CALCULATION SHEET.xls
XLS spreadsheet 788 KB Posted
- Solicitation number
- N4008420B0402
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 0001.pdf | ||
| 20B0402A.pdf | ||
| 20B0402B.pdf | ||
| 20B0402C.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Recurring&Non-Recurring
| SCHEDULE OF PRICE | ||||
| CONTRACTOR IS RESPONSIBLE FOR ALL CALCULATIONS | ||||
| NAME OF OFFEROR OR CONTRACTOR: | ||||
| LINE ITEM | ITEM | Q'TY | UNIT | AMOUNT |
| NO. | ||||
| Item 0001 | Recurring, Base Period | 1 | LS | |
| Provide Operation and Maintenance and | ||||
| PM program Services For | ||||
| One year from the date of award. | ||||
| Item 0002 | Non-Recurring, Base Period | 1 | LS | |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year from the date of award. | ||||
| Item 0003 | Recurring, First Option Period | 1 | LS | |
| Provide Operation and Maintenance and | ||||
| PM program Services For | ||||
| One year from the Base period. | ||||
| Item 0004 | Non-Recurring, First Option Period | 1 | LS | |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year from the Base period. | ||||
| Item 0005 | Recurring, Second Option Period | 1 | LS | |
| Provide Operation and Maintenance and | ||||
| PM program Services For | ||||
| One year from the First Option period. | ||||
| Item 0006 | Non-Recurring, Second Option Period | 1 | LS | |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year from the First Option period. | ||||
| Item 0007 | Recurring, Third Option Period | 1 | LS | |
| Provide Operation and Maintenance and | ||||
| PM program Services For | ||||
| One year from the Second Option period. | ||||
| Item 0008 | Non-Recurring, Third Option Period | 1 | LS | |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year from the Second Option period. | ||||
| Item 0009 | Recurring, Fourth Option Period | 1 | LS | |
| Provide Operation and Maintenance and | ||||
| PM program Services For | ||||
| One year from the Third Option period. | ||||
| Item 0010 | Non-Recurring, Fourth Option Period | 1 | LS | |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year from the Third Option period. | ||||
| TOTAL: (LINE ITEM 0001 through 0010) | ||||
| CLIN 9000 | Exhibit A (Base Period) | |||
| CLIN 9001 | Exhibit B (First Option Period) | |||
| CLIN 9002 | Exhibit C (Second Option Period) | |||
| CLIN 9003 | Exhibit D (Third Option Period) | |||
| CLIN 9004 | Exhibit E (Fourth Option Period) | |||
| NOTE: | The number of Placeholders established depends on the maximum number of lines | |||
| of accounting anticipated on an individual task order. | ||||
| Detail line items for task order is located in Attachment J-0200000-07 | ||||
| CLIN = CONTRACT LINE ITEM | ||||
| LS = LUMP SUM | ||||
| NTE = NOT-TO-EXCEED | ||||
| Q'TY = QUANTITY |
&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 B-&P
ELIN-B Recurring
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # | |||||||
| EXHIBIT A - CLIN 9000 | |||||||
| Line Item 0001 Recurring - Base Period | |||||||
| Provide Prices For Recurring - In Accordance With Section C, Spec Item 3 | |||||||
| ELINs A001 through A007 | |||||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | Ratio | |
| A001 | CFAY SRM Portion (SR#18828608) | ||||||
| A001A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 57% | ||
| A001B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 46% | ||
| A001C | Weight Scale (Bldg. 1822), Spec Item 3.2.2 in Annex 1502000 | 2 | TM | ¥ - | |||
| A001D | Weight Scale (Bldg. 4856), Spec Item 3.2.2 in Annex 1502000 | 1 | TM | ¥ - | |||
| A001E | Paint Water Treatment Plant, Spec Item 3.2.3 in Annex 1604000 | 12 | MO | ¥ - | |||
| A001F | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | 3Y | ¥ - | |||
| A001G | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| A001H | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (UH Portion) | 1 | TM | ¥ - | |||
| A001I | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (MWR Portion) | 1 | TM | ¥ - | |||
| A001J | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (COMSUBGRU-7 Portion) | 1 | TM | ¥ - | |||
| A001K | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (NEX Portion) | 1 | TM | ¥ - | |||
| A001L | Relay Pump Station, Spec Item 3.2.2.1 in Annex 1604000 (NEX Portion) | 12 | MO | ¥ - | |||
| CFAY Total | ¥ - | ||||||
| A002 | SRF-JRMC Portion (SR#18801720): | ||||||
| A002A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 11% | ||
| A002B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 10% | ||
| A002C | Industrial Wastewater Treatment Plant at DD4, Spec Item 3.2.4.1in Annex 1604000 | 1 | TM | ¥ - | |||
| A002D | Oily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 1604000 (Biweekly PM Work) | 12 | MO | ¥ - | |||
| A002E | Oily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 1604000 | 2 | TM | ¥ - | |||
| SRF Total | ¥ - | ||||||
| A003 | DLA DDYJ Portion (SR#18829480): | ||||||
| A003A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 4% | ||
| A003B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 1% | ||
| A003C | Weight Scale, Spec Item 3.2.2 in Annex 1502000 | 2 | TM | ¥ - | |||
| DLATotal | ¥ - | ||||||
| A004 | HSG Portion (SR#18816420): | ||||||
| A004A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 20% | ||
| A004B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 36% | ||
| A004C | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| HSG Total | ¥ - | ||||||
| A005 | DODDS Portion(SR#18816409): | ||||||
| A005A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 2% | ||
| A005B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 2% | ||
| A005C | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| DODDS Total | ¥ - | ||||||
| A006 | USNH Portion (SR#18816432): | ||||||
| A006A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 3% | ||
| A006B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 4% | ||
| A006C | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| USNH Total | ¥ - | ||||||
| A007 | DECA YOKOSUKA Portion (SR#18816393) | ||||||
| A007A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 3% | ||
| A007B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 1% | ||
| DECA YOKOSUKA | ¥ - | ||||||
| TOTAL RECURRING LINE ITEMS | ¥ | ||||||
| MO = | Monthly | ||||||
| SA = | Semi-Annual | ||||||
| Q = | Quarterly | ||||||
| A = | Annual |
&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELIN-B Non-Recurring
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # | |||||||
| EXHIBIT A - CLIN 9000 | |||||||
| Line Item 0002 Non-Recurring Price - Base Period | |||||||
| Provide Prices For Facility Investment and Waste Water - Non-Recurring - In Accordance With Section C, Spec Item 4 | |||||||
| ELINs A700 through A706 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A 700 | MAJOR REPAIR WORK - MUST BE NEGOTIATED BY KO. | MAJOR REPAIR WORK is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Recurring work. Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service call or PM repair. Task order completion times will be specified in task order. | 1 | LS | N/A | ¥ 270,000,000 | |
| A701 | Replace Wall bricks on Left side and Right side of both two incinerators at Bldg. 1829. | The Contractor shall replace wall bricks including associated fittings with new one. Perform necessary adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is specified in J-1502000-03-03. | 20 | m2 | ¥ | ||
| A702 | Replace Casings on Left side and Right side of both two incinerators at Bldg. 1829. | The Contractor shall replace Casings including associated fittings with new one. Perform necessary adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is specified in J-1502000-03-03. | 20 | m2 | ¥ | ||
| A 703 | Replace One (1) Reduction |
Gear for No. 1 Ash Bunker at Bldg. 1829. The Contractor shall replace the existing one (1) reduction gear for No.1 ash bunker with new one.
Perform total operation test and make necessary
| adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is 1) Model No.: 08120-150B, 2) Manufacturer: Takuma Co., Ltd. | 2 | EA | ¥ | ||||
| A 704 | Replace Side Fire Grates | ||||||
| for Furnace at Bldg. 1829. | The Contractor shall replace the existing side fire | ||||||
| grates (Right side and left side of one furnace) with new one. Perform operation test and make necessary adjustment after completion of replacement work. All work shall be completed within 150 calendar days after the date of order. | 2 | SET | ¥ | ||||
| A 705 | Replace Water Level Gage System at Bldg. 1568. | The Contractor shall replace the existing two (2) level gages and one (1) distributor with new ones, and provide program software for new system. Perform total operation test and make necessary adjustment after completion of replacement work. All work shall be completed within 90 calendar dates after the date of order. Applicable equipment is as follows. a. Level Gages: 1) Model No. is EJA110-DMS1A-20DC-S2, Manufacturer is Yokogawa Electric Co., Ltd. b. Distributor: 1) Model No. is VJA7-026-AAAO/FB-1.06, 2) Manufacturer is Yokogawa Electric Co., Ltd. | 1 | SET | ¥ | ||
| A 706 | Clean Utility Trench at | ||||||
| Berth Area and Pears. | The Contractor shall remove debris from utility trench utilizing high pressure water and vacuum at berth area and pears. All work shall be completed within 30 calendar days after the date of order. One (1) occurrence of order is 10 meter length. | 20 | TM | ¥ | |||
| TOTAL NON-RECUURRING PRICE | ¥ 270,000,000 | ||||||
| HR = | Hour | ||||||
| LS = | Lump Sum | ||||||
| EA = | Each | ||||||
| TM = | Time |
&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N
ELIN-1st Recurring
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # | |||||||
| EXHIBIT B - CLIN 9001 | |||||||
| Line Item 0003 Recurring - First Option Period | |||||||
| Provide Prices For Recurring - In Accordance With Section C, Spec Item 3 | |||||||
| ELINs B001 through B007 | |||||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | Ratio | |
| B001 | CFAY SRM Portion (SR#18828608) | ||||||
| B001A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 57% | ||
| B001B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 46% | ||
| B001C | Weight Scale (Bldg. 1822), Spec Item 3.2.2 in Annex 1502000 | 2 | TM | ¥ - | |||
| B001D | Weight Scale (Bldg. 4856), Spec Item 3.2.2 in Annex 1502000 | 1 | TM | ¥ - | |||
| B001E | Paint Water Treatment Plant, Spec Item 3.2.3 in Annex 1604000 | 12 | MO | ¥ - | |||
| B001F | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 0 | 3Y | ¥ - | |||
| B001G | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| B001H | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (UH Portion) | 1 | TM | ¥ - | |||
| B001I | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (MWR Portion)(SR#16706508) | 1 | TM | ¥ - | |||
| B001J | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (COMSUBGRU-7 Portion) | 1 | TM | ¥ - | |||
| B001K | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (NEX Portion) | 1 | TM | ¥ - | |||
| B001L | Relay Pump Station, Spec Item 3.2.2.1 in Annex 1604000 (NEX Portion) | 12 | MO | ¥ - | |||
| CFAY Total | ¥ - | ||||||
| B002 | SRF-JRMC Portion (SR#18801720): | ||||||
| B002A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 11% | ||
| B002B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 10% | ||
| B002C | Industrial Wastewater Treatment Plant at DD4, Spec Item 3.2.4.1in Annex 1604000 | 1 | TM | ¥ - | |||
| B002D | Oily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 1604000 (Biweekly PM Work) | 12 | MO | ¥ - | |||
| B002E | Oily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 1604000 | 2 | TM | ¥ - | |||
| SRF Total | ¥ - | ||||||
| B003 | DLA DDYJ Portion (SR#18829480): | ||||||
| B003A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 4% | ||
| B003B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 1% | ||
| B003C | Weight Scale, Spec Item 3.2.2 in Annex 1502000 | 2 | TM | ¥ - | |||
| DLATotal | ¥ - | ||||||
| B004 | HSG Portion (SR#18816420): | ||||||
| B004A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 20% | ||
| B004B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 36% | ||
| B004C | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| HSG Total | ¥ - | ||||||
| B005 | DODDS Portion(SR#18816409): | ||||||
| B005A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 2% | ||
| B005B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 2% | ||
| B005C | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| DODDS Total | ¥ - | ||||||
| B006 | USNH Portion (SR#18816432): | ||||||
| B006A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 3% | ||
| B006B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 4% | ||
| B006C | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| USNH Total | ¥ - | ||||||
| B007 | DECA YOKOSUKA Portion (SR#18816393) | ||||||
| B007A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 3% | ||
| B007B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 1% | ||
| DECA YOKOSUKA | ¥ - | ||||||
| TOTAL RECURRING LINE ITEMS | ¥ | ||||||
| MO = | Monthly | ||||||
| SA = | Semi-Annual | ||||||
| Q = | Quarterly | ||||||
| A = | Annual |
&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELIN-1st Non-Recurring
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # | |||||||
| EXHIBIT B - CLIN 9001 | |||||||
| Line Item 0004 Non-Recurring Price - First Option Period | |||||||
| Provide Prices For Facility Investment and Waste Water- Non-Recurring - In Accordance With Section C, Spec Item 4 | |||||||
| ELINs B 700 through B 706 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| B 700 | MAJOR REPAIR WORK - MUST BE NEGOTIATED BY KO. | MAJOR REPAIR WORK is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Recurring work. Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service call or PM repair. Task order completion times will be specified in task order. | 1 | LS | N/A | ¥ 270,000,000 | |
| B 701 | Replace Wall bricks on Left side and Right side of both two incinerators at Bldg. 1829. | The Contractor shall replace wall bricks including associated fittings with new one. Perform necessary adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is specified in J-1502000-03-03. | 20 | m2 | ¥ | ||
| B 702 | Replace Casings on Left side and Right side of both two incinerators at Bldg. 1829. | The Contractor shall replace Casings including associated fittings with new one. Perform necessary adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is specified in J-1502000-03-03. | 20 | m2 | ¥ | ||
| B 703 | Replace One (1) Reduction |
Gear for No. 1 Ash Bunker at Bldg. 1829. The Contractor shall replace the existing one (1) reduction gear for No.1 ash bunker with new one.
Perform total operation test and make necessary
| adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is 1) Model No.: 08120-150B, 2) Manufacturer: Takuma Co., Ltd. | 2 | EA | ¥ | ||||
| B 704 | Replace Side Fire Grates | ||||||
| for Furnace at Bldg. 1829. | The Contractor shall replace the existing side fire | ||||||
| grates (Right side and left side of one furnace) with new one. Perform operation test and make necessary adjustment after completion of replacement work. All work shall be completed within 150 calendar days after the date of order. | 2 | SET | ¥ | ||||
| B 705 | Replace Water Level Gage System at Bldg. 1568. | The Contractor shall replace the existing two (2) level gages and one (1) distributor with new ones, and provide program software for new system. Perform total operation test and make necessary adjustment after completion of replacement work. All work shall be completed within 90 calendar dates after the date of order. Applicable equipment is as follows. a. Level Gages: 1) Model No. is EJA110-DMS1A-20DC-S2, Manufacturer is Yokogawa Electric Co., Ltd. b. Distributor: 1) Model No. is VJA7-026-AAAO/FB-1.06, 2) Manufacturer is Yokogawa Electric Co., Ltd. | 1 | SET | ¥ | ||
| B 706 | Clean Utility Trench at | ||||||
| Berth Area and Pears. | The Contractor shall remove debris from utility trench utilizing high pressure water and vacuum at berth area and pears. All work shall be completed within 30 calendar days after the date of order. One (1) occurrence of order is 10 meter length. | 20 | TM | ¥ | |||
| TOTAL NON-RECUURRING PRICE | ¥ 270,000,000 | ||||||
| HR = | Hour | ||||||
| LS = | Lump Sum | ||||||
| EA = | Each | ||||||
| TM = | Time |
&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N
ELIN-2nd Recurring
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # | |||||||
| EXHIBIT C - CLIN 9002 | |||||||
| Line Item 0005 Recurring - Second Option Period | |||||||
| Provide Prices For Recurring - In Accordance With Section C, Spec Item 3 | |||||||
| ELINs C001 through C007 | |||||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | Ratio | |
| C001 | CFAY SRM Portion (SR#18828608) | ||||||
| C001A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 57% | ||
| C001B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 46% | ||
| C001C | Weight Scale (Bldg. 1822), Spec Item 3.2.2 in Annex 1502000 | 2 | TM | ¥ - | |||
| C001D | Weight Scale (Bldg. 4856), Spec Item 3.2.2 in Annex 1502000 | 1 | TM | ¥ - | |||
| C001E | Paint Water Treatment Plant, Spec Item 3.2.3 in Annex 1604000 | 12 | MO | ¥ - | |||
| C001F | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 0 | 3Y | ¥ - | |||
| C001G | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| C001H | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (UH Portion) | 1 | TM | ¥ - | |||
| C001I | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (MWR Portion) | 1 | TM | ¥ - | |||
| C001J | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (COMSUBGRU-7 Portion) | 1 | TM | ¥ - | |||
| C001K | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (NEX Portion) | 1 | TM | ¥ - | |||
| C001L | Relay Pump Station, Spec Item 3.2.2.1 in Annex 1604000 (NEX Portion) | 12 | MO | ¥ - | |||
| CFAY Total | ¥ - | ||||||
| C002 | SRF-JRMC Portion (SR#18801720): | ||||||
| C002A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 11% | ||
| C002B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 10% | ||
| C002C | Industrial Wastewater Treatment Plant at DD4, Spec Item 3.2.4.1in Annex 1604000 | 1 | TM | ¥ - | |||
| C002D | Oily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 1604000 (Biweekly PM Work) | 12 | MO | ¥ - | |||
| C002E | Oily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 1604000 | 2 | TM | ¥ - | |||
| SRF Total | ¥ - | ||||||
| C003 | DLA DDYJ Portion (SR#18829480): | ||||||
| C003A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 4% | ||
| C003B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 1% | ||
| C003C | Weight Scale, Spec Item 3.2.2 in Annex 1502000 | 2 | TM | ¥ - | |||
| DLATotal | ¥ - | ||||||
| C004 | HSG Portion (SR#18816420): | ||||||
| C004A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 20% | ||
| C004B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 36% | ||
| C004C | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| HSG Total | ¥ - | ||||||
| C005 | DODDS Portion(SR#18816409): | ||||||
| C005A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 2% | ||
| C005B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 2% | ||
| C005C | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| DODDS Total | ¥ - | ||||||
| C006 | USNH Portion (SR#18816432): | ||||||
| C006A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 3% | ||
| C006B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 4% | ||
| C006C | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| USNH Total | ¥ - | ||||||
| C007 | DECA YOKOSUKA Portion (SR#18816393) | ||||||
| C007A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 3% | ||
| C007B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 1% | ||
| DECA YOKOSUKA | ¥ - | ||||||
| TOTAL RECURRING LINE ITEMS | ¥ | ||||||
| MO = | Monthly | ||||||
| SA = | Semi-Annual | ||||||
| Q = | Quarterly | ||||||
| A = | Annual |
&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELIN-2nd Non-Recurring
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # | |||||||
| EXHIBIT C - CLIN 9002 | |||||||
| Line Item 0006 Non-Recurring Price - Second Option Period | |||||||
| Provide Prices For Facility Investment and Waste Water- Non-Recurring - In Accordance With Section C, Spec Item 4 | |||||||
| ELINs C 700 through C 706 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| C 700 | MAJOR REPAIR WORK - MUST BE NEGOTIATED BY KO. | MAJOR REPAIR WORK is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Recurring work. Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service call or PM repair. Task order completion times will be specified in task order. | 1 | LS | N/A | ¥ 270,000,000 | |
| C 701 | Replace Wall bricks on Left side and Right side of both two incinerators at Bldg. 1829. | The Contractor shall replace wall bricks including associated fittings with new one. Perform necessary adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is specified in J-1502000-03-03. | 20 | m2 | ¥ | ||
| C 702 | Replace Casings on Left side and Right side of both two incinerators at Bldg. 1829. | The Contractor shall replace Casings including associated fittings with new one. Perform necessary adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is specified in J-1502000-03-03. | 20 | m2 | ¥ | ||
| C 703 | Replace One (1) Reduction |
Gear for No. 1 Ash Bunker at Bldg. 1829. The Contractor shall replace the existing one (1) reduction gear for No.1 ash bunker with new one.
Perform total operation test and make necessary
| adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is 1) Model No.: 08120-150B, 2) Manufacturer: Takuma Co., Ltd. | 2 | EA | ¥ | ||||
| C 704 | Replace Side Fire Grates | ||||||
| for Furnace at Bldg. 1829. | The Contractor shall replace the existing side fire | ||||||
| grates (Right side and left side of one furnace) with new one. Perform operation test and make necessary adjustment after completion of replacement work. All work shall be completed within 150 calendar days after the date of order. | 2 | SET | ¥ | ||||
| C 705 | Replace Water Level Gage System at Bldg. 1568. | The Contractor shall replace the existing two (2) level gages and one (1) distributor with new ones, and provide program software for new system. Perform total operation test and make necessary adjustment after completion of replacement work. All work shall be completed within 90 calendar dates after the date of order. Applicable equipment is as follows. a. Level Gages: 1) Model No. is EJA110-DMS1A-20DC-S2, Manufacturer is Yokogawa Electric Co., Ltd. b. Distributor: 1) Model No. is VJA7-026-AAAO/FB-1.06, 2) Manufacturer is Yokogawa Electric Co., Ltd. | 1 | SET | ¥ | ||
| C 706 | Clean Utility Trench at | ||||||
| Berth Area and Pears. | The Contractor shall remove debris from utility trench utilizing high pressure water and vacuum at berth area and pears. All work shall be completed within 30 calendar days after the date of order. One (1) occurrence of order is 10 meter length. | 20 | TM | ¥ | |||
| TOTAL NON-RECUURRING PRICE | ¥ 270,000,000 | ||||||
| HR = | Hour | ||||||
| LS = | Lump Sum | ||||||
| EA = | Each | ||||||
| TM = | Time |
&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N
ELIN-3rd Recurring
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # | |||||||
| EXHIBIT D - CLIN 9003 | |||||||
| Line Item 0007 Recurring - Third Option Period | |||||||
| Provide Prices For Recurring - In Accordance With Section C, Spec Item 3 | |||||||
| ELINs D001 through D007 | |||||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | Ratio | |
| D001 | CFAY SRM Portion (SR#18828608) | ||||||
| D001A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 57% | ||
| D001B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 46% | ||
| D001C | Weight Scale (Bldg. 1822), Spec Item 3.2.2 in Annex 1502000 | 2 | TM | ¥ - | |||
| D001D | Weight Scale (Bldg. 4856), Spec Item 3.2.2 in Annex 1502000 | 1 | TM | ¥ - | |||
| D001E | Paint Water Treatment Plant, Spec Item 3.2.3 in Annex 1604000 | 12 | MO | ¥ - | |||
| D001F | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | 3Y | ¥ - | |||
| D001G | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| D001H | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (UH Portion) | 1 | TM | ¥ - | |||
| D001I | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (MWR Portion) | 1 | TM | ¥ - | |||
| D001J | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (COMSUBGRU-7 Portion) | 1 | TM | ¥ - | |||
| D001K | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (NEX Portion) | 1 | TM | ¥ - | |||
| D001L | Relay Pump Station, Spec Item 3.2.2.1 in Annex 1604000 (NEX Portion) | 12 | MO | ¥ - | |||
| CFAY Total | ¥ - | ||||||
| D002 | SRF-JRMC Portion (18801720): | ||||||
| D002A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 11% | ||
| D002B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 10% | ||
| D002C | Industrial Wastewater Treatment Plant at DD4, Spec Item 3.2.4.1in Annex 1604000 | 1 | TM | ¥ - | |||
| D002D | Oily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 1604000 (Biweekly PM Work) | 12 | MO | ¥ - | |||
| D002E | Oily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 1604000 | 2 | TM | ¥ - | |||
| SRF Total | ¥ - | ||||||
| D003 | DLA DDYJ Portion (SR#18829480): | ||||||
| D003A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 4% | ||
| D003B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 1% | ||
| D003C | Weight Scale, Spec Item 3.2.2 in Annex 1502000 | 2 | TM | ¥ - | |||
| DLATotal | ¥ - | ||||||
| D004 | HSG Portion (SR#18816420): | ||||||
| D004A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 20% | ||
| D004B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 36% | ||
| D004C | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| HSG Total | ¥ - | ||||||
| D005 | DODDS Portion(SR#18816409): | ||||||
| D005A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 2% | ||
| D005B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 2% | ||
| D005C | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| DODDS Total | ¥ - | ||||||
| D006 | USNH Portion (SR#18816432): | ||||||
| D006A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 3% | ||
| D006B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 4% | ||
| D006C | Potable Water Tanks, Spec Item 3.2.3 in Annex 1502000 | 1 | TM | ¥ - | |||
| USNH Total | ¥ - | ||||||
| D007 | DECA YOKOSUKA Portion (SR#18816393) | ||||||
| D007A | Operation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 1502000 | 12 | MO | ¥ - | 3% | ||
| D007B | Operation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 1604000 | 12 | MO | ¥ - | 1% | ||
| DECA YOKOSUKA | ¥ - | ||||||
| TOTAL RECURRING LINE ITEMS | ¥ | ||||||
| MO = | Monthly | ||||||
| SA = | Semi-Annual | ||||||
| Q = | Quarterly | ||||||
| A = | Annual |
&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .