BASE REC
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008420B5403 |
| EXHIBIT A - CLIN 0001 |
| Line Item 0001 Recurring Work - Base Period |
| PROVIDE PRICES TO PERFORM SERVICES FOR MCAS IWAKUNI - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs A001 through A002 |
| Note: The Contractor may be required to submit the breakdown of the ELIN prices during the contract period. If requested, the breakdown shall be submitted at no additional cost to the Government. |
| ELIN / Sub ELIN | | Description | Quantity | Unit of Issue | Unit Price | Total |
| SLIN 000101 | | STATION | | | | |
| 1 | 1502000 Facility Investment | | | | | |
| 1 | AA | Preventive Maintenance (PM) services per Spec Item 3.1 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| 1 | AB | Other Recurring Services per Spec Item 3.2 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| | | | | 1502000 Sub-total | ¥ - |
| 2 | 1800000 Environmental | | | | | |
| 2 | AA | Range Cleaning Services per Spec Item 3.1 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| | | | | 1800000 Sub-total | ¥ - |
| TOTAL RECURRING WORK PRICE - BASE PERIOD | ¥ - |
| YR = Year | | |
&"Times New Roman,Regular"&8&KFF0000UNCLASSIFIED/FOR OFFICIAL USE ONLY
BASE NON-REC
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008420B5403 |
| EXHIBIT A - CLIN 0002 |
| Line Item 0002 Non-Recurring Work - Base Period |
| PROVIDE PRICES FOR INDOOR SMALL ARMS RANGE MAINTENANCE SERVICES - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A710 |
| Part Number (ELIN) | | Part Name (Product) (120 Characters) | Price | Unit of Issue | Unit per UOI (Quantity) | OEM Name (Contractor Name) | OEM Number (ELIN) | Description (NTE 120 Characters) | ARO Days | PSC Code | Long Description (NTE 2,048) | Estimated Quantity | Extended Price (Price × Estimated Quantity) | IMAP CAC |
| Unit Priced Task (UPT) Work | | | | | | | | | | | | | | |
| 1502000 | Facility Investment | | | | | | | | | | | | | |
| A700 | | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | | EA | 1 | | A700 | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | | | The Contractor shall replace all filters; two (2) layers for supply air system (ACC-1 No.1 & No.2) and three (3) layers for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 1 | | ALL FILTERS replacement for SUPPLY AIR system | | EA | 1 | | | ALL FILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace all filters (two layers) for the supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 2 | | ALL FILTERS replacement for EXHAUST system | | EA | 1 | | | ALL FILTERS replacement for EXHAUST system | | | The Contractor shall replace all filters (three layers) for the exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 3 | | PREFILTERS replacement for SUPPLY AIR system | | EA | 1 | | 3 | PREFILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace prefilters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 4 | | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR system | | EA | 1 | | 4 | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace medium-performance filters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 5 | | PREFILTERS replacement for EXHAUST system | | EA | 1 | | 5 | PREFILTERS replacement for EXHAUST system | | | The Contractor shall replace prefilters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 6 | | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST system | | EA | 1 | | | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST system | | | The Contractor shall replace medium-performance filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 7 | | HEPA FILTERS replacement for EXHAUST system | | EA | 1 | | 7 | HEPA FILTERS replacement for EXHAUST system | | | The Contractor shall replace HEPA filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 1800000 | Environmental | | | | | | | |
| 8 | | Training Range Cleaning | EA | 1 | Training Range Cleaning | The Contractor shall clean the training range per Spec Item 3.1 and its subordinate spec items. | 2 | ¥ - |
| Unit Priced Labor (UPL) Work |
| Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work. |
Also refer to J-0200000-01, Definitions and Acronyms, for the description of UPL Hour to determine the labor hour unit prices below.
| Labor | | | | | | | | | | |
| 9 | | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | | | | 9 | Labor Hours | Labor Price Total of A709AA through A709AD | | ¥ - |
| 9 | AA | Labor Price - Custodian | | HR | 1 | 9 | Labor Price - Custodian | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 150 | ¥ - |
| 9 | AB | Labor Price -Maintenance Engineer | | HR | 1 | | Labor Price -Maintenance Engineer | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 150 | ¥ - |
| 9 | AC | Labor Price -SSHO | | HR | 1 | 9 | Labor Price -SSHO | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 50 | ¥ - |
| 9 | AD | Labor Price -QM | | HR | 1 | 9 | Labor Price -QM | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 50 | ¥ - |
| Material and Equipment | | | | | | | | | | |
| 10 | | Material and Equipment Costs- MUST BE NEGOTIATED BY KO | ¥ 1 | EA | 1 | 10 | Materials and Equipment | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A709. | 5,000,000 | ¥ 5,000,000 |
| | Fixed Burden Rate (FBR) | | % | | | Fixed Burden Rate (FBR) | The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO. | | |
For example, if the Contractor's Fixed Burden Rate in this period is 10%, then the total negotiated material and equipment cost equals ¥110,000 = ¥100,000 + (¥100,000 x 10%).
| TOTAL NON-RECURRING WORK PRICE - BASE PERIOD | ¥ 5,000,000 |
| Abbreviations: EA = Each, HR = Hour | | |
| Special Notes to Offerors: |
| (1) Price Column - Prices must be expressed in whole YEN amounts. Extended Price must equal Price multiplied by Estimated Quantity. |
| (2) For all Non-recurring negotiated task order work, the Contractor shall provide a breakdown of labor hours, material and equipment prices as a part of the price proposal. Overhead and profit is not authorized for subcontracted costs. The price breakdown shall be included in the Non-Recurring Work Proposal. Refer to Spec Item 2.15.2.1 of Annex 2. |
(3) For FedMall orders, the Contractor shall contact the supported command upon completion of work for acceptance and payment.
1st REC
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008420B5403 |
| EXHIBIT A - CLIN 0003 |
| Line Item 0003 Recurring Work - 1st Option Period |
| PROVIDE PRICES TO PERFORM SERVICES FOR MCAS IWAKUNI - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs B001 through B002 |
| Note: The Contractor may be required to submit the breakdown of the ELIN prices during the contract period. If requested, the breakdown shall be submitted at no additional cost to the Government. |
| ELIN / Sub ELIN | | Description | Quantity | Unit of Issue | Unit Price | Total |
| SLIN 000101 | | STATION | | | | |
| 1 | 1502000 Facility Investment | | | | | |
| 1 | AA | Preventive Maintenance (PM) services per Spec Item 3.1 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| 1 | AB | Other Recurring Services per Spec Item 3.2 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| | | | | 1502000 Sub-total | ¥ - |
| 2 | 1800000 Environmental | | | | | |
| 2 | AA | Range Cleaning Services per Spec Item 3.1 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| | | | | 1800000 Sub-total | ¥ - |
| TOTAL RECURRING WORK PRICE - 1st OPTION PERIOD | ¥ - |
| YR = Year | | |
1st NON-REC
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008420B5403 |
| EXHIBIT A - CLIN 0004 |
| Line Item 0004 Non-Recurring Work - 1st Option Period |
| PROVIDE PRICES FOR INDOOR SMALL ARMS RANGE MAINTENANCE SERVICES - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B710 |
| Part Number (ELIN) | | Part Name (Product) (120 Characters) | Price | Unit of Issue | Unit per UOI (Quantity) | OEM Name (Contractor Name) | OEM Number (ELIN) | Description (NTE 120 Characters) | ARO Days | PSC Code | Long Description (NTE 2,048) | Estimated Quantity | Extended Price (Price × Estimated Quantity) | IMAP CAC |
| Unit Priced Task (UPT) Work | | | | | | | | | | | | | | |
| 1502000 | Facility Investment | | | | | | | | | | | | | |
| B700 | | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | | EA | 1 | | B700 | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | | | The Contractor shall replace all filters; two (2) layers for supply air system (ACC-1 No.1 & No.2) and three (3) layers for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 1 | | ALL FILTERS replacement for SUPPLY AIR system | | EA | 1 | | | ALL FILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace all filters (two layers) for the supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 2 | | ALL FILTERS replacement for EXHAUST system | | EA | 1 | | | ALL FILTERS replacement for EXHAUST system | | | The Contractor shall replace all filters (three layers) for the exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 3 | | PREFILTERS replacement for SUPPLY AIR system | | EA | 1 | | 3 | PREFILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace prefilters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 4 | | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR system | | EA | 1 | | 4 | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace medium-performance filters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 5 | | PREFILTERS replacement for EXHAUST system | | EA | 1 | | 5 | PREFILTERS replacement for EXHAUST system | | | The Contractor shall replace prefilters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 6 | | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST system | | EA | 1 | | | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST system | | | The Contractor shall replace medium-performance filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 7 | | HEPA FILTERS replacement for EXHAUST system | | EA | 1 | | 7 | HEPA FILTERS replacement for EXHAUST system | | | The Contractor shall replace HEPA filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 1800000 | Environmental | | | | | | | |
| 8 | | Training Range Cleaning | EA | 1 | Training Range Cleaning | The Contractor shall clean the training range per Spec Item 3.1 and its subordinate spec items. | 2 | ¥ - |
| Unit Priced Labor (UPL) Work |
| Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work. |
Also refer to J-0200000-01, Definitions and Acronyms, for the description of UPL Hour to determine the labor hour unit prices below.
| Labor | | | | | | | | | | |
| 9 | | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | | | | 9 | Labor Hours | Labor Price Total of A709AA through A709AD | | ¥ - |
| 9 | AA | Labor Price - Custodian | | HR | 1 | 9 | Labor Price - Custodian | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 150 | ¥ - |
| 9 | AB | Labor Price -Maintenance Engineer | | HR | 1 | | Labor Price -Maintenance Engineer | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 150 | ¥ - |
| 9 | AC | Labor Price -SSHO | | HR | 1 | 9 | Labor Price -SSHO | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 50 | ¥ - |
| 9 | AD | Labor Price -QM | | HR | 1 | 9 | Labor Price -QM | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 50 | ¥ - |
| Material and Equipment | | | | | | | | | | |
| 10 | | Material and Equipment Costs- MUST BE NEGOTIATED BY KO | ¥ 1 | EA | 1 | 10 | Materials and Equipment | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B709. | 5,000,000 | ¥ 5,000,000 |
| | Fixed Burden Rate (FBR) | | % | | | Fixed Burden Rate (FBR) | The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO. | | |
For example, if the Contractor's Fixed Burden Rate in this period is 10%, then the total negotiated material and equipment cost equals ¥110,000 = ¥100,000 + (¥100,000 x 10%).
| TOTAL NON-RECURRING WORK PRICE - 1st OPTION PERIOD | ¥ 5,000,000 |
| Abbreviations: EA = Each, HR = Hour | | |
| Special Notes to Offerors: |
| (1) Price Column - Prices must be expressed in whole YEN amounts. Extended Price must equal Price multiplied by Estimated Quantity. |
| (2) For all Non-recurring negotiated task order work, the Contractor shall provide a breakdown of labor hours, material and equipment prices as a part of the price proposal. Overhead and profit is not authorized for subcontracted costs. The price breakdown shall be included in the Non-Recurring Work Proposal. Refer to Spec Item 2.15.2.1 of Annex 2. |
(3) For FedMall orders, the Contractor shall contact the supported command upon completion of work for acceptance and payment.
2nd REC
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008420B5403 |
| EXHIBIT A - CLIN 0005 |
| Line Item 0005 Recurring Work - 2nd Option Period |
| PROVIDE PRICES TO PERFORM SERVICES FOR MCAS IWAKUNI - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs C001 through C002 |
| Note: The Contractor may be required to submit the breakdown of the ELIN prices during the contract period. If requested, the breakdown shall be submitted at no additional cost to the Government. |
| ELIN / Sub ELIN | | Description | Quantity | Unit of Issue | Unit Price | Total |
| SLIN 000101 | | STATION | | | | |
| 1 | 1502000 Facility Investment | | | | | |
| 1 | AA | Preventive Maintenance (PM) services per Spec Item 3.1 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| 1 | AB | Other Recurring Services per Spec Item 3.2 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| | | | | 1502000 Sub-total | ¥ - |
| 2 | 1800000 Environmental | | | | | |
| 2 | AA | Range Cleaning Services per Spec Item 3.1 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| | | | | 1800000 Sub-total | ¥ - |
| TOTAL RECURRING WORK PRICE - 2nd OPTION PERIOD | ¥ - |
| YR = Year | | |
2nd NON-REC
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008420B5403 |
| EXHIBIT A - CLIN 0006 |
| Line Item 0006 Non-Recurring Work - 2nd Option Period |
| PROVIDE PRICES FOR INDOOR SMALL ARMS RANGE MAINTENANCE SERVICES - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs C700 through C710 |
| Part Number (ELIN) | | Part Name (Product) (120 Characters) | Price | Unit of Issue | Unit per UOI (Quantity) | OEM Name (Contractor Name) | OEM Number (ELIN) | Description (NTE 120 Characters) | ARO Days | PSC Code | Long Description (NTE 2,048) | Estimated Quantity | Extended Price (Price × Estimated Quantity) | IMAP CAC |
| Unit Priced Task (UPT) Work | | | | | | | | | | | | | | |
| 1502000 | Facility Investment | | | | | | | | | | | | | |
| C700 | | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | | EA | 1 | | C700 | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | | | The Contractor shall replace all filters; two (2) layers for supply air system (ACC-1 No.1 & No.2) and three (3) layers for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 1 | | ALL FILTERS replacement for SUPPLY AIR system | | EA | 1 | | | ALL FILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace all filters (two layers) for the supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 2 | | ALL FILTERS replacement for EXHAUST system | | EA | 1 | | | ALL FILTERS replacement for EXHAUST system | | | The Contractor shall replace all filters (three layers) for the exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 3 | | PREFILTERS replacement for SUPPLY AIR system | | EA | 1 | | 3 | PREFILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace prefilters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 4 | | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR system | | EA | 1 | | 4 | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace medium-performance filters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 5 | | PREFILTERS replacement for EXHAUST system | | EA | 1 | | 5 | PREFILTERS replacement for EXHAUST system | | | The Contractor shall replace prefilters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 6 | | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST system | | EA | 1 | | | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST system | | | The Contractor shall replace medium-performance filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 7 | | HEPA FILTERS replacement for EXHAUST system | | EA | 1 | | 7 | HEPA FILTERS replacement for EXHAUST system | | | The Contractor shall replace HEPA filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 1800000 | Environmental | | | | | | | |
| 8 | | Training Range Cleaning | EA | 1 | Training Range Cleaning | The Contractor shall clean the training range per Spec Item 3.1 and its subordinate spec items. | 2 | ¥ - |
| Unit Priced Labor (UPL) Work |
| Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work. |
Also refer to J-0200000-01, Definitions and Acronyms, for the description of UPL Hour to determine the labor hour unit prices below.
| Labor | | | | | | | | | | |
| 9 | | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | | | | 9 | Labor Hours | Labor Price Total of A709AA through A709AD | | ¥ - |
| 9 | AA | Labor Price - Custodian | | HR | 1 | 9 | Labor Price - Custodian | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 150 | ¥ - |
| 9 | AB | Labor Price -Maintenance Engineer | | HR | 1 | | Labor Price -Maintenance Engineer | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 150 | ¥ - |
| 9 | AC | Labor Price -SSHO | | HR | 1 | 9 | Labor Price -SSHO | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 50 | ¥ - |
| 9 | AD | Labor Price -QM | | HR | 1 | 9 | Labor Price -QM | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 50 | ¥ - |
| Material and Equipment | | | | | | | | | | |
| 10 | | Material and Equipment Costs- MUST BE NEGOTIATED BY KO | ¥ 1 | EA | 1 | 10 | Materials and Equipment | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN C709. | 5,000,000 | ¥ 5,000,000 |
| | Fixed Burden Rate (FBR) | | % | | | Fixed Burden Rate (FBR) | The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO. | | |
For example, if the Contractor's Fixed Burden Rate in this period is 10%, then the total negotiated material and equipment cost equals ¥110,000 = ¥100,000 + (¥100,000 x 10%).
| TOTAL NON-RECURRING WORK PRICE - 2nd OPTION PERIOD | ¥ 5,000,000 |
| Abbreviations: EA = Each, HR = Hour | | |
| Special Notes to Offerors: |
| (1) Price Column - Prices must be expressed in whole YEN amounts. Extended Price must equal Price multiplied by Estimated Quantity. |
| (2) For all Non-recurring negotiated task order work, the Contractor shall provide a breakdown of labor hours, material and equipment prices as a part of the price proposal. Overhead and profit is not authorized for subcontracted costs. The price breakdown shall be included in the Non-Recurring Work Proposal. Refer to Spec Item 2.15.2.1 of Annex 2. |
(3) For FedMall orders, the Contractor shall contact the supported command upon completion of work for acceptance and payment.
3rd REC
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008420B5403 |
| EXHIBIT A - CLIN 0007 |
| Line Item 0007 Recurring Work - 3rd Option Period |
| PROVIDE PRICES TO PERFORM SERVICES FOR MCAS IWAKUNI - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs D001 through D002 |
| Note: The Contractor may be required to submit the breakdown of the ELIN prices during the contract period. If requested, the breakdown shall be submitted at no additional cost to the Government. |
| ELIN / Sub ELIN | | Description | Quantity | Unit of Issue | Unit Price | Total |
| SLIN 000101 | | STATION | | | | |
| 1 | 1502000 Facility Investment | | | | | |
| 1 | AA | Preventive Maintenance (PM) services per Spec Item 3.1 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| 1 | AB | Other Recurring Services per Spec Item 3.2 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| | | | | 1502000 Sub-total | ¥ - |
| 2 | 1800000 Environmental | | | | | |
| 2 | AA | Range Cleaning Services per Spec Item 3.1 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| | | | | 1800000 Sub-total | ¥ - |
| TOTAL RECURRING WORK PRICE - 3rd OPTION PERIOD | ¥ - |
| YR = Year | | |
3rd NON-REC
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008420B5403 |
| EXHIBIT A - CLIN 0008 |
| Line Item 0008 Non-Recurring Work - 3rd Option Period |
| PROVIDE PRICES FOR INDOOR SMALL ARMS RANGE MAINTENANCE SERVICES - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs D700 through D710 |
| Part Number (ELIN) | | Part Name (Product) (120 Characters) | Price | Unit of Issue | Unit per UOI (Quantity) | OEM Name (Contractor Name) | OEM Number (ELIN) | Description (NTE 120 Characters) | ARO Days | PSC Code | Long Description (NTE 2,048) | Estimated Quantity | Extended Price (Price × Estimated Quantity) | IMAP CAC |
| Unit Priced Task (UPT) Work | | | | | | | | | | | | | | |
| 1502000 | Facility Investment | | | | | | | | | | | | | |
| D700 | | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | | EA | 1 | | D700 | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | | | The Contractor shall replace all filters; two (2) layers for supply air system (ACC-1 No.1 & No.2) and three (3) layers for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 1 | | ALL FILTERS replacement for SUPPLY AIR system | | EA | 1 | | | ALL FILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace all filters (two layers) for the supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 2 | | ALL FILTERS replacement for EXHAUST system | | EA | 1 | | | ALL FILTERS replacement for EXHAUST system | | | The Contractor shall replace all filters (three layers) for the exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 3 | | PREFILTERS replacement for SUPPLY AIR system | | EA | 1 | | 3 | PREFILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace prefilters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 4 | | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR system | | EA | 1 | | 4 | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace medium-performance filters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 5 | | PREFILTERS replacement for EXHAUST system | | EA | 1 | | 5 | PREFILTERS replacement for EXHAUST system | | | The Contractor shall replace prefilters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 6 | | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST system | | EA | 1 | | | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST system | | | The Contractor shall replace medium-performance filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 7 | | HEPA FILTERS replacement for EXHAUST system | | EA | 1 | | 7 | HEPA FILTERS replacement for EXHAUST system | | | The Contractor shall replace HEPA filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 1800000 | Environmental | | | | | | | |
| 8 | | Training Range Cleaning | EA | 1 | Training Range Cleaning | The Contractor shall clean the training range per Spec Item 3.1 and its subordinate spec items. | 2 | ¥ - |
| Unit Priced Labor (UPL) Work |
| Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work. |
Also refer to J-0200000-01, Definitions and Acronyms, for the description of UPL Hour to determine the labor hour unit prices below.
| Labor | | | | | | | | | | |
| 9 | | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | | | | 9 | Labor Hours | Labor Price Total of A709AA through A709AD | | ¥ - |
| 9 | AA | Labor Price - Custodian | | HR | 1 | 9 | Labor Price - Custodian | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 150 | ¥ - |
| 9 | AB | Labor Price -Maintenance Engineer | | HR | 1 | | Labor Price -Maintenance Engineer | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 150 | ¥ - |
| 9 | AC | Labor Price -SSHO | | HR | 1 | 9 | Labor Price -SSHO | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 50 | ¥ - |
| 9 | AD | Labor Price -QM | | HR | 1 | 9 | Labor Price -QM | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 50 | ¥ - |
| Material and Equipment | | | | | | | | | | |
| 10 | | Material and Equipment Costs- MUST BE NEGOTIATED BY KO | ¥ 1 | EA | 1 | 10 | Materials and Equipment | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN D709. | 5,000,000 | ¥ 5,000,000 |
| | Fixed Burden Rate (FBR) | | % | | | Fixed Burden Rate (FBR) | The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO. | | |
For example, if the Contractor's Fixed Burden Rate in this period is 10%, then the total negotiated material and equipment cost equals ¥110,000 = ¥100,000 + (¥100,000 x 10%).
| TOTAL NON-RECURRING WORK PRICE - 3rd OPTION PERIOD | ¥ 5,000,000 |
| Abbreviations: EA = Each, HR = Hour | | |
| Special Notes to Offerors: |
| (1) Price Column - Prices must be expressed in whole YEN amounts. Extended Price must equal Price multiplied by Estimated Quantity. |
| (2) For all Non-recurring negotiated task order work, the Contractor shall provide a breakdown of labor hours, material and equipment prices as a part of the price proposal. Overhead and profit is not authorized for subcontracted costs. The price breakdown shall be included in the Non-Recurring Work Proposal. Refer to Spec Item 2.15.2.1 of Annex 2. |
(3) For FedMall orders, the Contractor shall contact the supported command upon completion of work for acceptance and payment.
4th REC
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008420B5403 |
| EXHIBIT A - CLIN 0009 |
| Line Item 0009 Recurring Work - 4th Option Period |
| PROVIDE PRICES TO PERFORM SERVICES FOR MCAS IWAKUNI - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs E001 through E002 |
| Note: The Contractor may be required to submit the breakdown of the ELIN prices during the contract period. If requested, the breakdown shall be submitted at no additional cost to the Government. |
| ELIN / Sub ELIN | | Description | Quantity | Unit of Issue | Unit Price | Total |
| SLIN 000101 | | STATION | | | | |
| 1 | 1502000 Facility Investment | | | | | |
| 1 | AA | Preventive Maintenance (PM) services per Spec Item 3.1 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| 1 | AB | Other Recurring Services per Spec Item 3.2 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| | | | | 1502000 Sub-total | ¥ - |
| 2 | 1800000 Environmental | | | | | |
| 2 | AA | Range Cleaning Services per Spec Item 3.1 and its subordinate Spec Items. | 1 | YR | | ¥ - |
| | | | | 1800000 Sub-total | ¥ - |
| TOTAL RECURRING WORK PRICE - 4th OPTION PERIOD | ¥ - |
| YR = Year | | |
4th NON-REC
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008420B5403 |
| EXHIBIT A - CLIN 0010 |
| Line Item 0010 Non-Recurring Work - 4th Option Period |
| PROVIDE PRICES FOR INDOOR SMALL ARMS RANGE MAINTENANCE SERVICES - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs E700 through E710 |
| Part Number (ELIN) | | Part Name (Product) (120 Characters) | Price | Unit of Issue | Unit per UOI (Quantity) | OEM Name (Contractor Name) | OEM Number (ELIN) | Description (NTE 120 Characters) | ARO Days | PSC Code | Long Description (NTE 2,048) | Estimated Quantity | Extended Price (Price × Estimated Quantity) | IMAP CAC |
| Unit Priced Task (UPT) Work | | | | | | | | | | | | | | |
| 1502000 | Facility Investment | | | | | | | | | | | | | |
| E700 | | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | | EA | 1 | | E700 | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | | | The Contractor shall replace all filters; two (2) layers for supply air system (ACC-1 No.1 & No.2) and three (3) layers for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 1 | | ALL FILTERS replacement for SUPPLY AIR system | | EA | 1 | | | ALL FILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace all filters (two layers) for the supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 2 | | ALL FILTERS replacement for EXHAUST system | | EA | 1 | | | ALL FILTERS replacement for EXHAUST system | | | The Contractor shall replace all filters (three layers) for the exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 3 | | PREFILTERS replacement for SUPPLY AIR system | | EA | 1 | | 3 | PREFILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace prefilters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 4 | | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR system | | EA | 1 | | 4 | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR system | | | The Contractor shall replace medium-performance filters for supply air system (ACC-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 5 | | PREFILTERS replacement for EXHAUST system | | EA | 1 | | 5 | PREFILTERS replacement for EXHAUST system | | | The Contractor shall replace prefilters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 6 | | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST system | | EA | 1 | | | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST system | | | The Contractor shall replace medium-performance filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 7 | | HEPA FILTERS replacement for EXHAUST system | | EA | 1 | | 7 | HEPA FILTERS replacement for EXHAUST system | | | The Contractor shall replace HEPA filters for exhaust system (AFU-1 No.1 & No.2) per Spec Item 3.1.1.1. | 1 | ¥ - | |
| 1800000 | Environmental | | | | | | | |
| 8 | | Training Range Cleaning | EA | 1 | Training Range Cleaning | The Contractor shall clean the training range per Spec Item 3.1 and its subordinate spec items. | 2 | ¥ - |
| Unit Priced Labor (UPL) Work |
| Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work. |
Also refer to J-0200000-01, Definitions and Acronyms, for the description of UPL Hour to determine the labor hour unit prices below.
| Labor | | | | | | | | | | |
| 9 | | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | | | | 9 | Labor Hours | Labor Price Total of A709AA through A709AD | | ¥ - |
| 9 | AA | Labor Price - Custodian | | HR | 1 | 9 | Labor Price - Custodian | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 150 | ¥ - |
| 9 | AB | Labor Price -Maintenance Engineer | | HR | 1 | | Labor Price -Maintenance Engineer | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 150 | ¥ - |
| 9 | AC | Labor Price -SSHO | | HR | 1 | 9 | Labor Price -SSHO | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 50 | ¥ - |
| 9 | AD | Labor Price -QM | | HR | 1 | 9 | Labor Price -QM | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 50 | ¥ - |
| Material and Equipment | | | | | | | | | | |
| 10 | | Material and Equipment Costs- MUST BE NEGOTIATED BY KO | ¥ 1 | EA | 1 | 10 | Materials and Equipment | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN E709. | 5,000,000 | ¥ 5,000,000 |
| | Fixed Burden Rate (FBR) | | % | | | Fixed Burden Rate (FBR) | The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO. | | |
For example, if the Contractor's Fixed Burden Rate in this period is 10%, then the total negotiated material and equipment cost equals ¥110,000 = ¥100,000 + (¥100,000 x 10%).
| TOTAL NON-RECURRING WORK PRICE - 4th OPTION PERIOD | ¥ 5,000,000 |
| Abbreviations: EA = Each, HR = Hour | | |
| Special Notes to Offerors: |
| (1) Price Column - Prices must be expressed in whole YEN amounts. Extended Price must equal Price multiplied by Estimated Quantity. |
| (2) For all Non-recurring negotiated task order work, the Contractor shall provide a breakdown of labor hours, material and equipment prices as a part of the price proposal. Overhead and profit is not authorized for subcontracted costs. The price breakdown shall be included in the Non-Recurring Work Proposal. Refer to Spec Item 2.15.2.1 of Annex 2. |
(3) For FedMall orders, the Contractor shall contact the supported command upon completion of work for acceptance and payment.