SF30 for Amendment 0001.pdf

PDF 298 KB Posted

Attached to
REPAIR PLUMBING SYSTEMS AT VARIOUS BUILDINGS, CFA CHINHAE, KOREA
Solicitation number
N40084-22-T-4004
Issued by

View the file

Other files

File Type Posted
SF18 FOR RFQ N4008422T4004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMPORTANT

This amendment must be acknowledged when your quote is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the quote. The acknowledgement must be received prior to quote opening time. Acceptance of late acknowledgement is subject to the provisions set forth in the Defense Federal Acquisition Regulations Supplement.

ACQR5901520

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Nov-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008422T4004

X 9B. DATED (SEE ITEM 11)

10-Nov-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AMENDMENT 0001 TO SOLICITATION NO. N4008422T4004, REPAIR PLUMBING SYSTEMS AT VARIOUS BUILDINGS, CFA CHINHAE, KOREA

THE PURPOSE OF THIS AMENDMENT IS TO PROVIDE ANSWERS TO INQUIRES FOR THE SUBJECT RFQ.

SEE DESCRIPTION ON PAGE 2.

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Nov-2021

CODE

NAVFAC FAR EAST

FEAD CHINHAE

PSC 479

FPO AP 96269-1100

N40084 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

sung.ho.yu.ks@fe.navy.milEMAIL:315-762-5834TEL:

SUNG-HO YU / ROICC

N4008422T4004

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

SUMMARY OF CHANGES

The following have been added by full text:

DESCRIPTION OF AMENDMENT 0001

1. The purpose of this amendment is to provide answers to requests for information (RFI) for solicitation no.

N40084-22-T-4004, Repair Plumbing Systems at Various Buildings, CFA Chinhae, Korea.

No Date Questions Answers 1 11/23/21 Based on working scope (B790, B794) (working scope unclear in supplied drawing (dwg no. 17276292, 17276293))

Cut the existing pipes at the walls part of the pipes in the mechanical rooms and replace them.

2 11/23/21 Who is the supplier of the tank to be replaced? (If it is to be supplied by the ordering party or the contractor-constructor, please provide the tank specifications.)

See the specifications at M-004 (Sheet 5 of 6).

3 11/23/21 "SF18 FOR RFQ N4008422T4004 - ATTACHMENT

"D"" Material specified in 'SCOPE OF WORK' of drawing number "17276289" (Circulation Pump - UP15-1OSU7P/TLC, BackFlower Preventer - Watts 757 Double check v/v, PRESSURE REDUCING Specifications for materials (Water v/v, Relief v/v, Fitting, Pressure Gauge, etc.) other than VALVE - 3", ZURN WILKINS 3-500XLHLR, FLOW METER - 3"

NEPTUNE HP (allowable pressure, material, etc.)

(Can the contractor decide arbitrarily? Is there a separate specification?)

Contractor can select any material based on the SOW and DWG.

They need to be approved through material submittal.

4 11/23/21 Insulation regulations for tanks and piping Contractor could select and submit the material of insulation and piping through material submittal.

2. Quoters shall acknowledge all solicitation amendments in their quotations.

3. By reason of this amendment, the RFQ due date remains unchanged, set on 29 November 2021, at no later than 14:00 PM Korea Standard Time (KST).

4. All other terms and conditions remain the same.

Amendment 0001 Acknowledgment

Signature _______________________

Name/Title _______________________

Company _______________________

(End of Summary of Changes)

File details come from the government source that posted it. Updated .