | Non-Recurring, First Option Period | 1 | LS | ¥ |
| Provide Delivery, Install, Lease and Removal Services of | ||||
| Relocatable Facility and Related Eqipments | ||||
| One year from the next date of the completion | ||||
| date of the Base Period. |
| Item 0003 | Non-Recurring, Second Option Period | 1 | LS | ¥ |
| Provide Delivery, Install, Lease and Removal Services of | ||||
| Relocatable Facility and Related Eqipments | ||||
| One year from the next date of the completion | ||||
| date of the First Option period |
| Item 0004 | Non-Recurring, Third Option Period | 1 | LS | ¥ |
| Provide Delivery, Install, Lease and Removal Services of | ||||
| Relocatable Facility and Related Eqipments | ||||
| One year from the next date of the completion | ||||
| date of the Second Option period. |
| Item 0005 | Non-Recurring, Fourth Option Period | 1 | LS | ¥ |
| Provide Delivery, Install, Lease and Removal Services of | ||||
| Relocatable Facility and Related Eqipments | ||||
| One year from the next date of the completion | ||||
| date of the Third Option period. |
| TOTAL: (LINE ITEM 0001 through 0005) | ¥ | |
| FY23 Exchange Rate = | ¥ 109.7015 | $ - 0 |
| CLIN 9000 | Exhibit A (Base Period) |
| CLIN 9001 | Exhibit B (First Option Period) |
| CLIN 9002 | Exhibit C (Second Option Period) |
| CLIN 9003 | Exhibit D (Third Option Period) |
| CLIN 9004 | Exhibit E (Fourth Option Period) |
Detail line items for task order is located in Attachment J-0200000-07
| CLIN = CONTRACT LINE ITEM |
| LS = Lump Sum |
| Q'TY = QUANTITY |
&"Times New Roman,Regular"&8CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] B-&P
&8CUI // FEDCON [when filled in]
Base Period
| Fund Source | e.g,, SRF, CNIC | Fund Source | e.g,, SRF, CNIC | ||||||||
| SOLICITATION/CONTRACT # | Install Location | YSK-#### | Install Location | YSK-#### | |||||||
| EXHIBIT A - CLIN 9000 | Install Period | # dsys | Install Period | # dsys | |||||||
| Lease Start Date | MM/DD/YYYY | Lease Start Date | MM/DD/YYYY | ||||||||
| Line Item 0001 Non-Recurring Price - Base Period | Lease Term | # months | Lease Term | # months | |||||||
| Provide Prices For Facility Management (Relocatable Facility) Services- Non-Recurring - In Accordance With Section C, Spec Item 4 | S/R# : | 2109876 | S/R# : | 2109876 | |||||||
| ELINs A700 through A703 | ePro# : | 123456 | ePro# : | 123456 | |||||||
| ACQ# : | 654321 | ACQ# : | 654321 | ||||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC | Service Quantity | Extended Price | Service Quantity | Extended Price |
| A700 | Delivery, Install, Lease and Removal Services of Relocatable Facility | ||||||||||
| A700AA | Delivery/install, six (6) months lease and lease item removal services of a relocatable facility unit (up to two-stories) at designated location | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services of a relocatable facility unit (up to two-stories) at designated location. The unit size, up to length 7.2 meters × width 2.3 meters (accept size within plus or minus 0.2 meters), connectable with similar units. The unit typical drawing shown J-1501001-04. Standard equipment: Interior electrical wiring include 100 volt outlets (three pole type with ground wire) 3 EA, FHF32W×2 fluorescent lights 4 EA and 200 mm diameter ventilation fan, local smoke detectors 1 EA, window (1600 mm×900 mm) 2 EA, door (sliding or swing). The electrical power supply and utility primary connection coordinate by the Government requester/customer POC. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 60 | UN | ¥ | ¥ - | ¥ - | ||||
| A700AB | Delivery/install, six (6) months lease and lease item removal services of a metal stair unit. | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services of a metal stair unit at designated location. The metal stair/corridor length up to 4.8 meters, or corridor length up to 4.8 meters. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 20 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| A700AC | Delivery/install, six (6) months lease and lease item removal services of an A/C unit. | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services of an A/C unit (output, 200v/2hp/5.0kw, 200v/3hp/8.0kw, 200v/5hp/14kw) at designated location. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 40 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| A700AD | Delivery/install, six (6) months lease and lease item removal services of a kitchen capsule unit | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services of a kitchen capsule unit at designated location. The approximately size: length 1795 mm × width 715 mm × height 2020 mm. Standard equipment: Sink 1 EA length 1000 mm × width 550 mm × height 800 mm with drain trap, window (1240 mm×755 mm) 1 EA, 100 mm diameter ventilation fan, FHF20W×1 fluorescent lights 1 EA and small shelf. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 10 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| A700AE | Delivery/install, six (6) months lease and removal services of a shower capsule unit | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services of a shower capsule unit at designated location. The outside size is approximately length 1845 mm × width 900 mm × height 2223 mm, interior size is approximately length 1678 mm × width 858 mm × height 1928 mm: Standard specification/equipment: interior wall/ceiling are colored metal sheet, interior floor is waterproof paint finish, window (650 mm×450 mm) 1 EA, aluminum door sash 1EA, 100 mm diameter ventilation fan 1 EA, FHF10W×1 waterproof fluorescent lights 1 EA and waterproof 100 volt outlets. Attached appliance: Mixed faucet with shower head, drainboard with drain trap, water proofing bread, towel hanger. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 4 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| A700AF | Delivery/install, six (6) months lease and lease item removal services of a restroom capsule unit | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services of a restroom capsule unit at designated location. The outside size is approximately length 1845 mm × width 900 mm × height 2223 mm, interior size is approximately length 1678 mm × width 858 mm × height 1928 mm: Standard specification/equipment: interior wall/ceiling are colored metal sheet, interior floor is waterproof paint finish, window (650 mm×450 mm) 1 EA, aluminum door sash 1EA, 100 mm diameter ventilation fan 1 EA, and FHF20W×1 fluorescent lights 1 EA. Attached appliance: Towel hanger (ring type), toilet tissue hanger. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 4 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| A700AG | Delivery/install, six (6) months lease and lease item removal services of a relocatable facility restroom unit | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services at designated location. The unit size is approximately length 7.4 meters × width 2.3 meters (accept size within plus or minus 0.3 meters), connectable with similar units. The unit typical drawing shown J-1501001-04. Standard specification/equipment: Interior electrical wiring include 100 volt outlets (three pole type with ground wire) 3 EA, FHF32W×2 fluorescent lights 4 EA and 200 mm diameter ventilation Fan, Urinal 3 EA, Toilet bowl 3EA (2 for mail 1 for femail), Hand wash bowl with single faucet 2 EA, local smoke detectors 1 EA, window (620 mm × 380 mm) 2 EA, swing door 2 EA, washable non-slip PVC finish floor. The electrical power supply and utility primary connection coordinate by the Government requester/customer POC. The Contractor shall perform connect secondary power supply and utilty line designated by the Government. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 6 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| A700AH | Delivery/install, one (1) month lease and lease item removal service of Porta-Johns | The Contractor shall provide delivery/install, one (1) month lease and lease item removal services of a porta-johns unit at designated location. The Contractor shall supply water, collect sewage and clean interior surface three (3) time a week, during lease service. The unit typical photos/drawing shown J-1501001-04. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 5 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| A700AI | Delivery/install, one (1) month lease and lease item removal services of a portable restroom for handicapped unit | The Contractor shall provide delivery/install, one (1) month lease and lease item removal services of a portable restroom for handicapped unit at designated location. The Contractor shall supply water, collect sewage and clean interior surface three (3) time a week, during lease service, with provide one (1) time a LED small lamp (batterie/hanging type) if required. The unit typical photos/drawing shown J-1501001-04. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 2 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| A700AJ | Delivery/install, one (1) month lease and lease item removal services of a hand wash station unit | The Contractor shall provide delivery/install, one (1) month lease and lease item removal services of a hand wash station unit at designated location. The Contractor shall supply water, collect sewage and clean surface three (3) time a week, during lease service. The unit typical photos/drawing shown J-1501001-04. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 2 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| A700AK | Delivery/pickup and one (1) month lease of a portable cooler up to 62/75 kW (Kcal/h) | The Contractor shall provide delivery/pickup and one (1) month lease of a portable cooler up to 62/75 kW (Kcal/h) at designated location, with connecting duct caliber: Quantity 4 EA of 300mm/5m insulated ducts. Capacity: {64,500 kcal/h} (+/-10% tolerance rate). Air volume: 174㎥/Min, 10,440㎥/Hr. (+/-10% tolerance rate). Power source: 200/220V, 37A, 3PH. Frequency: 50/60 Hz. Fuel: diesel. Format: Hermetic scroll type. Delivery/Pickup works shall be completed within 20 calendar days after ordered or completion of lease period. | 2 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A700AL | Delivery/pickup and one (1) month lease of a generator up to 195/220 kVA. | The Contractor shall provide delivery/pickup and one (1) month lease of a generator up to 195/220 kVA at designated location. Frequency: 50/60 Hz, voltage: 200/220V, output: 156/176 kW/, engine output: 181/199, fuel: diesel. The fuel tank shall be full when delivery to the location. Delivery/pickup works shall be completed within 20 calendar days after ordered or completion of lease period. | 10 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A700AM | Delivery/pickup and one (1) month lease of a generator up to 20/25 kVA | The Contractor shall provide delivery/pickup and one (1) month lease of a generator up to 20/25 kVA at designated location, with distribution panel board. Frequency: 50/60 Hz, voltage: 200V, output: 16/20 kW/, engine output: 19.1/23.5, fuel: diesel. The fuel tank shall be full when delivery to the location. Delivery/pickup works shall be completed within 10 calendar days after ordered or completion of lease period. | 5 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A700AN | Delivery/pickup and one (1) month lease of a generator up to 2.8 kVA inverter type | The Contractor shall provide delivery/pickup and one (1) month lease of a generator up to 2.8 kVA inverter type at designated location. Frequency: 50/60 Hz, voltage: 100V, rated output: 2.8 kVA/12V – 12A, fuel: gasoline, with 4 swing wheel tires. The fuel tank shall be full when delivery to the location. Delivery/pickup works shall be completed within 10 calendar days after ordered or completion of lease period. | 5 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A701 | Extend One (1) Month, One (1) Yaer Lease Service of the Relocatable Facility | ¥ - | ¥ - | ||||||||
| A701AA | Extend one (1) month lease service of the relocatable facility unit. | Extend one (1) month lease service of during leasing relocatable facility unit with standard equipment as item 700AA. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 50 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AB | Extend one (1) month lease service of metal stair unit | Extend one (1) month lease service of during leasing metal stair unit as item 700AB. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 30 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AC | Extend one (1) month lease service of one (1) A/C unit. | Extend one (1) month lease service of during leasing one (1) A/C unit (output, 200v/2hp/5.0kw, 200v/3hp/8.0kw, 200v/5hp/14kw) at 700AC. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 40 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AD | Extend one (1) month lease service of kitchen capsule unit | Extend one (1) month lease service of during leasing kitchen capsule unit, and standard equipment as item 700AD. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AE | Extend one (1) month lease service of shower capsule unit | Extend one (1) month lease service of during leasing shower capsule unit, and standard equipment as item 700AE. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 15 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AF | Extend one (1) month lease service of restroom capsule unit | Extend one (1) month lease service of during leasing restroom capsule unit, and standard equipment as item 700AF. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 15 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AG | Extend one (1) month lease service of relocatable facility restroom unit | Extend one (1) month lease service of during leasing relocatable facility restroom unit, and standard equipment as item 700AG. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 15 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AH | Extend one (1) month lease service of porta-johns | Extend one (1) month lease service of during leasing porta-johns as item 700AH. The Contractor shall supply water, collect sewage and clean interior surface three (3) time a week, during lease service. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 30 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AI | Extend one (1) month lease service of portable restroom for handicapped | Extend one (1) month lease service of during leasing portable restroom for handicapped as item 700AI. The Contractor shall supply water, collect sewage and clean interior surface three (3) time a week, during lease service. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 30 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AJ | Extend one (1) month lease service of hand wash station | Extend one (1) month lease service of during leasing hand wash station as item 700AJ. The Contractor shall supply water, collect sewage and clean of the hand wash station surface three (3) time a week, during lease service. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 30 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AK | Extend one (1) month lease service of portable cooler up to 62/75 kW(Kcal/h) | Extend one (1) month lease service of during leasing portable cooler up to 62/75 kW(Kcal/h) as item 700AK. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AL | Extend one (1) month lease service of generator up to 195/220 kVA | Extend one (1) month lease service of during leasing of a generator up to 195/220 kVA. as item 700AL. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AM | Extend one (1) month lease service of generator up to 20/25 kVA | Extend one (1) month lease service of during leasing of a generator up to 20/25 kVA as item 700AM. The extend lease service is not included refuel service. Lease item removal services shall be completed within 10 calendar days, unless specified spec item 2.3.6. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701AN | Extend one (1) month lease service of generator up to 2.8 kVA inverter type. | Extend one (1) month lease service of during leasing of a generator up to 2.8 kVA as item 700AN. The extend lease service is not included refuel service. Lease item removal services shall be completed within 10 calendar days, unless specified spec item 2.3.6. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A701BA | Extend one (1) year lease service of the relocatable facility unit. | Extend one (1) year lease service of during leasing relocatable facility unit with standard equipment as item 700AA. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 120 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A701BB | Extend one (1) year lease service of metal stair unit | Extend one (1) year lease service of during leasing metal stair unit as item 700AB. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 20 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A701BC | Extend one (1) year lease service of one (1) A/C unit. | Extend one (1) year lease service of during leasing one (1) A/C unit (output, 200v/2hp/5.0kw, 200v/3hp/8.0kw, 200v/5hp/14kw) at 700AC. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 100 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A701BD | Extend one (1) year lease service of kitchen capsule unit | Extend one (1) year lease service of during leasing kitchen capsule unit, and standard equipment as item 700AD. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 10 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A701BE | Extend one (1) year lease service of shower capsule unit | Extend one (1) year lease service of during leasing shower capsule unit, and standard equipment as item 700AE. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 5 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A701BF | Extend one (1) year lease service of restroom capsule unit | Extend one (1) year lease service of during leasing restroom capsule unit, and standard equipment as item 700AF. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 5 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A701BG | Extend one (1) year lease service of relocatable facility restroom unit | Extend one (1) year lease service of during leasing relocatable facility restroom unit, and standard equipment as item 700AG. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 5 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A701BH | Extend one (1) year lease service of porta-johns | Extend one (1) year lease service of during leasing porta-johns as item 700AH. The Contractor shall supply water, collect sewage and clean interior surface three (3) time a week, during lease service. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 1 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A702 | Install Optional Equipment with Lease Services | ¥ - | ¥ - | ||||||||
| A702AA | Install telecommunication (BCO's standard) box and voice/data outlets to relocatable facility. | The Contractor shall provide of a Telecommunication Box (BCO's standard), refer J-1501001-04, voice/data outlets, quantity up to 24 EA per the one (1) telecommunication box, and install for terms of lease, location designated by the requester POC. The telecommunication box primary connection coordinate by the Government requester/customer POC. The install work shall be completed within 180 calendar days including process of manufacture after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 6 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AB | Install double layers plywood floor to relocatable facility. | The Contractor shall provide of double layers plywood floor per each unit, size up to 17 SM and install for terms of lease, location designated by the requester POC. The install work shall be completed within 20 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 40 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AC | Install floor carpet tile to relocatable facility. | The Contractor shall provide of floor carpet tile, size: up to 500 mm × 500 mm, thickness more than 6 mm up to 12 mm, pile height up to 4 mm, size up to 17 SM and install for terms of lease, location designated by the requester POC. The install work shall be completed within 20 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 40 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AD | Install vinyl floor sheet to relocatable facility. | The Contractor shall provide of vinyl floor sheet, non-slip store/office use type, thickness up to 4 mm, size up to 17 SM and install for terms of lease, location designated by the requester POC. The install work shall be completed within 20 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 40 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AE | Install swing door with combination key system to relocatable facility. | The Contractor shall provide of a swing door with combination key system and install for terms of lease, location designated by the requester POC. The install work shall be completed within 20 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 10 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AF | Install High Height Swing Door with combination key system to relocatable facility. | The Contractor shall provide of a High Height Swing Door (height minimum 6'8") for exit doorway or indoor escape door IAW NFPA 101, UFC 3-600-01 (Fire Protection Engineering for Facilities) and OSHA, with combination key system and install for terms of lease, location designated by the requester POC. The install work shall be completed within 90 calendar days including process of manufacture after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 5 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AG | Install partition wall to relocatable facility. | The Contractor shall provide of a partition wall, length up to 7200 mm, height floor from ceiling reach, partition wall edge has proper frame and install for terms of lease, location designated by the requester POC. The install work shall be completed within 20 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 20 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AH | Install partition wall with window to relocatable facility. | The Contractor shall provide of a partition wall, length up to 2300 mm, height floor from ceiling reach, partition wall edge has proper frame, with window size up to 2.0 SM and install for terms of lease, location designated by the requester POC. The install work shall be completed within 20 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 5 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AI | Install indoor sliding door to relocatable facility. | The Contractor shall provide of a indoor sliding door with proper frame, height up to 1900 mm, wide up to 1750 mm, with door window size up to 1.0 SM and install for terms of lease, location designated by the requester POC. The install work shall be completed within 20 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 5 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AJ | Install indoor swing door to relocatable facility. | The Contractor shall provide of a indoor swing door with proper frame, height up to 1850 mm, wide up to 850 mm, with door window size up to 0.5 SM and install for terms of lease, location designated by the requester POC. The install work shall be completed within 20 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 5 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AK | Install horizontal blind to relocatable facility. | The Contractor shall provide of a horizontal blind and install for terms of lease, location designated by the requester POC. The blind size is approximately width 2.0M × height 1.0M. The install work shall be completed within 20 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 40 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AL | Install additional window to relocatable facility. | The Contractor shall provide of an additional window and install for terms of lease, location designated by the requester POC. The window size is approximately width 1600 mm × height 900 mm. The install work shall be completed within 20 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 20 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AM | Install local smoke detector to relocatable facility. | The Contractor shall provide of a local smoke detector and install for terms of lease, location designated by the requester POC. The install work shall be completed within 20 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 50 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AN | Install of 200 mm diameter ventilation fan guard to relocatable facility. | The Contractor shall provide of a 200 mm diameter ventilation fan guard and install for terms of lease, location at designated by the requester POC. The install work shall be completed within 60 calendar days after ordered including process of manufacture, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 20 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AO | Remodeling services during the term of the lease for relocatable facility. | The Contractor shall provide of remodeling materials, e.g. miscellaneous optional equipment/structure, electrical power distribution board for increased capacity, additional electrical power outlets with wire and install services at designated by the requester POC prior to issue of the task order. The remodeling service; material cost up to ¥ 150,000 and labor up to 25 hours. The service work shall be completed within 20 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 10 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AP | Major remodeling services during install or the term of the lease for relocatable facility. | The Contractor shall provide of major remodeling material, e.g. miscellaneous optional equipment/structure, fire alarm communication system, indoor stairs, electrical power distribution board for increased capacity, additional electrical power outlets with wire and install services, including related structure removal at designated by the requester POC prior to issue of the task order. The major remodeling service; material and heavy equipment cost up to ¥ 1,200,000 and labor up to 100 hours. The service work shall be completed within 30 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 5 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AQ | Install metal bar of building foundation to relocatable facility | The Contractor shall provide of proper metal bar and metal plate as required the relocatable facility foundation and any adjustment sloping installation site, 1st floor area up to 200 SM with metal plate, for install three (3) stories of relocatable facility or adjustment work of sloping installation site. Install location is designated by the requester POC, prior to issue of the task order. The install work shall be completed within 60 calendar days after ordered, unless specified, and the collection work of installed optional equipment shall be same day with lease item removal service. | 2 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AR | Repairs service for during leasing the relocatable facility | The Contractor shall provide repair service during the term of lease for the relocatable facility include any installed equipment, office furniture/optional equipment to be normal workind condition, and replace service. Service location is designated by the requester POC. Except in cases of damage arising out of the willful act or gross negligence of a Government employee, the contractor shall maintain the relocatable facility and all associated equipment and furniture provided under this task order in good repair and condition. The repair service material cost up to ¥150,000 and labor up to 25 hours. The repairs work shall be completed within 20 calendar days after ordered, unless specified, and the collection work shall be same day with lease item removal service. | 6 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AS | Complex Nanocolloid Aqueous Solution Treatment Service | The Contractor shall provide service of complex Nanocolloid aqueous solution treatment as semi-permanent disinfection for related leasing the relocatable facility. Service area size, up to 200 SM with any installed optional equipment and any installed office furniture. On-site work within three (3) working days. This typical service content information provided in J-1501000-07. The service work shall be completed within 20 calendar days after ordered, unless specified. | 5 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AT | Install or removal service of portable cooler or generator. | The Contractor shall provide install or removal services of portable cooler or generator for normal operational condition at designated by the requester POC. The install service labor up to 80 hours. | 10 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A702AU | Provide materials for install of portable cooler or generator. | The Contractor shall provide related miscellaneous materials as cable/wire and duct for install of portable cooler or generator for normal operational condition at designated by the requester POC. The install related miscellaneous materials up to ¥100,000 with delivery/removal cost. | 10 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| A703 | Lease Office Furniture/Equipments and Delivery & Collection/Removal Services for Relocatable Facility Unit | ¥ - | ¥ - | ||||||||
| A703AA | Lease Service One (1) Month of Office Desk | Lease period up to one (1) month of one (1) office desk. The office desk with one (1) movable drawer and one (1) swivel chair. The office desk unit size is approximately width 1200 mm × depth 700 mm × height 700 mm, the drawer size is approximately width 400 mm × depth 600 mm × height 600 mm. Swivel chair with armrest task chair with adjustment. | 60 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A703AB | Lease Service One (1) Month of Conference Table | Lease period up to one (1) month of one (1) conference table. The conference table size is approximately width 1900 mm × depth 900 mm × height 700 mm, with six (6) folding metal pipe chairs. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A703AC | Lease Service One (1) Month of Metal Locker (2 Boxes) | Lease period up to one (1) month of one (1) Metal Locker. The metal locker unit size is approximately width 610 mm × depth 520 mm × height 1800 mm, for two (2) people. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A703AD | Lease Service One (1) Month of Dry Chemical Fire Extinguisher | Lease period up to one (1) month of one (1) Fully Charged Dry Chemical Fire Extinguisher. The dry chemical fire extinguisher size is approximately 300 milli liter. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A703AE | Lease Service One (1) Month of Refrigerator, Size up to 170 liter | Lease period up to one (1) month of one (1) Refrigerator. The refrigerator unit size is approximately width 500 mm × depth 600 mm × height 1285 mm, size up to 170 liter. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A703AF | Lease Service One (1) Month of Microwave | Lease period up to one (1) month of one (1) microwave, unless directed to terminate by the requester POC. The microwave unit size is approximately width 450 mm × depth 400 mm × height 300 mm, out put up to 1100/1300W. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A703AG | Lease Service One (1) Month of White Boards | Lease period up to one (1) month of one (1) white board. The white board size is approximately width 1200 mm × height 900 mm, with six (6) dry erase markers. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A703AH | Lease Service One (1) Month of Shelf (Lateral 3 drawers) | Lease period up to one (1) month of one (1) Shelf (Lateral 3 drawers). The Shelf (Lateral 3 drawers) unit size is approximately length/width 900 mm × depth 450 mm × height 1050 mm. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A703AI | Lease Service One (1) Month of Shelf (Open) | Lease period up to one (1) month of one (1) Open type Shelf. The shelf unit size is approximately width 880 mm × depth 450 mm × height 1800 mm. | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A703AJ | Lease Service One (1) Month of Helmet Holder | Lease period up to one (1) month of one (1) Helmet Holder. The helmet holder available hold of helmets quantity up to six (6). | 20 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A703AK | Lease Service One (1) Month of Metal Pipe Bed | Lease period up to one (1) month of one (1) Metal Pipe Bed with urethane form mattress, or pocket coil mattress, unless direction by the requester POC. The metal pipe bed/mattress size is approximately length 1950 mm × width 950 mm, height of lying down from floor 280 mm ~ 500 mm. Thickness of the urethane mattress 60 mm minimum, or pocket coil mattress 150 mm minimum. | 30 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| A703BA | Lease Service One (1) Year of Office desk | Lease period up to one (1) year of one (1) office desk with one (1) movable drawer, one (1) swivel chair. The office desk unit size is approximately width 1200 mm × depth 700 mm × height 700 mm, the drawer size is approximately width 400 mm × depth 600 mm × height 600 mm. Swivel chair with armrest task chair with adjustment. | 400 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A703BB | Lease Service One (1) Year of Conference Table | Lease period up to one (1) year of one (1) Conference Table. The conference table size is approximately width 1900 mm × depth 900 mm × height 700 mm, with six (6) folding metal pipe chairs. | 20 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A703BC | Lease Service One (1) Year of Metal Locker (2 Boxes) | Lease period up to one (1) year of one (1) Metal Locker. The metal locker unit size is approximately width 610 mm × depth 520 mm × height 1800 mm, for two (2) people. | 25 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A703BD | Lease Service One (1) Year of Dry Chemical Fire Extinguisher | Lease period up to one (1) year of one (1) Fully Charged Dry Chemical Fire Extinguisher. The dry chemical fre extinguisher size up to 300 milli liter. | 20 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A703BE | Lease Service One (1) Year of Refrigerator, Size up to 170 liter | Lease period up to one (1) year of one (1) Refrigerator. The refrigerator unit size is approximately width 500 mm × depth 600 mm × height 1285 mm, size up to 170 liter. | 20 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A703BF | Lease Service One (1) Year of Microwave | Lease period up to one (1) year of one (1) Microwave. The microwave unit size is approximately width 450 mm × depth 400 mm × height 300 mm, out put up to 1100/1300W. | 20 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A703BG | Lease Service One (1) Year of White Boards | Lease period up to one (1) year of one (1) White Board. The white board size is approximately width 1200 mm × height 900 mm, with six (6) dry erase markers. | 20 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A703BH | Lease Service One (1) Year of Shelf (Lateral 3 drawers) | Lease period up to one (1) year of one (1) Shelf (Lateral 3 drawers). The shelf (Lateral 3 drawers) unit size is approximately length/width 900 mm × depth 450 mm × height 1050 mm. | 10 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A703BI | Lease Service One (1) Year of Shelf (Open) | Lease period up to one (1) year of one (1) Open type Shelf. The shelf unit size is approximately width 880 mm × depth 450 mm × height 1800 mm. | 20 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A703BJ | Lease Service One (1) Year of Helmet Holder | Lease period up to one (1) year of one (1) Helmet Holder. The helmet holder available hold of helmets quantity up to six (6). | 10 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A703BK | Lease Service One (1) Year of Metal Pipe Bed | Lease period up to one (1) year of one (1) Metal Pipe Bed with urethane form mattress, or pocket coil mattress, unless direction by the requester POC. The metal pipe bed/mattress size is approximately length 1950 mm × width 950 mm, height of lying down from floor 280 mm ~ 500 mm. Thickness of the urethane mattress 60 mm minimum, or pocket coil mattress 150 mm minimum. | 30 | YR | ¥ | ¥ | ¥ - | ¥ - | |||
| A703CA | Delivery or Collection/Removal Services for Lease Items of Office Furniture/Equipments | Delivery to designated location or collection/removal services of 703 items by the requester POC, loading capacity up to two (2) ton class transportation track, shall be completed within seven (7) calendar days after ordered. | 80 | Time | ¥ | ¥ | ¥ - | ¥ - | |||
| Total Non-Recurring Price Line Item 0001 | ¥ | ¥ - | ¥ - | ||||||||
| Unit | = UN | Months | = MO Meter | = M | |||||||
| Week | = WK | Each | = EA | ||||||||
| Year | = YR (Moths) |
&"Times New Roman,Regular"&K000000CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]&U
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] Page &P of &N
CUI // FEDCON [when filled in]
OPTP1
| Fund Source | e.g,, SRF, CNIC | Fund Source | e.g,, SRF, CNIC | ||||||||
| SOLICITATION/CONTRACT # | Install Location | YSK-#### | Install Location | YSK-#### | |||||||
| EXHIBIT B - CLIN 9001 | Install Period | # dsys | Install Period | # dsys | |||||||
| Lease Start Date | MM/DD/YYYY | Lease Start Date | MM/DD/YYYY | ||||||||
| Line Item 0002 Non-Recurring Price - First Option Period | Lease Term | # months | Lease Term | # months | |||||||
| Provide Prices For Facility Management (Relocatable Facility) Services- Non-Recurring - In Accordance With Section C, Spec Item 4 | S/R# : | 2109876 | S/R# : | 2109876 | |||||||
| ELINs B700 through B703 | ePro# : | 123456 | ePro# : | 123456 | |||||||
| ACQ# : | 654321 | ACQ# : | 654321 | ||||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC | Service Quantity | Extended Price | Service Quantity | Extended Price |
| B700 | Delivery, Install, Lease and Removal Services of Relocatable Facility | ||||||||||
| B700AA | Delivery/install, six (6) months lease and lease item removal services of a relocatable facility unit (up to two-stories) at designated location | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services of a relocatable facility unit (up to two-stories) at designated location. The unit size, up to length 7.2 meters × width 2.3 meters (accept size within plus or minus 0.2 meters), connectable with similar units. The unit typical drawing shown J-1501001-04. Standard equipment: Interior electrical wiring include 100 volt outlets (three pole type with ground wire) 3 EA, FHF32W×2 fluorescent lights 4 EA and 200 mm diameter ventilation fan, local smoke detectors 1 EA, window (1600 mm×900 mm) 2 EA, door (sliding or swing). The electrical power supply and utility primary connection coordinate by the Government requester/customer POC. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 60 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AB | Delivery/install, six (6) months lease and lease item removal services of a metal stair unit. | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services of a metal stair unit at designated location. The metal stair/corridor length up to 4.8 meters, or corridor length up to 4.8 meters. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 20 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AC | Delivery/install, six (6) months lease and lease item removal services of an A/C unit. | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services of an A/C unit (output, 200v/2hp/5.0kw, 200v/3hp/8.0kw, 200v/5hp/14kw) at designated location. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 40 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AD | Delivery/install, six (6) months lease and lease item removal services of a kitchen capsule unit | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services of a kitchen capsule unit at designated location. The approximately size: length 1795 mm × width 715 mm × height 2020 mm. Standard equipment: Sink 1 EA length 1000 mm × width 550 mm × height 800 mm with drain trap, window (1240 mm×755 mm) 1 EA, 100 mm diameter ventilation fan, FHF20W×1 fluorescent lights 1 EA and small shelf. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 10 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AE | Delivery/install, six (6) months lease and removal services of a shower capsule unit | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services of a shower capsule unit at designated location. The outside size is approximately length 1845 mm × width 900 mm × height 2223 mm, interior size is approximately length 1678 mm × width 858 mm × height 1928 mm: Standard specification/equipment: interior wall/ceiling are colored metal sheet, interior floor is waterproof paint finish, window (650 mm×450 mm) 1 EA, aluminum door sash 1EA, 100 mm diameter ventilation fan 1 EA, FHF10W×1 waterproof fluorescent lights 1 EA and waterproof 100 volt outlets. Attached appliance: Mixed faucet with shower head, drainboard with drain trap, water proofing bread, towel hanger. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 4 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AF | Delivery/install, six (6) months lease and lease item removal services of a restroom capsule unit | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services of a restroom capsule unit at designated location. The outside size is approximately length 1845 mm × width 900 mm × height 2223 mm, interior size is approximately length 1678 mm × width 858 mm × height 1928 mm: Standard specification/equipment: interior wall/ceiling are colored metal sheet, interior floor is waterproof paint finish, window (650 mm×450 mm) 1 EA, aluminum door sash 1EA, 100 mm diameter ventilation fan 1 EA, and FHF20W×1 fluorescent lights 1 EA. Attached appliance: Towel hanger (ring type), toilet tissue hanger. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 4 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AG | Delivery/install, six (6) months lease and lease item removal services of a relocatable facility restroom unit | The Contractor shall provide delivery/install, six (6) months lease and lease item removal services at designated location. The unit size is approximately length 7.4 meters × width 2.3 meters (accept size within plus or minus 0.3 meters), connectable with similar units. The unit typical drawing shown J-1501001-04. Standard specification/equipment: Interior electrical wiring include 100 volt outlets (three pole type with ground wire) 3 EA, FHF32W×2 fluorescent lights 4 EA and 200 mm diameter ventilation Fan, Urinal 3 EA, Toilet bowl 3EA (2 for mail 1 for femail), Hand wash bowl with single faucet 2 EA, local smoke detectors 1 EA, window (620 mm × 380 mm) 2 EA, swing door 2 EA, washable non-slip PVC finish floor. The electrical power supply and utility primary connection coordinate by the Government requester/customer POC. The Contractor shall perform connect secondary power supply and utilty line designated by the Government. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 6 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AH | Delivery/install, one (1) month lease and lease item removal service of Porta-Johns | The Contractor shall provide delivery/install, one (1) month lease and lease item removal services of a porta-johns unit at designated location. The Contractor shall supply water, collect sewage and clean interior surface three (3) time a week, during lease service. The unit typical photos/drawing shown J-1501001-04. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 5 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AI | Delivery/install, one (1) month lease and lease item removal services of a portable restroom for handicapped unit | The Contractor shall provide delivery/install, one (1) month lease and lease item removal services of a portable restroom for handicapped unit at designated location. The Contractor shall supply water, collect sewage and clean interior surface three (3) time a week, during lease service, with provide one (1) time a LED small lamp (batterie/hanging type) if required. The unit typical photos/drawing shown J-1501001-04. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 2 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AJ | Delivery/install, one (1) month lease and lease item removal services of a hand wash station unit | The Contractor shall provide delivery/install, one (1) month lease and lease item removal services of a hand wash station unit at designated location. The Contractor shall supply water, collect sewage and clean surface three (3) time a week, during lease service. The unit typical photos/drawing shown J-1501001-04. Delivery/install and lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 2 | UN | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AK | Delivery/pickup and one (1) month lease of a portable cooler up to 62/75 kW (Kcal/h) | The Contractor shall provide delivery/pickup and one (1) month lease of a portable cooler up to 62/75 kW (Kcal/h) at designated location, with connecting duct caliber: Quantity 4 EA of 300mm/5m insulated ducts. Capacity: {64,500 kcal/h} (+/-10% tolerance rate). Air volume: 174㎥/Min, 10,440㎥/Hr. (+/-10% tolerance rate). Power source: 200/220V, 37A, 3PH. Frequency: 50/60 Hz. Fuel: diesel. Format: Hermetic scroll type. Delivery/Pickup works shall be completed within 20 calendar days after ordered or completion of lease period. | 2 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AL | Delivery/pickup and one (1) month lease of a generator up to 195/220 kVA. | The Contractor shall provide delivery/pickup and one (1) month lease of a generator up to 195/220 kVA at designated location. Frequency: 50/60 Hz, voltage: 200/220V, output: 156/176 kW/, engine output: 181/199, fuel: diesel. The fuel tank shall be full when delivery to the location. Delivery/pickup works shall be completed within 20 calendar days after ordered or completion of lease period. | 10 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AM | Delivery/pickup and one (1) month lease of a generator up to 20/25 kVA | The Contractor shall provide delivery/pickup and one (1) month lease of a generator up to 20/25 kVA at designated location, with distribution panel board. Frequency: 50/60 Hz, voltage: 200V, output: 16/20 kW/, engine output: 19.1/23.5, fuel: diesel. The fuel tank shall be full when delivery to the location. Delivery/pickup works shall be completed within 10 calendar days after ordered or completion of lease period. | 5 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| B700AN | Delivery/pickup and one (1) month lease of a generator up to 2.8 kVA inverter type | The Contractor shall provide delivery/pickup and one (1) month lease of a generator up to 2.8 kVA inverter type at designated location. Frequency: 50/60 Hz, voltage: 100V, rated output: 2.8 kVA/12V – 12A, fuel: gasoline, with 4 swing wheel tires. The fuel tank shall be full when delivery to the location. Delivery/pickup works shall be completed within 10 calendar days after ordered or completion of lease period. | 5 | EA | ¥ | ¥ | ¥ - | ¥ - | |||
| B701 | Extend One (1) Month, One (1) Yaer Lease Service of the Relocatable Facility | ¥ - | ¥ - | ||||||||
| B701AA | Extend one (1) month lease service of the relocatable facility unit. | Extend one (1) month lease service of during leasing relocatable facility unit with standard equipment as item 700AA. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 50 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| B701AB | Extend one (1) month lease service of metal stair unit | Extend one (1) month lease service of during leasing metal stair unit as item 700AB. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 30 | MO | ¥ | ¥ | ¥ - | ¥ - | |||
| B701AC | Extend one (1) month lease service of one (1) A/C unit. | Extend one (1) month lease service of during leasing one (1) A/C unit (output, 200v/2hp/5.0kw, 200v/3hp/8.0kw, 200v/5hp/14kw) at 700AC. Lease item removal services shall be completed within 20 calendar days, unless specified spec item 2.3.6. | 40 | MO | ¥ | ¥ | ¥ - | ¥ - |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .