Atch(2)_J-0200000-14 ELINs.xlsx

XLSX spreadsheet 110 KB Posted

Attached to
Indoor Small Arms Range (ISAR) Cleaning and Ventilation System Maintenance Services at U. S. MCAS Iwakuni, Japan
Solicitation number
N4008420B5403
Issued by

View the file

Other files

File Type Posted
20B5403_A0002.pdf PDF
Encl(2)_Amend_List_A0001.pdf PDF
20B5403_A0001.pdf PDF
Encl(3)_Pictures.pdf PDF
Atch(4)_PreBid_Inquiry_Form.xlsx XLSX spreadsheet
Atch(3)_1-Day_Official_Entry-Exit_Request.pdf PDF
20B5403_SF1449.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE REC

ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N4008420B5403
EXHIBIT A - CLIN 0001
Line Item 0001 Recurring Work - Base Period
PROVIDE PRICES TO PERFORM SERVICES FOR MCAS IWAKUNI - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A002
Note: The Contractor may be required to submit the breakdown of the ELIN prices during the contract period. If requested, the breakdown shall be submitted at no additional cost to the Government.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
SLIN 000101STATION
11502000 Facility Investment
1AAPreventive Maintenance (PM) services per Spec Item 3.1 and its subordinate Spec Items.1YR¥ -
1ABOther Recurring Services per Spec Item 3.2 and its subordinate Spec Items.1YR¥ -
1502000 Sub-total¥ -
21800000 Environmental
2AARange Cleaning Services per Spec Item 3.1 and its subordinate Spec Items.1YR¥ -
1800000 Sub-total¥ -
TOTAL RECURRING WORK PRICE - BASE PERIOD¥ -
YR = Year

&"Times New Roman,Regular"&8&KFF0000UNCLASSIFIED/FOR OFFICIAL USE ONLY

BASE NON-REC

ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N4008420B5403
EXHIBIT A - CLIN 0002
Line Item 0002 Non-Recurring Work - Base Period
PROVIDE PRICES FOR INDOOR SMALL ARMS RANGE MAINTENANCE SERVICES - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A710
Part Number (ELIN)Part Name (Product) (120 Characters)PriceUnit of IssueUnit per UOI (Quantity)OEM Name (Contractor Name)OEM Number (ELIN)Description (NTE 120 Characters)ARO DaysPSC CodeLong Description (NTE 2,048)Estimated QuantityExtended Price (Price × Estimated Quantity)IMAP CAC
Unit Priced Task (UPT) Work
1502000Facility Investment
A700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsEA1A700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsThe Contractor shall replace all filters; two (2) layers for supply air system (ACC-1 No.1 & No.2) and three (3) layers for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
1ALL FILTERS replacement for SUPPLY AIR systemEA1ALL FILTERS replacement for SUPPLY AIR systemThe Contractor shall replace all filters (two layers) for the supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
2ALL FILTERS replacement for EXHAUST systemEA1ALL FILTERS replacement for EXHAUST systemThe Contractor shall replace all filters (three layers) for the exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
3PREFILTERS replacement for SUPPLY AIR systemEA13PREFILTERS replacement for SUPPLY AIR systemThe Contractor shall replace prefilters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
4MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemEA14MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemThe Contractor shall replace medium-performance filters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
5PREFILTERS replacement for EXHAUST systemEA15PREFILTERS replacement for EXHAUST systemThe Contractor shall replace prefilters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
6MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemEA1MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemThe Contractor shall replace medium-performance filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
7HEPA FILTERS replacement for EXHAUST systemEA17HEPA FILTERS replacement for EXHAUST systemThe Contractor shall replace HEPA filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
1800000Environmental
8Training Range CleaningEA1Training Range CleaningThe Contractor shall clean the training range per Spec Item 3.1 and its subordinate spec items.2¥ -
Unit Priced Labor (UPL) Work
Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work.

Also refer to J-0200000-01, Definitions and Acronyms, for the description of UPL Hour to determine the labor hour unit prices below.

Labor
9Unit Priced Labor Work - MUST BE NEGOTIATED BY KO9Labor HoursLabor Price Total of A709AA through A709AD¥ -
9AALabor Price - CustodianHR19Labor Price - CustodianProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.150¥ -
9ABLabor Price -Maintenance EngineerHR1Labor Price -Maintenance EngineerProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.150¥ -
9ACLabor Price -SSHOHR19Labor Price -SSHOProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.50¥ -
9ADLabor Price -QMHR19Labor Price -QMProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.50¥ -
Material and Equipment
10Material and Equipment Costs- MUST BE NEGOTIATED BY KO¥ 1EA110Materials and EquipmentProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A709.5,000,000¥ 5,000,000
Fixed Burden Rate (FBR)%Fixed Burden Rate (FBR)The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO.

For example, if the Contractor's Fixed Burden Rate in this period is 10%, then the total negotiated material and equipment cost equals ¥110,000 = ¥100,000 + (¥100,000 x 10%).

TOTAL NON-RECURRING WORK PRICE - BASE PERIOD¥ 5,000,000
Abbreviations: EA = Each, HR = Hour
Special Notes to Offerors:
(1) Price Column - Prices must be expressed in whole YEN amounts. Extended Price must equal Price multiplied by Estimated Quantity.
(2) For all Non-recurring negotiated task order work, the Contractor shall provide a breakdown of labor hours, material and equipment prices as a part of the price proposal. Overhead and profit is not authorized for subcontracted costs. The price breakdown shall be included in the Non-Recurring Work Proposal. Refer to Spec Item 2.15.2.1 of Annex 2.

(3) For FedMall orders, the Contractor shall contact the supported command upon completion of work for acceptance and payment.

1st REC

ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N4008420B5403
EXHIBIT A - CLIN 0003
Line Item 0003 Recurring Work - 1st Option Period
PROVIDE PRICES TO PERFORM SERVICES FOR MCAS IWAKUNI - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 through B002
Note: The Contractor may be required to submit the breakdown of the ELIN prices during the contract period. If requested, the breakdown shall be submitted at no additional cost to the Government.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
SLIN 000101STATION
11502000 Facility Investment
1AAPreventive Maintenance (PM) services per Spec Item 3.1 and its subordinate Spec Items.1YR¥ -
1ABOther Recurring Services per Spec Item 3.2 and its subordinate Spec Items.1YR¥ -
1502000 Sub-total¥ -
21800000 Environmental
2AARange Cleaning Services per Spec Item 3.1 and its subordinate Spec Items.1YR¥ -
1800000 Sub-total¥ -
TOTAL RECURRING WORK PRICE - 1st OPTION PERIOD¥ -
YR = Year

1st NON-REC

ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N4008420B5403
EXHIBIT A - CLIN 0004
Line Item 0004 Non-Recurring Work - 1st Option Period
PROVIDE PRICES FOR INDOOR SMALL ARMS RANGE MAINTENANCE SERVICES - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B700 through B710
Part Number (ELIN)Part Name (Product) (120 Characters)PriceUnit of IssueUnit per UOI (Quantity)OEM Name (Contractor Name)OEM Number (ELIN)Description (NTE 120 Characters)ARO DaysPSC CodeLong Description (NTE 2,048)Estimated QuantityExtended Price (Price × Estimated Quantity)IMAP CAC
Unit Priced Task (UPT) Work
1502000Facility Investment
B700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsEA1B700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsThe Contractor shall replace all filters; two (2) layers for supply air system (ACC-1 No.1 & No.2) and three (3) layers for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
1ALL FILTERS replacement for SUPPLY AIR systemEA1ALL FILTERS replacement for SUPPLY AIR systemThe Contractor shall replace all filters (two layers) for the supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
2ALL FILTERS replacement for EXHAUST systemEA1ALL FILTERS replacement for EXHAUST systemThe Contractor shall replace all filters (three layers) for the exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
3PREFILTERS replacement for SUPPLY AIR systemEA13PREFILTERS replacement for SUPPLY AIR systemThe Contractor shall replace prefilters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
4MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemEA14MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemThe Contractor shall replace medium-performance filters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
5PREFILTERS replacement for EXHAUST systemEA15PREFILTERS replacement for EXHAUST systemThe Contractor shall replace prefilters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
6MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemEA1MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemThe Contractor shall replace medium-performance filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
7HEPA FILTERS replacement for EXHAUST systemEA17HEPA FILTERS replacement for EXHAUST systemThe Contractor shall replace HEPA filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
1800000Environmental
8Training Range CleaningEA1Training Range CleaningThe Contractor shall clean the training range per Spec Item 3.1 and its subordinate spec items.2¥ -
Unit Priced Labor (UPL) Work
Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work.

Also refer to J-0200000-01, Definitions and Acronyms, for the description of UPL Hour to determine the labor hour unit prices below.

Labor
9Unit Priced Labor Work - MUST BE NEGOTIATED BY KO9Labor HoursLabor Price Total of A709AA through A709AD¥ -
9AALabor Price - CustodianHR19Labor Price - CustodianProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.150¥ -
9ABLabor Price -Maintenance EngineerHR1Labor Price -Maintenance EngineerProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.150¥ -
9ACLabor Price -SSHOHR19Labor Price -SSHOProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.50¥ -
9ADLabor Price -QMHR19Labor Price -QMProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.50¥ -
Material and Equipment
10Material and Equipment Costs- MUST BE NEGOTIATED BY KO¥ 1EA110Materials and EquipmentProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B709.5,000,000¥ 5,000,000
Fixed Burden Rate (FBR)%Fixed Burden Rate (FBR)The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO.

For example, if the Contractor's Fixed Burden Rate in this period is 10%, then the total negotiated material and equipment cost equals ¥110,000 = ¥100,000 + (¥100,000 x 10%).

TOTAL NON-RECURRING WORK PRICE - 1st OPTION PERIOD¥ 5,000,000
Abbreviations: EA = Each, HR = Hour
Special Notes to Offerors:
(1) Price Column - Prices must be expressed in whole YEN amounts. Extended Price must equal Price multiplied by Estimated Quantity.
(2) For all Non-recurring negotiated task order work, the Contractor shall provide a breakdown of labor hours, material and equipment prices as a part of the price proposal. Overhead and profit is not authorized for subcontracted costs. The price breakdown shall be included in the Non-Recurring Work Proposal. Refer to Spec Item 2.15.2.1 of Annex 2.

(3) For FedMall orders, the Contractor shall contact the supported command upon completion of work for acceptance and payment.

2nd REC

ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N4008420B5403
EXHIBIT A - CLIN 0005
Line Item 0005 Recurring Work - 2nd Option Period
PROVIDE PRICES TO PERFORM SERVICES FOR MCAS IWAKUNI - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs C001 through C002
Note: The Contractor may be required to submit the breakdown of the ELIN prices during the contract period. If requested, the breakdown shall be submitted at no additional cost to the Government.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
SLIN 000101STATION
11502000 Facility Investment
1AAPreventive Maintenance (PM) services per Spec Item 3.1 and its subordinate Spec Items.1YR¥ -
1ABOther Recurring Services per Spec Item 3.2 and its subordinate Spec Items.1YR¥ -
1502000 Sub-total¥ -
21800000 Environmental
2AARange Cleaning Services per Spec Item 3.1 and its subordinate Spec Items.1YR¥ -
1800000 Sub-total¥ -
TOTAL RECURRING WORK PRICE - 2nd OPTION PERIOD¥ -
YR = Year

2nd NON-REC

ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N4008420B5403
EXHIBIT A - CLIN 0006
Line Item 0006 Non-Recurring Work - 2nd Option Period
PROVIDE PRICES FOR INDOOR SMALL ARMS RANGE MAINTENANCE SERVICES - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C700 through C710
Part Number (ELIN)Part Name (Product) (120 Characters)PriceUnit of IssueUnit per UOI (Quantity)OEM Name (Contractor Name)OEM Number (ELIN)Description (NTE 120 Characters)ARO DaysPSC CodeLong Description (NTE 2,048)Estimated QuantityExtended Price (Price × Estimated Quantity)IMAP CAC
Unit Priced Task (UPT) Work
1502000Facility Investment
C700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsEA1C700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsThe Contractor shall replace all filters; two (2) layers for supply air system (ACC-1 No.1 & No.2) and three (3) layers for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
1ALL FILTERS replacement for SUPPLY AIR systemEA1ALL FILTERS replacement for SUPPLY AIR systemThe Contractor shall replace all filters (two layers) for the supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
2ALL FILTERS replacement for EXHAUST systemEA1ALL FILTERS replacement for EXHAUST systemThe Contractor shall replace all filters (three layers) for the exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
3PREFILTERS replacement for SUPPLY AIR systemEA13PREFILTERS replacement for SUPPLY AIR systemThe Contractor shall replace prefilters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
4MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemEA14MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemThe Contractor shall replace medium-performance filters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
5PREFILTERS replacement for EXHAUST systemEA15PREFILTERS replacement for EXHAUST systemThe Contractor shall replace prefilters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
6MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemEA1MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemThe Contractor shall replace medium-performance filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
7HEPA FILTERS replacement for EXHAUST systemEA17HEPA FILTERS replacement for EXHAUST systemThe Contractor shall replace HEPA filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
1800000Environmental
8Training Range CleaningEA1Training Range CleaningThe Contractor shall clean the training range per Spec Item 3.1 and its subordinate spec items.2¥ -
Unit Priced Labor (UPL) Work
Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work.

Also refer to J-0200000-01, Definitions and Acronyms, for the description of UPL Hour to determine the labor hour unit prices below.

Labor
9Unit Priced Labor Work - MUST BE NEGOTIATED BY KO9Labor HoursLabor Price Total of A709AA through A709AD¥ -
9AALabor Price - CustodianHR19Labor Price - CustodianProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.150¥ -
9ABLabor Price -Maintenance EngineerHR1Labor Price -Maintenance EngineerProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.150¥ -
9ACLabor Price -SSHOHR19Labor Price -SSHOProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.50¥ -
9ADLabor Price -QMHR19Labor Price -QMProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.50¥ -
Material and Equipment
10Material and Equipment Costs- MUST BE NEGOTIATED BY KO¥ 1EA110Materials and EquipmentProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN C709.5,000,000¥ 5,000,000
Fixed Burden Rate (FBR)%Fixed Burden Rate (FBR)The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO.

For example, if the Contractor's Fixed Burden Rate in this period is 10%, then the total negotiated material and equipment cost equals ¥110,000 = ¥100,000 + (¥100,000 x 10%).

TOTAL NON-RECURRING WORK PRICE - 2nd OPTION PERIOD¥ 5,000,000
Abbreviations: EA = Each, HR = Hour
Special Notes to Offerors:
(1) Price Column - Prices must be expressed in whole YEN amounts. Extended Price must equal Price multiplied by Estimated Quantity.
(2) For all Non-recurring negotiated task order work, the Contractor shall provide a breakdown of labor hours, material and equipment prices as a part of the price proposal. Overhead and profit is not authorized for subcontracted costs. The price breakdown shall be included in the Non-Recurring Work Proposal. Refer to Spec Item 2.15.2.1 of Annex 2.

(3) For FedMall orders, the Contractor shall contact the supported command upon completion of work for acceptance and payment.

3rd REC

ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N4008420B5403
EXHIBIT A - CLIN 0007
Line Item 0007 Recurring Work - 3rd Option Period
PROVIDE PRICES TO PERFORM SERVICES FOR MCAS IWAKUNI - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs D001 through D002
Note: The Contractor may be required to submit the breakdown of the ELIN prices during the contract period. If requested, the breakdown shall be submitted at no additional cost to the Government.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
SLIN 000101STATION
11502000 Facility Investment
1AAPreventive Maintenance (PM) services per Spec Item 3.1 and its subordinate Spec Items.1YR¥ -
1ABOther Recurring Services per Spec Item 3.2 and its subordinate Spec Items.1YR¥ -
1502000 Sub-total¥ -
21800000 Environmental
2AARange Cleaning Services per Spec Item 3.1 and its subordinate Spec Items.1YR¥ -
1800000 Sub-total¥ -
TOTAL RECURRING WORK PRICE - 3rd OPTION PERIOD¥ -
YR = Year

3rd NON-REC

ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N4008420B5403
EXHIBIT A - CLIN 0008
Line Item 0008 Non-Recurring Work - 3rd Option Period
PROVIDE PRICES FOR INDOOR SMALL ARMS RANGE MAINTENANCE SERVICES - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs D700 through D710
Part Number (ELIN)Part Name (Product) (120 Characters)PriceUnit of IssueUnit per UOI (Quantity)OEM Name (Contractor Name)OEM Number (ELIN)Description (NTE 120 Characters)ARO DaysPSC CodeLong Description (NTE 2,048)Estimated QuantityExtended Price (Price × Estimated Quantity)IMAP CAC
Unit Priced Task (UPT) Work
1502000Facility Investment
D700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsEA1D700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsThe Contractor shall replace all filters; two (2) layers for supply air system (ACC-1 No.1 & No.2) and three (3) layers for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
1ALL FILTERS replacement for SUPPLY AIR systemEA1ALL FILTERS replacement for SUPPLY AIR systemThe Contractor shall replace all filters (two layers) for the supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
2ALL FILTERS replacement for EXHAUST systemEA1ALL FILTERS replacement for EXHAUST systemThe Contractor shall replace all filters (three layers) for the exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
3PREFILTERS replacement for SUPPLY AIR systemEA13PREFILTERS replacement for SUPPLY AIR systemThe Contractor shall replace prefilters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
4MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemEA14MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemThe Contractor shall replace medium-performance filters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
5PREFILTERS replacement for EXHAUST systemEA15PREFILTERS replacement for EXHAUST systemThe Contractor shall replace prefilters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
6MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemEA1MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemThe Contractor shall replace medium-performance filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
7HEPA FILTERS replacement for EXHAUST systemEA17HEPA FILTERS replacement for EXHAUST systemThe Contractor shall replace HEPA filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
1800000Environmental
8Training Range CleaningEA1Training Range CleaningThe Contractor shall clean the training range per Spec Item 3.1 and its subordinate spec items.2¥ -
Unit Priced Labor (UPL) Work
Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work.

Also refer to J-0200000-01, Definitions and Acronyms, for the description of UPL Hour to determine the labor hour unit prices below.

Labor
9Unit Priced Labor Work - MUST BE NEGOTIATED BY KO9Labor HoursLabor Price Total of A709AA through A709AD¥ -
9AALabor Price - CustodianHR19Labor Price - CustodianProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.150¥ -
9ABLabor Price -Maintenance EngineerHR1Labor Price -Maintenance EngineerProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.150¥ -
9ACLabor Price -SSHOHR19Labor Price -SSHOProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.50¥ -
9ADLabor Price -QMHR19Labor Price -QMProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.50¥ -
Material and Equipment
10Material and Equipment Costs- MUST BE NEGOTIATED BY KO¥ 1EA110Materials and EquipmentProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN D709.5,000,000¥ 5,000,000
Fixed Burden Rate (FBR)%Fixed Burden Rate (FBR)The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO.

For example, if the Contractor's Fixed Burden Rate in this period is 10%, then the total negotiated material and equipment cost equals ¥110,000 = ¥100,000 + (¥100,000 x 10%).

TOTAL NON-RECURRING WORK PRICE - 3rd OPTION PERIOD¥ 5,000,000
Abbreviations: EA = Each, HR = Hour
Special Notes to Offerors:
(1) Price Column - Prices must be expressed in whole YEN amounts. Extended Price must equal Price multiplied by Estimated Quantity.
(2) For all Non-recurring negotiated task order work, the Contractor shall provide a breakdown of labor hours, material and equipment prices as a part of the price proposal. Overhead and profit is not authorized for subcontracted costs. The price breakdown shall be included in the Non-Recurring Work Proposal. Refer to Spec Item 2.15.2.1 of Annex 2.

(3) For FedMall orders, the Contractor shall contact the supported command upon completion of work for acceptance and payment.

4th REC

ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N4008420B5403
EXHIBIT A - CLIN 0009
Line Item 0009 Recurring Work - 4th Option Period
PROVIDE PRICES TO PERFORM SERVICES FOR MCAS IWAKUNI - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs E001 through E002
Note: The Contractor may be required to submit the breakdown of the ELIN prices during the contract period. If requested, the breakdown shall be submitted at no additional cost to the Government.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
SLIN 000101STATION
11502000 Facility Investment
1AAPreventive Maintenance (PM) services per Spec Item 3.1 and its subordinate Spec Items.1YR¥ -
1ABOther Recurring Services per Spec Item 3.2 and its subordinate Spec Items.1YR¥ -
1502000 Sub-total¥ -
21800000 Environmental
2AARange Cleaning Services per Spec Item 3.1 and its subordinate Spec Items.1YR¥ -
1800000 Sub-total¥ -
TOTAL RECURRING WORK PRICE - 4th OPTION PERIOD¥ -
YR = Year

4th NON-REC

ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N4008420B5403
EXHIBIT A - CLIN 0010
Line Item 0010 Non-Recurring Work - 4th Option Period
PROVIDE PRICES FOR INDOOR SMALL ARMS RANGE MAINTENANCE SERVICES - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs E700 through E710
Part Number (ELIN)Part Name (Product) (120 Characters)PriceUnit of IssueUnit per UOI (Quantity)OEM Name (Contractor Name)OEM Number (ELIN)Description (NTE 120 Characters)ARO DaysPSC CodeLong Description (NTE 2,048)Estimated QuantityExtended Price (Price × Estimated Quantity)IMAP CAC
Unit Priced Task (UPT) Work
1502000Facility Investment
E700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsEA1E700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsThe Contractor shall replace all filters; two (2) layers for supply air system (ACC-1 No.1 & No.2) and three (3) layers for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
1ALL FILTERS replacement for SUPPLY AIR systemEA1ALL FILTERS replacement for SUPPLY AIR systemThe Contractor shall replace all filters (two layers) for the supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
2ALL FILTERS replacement for EXHAUST systemEA1ALL FILTERS replacement for EXHAUST systemThe Contractor shall replace all filters (three layers) for the exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
3PREFILTERS replacement for SUPPLY AIR systemEA13PREFILTERS replacement for SUPPLY AIR systemThe Contractor shall replace prefilters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
4MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemEA14MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemThe Contractor shall replace medium-performance filters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
5PREFILTERS replacement for EXHAUST systemEA15PREFILTERS replacement for EXHAUST systemThe Contractor shall replace prefilters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
6MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemEA1MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemThe Contractor shall replace medium-performance filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
7HEPA FILTERS replacement for EXHAUST systemEA17HEPA FILTERS replacement for EXHAUST systemThe Contractor shall replace HEPA filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1.1¥ -
1800000Environmental
8Training Range CleaningEA1Training Range CleaningThe Contractor shall clean the training range per Spec Item 3.1 and its subordinate spec items.2¥ -
Unit Priced Labor (UPL) Work
Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work.

Also refer to J-0200000-01, Definitions and Acronyms, for the description of UPL Hour to determine the labor hour unit prices below.

Labor
9Unit Priced Labor Work - MUST BE NEGOTIATED BY KO9Labor HoursLabor Price Total of A709AA through A709AD¥ -
9AALabor Price - CustodianHR19Labor Price - CustodianProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.150¥ -
9ABLabor Price -Maintenance EngineerHR1Labor Price -Maintenance EngineerProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.150¥ -
9ACLabor Price -SSHOHR19Labor Price -SSHOProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.50¥ -
9ADLabor Price -QMHR19Labor Price -QMProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.50¥ -
Material and Equipment
10Material and Equipment Costs- MUST BE NEGOTIATED BY KO¥ 1EA110Materials and EquipmentProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN E709.5,000,000¥ 5,000,000
Fixed Burden Rate (FBR)%Fixed Burden Rate (FBR)The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO.

For example, if the Contractor's Fixed Burden Rate in this period is 10%, then the total negotiated material and equipment cost equals ¥110,000 = ¥100,000 + (¥100,000 x 10%).

TOTAL NON-RECURRING WORK PRICE - 4th OPTION PERIOD¥ 5,000,000
Abbreviations: EA = Each, HR = Hour
Special Notes to Offerors:
(1) Price Column - Prices must be expressed in whole YEN amounts. Extended Price must equal Price multiplied by Estimated Quantity.
(2) For all Non-recurring negotiated task order work, the Contractor shall provide a breakdown of labor hours, material and equipment prices as a part of the price proposal. Overhead and profit is not authorized for subcontracted costs. The price breakdown shall be included in the Non-Recurring Work Proposal. Refer to Spec Item 2.15.2.1 of Annex 2.

(3) For FedMall orders, the Contractor shall contact the supported command upon completion of work for acceptance and payment.

File details come from the government source that posted it. Updated .