About this file

This solicitation is for Indefinite Delivery/Indefinite Quantity (IDIQ) Design-Build (DB)/Design-Bid-Build (DBB) Multiple Award Construction Contracts (MACC) for the U.S. Navy Support Facility in Diego Garcia, British Indian Ocean Territory. The resultant MACC will be used to issue task orders for design and construction projects such as office renovations, building demolitions, mechanical and electrical work, road paving, fencing, roofing, painting, and asbestos and lead abatement. The total ceiling for all MACC awards is $249 million to be tracked using obligated task order amounts. Individual task orders will range from $150,000 to $50 million but may be other amounts by agreement. A minimum $100,000 task order will be issued with each MACC award. One $1-5 million seed project will also be awarded. In accordance with an exchange of notes, contracts must be awarded to joint ventures of U.S. and U.K. firms unless no reasonable offers are received, then they may be open to U.S. firms.

View the file

Other files

File Type Posted
21R0079_0004.pdf PDF
21R0079_0003.pdf PDF
21R0079_0002.pdf PDF
21R0079.pdf PDF
Attach_1_Pre-Bid_Inquiry_Form.xls XLS spreadsheet
21R0079_Exhibits.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RFP N40084-21-R-0079 INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB) MULTIPLE AWARD CONSTRUCTION CONTRACT FOR U.S. NAVY SUPPORT FACILITY, DIEGO GARCIA, BRITISH INDIAN OCEAN TERRITORY

Description of the amendment begins on page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jan-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008421R0079

X 9B. DATED (SEE ITEM 11)

04-Jan-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jan-2021

CODE

NAVFAC FAR EAST

PSC 473 BOX 13

FPO AP 96349-0013

N40084 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008421R0079

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 001

The purpose of this amendment is as follows:

(1) Incorporate Change Notice No. 001 for Seed Project (Repairs to DEODSS Operations Building, F-631/F-

632 at the US Navy Support Facility, Diego Garcia dated 26 Jan 21 (10 pages)

(2) Replace Section 00 10 00 – Solicitation C. DESCRIPTION OF SEED PROJECT in it’s entirety to:

1. There is one (1) seed project for this solicitation, which will be awarded at the time of award of the MACC contracts.

Title: Design-Bid-Build Repairs to GEODSS OPS BLDG. F-631/F-632 at the US Navy Support Facility Diego Garcia, BIOT, Work Order Number (WON) 1585121

2. A Task Order for the seed project will be issued concurrently with the award of the basic contract to the contractor selected as the best value for the seed project

3. In accordance with FAR 36.204, the magnitude of construction for the Seed Project is between $1,000,000 and $5,000,000.

4. In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Offeror awarded the seed project shall be required to commence work for the seed project within 15 days after date of award, prosecute the work diligently, and complete the entire work ready for use not later than 369 days after date of Task Order award. The time stated for completion shall include final cleanup of the premises.

In accordance with FAR 52.211-12 Liquidated Damages, if the Offeror awarded the seed project fails to complete the work within the time specified in the Task Order for the seed project, the contractor shall pay liquidated damages to the Government in the amount of $685 for each calendar day of delay until the work is completed or accepted.

(3) Add the following provision and clause: DFARS 252.204-7019 Notice of NIST SP 800-171 DoD

Assessment Requirements (NOV 2020) and DFARS 252-204-7020 NIST SP 800-171 DoD Assessment Requirements.

(4) Provide Government response to Offeror’s inquiries questions 1 through 12.

Question No.

REFERENCE QUESTION GOVERNMENT RESPONSE

Page Section

DRAWING

A-103

Key note no 2

Key note no 2 - Provide mesh-reinforced coating roof application. The existing roofing system for the F-632 is noted to be built-up roof per project inspection photos page 9 of 27. What will be the required preparation of the existing built-up roof surface. Please confirm that no repair is required on the existing built-up roofing system.

No repair is required on the BUR. Project requires MREC Application only.

DRAWING

A-102

Key note no 1 and A

Key note no 1 and A - Remove and provide acoustical ceiling tile system on called out ceiling areas additionally on note A to remove, secure and re-install acoustical ceiling panels affected by mechanical, electrical, fire alarm and IDS works. Replace damage and deteriorated ceiling panels. For uniformity in bid pricing please advise percentage of ceiling panels to be replaced based on the ceiling area which will be affected by the other trades work.

Based on actual inspection, replacement of acoustical tiles is between 10-15% only.

Ceiling panels should match the existing panels: Scored 24"x48" panels.

Acoustical Ceiling Tile System will be remove and re-install.

Repair will be minimal which is to replace deteriorated panels and affected by trades work.

DRAWING

A-101, A- 103, A-601

Key note no 1

Key note no 1 - Remove and provide exterior door assembly including door hardware and accessories. We noted that the door count to be replaced from the floor plans A-101 and A-103 against the door schedule on drawing A-601 does not match. From the plans quantity of pair door = 8 sets, single door = 5 sets while the quantity from the schedule A-601 pair door = 8 sets, single door = 10 sets.

Please advise which to follow.

A-101/A-601: 3 units D-02, 3 units D-04, 2 units D-09 = 8 Single Door Assemblies to be provided; 1 unit D-01, 1 unit D- 03, 3 units D-05, 1 unit D-06 = 6 Double Door Assemblies to be provided;

6 units D-07, 1 unit D-08 Door Hardware repair only, Doors to remain.

A-103/A-601: 1 unit D-10, 1 unit D-13 = 2 Door Assemblies to be provided; 1 unit D-11, 1 unit D-12 = 2 Single Door Assemblies to be provided.

DRAWING

A-102 and A-

Key note no 5 to 8 Please provide specification for toilet accessories

Notice of Change 001 (NOC-

001) via amendment 0001 to the RFP: Repair of Heads in F- 631 will not be included in the scope.

DRAWING

A-601

Specification section 08 71 00

Please provide complete door hardware schedule

Door Hardware requirement are in the Door Schedule in A-601.

Refer to Spec Section 08 71 00 Door Hardware. Utilize products that are part of the CNIC NESS (Navy Enterprise Security Systems) Package.

DRAWING

A-101

Key note no 3 - Replace floor finishes

Please advise if wall base will also be replaced. If it is, please provide wall base specification for the following: 1.

ceramic tile floor, 2. carpet tile floor and

3. vinyl composition tile floor

VCT Floor for the following:

Shipping, Receiving & Storage, Spare Parts Storage, Maintenance, Facility Maintenance Storage, Kitchen & Pantry, and the 3 Sensor towers.

Carpet Tiles for the rest of the areas.

Notice of Change 001 (NOC-

001) via amendment 0001 to the RFP:

Repair of Floor Finishes (Carpet tile, Ceramic floor & wall tiles, and VCT) will not be included in this project.

Repair VCT on the Entrance Vestibules only.

DRAWING

A-101

Key note no 3 - Replace floor finishes specification section 09 30 10 - Ceramic tiles

Please confirm and advise if our understanding is correct as follows: 1.

Floor tiles for the toilets will be 150mm x 150mm porcelain tiles 2. Wall tiles for the toilets will be 150mm x 150mm glazed tiles 3. Floor tiles for the rooms will be 300mm x 300mm porcelain tiles

For item 1 & 2: Notice of Change 001 (NOC-001) via an amendment 0001 to the RFP:

Repair of Floor Finishes (Carpet tile, Ceramic floor & wall tiles, and VCT) will not be included in this project.

Repair VCT on the Entrance Vestibules only.

3. a. VCT Floor for: Shipping, Receiving & Storage, Spare Parts Storage, Maintenance, Facility Maintenance Storage, Kitchen & Pantry, and the 3 Sensor towers.

b. Carpet tiles for the rest of the areas.

Seed Project Drawings

Please provide full size scaled drawings for the seed project - eProject 1585121

QS7016 REPAIRS TO GEODDS OPS

BLDG, F-631/F-632

Full size scaled drawings are provided in the RFP.

9 Page 7 00 21 00 – Instructions

C. RESTRICTION

If a company that is incorporated and registered as a full UK company although owned by a US Company, qualifies under the JV requirement of GOV?

The entity described above does not appear to meet the RFP's requirements for a UK/US Joint Venture (JV). The RFP's JV requirements language require that any proposed UK/US JV meet all of the requirements specified in Section C RESTRICTION and

D JOINT VENTURE

REQUIREMENTS. See pages 7 of 62 and 8 of 62 of RFP

21R0079.

10 Page 8 00 21 00 – Instructions

C. RESTRICTION

Also, if so, can the experience of the mother US company be used for the UK based firm considering the limited performance required by the UK firm under the set threshold (JV with the UK at 20% min and US at 60% min).

The RFP specifically described the experience submittal requirements for JV's and the process for utilizing experience information of affiliates/subsidiaries/parent/LL C/LTD member companies.

See pages 15 of 52 last two paragraphs of RFP 21R0079.

11 Page 9 00 21 00 – Instructions

C. RESTRICTION

So, if a UK company is owned by a US company does the UK company still qualify as the UK part of that JV?

See response to question in PPI 9.

In regards to the referenced solicitation, unless we are missing a detail, we couldn't find the pre-proposal meeting date and time for the SEED Project

There will be no pre-proposal meeting date and time for the SEED Project. See page 22 of SF1442, clause 52.236-27. Site visit will be conducted virtually, Photographs pertaining to the seed project are included in Attachment 5.

(5) All other terms and conditions remain unchanged.

SECTION 00 21 00 - INSTRUCTIONS

252.204-7019 NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020)

(a) Definitions.

Basic Assessment, Medium Assessment, and High Assessment have the meaning given in the clause 252.204-7020, NIST SP 800-171 DoD Assessments.

Covered contractor information system has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this solicitation.

(b) Requirement. In order to be considered for award, if the Offeror is required to implement NIST SP 800-171, the Offeror shall have a current assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) (see 252.204-7020) for each covered contractor information system that is relevant to the offer, contract, task order, or delivery order. The Basic, Medium, and High NIST SP 800-171 DoD Assessments are described in the NIST SP 800-171 DoD Assessment Methodology located at https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_implementation_of_NIST_SP_800- 171.html.

(c) Procedures.

(1) The Offeror shall verify that summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) are posted in the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) for all covered contractor information systems relevant to the offer.

(2) If the Offeror does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the Offeror may conduct and submit a Basic Assessment to webptsmh@navy.mil for posting to SPRS in the format identified in paragraph (d) of this provision.

(d) Summary level scores. Summary level scores for all assessments will be posted 30 days post-assessment in SPRS to provide DoD Components visibility into the summary level scores of strategic assessments.

(1) Basic Assessments. An Offeror may follow the procedures in paragraph (c)(2) of this provision for posting Basic Assessments to SPRS.

(i) The email shall include the following information:

(A) Cybersecurity standard assessed (e.g., NIST SP 800-171 Rev 1).

(B) Organization conducting the assessment (e.g., Contractor self-assessment).

(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract--

(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and

(2) A brief description of the system security plan architecture, if more than one plan exists.

(D) Date the assessment was completed.

(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).

(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(ii) If multiple system security plans are addressed in the email described at paragraph (d)(1)(i) of this section, the Offeror shall use the following format for the report:

Brief CAGE codes description of Date of Total Date score of System security plan supported by this the plan assessment score 110 will plan architecture achieved

(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system assessed:

(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).

(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).

(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.

(iv) A brief description of the system security plan architecture, if more than one system security plan exists.

(v) Date and level of the assessment, i.e., medium or high.

(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).

(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(3) Accessibility.

(i) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).

(ii) Authorized representatives of the Offeror for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User's Guide for Awardees/Contractors available at https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf.

(iii) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this section.

DoD will retain and protect any such documentation as "Controlled Unclassified Information (CUI)" and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).

(End of provision)

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020)

(a) Definitions.

Basic Assessment means a contractor's self-assessment of the contractor's implementation of NIST SP 800-171 that-

(1) Is based on the Contractor's review of their system security plan(s) associated with covered contractor information system(s);

(2) Is conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology; and

(3) Results in a confidence level of "Low" in the resulting score, because it is a self-generated score.

Covered contractor information system has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.

High Assessment means an assessment that is conducted by Government personnel using NIST SP 800-171A, Assessing Security Requirements for Controlled Unclassified Information that--

(1) Consists of--

(i) A review of a contractor's Basic Assessment;

(ii) A thorough document review;

(iii) Verification, examination, and demonstration of a Contractor's system security plan to validate that NIST SP 800-171 security requirements have been implemented as described in the contractor's system security plan; and

(iv) Discussions with the contractor to obtain additional information or clarification, as needed; and

(2) Results in a confidence level of "High" in the resulting score.

Medium Assessment means an assessment conducted by the Government that--

(1) Consists of--

(i) A review of a contractor's Basic Assessment;

(ii) A thorough document review; and

(iii) Discussions with the contractor to obtain additional information or clarification, as needed; and

(2) Results in a confidence level of "Medium" in the resulting score.

(b) Applicability. This clause applies to covered contractor information systems that are required to comply with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, in accordance with Defense Federal Acquisition Regulation System (DFARS) clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.

(c) Requirements. The Contractor shall provide access to its facilities, systems, and personnel necessary for the Government to conduct a Medium or High NIST SP 800-171 DoD Assessment, as described in NIST SP 800-171 DoD Assessment Methodology at https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_implementation_of_NIST_SP_800- 171.html, if necessary.

(d) Procedures. Summary level scores for all assessments will be posted in the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) to provide DoD Components visibility into the summary level scores of strategic assessments.

(1) Basic Assessments. A contractor may submit, via encrypted email, summary level scores of Basic Assessments conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology to webptsmh@navy.mil for posting to SPRS.

(i) The email shall include the following information:

(A) Version of NIST SP 800-171 against which the assessment was conducted.

(B) Organization conducting the assessment (e.g., Contractor self-assessment).

(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract--

(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and

(2) A brief description of the system security plan architecture, if more than one plan exists.

(D) Date the assessment was completed.

(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).

(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(ii) If multiple system security plans are addressed in the email described at paragraph (b)(1)(i) of this section, the Contractor shall use the following format for the report:

Brief CAGE codes description of Date of Total Date score of System security plan supported by this the plan assessment score 110 will plan architecture achieved

(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system security plan assessed:

(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).

(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).

(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.

(iv) A brief description of the system security plan architecture, if more than one system security plan exists.

(v) Date and level of the assessment, i.e., medium or high.

(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).

(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(e) Rebuttals. (1) DoD will provide Medium and High Assessment summary level scores to the Contractor and offer the opportunity for rebuttal and adjudication of assessment summary level scores prior to posting the summary level scores to SPRS (see SPRS User's Guide https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf).

(2) Upon completion of each assessment, the contractor has 14 business days to provide additional information to demonstrate that they meet any security requirements not observed by the assessment team or to rebut the findings that may be of question.

(f) Accessibility.

(1) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).

(2) Authorized representatives of the Contractor for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User's Guide for Awardees/Contractors available at https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf.

(3) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this clause.

DoD will retain and protect any such documentation as "Controlled Unclassified Information (CUI)" and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).

(g) Subcontracts.

(1) The Contractor shall insert the substance of this clause, including this paragraph (g), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial items (excluding COTS items).

(2) The Contractor shall not award a subcontract or other contractual instrument, that is subject to the implementation of NIST SP 800-171 security requirements, in accordance with DFARS clause 252.204-7012 of this contract, unless the subcontractor has completed, within the last 3 years, at least a Basic NIST SP 800-171 DoD Assessment, as described in https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_implementation_of_NIST_SP_800- 171.html, for all covered contractor information systems relevant to its offer that are not part of an information technology service or system operated on behalf of the Government.

(3) If a subcontractor does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the subcontractor may conduct and submit a Basic Assessment, in accordance with the NIST SP 800-171 DoD Assessment Methodology, to webptsmh@navy.mil for posting to SPRS along with the information required by paragraph (d) of this clause.

(End of clause)

(End of Summary of Changes) eProject No. 1585121

NXXXXX-XX-X-XXXX

NAVFAC SPECIFICATION

NO. 84-0_-____

Appropriation: O&M, N

CHANGE NOTICE NO. 001

REPAIRS TO GEODSS OPERATIONS BUILDING, F-631/F-632

At The

US Navy Support Facility, Diego Garcia

British Indian Ocean Territory

PREPARED BY:

NAVAL FACILITIES ENGINEERING COMMAND, FAR EAST

Architectural: JOSE F. PAHILANGA, JR. Mechanical: DENNIS T. MANANSALA

Civil: N/A. Electrical: ARNULFO M. JULAGAY

Structural: N/A Fire Protection: T.E.B.

Submitted By (Lead PDE): JOSE F. PAHILANGA, JR. Date: 25 January 2021

REQUEST FOR PROPOSAL APPROVED BY:

Specification / Drawing: JOSE F. PAHILANGA, JR.

FOR COMMANDER, NAFVAC: CECILLE C. PEÑAFLORIDA

Date: 26 January 2021

25 January 2021 eProject 1585121

QS7016 REPAIRS TO GEODSS OPERATIONS BUILDING, F-631

NOTICE OF CHANGE:

The following scope of work in the RFP will be changed as follows:

1. Repair of Floor Finishes: Carpeting; and Vinyl Composite Tiles will not be included. Vinyl Composite tiles in the Entry Vestibules only.

2. Remove, secure, & re-install acoustical ceiling panels affected by mechanical, electrical and fire alarm works. Remove and provide acoustical ceiling system in the Entry Vestibules and Repro Room only.

3. Repair of Men & Women’s Heads in F-631 will not be included.

4. Asbestos abatement will be reduced to affected components only (maintain

20% in IGE for applicable ductwork and entry vestibule ACM Vinyl tiles)

ATTACHMENTS:

1. Attachment-01 included in this Notice of Change shall supersede the following specification in the RFP:

Division 01 11 00 SUMMARY OF WORK

The following specifications in the RFP shall not be applicable to the project:

Division 09 68 00 CARPETING Division 10 21 13 TOILET COMPARTMENTS

2. Attachment-02 included in this Notice of Change shall supersede the following drawings in the RFP:

G-001 (01 of 29) NAVFAC DWG No. 17249824;

A-101 (04 of 29) NAVFAC DWG No. 17249827;

A-102 (05 of 29) NAVFAC DWG No. 17249828;

A-401 (07 of 29) NAVFAC DWG No. 17249830;

- NOTHING FOLLOWS -

REPAIRS TO GEODSS OPS BUILDING, F-631 F-632 1585121

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 SUBMITTALS

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

1.2.2 Location

1.3 OCCUPANCY OF PREMISES

1.4 EXISTING WORK

1.5 LOCATION OF UNDERGROUND UTILITIES

1.5.1 Notification Prior to Excavation

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 00 Page 1

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes the following scope of repairs in the 2 facilities and incidental related work:

GEODSS OPERATIONS BUILDING, F-631

ARCHITECTURAL

1. REMOVE AND PROVIDE VINYL COMPOSITE TILES IN THE ENTRANCE VESTIBULES

ONLY.

2. REPAIR CEILING AFFECTED BY MECHANICAL, FIRE ALARM AND IDS WORKS.

REMOVE, SECURE AND REINSTALL CEILING TILES. PROVIDE REPLACEMENT TILES FOR

DAMAGED AND DETERIORATED CEILING PANELS. USE SCORED 24" X 48" CEILING

PANELS TO MATCH THE EXISTING PANELS.

3. REMOVE AND PROVIDE ACOUSTICAL GRID TILE CEILING SYSTEM IN THE

FOLLOWING AREAS:

A. ENTRANCE VESTIBULES.

B. REPRO ROOM.

4. REPAIR EXTERIOR DOORS. PROVIDE INTRUSION DETECTION SYSTEM (IDS) REFER

TO ELECTRICAL IDS DESIGN.

5. ASBESTOS AND LEAD ABATEMENT.

MECHANICAL

1. REPLACE OUTSIDE AIR FILTER SYSTEM AND DAMPER ACTUATORS. REPAIR

FLEXIBLE DUCT.

ELECTRICAL

1. REMOVE EXISTING LIGHTING FIXTURES AND CONVENIENCE OUTLETS AND PROVIDE

NEW.

FIRE NOTIFICATION

1. REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL PANELS, DEVICES,

CONDUITS AND WIRES AND PROVIDE NEW.

SECTION 01 11 00 Page 2

INTRUSION DETECTION SYSTEM

1. REMOVE EXISTING DOOR LOCK AND ACCESS SYSTEM INCLUDING DEVICES,

HARDWARE AND SOFTWARE COMPUTER, CONDUITS AND WIRES.

2. PROVIDE NEW VINDICATOR 5 INTRUSION DETECTION SYSTEM INCLUDING DOOR

ACCESS SYSTEM AND CCTV SYSTEM COMPLETE WITH HARDWARE, SOFTWARE, CPU

CONTROLLERS, TV MONITORS AND CAMERA SYSTEM.

IDS Notes:

a. Utilize products that are part of the CNIC NESS (Navy Enterprise Security Systems) Package. Use of products that are outside of the NESS APL, risk not being able to connect to the LDC/RDC Monitoring Services.

b. Coordinate with the N61 for the latest guidance and requirements for the LDC/RDC upgrades and requirements to connect the buildings to the LDC/RDC.

GEODSS UTILITY BUILDING, F-632

ARCHITECTURAL

1. PROVIDE MESH-REINFORCED ELASTOMERIC COATING (MREC) SYSTEM.

2. REPAIR EXTERIOR DOORS.

3. REPAIR HEAD (TOILET FIXTURES, WALL & FLOOR FINISHES)

4. ASBESTOS ABATEMENT.

MECHANICAL

1. REPLACE AIR HANDLING UNITS, INCLUDING DUCTWORK, AFFECTED CHILLED WATER

PIPING AND RELATED APPURTENANCES. REPAIR CHILLED WATER PIPING.

2. REPLACE GENERATOR ROOM INTAK DAMPER AND GENERATOR RADIATOR. REPLACE

ACCU FAN MOTORS.

3. PROVIDE TAB, START-UP AND COMMISSIONING.

ELECTRICAL

1. REMOVE EXISTING LIGHTING FIXTURES AND CONVENIENCE OUTLETS AND PROVIDE

NEW.

FIRE NOTIFICATION

1. REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL PANELS, DEVICES,

CONDUITS AND WIRES AND PROVIDE NEW.

INTRUSION DETECTION SYSTEM

1. REMOVE EXISTING DOOR LOCK AND ACCESS SYSTEM INCLUDING DEVICES,

HARDWARE AND SOFTWARE COMPUTER, CONDUITS AND WIRES.

2. PROVIDE NEW VINDICATOR 5 INTRUSION DETECTION SYSTEM INCLUDING DOOR

ACCESS SYSTEM AND CCTV SYSTEM COMPLETE WITH HARDWARE, SOFTWARE, CPU

CONTROLLERS, TV MONITORS AND CAMERA SYSTEM.

1.2.2 Location

The work is located at the the GEODSS Site Facility, the work includes the Operations Building, F-631 and the Utility Building, F-632, approximately as indicated. The exact location will be shown by the Contracting Officer.

SECTION 01 11 00 Page 3

1.3 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract.

Occupancy notifications will be posted in a prominent location in the work area.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.4 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.5 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Verify existing utility locations indicated on contract drawings, within area of work.

1.5.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 4

G-001

RE

PA

IR

S

TO

G

EO

DS

S O

PS

B

UI

LD

IN

G

, F -6

F-

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

FA

R

EA

ST

DIEGO GARCIA

BRITISH INDIAN OCEAN TERRITORY

1585121 QS7016 REPAIRS TO GEODSS OPS BLDG, F-631/F-632

15 MAY 2020

FY20

DESCRIPTION OF WORK

REGIONAL MAP

VICINITY MAP

SITE

A3 LOCATION MAP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 632A

AutoCAD SHX Text 632B

AutoCAD SHX Text

AutoCAD SHX Text 631A

AutoCAD SHX Text 623A

AutoCAD SHX Text

AutoCAD SHX Text

NSF DG

AutoCAD SHX Text 06/05/20

AutoCAD SHX Text

VICINITY , REGIONAL, LOCATION MAPS / DESCRIPTION OF WORK

AutoCAD SHX Text 17249824

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NAVY SUPPORT FACILITY DIEGO GARCIA

AutoCAD SHX Text

DIEGO GARCIA, B.I.O.T.

AutoCAD SHX Text

PWD FEAD PMEB

AutoCAD SHX Text

DIEGO GARCIA, B.I.O.T.

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text 1585121

AutoCAD SHX Text

AutoCAD SHX Text

JP

AutoCAD SHX Text

JP

AutoCAD SHX Text

JG

AutoCAD SHX Text

CCP/JFP

AutoCAD SHX Text

JFP

AutoCAD SHX Text

CCP

AutoCAD SHX Text

TEB

AutoCAD SHX Text CECILLE C. PEÑAFLORIDA Int'l Assoc. AIA

AutoCAD SHX Text 04/07/20

AutoCAD SHX Text N

AutoCAD SHX Text

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND FAR EAST

AutoCAD SHX Text

CONSTRUCTION CONTRACT NO.: NXXXXX-XX-X-XXXX

AutoCAD SHX Text THIS PROJECT WILL REPAIR TWO BUILDINGS AT THE GEODSS SITE FACILITY: THE OPERATIONS BUILDING, F-631 AND THE UTILITY BUILDING, F-632. THE FOLLOWING ARE THE SCOPE OF WORK AND SHALL NOT BE LIMITED TO COMPLETE THE PROJECT: GEODSS OPERATIONS BUILDING, F-631 ARCHITECTURAL 1. REMOVE AND PROVIDE FLOOR FINISHES. REMOVE AND PROVIDE FLOOR FINISHES. 2. REPAIR CEILING AFFECTED BY MECHANICAL WORK. REPAIR CEILING AFFECTED BY MECHANICAL WORK. 3. REPAIR EXTERIOR DOORS. PROVIDE INTRUSION DETECTION REPAIR EXTERIOR DOORS. PROVIDE INTRUSION DETECTION SYSTEM (IDS). 4. ASBESTOS AND LEAD ABATEMENT. ASBESTOS AND LEAD ABATEMENT. MECHANICAL 1. REPLACE OUTSIDE AIR FILTER SYSTEM AND DAMPER REPLACE OUTSIDE AIR FILTER SYSTEM AND DAMPER ACTUATORS. REPAIR FLEXIBLE DUCT. ELECTRICAL 1. REMOVE EXISTING LIGHTING FIXTURES AND CONVENIENCE REMOVE EXISTING LIGHTING FIXTURES AND CONVENIENCE OUTLETS AND PROVIDE NEW. FIRE NOTIFICATION 1. REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL PANELS, REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL PANELS, DEVICES, CONDUITS AND WIRES AND PROVIDE NEW. INTRUSION DETECTION SYSTEM 1. REMOVE EXISTING DOOR LOCK AND ACCESS SYSTEM REMOVE EXISTING DOOR LOCK AND ACCESS SYSTEM INCLUDING DEVICES, HARDWARE AND SOFTWARE COMPUTER, CONDUITS AND WIRES. 2. PROVIDE NEW VINDICATOR 5 INTRUSION DETECTION SYSTEM PROVIDE NEW VINDICATOR 5 INTRUSION DETECTION SYSTEM INCLUDING DOOR ACCESS SYSTEM AND CCTV SYSTEM COMPLETE WITH HARDWARE, SOFTWARE, CPU CONTROLLERS, TV MONITORS AND CAMERA SYSTEM. GEODSS UTILITY BUILDING, F-632 ARCHITECTURAL 1. PROVIDE MESH-REINFORCED ELASTOMERIC COATING (MREC) PROVIDE MESH-REINFORCED ELASTOMERIC COATING (MREC) SYSTEM. 2. REPAIR EXTERIOR DOORS. REPAIR EXTERIOR DOORS. 3. REPAIR HEAD (TOILET FIXTURES, WALL & FLOOR FINISHES) REPAIR HEAD (TOILET FIXTURES, WALL & FLOOR FINISHES) 4. ASBESTOS ABATEMENT. ASBESTOS ABATEMENT. MECHANICAL 1. REPLACE AIR HANDLING UNITS, INCLUDING DUCTWORK, REPLACE AIR HANDLING UNITS, INCLUDING DUCTWORK, AFFECTED CHILLED WATER PIPING AND RELATED APPURTENANCES. REPAIR CHILLED WATER PIPING. 2. REPLACE GENERATOR ROOM INTAK DAMPER AND GENERATOR REPLACE GENERATOR ROOM INTAK DAMPER AND GENERATOR RADIATOR. REPLACE ACCU FAN MOTORS. 3. PROVIDE TAB, START-UP AND COMMISSIONING. PROVIDE TAB, START-UP AND COMMISSIONING. ELECTRICAL 1. REMOVE EXISTING LIGHTING FIXTURES AND CONVENIENCE REMOVE EXISTING LIGHTING FIXTURES AND CONVENIENCE OUTLETS AND PROVIDE NEW. FIRE NOTIFICATION 1. REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL PANELS, REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL PANELS, DEVICES, CONDUITS AND WIRES AND PROVIDE NEW. INTRUSION DETECTION SYSTEM 1. REMOVE EXISTING DOOR LOCK AND ACCESS SYSTEM REMOVE EXISTING DOOR LOCK AND ACCESS SYSTEM INCLUDING DEVICES, HARDWARE AND SOFTWARE COMPUTER, CONDUITS AND WIRES. 2. PROVIDE NEW VINDICATOR 5 INTRUSION DETECTION SYSTEM PROVIDE NEW VINDICATOR 5 INTRUSION DETECTION SYSTEM INCLUDING DOOR ACCESS SYSTEM AND CCTV SYSTEM COMPLETE WITH HARDWARE, SOFTWARE, CPU CONTROLLERS, TV MONITORS AND CAMERA SYSTEM.

AutoCAD SHX Text

INDIA

AutoCAD SHX Text

LANKA

AutoCAD SHX Text

SRI

AutoCAD SHX Text

ARABIA

AutoCAD SHX Text

SAUDI

AutoCAD SHX Text

AFRICA

AutoCAD SHX Text

ASIA

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

INDIAN

AutoCAD SHX Text

AUSTRALIA

AutoCAD SHX Text

EQUATOR

AutoCAD SHX Text

JAVA

AutoCAD SHX Text

SEA

AutoCAD SHX Text

SINGAPORE

AutoCAD SHX Text

THAILAND

AutoCAD SHX Text

BAY OF

AutoCAD SHX Text

BENGAL

AutoCAD SHX Text

ARABIAN

AutoCAD SHX Text

SEA

AutoCAD SHX Text

DIEGO

AutoCAD SHX Text

GARCIA

AutoCAD SHX Text

MADAGASCAR

AutoCAD SHX Text

1000 MILES

AutoCAD SHX Text

1500 MILES

AutoCAD SHX Text

2000 MILES

AutoCAD SHX Text

NTS

AutoCAD SHX Text

ECLIPSE

AutoCAD SHX Text

BAY

AutoCAD SHX Text

WEST

AutoCAD SHX Text

ISLAND

AutoCAD SHX Text

LAGOON

AutoCAD SHX Text

INDIAN

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

DIEGO GARCIA

AutoCAD SHX Text

'DOWNTOWN'

AutoCAD SHX Text

AREA

AutoCAD SHX Text

INDIAN

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

NTS

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 1:1000

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

NAVFAC METRIC DRAWFORM REVISION: 07 AUGUST 2018

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

CUI//FEDCON

AutoCAD SHX Text

CUI//FEDCON

AutoCAD SHX Text

PM/DM

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

CHIEF ENG/ARCH

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text THE CONTRACTOR MUST BE RESPONSIBLE FOR COORDINATING THE WORK MUST BE RESPONSIBLE FOR COORDINATING THE WORK BE RESPONSIBLE FOR COORDINATING THE WORK AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

AutoCAD SHX Text

IF SHEET IS LESS THAN 594 X 841 REDUCED PRINT. USE GRAPHIC SCALES

AutoCAD SHX Text A1

AutoCAD SHX Text

DE-SCOPED; REPAIR OF FLOOR FINISHES IN F-631

AutoCAD SHX Text 01/19/21

AutoCAD SHX Text

WILL NOT BE INCLUDED IN THIS PROJECT; NOC 001

A-101

PA

IR

S

TO

G

EO

DS

S O

PS

B

UI

LD

IN

G

, F -6

/F

-6

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

FA

R

EA

ST

A1 F-631: FLOOR PLAN

ARCHITECTURAL KEY NOTES

SHEET NOTES

GRAPHIC SCALE

AutoCAD SHX Text A.1

AutoCAD SHX Text B.1

AutoCAD SHX Text B.2

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text K.1

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4.1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

C/O OFFICE

AutoCAD SHX Text

SITE MANAGER OFFICE

AutoCAD SHX Text

SECRETARY

AutoCAD SHX Text

SHIPPING, RECEIVING & STORAGE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

COMPUTER AREA

AutoCAD SHX Text

COMMUNICATIONS CENTER

AutoCAD SHX Text

MECHANICAL ELECTRICAL ROOM

AutoCAD SHX Text

SENSOR TOWER NO. 11

AutoCAD SHX Text

SENSOR TOWER NO. 33

AutoCAD SHX Text

TOR

AutoCAD SHX Text

SPARE PARTS STORAGE

AutoCAD SHX Text

MAINTENANCE

AutoCAD SHX Text

FACILITY MAINTENANCE STORAGE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TAPE STORAGE

AutoCAD SHX Text

COMPRESSOR

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

PANTRY BREAKROOM

AutoCAD SHX Text

NCO OPS

AutoCAD SHX Text

REPRO ROOM

AutoCAD SHX Text

HALON STORAGE

AutoCAD SHX Text

HALON STORAGE

AutoCAD SHX Text

AIR FILTER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A-501

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A-501

AutoCAD SHX Text

SENSOR TOWER NO. 22

AutoCAD SHX Text

CONFERENCE ROOM

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

NSF DG

AutoCAD SHX Text 06/05/20

AutoCAD SHX Text

F-631: FLOOR PLAN

AutoCAD SHX Text 17249827

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NAVY SUPPORT FACILITY DIEGO GARCIA

AutoCAD SHX Text

DIEGO GARCIA, B.I.O.T.

AutoCAD SHX Text

PWD FEAD PMEB

AutoCAD SHX Text

DIEGO GARCIA, B.I.O.T.

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text 1585121

AutoCAD SHX Text

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

NAVFAC METRIC DRAWFORM REVISION: 01 FEBRUARY 2017

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

PM/DM

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

CHIEF ENG/ARCH

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text PAPER SIZE: 841mm X 594mm

AutoCAD SHX Text

UNCLASSIFIED/FOR OFFICIAL USE ONLY

AutoCAD SHX Text

UNCLASSIFIED/FOR OFFICIAL USE ONLY

AutoCAD SHX Text

UNCLASSIFIED/FOR OFFICIAL USE ONLY

AutoCAD SHX Text

JP

AutoCAD SHX Text

JP

AutoCAD SHX Text

JG

AutoCAD SHX Text

CCP/JFP

AutoCAD SHX Text

JFP

AutoCAD SHX Text

CCP

AutoCAD SHX Text

TEB

AutoCAD SHX Text CECILLE C. PEÑAFLORIDA Int'l Assoc. AIA

AutoCAD SHX Text 04/07/20

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 1:100

AutoCAD SHX Text A-101

AutoCAD SHX Text REMOVE AND PROVIDE EXTERIOR DOOR ASSEMBLY, INCLUDING DOOR HARDWARE AND ACCESSORIES. SEE A-601.

AutoCAD SHX Text

AutoCAD SHX Text

REMOVE AND PROVIDE ALL CARPET TILE FLOORING.

AutoCAD SHX Text

AutoCAD SHX Text REMOVE AND PROVIDE VINYL COMPOSITE TILE FLOORING. ASBESTOS ABATEMENT OF ACM MASTIC VINYL TILES.

AutoCAD SHX Text

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text REPAIR MEN & WOMEN'S HEAD. REMOVE AND PROVIDE PORCELAIN FLOOR AND WALL TILES. ASBESTOS ABATEMENT OF ACM CERAMIC TILES. REMOVE AND PROVIDE TOILET COMPARTMENTS. REMOVE AND PROVIDE TOILET FIXTURES AND ACCESSORIES. SEE A-401 DETAILS

AutoCAD SHX Text REMOVE, SECURE AND RE-INSTALL ACOUSTICAL CEILING PANELS AFFECTED BY MECHANICAL, ELECTRICAL, FIRE ALARM AND IDS WORKS. REPLACE DAMAGED AND DETERIORATED CEILING PANELS. MATCH EXISTING ACOUSTICAL CEILING PANELS (24" X 48" SCORED).

AutoCAD SHX Text A

AutoCAD SHX Text REMOVE AND PROVIDE INTRUSION DETECTION SYSTEM DEVICE, CIPHER LOCKSET, DOOR HARDWARE AND ACCESSORIES. SEE A-601.

AutoCAD SHX Text

AutoCAD SHX Text

1. FOR CONSTRUCTION DETAILS NOT SHOWN, USE THE FOR CONSTRUCTION DETAILS NOT SHOWN, USE THE MANUFACTURER'S STANDARD DETAILS OR APPROVED SHOP DRAWINGS / DATA SHEETS IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL THE CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND SHALL NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES BEFORE COMMENCING ANY WORK. 3. ALL DIMENSIONS AND/OR ELEVATIONS SHOWN ON THE DRAWINGS ALL DIMENSIONS AND/OR ELEVATIONS SHOWN ON THE DRAWINGS MUST BE VERIFIED ON SITE. 4. THE CONTRACTOR SHALL PROVIDE A COLOR BOARD FOR INTERIOR THE CONTRACTOR SHALL PROVIDE A COLOR BOARD FOR INTERIOR FINISHES FOR CUSTOMER APPROVAL DURING MATERIAL SUBMITTAL AND APPROVAL STAGE.

AutoCAD SHX Text C1

AutoCAD SHX Text A-401

AutoCAD SHX Text N

AutoCAD SHX Text 1:100

AutoCAD SHX Text 10000

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

VERIFY ACTUAL FLOOR FINISHES.

AutoCAD SHX Text B

AutoCAD SHX Text

REMOVE AND PROVIDE ALL FLOOR FINISHES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ALL RAISE ACCESS GRID FLOORING TO REMAIN.

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

DO NOT MOVE EQUIPMENT IN SENSOR TOWERS 1, 2, AND 3.

AutoCAD SHX Text A2

AutoCAD SHX Text A1

AutoCAD SHX Text A2

AutoCAD SHX Text

DE-SCOPED; REPAIR OF FLOOR FINISHES WILL NOT BE

AutoCAD SHX Text 01/19/21

AutoCAD SHX Text A1

AutoCAD SHX Text A1

AutoCAD SHX Text A1

AutoCAD SHX Text A1

AutoCAD SHX Text A1

AutoCAD SHX Text A1

AutoCAD SHX Text A1

AutoCAD SHX Text A2

AutoCAD SHX Text

DE-SCOPED: REPAIR OF MEN & WOMEN'S HEADS IN

AutoCAD SHX Text 01/19/21

AutoCAD SHX Text

F-631 WILL NOT BE INCLUDED IN THE PROJECT;

AutoCAD SHX Text

NOC 001.

AutoCAD SHX Text

INCLUDED; REPAIR VCT ON ENTRY VESTIBULES ONLY;

AutoCAD SHX Text

NOC 001.

A1

A-102

PA

IR

S

TO

G

EO

DS

S O

PS

B

UI

LD

IN

G

, F -6

/F

-6

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

FA

R

EA

ST

A1 F-631: CEILING PLAN

ARCHITECTURAL KEY NOTES

SHEET NOTES

GRAPHIC SCALE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

C/O OFFICE

AutoCAD SHX Text

SITE MANAGER OFFICE

AutoCAD SHX Text

SECRETARY

AutoCAD SHX Text

SENSOR TOWER NO.2

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

COMPUTER AREA

AutoCAD SHX Text

COMMUNICATIONS CENTER

AutoCAD SHX Text

MECHANICAL ELECTRICAL ROOM

AutoCAD SHX Text

SENSOR TOWER NO. 11

AutoCAD SHX Text

SENSOR TOWER NO. 33

AutoCAD SHX Text

TOR

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TAPE STORAGE

AutoCAD SHX Text

COMPRESSOR

AutoCAD SHX Text

NCO OPS

AutoCAD SHX Text

HALON STORAGE

AutoCAD SHX Text

HALON STORAGE

AutoCAD SHX Text

AIR FILTER

AutoCAD SHX Text A.1

AutoCAD SHX Text B.1

AutoCAD SHX Text B.2

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text K.1

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4.1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NSF DG

AutoCAD SHX Text 06/05/20

AutoCAD SHX Text

F-631: CEILING PLAN

AutoCAD SHX Text 17249828

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NAVY SUPPORT FACILITY DIEGO GARCIA

AutoCAD SHX Text

DIEGO GARCIA, B.I.O.T.

AutoCAD SHX Text

PWD FEAD PMEB

AutoCAD SHX Text

DIEGO GARCIA, B.I.O.T.

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text 1585121

AutoCAD SHX Text

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

NAVFAC METRIC DRAWFORM REVISION: 01 FEBRUARY 2017

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

PM/DM

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

CHIEF ENG/ARCH

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text PAPER SIZE: 841mm X 594mm

AutoCAD SHX Text

UNCLASSIFIED/FOR OFFICIAL USE ONLY

AutoCAD SHX Text

UNCLASSIFIED/FOR OFFICIAL USE ONLY

AutoCAD SHX Text

UNCLASSIFIED/FOR OFFICIAL USE ONLY

AutoCAD SHX Text

JP

AutoCAD SHX Text

JP

AutoCAD SHX Text

JG

AutoCAD SHX Text

CCP/JFP

AutoCAD SHX Text

JFP

AutoCAD SHX Text

CCP

AutoCAD SHX Text

TEB

AutoCAD SHX Text CECILLE C. PEÑAFLORIDA Int'l Assoc. AIA

AutoCAD SHX Text 04/07/20

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 1:100

AutoCAD SHX Text A-102

AutoCAD SHX Text REMOVE AND PROVIDE ACOUSTICAL CEILING TILE SYSTEM, INCLUDING HANGERS, SUPPORTS AND ACCESSORIES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. FOR CONSTRUCTION DETAILS NOT SHOWN, USE THE FOR CONSTRUCTION DETAILS NOT SHOWN, USE THE MANUFACTURER'S…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .