Recurring&Non-Recurring

SCHEDULE OF PRICE
CONTRACTOR IS RESPONSIBLE FOR ALL CALCULATIONS
NAME OF OFFEROR OR CONTRACTOR:
LINE ITEMITEMQ'TYUNITAMOUNT
NO.
Item 0001Recurring, Base Period1LS
Provide Operation and Maintenance and
PM program Services For
One year from the date of award.
Item 0002Non-Recurring, Base Period1LS
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
One year from the date of award.
Item 0003Recurring, First Option Period1LS
Provide Operation and Maintenance and
PM program Services For
One year from the Base period.
Item 0004Non-Recurring, First Option Period1LS
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
One year from the Base period.
Item 0005Recurring, Second Option Period1LS
Provide Operation and Maintenance and
PM program Services For
One year from the First Option period.
Item 0006Non-Recurring, Second Option Period1LS
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
One year from the First Option period.
Item 0007Recurring, Third Option Period1LS
Provide Operation and Maintenance and
PM program Services For
One year from the Second Option period.
Item 0008Non-Recurring, Third Option Period1LS
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
One year from the Second Option period.
Item 0009Recurring, Fourth Option Period1LS
Provide Operation and Maintenance and
PM program Services For
One year from the Third Option period.
Item 0010Non-Recurring, Fourth Option Period1LS
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
One year from the Third Option period.
TOTAL: (LINE ITEM 0001 through 0010)
CLIN 9000Exhibit A (Base Period)
CLIN 9001Exhibit B (First Option Period)
CLIN 9002Exhibit C (Second Option Period)
CLIN 9003Exhibit D (Third Option Period)
CLIN 9004Exhibit E (Fourth Option Period)
NOTE:The number of Placeholders established depends on the maximum number of lines
of accounting anticipated on an individual task order.
Detail line items for task order is located in Attachment J-0200000-07
CLIN = CONTRACT LINE ITEM
LS = LUMP SUM
NTE = NOT-TO-EXCEED
Q'TY = QUANTITY

&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 B-&P

ELIN-B Recurring

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0001 Recurring - Base Period
Provide Prices For Recurring - In Accordance With Section C, Spec Item 3
ELINs A001 through A007
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalRatio
A001CFAY SRM Portion (SR#18828608)
A001AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -57%
A001BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -46%
A001CWeight Scale (Bldg. 1822), Spec Item 3.2.2 in Annex 15020002TM¥ -
A001DWeight Scale (Bldg. 4856), Spec Item 3.2.2 in Annex 15020001TM¥ -
A001EPaint Water Treatment Plant, Spec Item 3.2.3 in Annex 160400012MO¥ -
A001FPotable Water Tanks, Spec Item 3.2.3 in Annex 150200013Y¥ -
A001GPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
A001HPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (UH Portion)1TM¥ -
A001IPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (MWR Portion)1TM¥ -
A001JPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (COMSUBGRU-7 Portion)1TM¥ -
A001KPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (NEX Portion)1TM¥ -
A001LRelay Pump Station, Spec Item 3.2.2.1 in Annex 1604000 (NEX Portion)12MO¥ -
CFAY Total¥ -
A002SRF-JRMC Portion (SR#18801720):
A002AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -11%
A002BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -10%
A002CIndustrial Wastewater Treatment Plant at DD4, Spec Item 3.2.4.1in Annex 16040001TM¥ -
A002DOily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 1604000 (Biweekly PM Work)12MO¥ -
A002EOily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 16040002TM¥ -
SRF Total¥ -
A003DLA DDYJ Portion (SR#18829480):
A003AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -4%
A003BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -1%
A003CWeight Scale, Spec Item 3.2.2 in Annex 15020002TM¥ -
DLATotal¥ -
A004HSG Portion (SR#18816420):
A004AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -20%
A004BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -36%
A004CPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
HSG Total¥ -
A005DODDS Portion(SR#18816409):
A005AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -2%
A005BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -2%
A005CPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
DODDS Total¥ -
A006USNH Portion (SR#18816432):
A006AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -3%
A006BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -4%
A006CPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
USNH Total¥ -
A007DECA YOKOSUKA Portion (SR#18816393)
A007AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -3%
A007BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -1%
DECA YOKOSUKA¥ -
TOTAL RECURRING LINE ITEMS¥
MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual

&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELIN-B Non-Recurring

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0002 Non-Recurring Price - Base Period
Provide Prices For Facility Investment and Waste Water - Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs A700 through A706
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
A 700MAJOR REPAIR WORK - MUST BE NEGOTIATED BY KO.MAJOR REPAIR WORK is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Recurring work. Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service call or PM repair. Task order completion times will be specified in task order.1LSN/A¥ 270,000,000
A701Replace Wall bricks on Left side and Right side of both two incinerators at Bldg. 1829.The Contractor shall replace wall bricks including associated fittings with new one. Perform necessary adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is specified in J-1502000-03-03.20m2¥
A702Replace Casings on Left side and Right side of both two incinerators at Bldg. 1829.The Contractor shall replace Casings including associated fittings with new one. Perform necessary adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is specified in J-1502000-03-03.20m2¥
A 703Replace One (1) Reduction

Gear for No. 1 Ash Bunker at Bldg. 1829. The Contractor shall replace the existing one (1) reduction gear for No.1 ash bunker with new one.

Perform total operation test and make necessary

adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is 1) Model No.: 08120-150B, 2) Manufacturer: Takuma Co., Ltd.2EA¥
A 704Replace Side Fire Grates
for Furnace at Bldg. 1829.The Contractor shall replace the existing side fire
grates (Right side and left side of one furnace) with new one. Perform operation test and make necessary adjustment after completion of replacement work. All work shall be completed within 150 calendar days after the date of order.2SET¥
A 705Replace Water Level Gage System at Bldg. 1568.The Contractor shall replace the existing two (2) level gages and one (1) distributor with new ones, and provide program software for new system. Perform total operation test and make necessary adjustment after completion of replacement work. All work shall be completed within 90 calendar dates after the date of order. Applicable equipment is as follows. a. Level Gages: 1) Model No. is EJA110-DMS1A-20DC-S2, Manufacturer is Yokogawa Electric Co., Ltd. b. Distributor: 1) Model No. is VJA7-026-AAAO/FB-1.06, 2) Manufacturer is Yokogawa Electric Co., Ltd.1SET¥
A 706Clean Utility Trench at
Berth Area and Pears.The Contractor shall remove debris from utility trench utilizing high pressure water and vacuum at berth area and pears. All work shall be completed within 30 calendar days after the date of order. One (1) occurrence of order is 10 meter length.20TM¥
TOTAL NON-RECUURRING PRICE¥ 270,000,000
HR =Hour
LS =Lump Sum
EA =Each
TM =Time

&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N

ELIN-1st Recurring

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0003 Recurring - First Option Period
Provide Prices For Recurring - In Accordance With Section C, Spec Item 3
ELINs B001 through B007
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalRatio
B001CFAY SRM Portion (SR#18828608)
B001AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -57%
B001BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -46%
B001CWeight Scale (Bldg. 1822), Spec Item 3.2.2 in Annex 15020002TM¥ -
B001DWeight Scale (Bldg. 4856), Spec Item 3.2.2 in Annex 15020001TM¥ -
B001EPaint Water Treatment Plant, Spec Item 3.2.3 in Annex 160400012MO¥ -
B001FPotable Water Tanks, Spec Item 3.2.3 in Annex 150200003Y¥ -
B001GPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
B001HPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (UH Portion)1TM¥ -
B001IPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (MWR Portion)(SR#16706508)1TM¥ -
B001JPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (COMSUBGRU-7 Portion)1TM¥ -
B001KPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (NEX Portion)1TM¥ -
B001LRelay Pump Station, Spec Item 3.2.2.1 in Annex 1604000 (NEX Portion)12MO¥ -
CFAY Total¥ -
B002SRF-JRMC Portion (SR#18801720):
B002AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -11%
B002BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -10%
B002CIndustrial Wastewater Treatment Plant at DD4, Spec Item 3.2.4.1in Annex 16040001TM¥ -
B002DOily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 1604000 (Biweekly PM Work)12MO¥ -
B002EOily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 16040002TM¥ -
SRF Total¥ -
B003DLA DDYJ Portion (SR#18829480):
B003AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -4%
B003BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -1%
B003CWeight Scale, Spec Item 3.2.2 in Annex 15020002TM¥ -
DLATotal¥ -
B004HSG Portion (SR#18816420):
B004AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -20%
B004BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -36%
B004CPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
HSG Total¥ -
B005DODDS Portion(SR#18816409):
B005AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -2%
B005BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -2%
B005CPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
DODDS Total¥ -
B006USNH Portion (SR#18816432):
B006AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -3%
B006BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -4%
B006CPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
USNH Total¥ -
B007DECA YOKOSUKA Portion (SR#18816393)
B007AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -3%
B007BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -1%
DECA YOKOSUKA¥ -
TOTAL RECURRING LINE ITEMS¥
MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual

&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELIN-1st Non-Recurring

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0004 Non-Recurring Price - First Option Period
Provide Prices For Facility Investment and Waste Water- Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs B 700 through B 706
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
B 700MAJOR REPAIR WORK - MUST BE NEGOTIATED BY KO.MAJOR REPAIR WORK is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Recurring work. Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service call or PM repair. Task order completion times will be specified in task order.1LSN/A¥ 270,000,000
B 701Replace Wall bricks on Left side and Right side of both two incinerators at Bldg. 1829.The Contractor shall replace wall bricks including associated fittings with new one. Perform necessary adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is specified in J-1502000-03-03.20m2¥
B 702Replace Casings on Left side and Right side of both two incinerators at Bldg. 1829.The Contractor shall replace Casings including associated fittings with new one. Perform necessary adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is specified in J-1502000-03-03.20m2¥
B 703Replace One (1) Reduction

Gear for No. 1 Ash Bunker at Bldg. 1829. The Contractor shall replace the existing one (1) reduction gear for No.1 ash bunker with new one.

Perform total operation test and make necessary

adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is 1) Model No.: 08120-150B, 2) Manufacturer: Takuma Co., Ltd.2EA¥
B 704Replace Side Fire Grates
for Furnace at Bldg. 1829.The Contractor shall replace the existing side fire
grates (Right side and left side of one furnace) with new one. Perform operation test and make necessary adjustment after completion of replacement work. All work shall be completed within 150 calendar days after the date of order.2SET¥
B 705Replace Water Level Gage System at Bldg. 1568.The Contractor shall replace the existing two (2) level gages and one (1) distributor with new ones, and provide program software for new system. Perform total operation test and make necessary adjustment after completion of replacement work. All work shall be completed within 90 calendar dates after the date of order. Applicable equipment is as follows. a. Level Gages: 1) Model No. is EJA110-DMS1A-20DC-S2, Manufacturer is Yokogawa Electric Co., Ltd. b. Distributor: 1) Model No. is VJA7-026-AAAO/FB-1.06, 2) Manufacturer is Yokogawa Electric Co., Ltd.1SET¥
B 706Clean Utility Trench at
Berth Area and Pears.The Contractor shall remove debris from utility trench utilizing high pressure water and vacuum at berth area and pears. All work shall be completed within 30 calendar days after the date of order. One (1) occurrence of order is 10 meter length.20TM¥
TOTAL NON-RECUURRING PRICE¥ 270,000,000
HR =Hour
LS =Lump Sum
EA =Each
TM =Time

&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N

ELIN-2nd Recurring

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT C - CLIN 9002
Line Item 0005 Recurring - Second Option Period
Provide Prices For Recurring - In Accordance With Section C, Spec Item 3
ELINs C001 through C007
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalRatio
C001CFAY SRM Portion (SR#18828608)
C001AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -57%
C001BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -46%
C001CWeight Scale (Bldg. 1822), Spec Item 3.2.2 in Annex 15020002TM¥ -
C001DWeight Scale (Bldg. 4856), Spec Item 3.2.2 in Annex 15020001TM¥ -
C001EPaint Water Treatment Plant, Spec Item 3.2.3 in Annex 160400012MO¥ -
C001FPotable Water Tanks, Spec Item 3.2.3 in Annex 150200003Y¥ -
C001GPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
C001HPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (UH Portion)1TM¥ -
C001IPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (MWR Portion)1TM¥ -
C001JPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (COMSUBGRU-7 Portion)1TM¥ -
C001KPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (NEX Portion)1TM¥ -
C001LRelay Pump Station, Spec Item 3.2.2.1 in Annex 1604000 (NEX Portion)12MO¥ -
CFAY Total¥ -
C002SRF-JRMC Portion (SR#18801720):
C002AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -11%
C002BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -10%
C002CIndustrial Wastewater Treatment Plant at DD4, Spec Item 3.2.4.1in Annex 16040001TM¥ -
C002DOily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 1604000 (Biweekly PM Work)12MO¥ -
C002EOily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 16040002TM¥ -
SRF Total¥ -
C003DLA DDYJ Portion (SR#18829480):
C003AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -4%
C003BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -1%
C003CWeight Scale, Spec Item 3.2.2 in Annex 15020002TM¥ -
DLATotal¥ -
C004HSG Portion (SR#18816420):
C004AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -20%
C004BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -36%
C004CPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
HSG Total¥ -
C005DODDS Portion(SR#18816409):
C005AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -2%
C005BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -2%
C005CPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
DODDS Total¥ -
C006USNH Portion (SR#18816432):
C006AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -3%
C006BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -4%
C006CPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
USNH Total¥ -
C007DECA YOKOSUKA Portion (SR#18816393)
C007AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -3%
C007BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -1%
DECA YOKOSUKA¥ -
TOTAL RECURRING LINE ITEMS¥
MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual

&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELIN-2nd Non-Recurring

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT C - CLIN 9002
Line Item 0006 Non-Recurring Price - Second Option Period
Provide Prices For Facility Investment and Waste Water- Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs C 700 through C 706
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
C 700MAJOR REPAIR WORK - MUST BE NEGOTIATED BY KO.MAJOR REPAIR WORK is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Recurring work. Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service call or PM repair. Task order completion times will be specified in task order.1LSN/A¥ 270,000,000
C 701Replace Wall bricks on Left side and Right side of both two incinerators at Bldg. 1829.The Contractor shall replace wall bricks including associated fittings with new one. Perform necessary adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is specified in J-1502000-03-03.20m2¥
C 702Replace Casings on Left side and Right side of both two incinerators at Bldg. 1829.The Contractor shall replace Casings including associated fittings with new one. Perform necessary adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is specified in J-1502000-03-03.20m2¥
C 703Replace One (1) Reduction

Gear for No. 1 Ash Bunker at Bldg. 1829. The Contractor shall replace the existing one (1) reduction gear for No.1 ash bunker with new one.

Perform total operation test and make necessary

adjustment after completion of replacement work. All work shall be completed within 120 calendar days after the date of order. Applicable equipment is 1) Model No.: 08120-150B, 2) Manufacturer: Takuma Co., Ltd.2EA¥
C 704Replace Side Fire Grates
for Furnace at Bldg. 1829.The Contractor shall replace the existing side fire
grates (Right side and left side of one furnace) with new one. Perform operation test and make necessary adjustment after completion of replacement work. All work shall be completed within 150 calendar days after the date of order.2SET¥
C 705Replace Water Level Gage System at Bldg. 1568.The Contractor shall replace the existing two (2) level gages and one (1) distributor with new ones, and provide program software for new system. Perform total operation test and make necessary adjustment after completion of replacement work. All work shall be completed within 90 calendar dates after the date of order. Applicable equipment is as follows. a. Level Gages: 1) Model No. is EJA110-DMS1A-20DC-S2, Manufacturer is Yokogawa Electric Co., Ltd. b. Distributor: 1) Model No. is VJA7-026-AAAO/FB-1.06, 2) Manufacturer is Yokogawa Electric Co., Ltd.1SET¥
C 706Clean Utility Trench at
Berth Area and Pears.The Contractor shall remove debris from utility trench utilizing high pressure water and vacuum at berth area and pears. All work shall be completed within 30 calendar days after the date of order. One (1) occurrence of order is 10 meter length.20TM¥
TOTAL NON-RECUURRING PRICE¥ 270,000,000
HR =Hour
LS =Lump Sum
EA =Each
TM =Time

&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N

ELIN-3rd Recurring

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT D - CLIN 9003
Line Item 0007 Recurring - Third Option Period
Provide Prices For Recurring - In Accordance With Section C, Spec Item 3
ELINs D001 through D007
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalRatio
D001CFAY SRM Portion (SR#18828608)
D001AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -57%
D001BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -46%
D001CWeight Scale (Bldg. 1822), Spec Item 3.2.2 in Annex 15020002TM¥ -
D001DWeight Scale (Bldg. 4856), Spec Item 3.2.2 in Annex 15020001TM¥ -
D001EPaint Water Treatment Plant, Spec Item 3.2.3 in Annex 160400012MO¥ -
D001FPotable Water Tanks, Spec Item 3.2.3 in Annex 150200013Y¥ -
D001GPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
D001HPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (UH Portion)1TM¥ -
D001IPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (MWR Portion)1TM¥ -
D001JPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (COMSUBGRU-7 Portion)1TM¥ -
D001KPotable Water Tanks, Spec Item 3.2.3 in Annex 1502000 (NEX Portion)1TM¥ -
D001LRelay Pump Station, Spec Item 3.2.2.1 in Annex 1604000 (NEX Portion)12MO¥ -
CFAY Total¥ -
D002SRF-JRMC Portion (18801720):
D002AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -11%
D002BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -10%
D002CIndustrial Wastewater Treatment Plant at DD4, Spec Item 3.2.4.1in Annex 16040001TM¥ -
D002DOily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 1604000 (Biweekly PM Work)12MO¥ -
D002EOily Wastewater Pipeline at Berth 12, Spec Item 3.2.5 in Annex 16040002TM¥ -
SRF Total¥ -
D003DLA DDYJ Portion (SR#18829480):
D003AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -4%
D003BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -1%
D003CWeight Scale, Spec Item 3.2.2 in Annex 15020002TM¥ -
DLATotal¥ -
D004HSG Portion (SR#18816420):
D004AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -20%
D004BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -36%
D004CPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
HSG Total¥ -
D005DODDS Portion(SR#18816409):
D005AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -2%
D005BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -2%
D005CPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
DODDS Total¥ -
D006USNH Portion (SR#18816432):
D006AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -3%
D006BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -4%
D006CPotable Water Tanks, Spec Item 3.2.3 in Annex 15020001TM¥ -
USNH Total¥ -
D007DECA YOKOSUKA Portion (SR#18816393)
D007AOperation, Maintenance and PMI work of Incinerator Plant, Spec Item 3.2.1 in Annex 150200012MO¥ -3%
D007BOperation, Maintenance and PMI work of Sewage Treatment Plant, Spec Item 3.1, 3.2.1 in Annex 160400012MO¥ -1%
DECA YOKOSUKA¥ -
TOTAL RECURRING LINE ITEMS¥
MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual

&C&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 Page &P of &N

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar…