This document outlines the scope of work for a federal contract to remove and dispose of sunken sections of Pier 1006 in Sasebo, Japan. The Naval Facilities Engineering Command Far East will award a fixed-price contract for one year to remove four sunken pontoon sections from the pier, minimize damage to existing piles, disconnect utilities, and dispose of all demolished materials off base. The contractor must submit an accident prevention plan, crane plan, dive plan, construction schedule and disposal documents for approval before starting work. Key deliverables include removing the sunken sections, relocating another section, and cleaning the job site daily.
Attachment (5) 1655714 Scope of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch_(b)_Base_Access_Pass_DBIDS_Card.xlsx | XLSX spreadsheet | |
| Atch_(4)_1559823_Drawings_(16_Pages).pdf | ||
| Atch_(a)_Pre-Bid_Inquiry_Form.doc | DOC document | |
| Atch_(3)_1559823_Spec-Final_(8_Pages).pdf | ||
| Atch_(2)_1623066_Drawings_(6_pages).pdf | ||
| Atch_(c)_Provision_52.204-24.pdf | ||
| IFB_N4008420B6501_Maintenance_Dredging.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Removal and Disposal of Sunken Sections of Pier 1006 Sasebo, Japan 22 October 2019
NAVFAC FAR EAST
SOW 22 Oct 2019
1.0 General Description
1.1 The Contractor shall provide supervision, labor, material, and equipment required to perform all work for the following project: Removal and Disposal of Sunken Sections of Pier 1006. All work shall be done in a manner to provide a complete, usable and finished end product. See section “11. Work Requirements” for an expanded and detailed scope of work.
1.2 All work shall be performed in accordance with, but not limited to, standard industry practices, applicable local, prefectural, and U.S. federal codes, laws, and .
2.0 Location
2.1 The work shall be performed at U.S. Fleet Activities, Sasebo, Japan
3.0 Time for Completion
3.1 The project Contraction Completion Date (CCD) shall be 365 calendar days from award.
4.0 Examination of the Premises
4.1 Contractor shall reference FAR Part 52.236-3 titled “Site Investigation and Conditions Affecting the Work”. Site visits by contractors are encouraged and can be arranged by contacting the Contracting Office.
5.0 Inspection and Approval
5.1 All material and workmanship shall be subject to the inspection and approval of the Government
6.0 Special Scheduling Requirements/Work Procedures
6.1 Existing and adjacent spaces to remain in operation during construction shall be protected from damage, dust, and debris at all times. Damage to any existing spaces, finishes, items, furniture and equipment, as a result of the contractor’s operations, shall be replaced in-kind by the Contractor at no expense to the Government.
6.2 Construction work areas shall have complete and secure separation from adjacent occupied areas.
6.3 Ensure procedures for scheduling outages are included if appropriate.
7.0 Passes and Badges
7.1 All Contractor employees shall obtain the required employee and vehicle passes.
UNCLASSIFIED/FOR OFFICIAL USE ONLY
Removal and Disposal of Sunken Sections of Pier 1006 Sasebo, Japan 22 October 2019
8.0 Safety
8.1 All work shall be conducted in a safe manner and shall comply with all requirements of the U.S. Army Corps of Engineers Safety and Health Requirements Manual EM-385-1-1.
8.2 The Contractor shall submit the Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA) plan for approval by the Contracting Officer. Submit within 60 days from issuance of this Task Order, and obtain approval prior to start of any construction activities.
9.0 Pre-Construction Conference
9.1 Within 90 workdays of issuance of the task order, the contractor shall contact the Contracting Officer Representative to schedule a pre-construction conference.
10.0 Submittals
10.1 The Contractor shall submit an accident prevention plan (APP), crane plan, dive plan, construction schedule, disposal method and manifests documents required for government approval, prior to the start of any construction activities.
11.0 Work Requirements
11.1 Remove and dispose of sunken pontoon sections at Pier 1006 as shown on page of this document.
11.2 The pier sections shall be removed in a manner which preserves as much of the existing piles as possible. Damage to piles shall be minimized in order to preserve for future use.
11.3 Pier utilities shall be disconnected by the Contractor.
11.4 Pontoon sections A, B, C, and D are underwater. Estimated weight calculations are shown on page .
11.5 The contractor shall dispose of all existing demolished/removed material off base and will completely clean up job site daily at the end of every work day.
LOCATION MAP
NAVAL FACILITIES ENGINEERING COMMAND FAR EAST
C1
EX
IS
TI
NG
A
ND
S
IT
E
PL
AN
O F
PI
ER
U N
C
LA
SS
IF
IE
D
/F O
R O
FF
IC
IA
L
U
SE
O N
LY
R em ov e
D is po se of
Su nk en Se ct io n -C
R em ov e
D is po se of
Su nk en Se ct io n -B
R em ov e
D is po se of
Su nk en Se ct io n -D
R em ov e
D is po se of
Su nk en Se ct io n -A
R el oc at e Se ct io n -E to lo ca tio n of re m ov ed se ct io n
-A
U N
C
LA
SS
IF
IE
D
/F O
R O
FF
IC
IA
L
U
SE
O
LY
C
LA
SS
IF
IE
D
/F O
R O
FF
IC
IA
L
U
SE
O
C
LA
SS
IF
IE
D
/F O
R O
FF
IC
IA
L
U
SE
O
File details come from the government source that posted it. Updated .