ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0001 Recurring Work - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC
ITEM 3
ELINs A001 through A009.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit Price (¥)Total (¥)
A001HOUSING FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A001AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A001ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A001ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A001ADPreventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.112MO¥0
A001AEPreventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.212MO¥0
A001AFInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.211MO¥0
A001AGOther Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.112MO¥0
A001AHOther Recurring Services Program, HVAC Systems Opepration, Spec Item 3.4.212MO¥0
A001AJOther Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.312MO¥0
A001AKOther Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.412MO¥0
A001 Housing Fund, Sub Total¥0
A002STATION FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A002AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A002ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A002ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A002ADPreventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.112MO¥0
A002AEPreventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.212MO¥0
A002AFPreventive Maintenance (PM) Program, Fan Convectors and Unit Heaters, Spec Item 3.2.312MO¥0
A002AGPreventive Maintenance (PM) Program, Low Pressure Compressed Air System (for Breathing Air) (for Spray Painting), Spec Item 3.2.412MO¥0
A002AHPreventive Maintenance (PM) Program, Paint Spray Booth Systems Including Outside Air Units, Spec Item 3.2.512MO¥0
A002AJPreventive Maintenance (PM) Program, Air Intake Hangar Doors (for Corrosion Control Hangar Bldg. 1502), Spec Item 3.2.612MO¥0
A002AKPreventive Maintenance (PM) Program, Hangar Doors, Spec Item 3.2.712MO¥0
A002ALInspection, Testing, and Certification Program, Underground Storage Tank, Spec Item 3.3.111MO¥0
A002AMInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.211MO¥0
A002ANOther Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.112MO¥0
A002APOther Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.312MO¥0
A002AQOther Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.412MO¥0
A002AROther Recurring Services Program, Steam Equipment Seasonal Start-Up and Shutdown (for Corrosion Control Hangar), Spec Item 3.4.512MO¥0
A002ASOther Recurring Services Program, Cooling Water's Water Testing and Treatmnet Services (for Corrosion Control Hangar), Spec Item 3.4.612MO¥0
A002 Station Fund, Sub Total¥0
A003DoDEA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A003AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A003ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A003ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A003ADPreventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.212MO¥0
A003AEOther Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.312MO¥0
A003AFOther Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.412MO¥0
A003 DoDEA Fund, Sub Total¥0
A004USNH (BUMED) FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A004AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A004ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A004ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A004ADPreventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.212MO¥0
A004AEInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.211MO¥0
A004AFOther Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.312MO¥0
A004AGOther Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.412MO¥0
A004 USNH (BUMED) Fund, Sub Total¥0
A005NAVFAC FE UEM FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A005AAEmergency Service Orders, Spec Item 3.1.111MO¥0
A005ABUrgent Service Orders, Spec Item 3.1.211MO¥0
A005ACRoutine Service Orders, Spec Item 3.1.311MO¥0
A005ADInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.211MO¥0
A005 NAVFAC FE UEM Fund, Sub Total¥0
A006FRCWP FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A006AAEmergency Service Orders, Spec Item 3.1.111MO¥0
A006ABUrgent Service Orders, Spec Item 3.1.211MO¥0
A006ACRoutine Service Orders, Spec Item 3.1.311MO¥0
A006ADInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.211MO¥0
A006 FRCWP Fund, Sub Total¥0
A007MWR FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A007AAEmergency Service Orders, Spec Item 3.1.111MO¥0
A007ABUrgent Service Orders, Spec Item 3.1.211MO¥0
A007ACRoutine Service Orders, Spec Item 3.1.311MO¥0
A007ADInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.211MO¥0
A007 MWR Fund, Sub Total¥0
A008DeCA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A008AAEmergency Service Orders, Spec Item 3.1.111MO¥0
A008ABUrgent Service Orders, Spec Item 3.1.211MO¥0
A008ACRoutine Service Orders, Spec Item 3.1.311MO¥0
A008ADInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.211MO¥0
A008 DeCA Fund, Sub Total¥0
A009NAVFAC FE NWCF FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A009AAEmergency Service Orders, Spec Item 3.1.111MO¥0
A009ABUrgent Service Orders, Spec Item 3.1.211MO¥0
A009ACRoutine Service Orders, Spec Item 3.1.311MO¥0
A009ADInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.211MO¥0
A009 NAVFAC FE NWCF Fund, Sub Total¥0
TOTAL RECURRING WORK PRICE - BASE PERIODTOTAL ¥¥0
NOTES:
(1) Abbreviation : MO = Month LS = Lump Sum
(2) The Offeror/Contractor will be requested to submit approximate cost breakdown per system and per building and/or per command
(facility.)

&RSRN13163177

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

Base Non

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0002 Non-Recurring Work - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT, CUSTODIAL - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A717
Name of Offeror/Contractor:
ELINProduct NameDescription ExtendedEstimated Quantity (Maximum)Unit of IssueUnit Price (¥)Extended (Total) Price (¥)
A700Unit Priced Labor Work - During Regular Working Hours (Negotiated)Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order.300HR¥0
A701Unit Priced Labor Work - Outside Regular Working Hours (Negotiated)Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order.100HR¥0
A702Material Costs- (Negotiated)Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.85,000,000Yen-¥85,000,000
A703Lease of Temporary Air Conditioner (Cooling capacity; approx. 30kW)Provide a lease service of a temporary air conditioner (cooling capacity; approx. 30kW or more) for the Government facility use. Exact location and duration will be specified when this item is used. The unit shall be; fuel operated (or Provide with sound-proof generator for the unit), outdoor type. Fuel shall be provided to its full by the Contractor upon initial delivery. Unit price shall include insurance. After both the Government and the Contractor confirm the unit is applicable to the subject facility, this item will be issued. (UPT Work)10Week¥0
A704Delivery of Temporary Air ConditionerThis item is for transporation (one round trip), installing (hook up) work and removal work of Lease of air conditioner (above A703). Up to ¥25,000 for materials and up to 12 hours labor respectively to hook up and remove the duct to subject facility's system (only when the modification to facility system is required) is also included. One round trip is counted as “1 EA.” (UPT Work)3EA¥0
A705Trouble Shooting (on NAF Atsugi)Respond to and perform trouble shooting, to investigate the trouble. The Government, using this line item, may ask for the Contractor’s trouble shooting work for HVAC or hangar systems/equipment or AST/UST not listed in Attachment J but located on NAF Atsugi.
Provide 4-hour on-site labor per trouble shooting to perform the trouble shooting requested within two (2) working days after the issurance of this item. The labor hour shall not include any hours for travel and administrative work. The Contractor may be requested to submit proposal and estimate for the repair/replacement, as specified in Annex 2 (Section C, Sub Annex 0200000.) Submit the trouble shooting report. (UPT Work)15EA¥0
A706Replacement of FCU, Cooling; 1.1 kW ~ 1.99 kW, Heating; 2.03 kW ~ 2.99 kW, Ceiling Mounted, Cassette, 2 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.1 kW and 1.99 kW, and approximate heating capacity is around between 2.03 kW ~ 2.99 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (1) HVAC System From Bldg. 3115 (g) (i), (2) HVAC System From Bldg. 3125 (g) (i), (4) HVAC System From Bldg. 3142 (f) (i), (9) Bldg. 3102 (g) (i), (3) HVAC System From Bldg. 3145 (e) (i), (5) HVAC System From Bldg. 3136 (e) (iv), (7) Bldg. 3050 (g) (i) and (ii), (8) Bldg. 3069 (g) (i). (UPT Work)125EA¥0
A707Replacement of FCU, Cooling; 2.0 kW ~ 2.99 kW, Heating; 3.5 kW ~ 4.99 kW, Ceiling Mounted, Cassette, 2 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 2.0 kW and 2.99 kW, and approximate heating capacity is around between 3.5 kW ~ 4.99 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (1) HVAC System from Bldg. 3115 (g) (ii) and (iii), (2) HVAC System from Bldg. 3125 (g) (ii) and (iii), (3) HVAC System Bldg. 3145 (e) (ii), (4) HVAC System from Bldg. 3142 (f) (ii) and (iii), (8) Bldg. 3069 (g) (ii), (9) Bldg. 3102 (g) (ii) and (iii), (5) HVAC System from Bldg. 3136 (e) (iii), (7) Bldg. 3050 (g) (iii). (UPT Work)40EA¥0
A708Replacement of FCU, Cooling; 3.5 kW ~ 3.99 kW, Heating; 5.5 kW ~ 6.5 kW, Ceiling Mounted, Cassette, 2 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 3.5 kW and 3.99 kW, and approximate heating capacity is around between 5.5 kW ~ 6.5 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (5) HVAC System from Bldg. 3136 (e) (ii) and (iv), (8) Bldg. 3069 (g) (iii). (UPT Work)10EA¥0
A709Replacement of FCU, Cooling; 4.4 kW ~ 4.99 kW, Heating; 7.0 kW ~ 7.9 kW, Ceiling Mounted, Cassette, 2 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 4.4 kW and 4.99 kW, and approximate heating capacity is around between 7.0 kW ~ 7.9 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (4) HVAC System from Bldg. 3142 (f) (iv), (5) HVAC System from Bldg. 3136 (e) (i), (8) Bldg. 3069 (g) (iv). (UPT Work)5EA¥0
A710Replacement of FCU, Cooling; 5.0 kW ~ 5.99 kW, Heating; 9.0 kW ~ 9.9 kW, Ceiling Mounted, Cassette, 2 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 5.0 kW and 5.99 kW, and approximate heating capacity is around between 9.0 kW ~ 9.9 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (4) HVAC System from Bldg. 3142 (f) (v). (UPT Work)2EA¥0
A711Replacement of FCU, Cooling; 1.8 kW ~ 2.0 kW, Heating; 3.09 kW ~ 4.1 kW, Ceiling Mounted, Cassette, 4 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.8 kW and 2.0 kW, and approximate heating capacity is around between 3.09 kW ~ 4.1 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (i). (UPT Work)2EA¥0
A712Replacement of FCU, Cooling; 1.7 kW ~ 2.0 kW, Heating; 3.1 kW ~ 3.5 kW, Ceiling Suspended (Exposed)Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.7 kW and 2.0 kW, and approximate heating capacity is around between 3.1 kW ~ 3.5 kW. Type; Ceiling suspended (exposed), 2 piping. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (ii). (UPT Work)2EA¥0
A713Replacement of FCU, Cooling; 2.6 kW ~ 2.99 kW, Heating; 4.5 kW ~ 4.99 kW, Ceiling Suspended (Exposed)Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 2.6 kW and 2.99 kW, and approximate heating capacity is around between 4.5 kW ~ 4.99 kW. Type; Ceiling suspended (exposed), 2 piping. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (ii). (UPT Work)2EA¥0
A714Replacement of FCU, Cooling; 3.7 kW ~ 5.1 kW, Heating; 6.7 kW ~ 8.9 kW, Ceiling Mounted, Cassette, 4 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 3.7 kW and 5.1 kW, and approximate heating capacity is around between 6.7 kW and 8.9 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (iii). (UPT Work)5EA¥0
A715Replacement of FCU, Cooling; 1.1 kW ~ 1.7 kW, Heating; 2.8 ~ 3.1 kW, Ceiling Mounted, Cassette, 4 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.1 kW and 1.7 kW, and approximate heating capacity is around between 2.8 kW and 3.1 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (iv). (UPT Work)2EA¥0
A716Replacement of All After-Filters for Paint Spray Booth, Hagar Bay 1, Bldg. 1502Remove and dispose of existing all after-filters located in hangar bay 1, Bldg. 1502, and Provide new after-filters. (32 ea. x 3 = 96 ea.) Refer to J-1502000-11 Part 1 for material information. (UPT Work)2EA¥0
A717Replacement of All After-Filters for Paint Spray Booth, Hagar Bay 2, Bldg. 1502Remove and dispose of existing all after-filters located in hangar bay 2, Bldg. 1502, and Provide new after-filters. (32 ea. x 4 = 128 ea.) Refer to J-1502000-11 Part 1 for material information. (UPT Work)2EA¥0
TOTAL NON-RECURRING WORK PRICE BASE PERIOD (MAX AMOUNT)¥85,000,000
Notes:
Note 1: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 2: Abbreviation - LS = Lump Sum EA = Each HR = Hour
Note 3: A705 through A717 are uploaded at FedMall.
Note 4: For replacement of FCU, the Governement may consult with the Contractor to identify exact line item that matches the requested site.

&R&9SRN13163177

1st Rec

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0003 Recurring Work - First Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC
ITEM 3
ELINs B001 through B009.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit Price (¥)Total (¥)
B001HOUSING FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B001AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B001ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B001ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B001ADPreventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.112MO¥0
B001AEPreventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.212MO¥0
B001AFInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.212MO¥0
B001AGOther Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.112MO¥0
B001AHOther Recurring Services Program, HVAC Systems Opepration, Spec Item 3.4.212MO¥0
B001AJOther Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.312MO¥0
B001AKOther Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.412MO¥0
B001 Housing Fund, Sub Total¥0
B002STATION FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B002AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B002ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B002ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B002ADPreventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.112MO¥0
B002AEPreventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.212MO¥0
B002AFPreventive Maintenance (PM) Program, Fan Convectors and Unit Heaters, Spec Item 3.2.312MO¥0
B002AGPreventive Maintenance (PM) Program, Low Pressure Compressed Air System (for Breathing Air) (for Spray Painting), Spec Item 3.2.412MO¥0
B002AHPreventive Maintenance (PM) Program, Paint Spray Booth Systems Including Outside Air Units, Spec Item 3.2.512MO¥0
B002AJPreventive Maintenance (PM) Program, Air Intake Hangar Doors (for Corrosion Control Hangar Bldg. 1502), Spec Item 3.2.612MO¥0
B002AKPreventive Maintenance (PM) Program, Hangar Doors, Spec Item 3.2.712MO¥0
B002ALInspection, Testing, and Certification Program, Underground Storage Tank, Spec Item 3.3.112MO¥0
B002AMInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.212MO¥0
B002ANOther Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.112MO¥0
B002APOther Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.312MO¥0
B002AQOther Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.412MO¥0
B002AROther Recurring Services Program, Steam Equipment Seasonal Start-Up and Shutdown (for Corrosion Control Hangar), Spec Item 3.4.512MO¥0
B002ASOther Recurring Services Program, Cooling Water's Water Testing and Treatmnet Services (for Corrosion Control Hangar), Spec Item 3.4.612MO¥0
B002 Station Fund, Sub Total¥0
B003DoDEA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B003AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B003ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B003ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B003ADPreventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.212MO¥0
B003AEOther Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.312MO¥0
B003AFOther Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.412MO¥0
B003 DoDEA Fund, Sub Total¥0
B004USNH (BUMED) FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B004AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B004ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B004ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B004ADPreventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.212MO¥0
B004AEInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.212MO¥0
B004AFOther Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.312MO¥0
B004AGOther Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.412MO¥0
B004 USNH (BUMED) Fund, Sub Total¥0
B005NAVFAC FE UEM FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B005AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B005ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B005ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B005ADInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.212MO¥0
B005 NAVFAC FE UEM Fund, Sub Total¥0
B006FRCWP FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B006AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B006ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B006ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B006ADInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.212MO¥0
B006 FRCWP Fund, Sub Total¥0
B007MWR FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B007AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B007ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B007ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B007ADInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.212MO¥0
B007 MWR Fund, Sub Total¥0
B008DeCA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B008AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B008ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B008ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B008ADInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.212MO¥0
B008 DeCA Fund, Sub Total¥0
B009NAVFAC FE NWCF FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B009AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B009ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B009ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B009ADInspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.212MO¥0
B009 NAVFAC FE NWCF Fund, Sub Total¥0
TOTAL RECURRING WORK PRICE - FIRST OPTION PERIODTOTAL ¥¥0
NOTES:
(1) Abbreviation : MO = Month LS = Lump Sum
(2) The Offeror/Contractor will be requested to submit approximate cost breakdown per system and per building and/or per command
(facility.)

&RSRN13163177

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

1st Non

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0004 Non-Recurring Work - First Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT, CUSTODIAL - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B700 through B717
Name of Offeror/Contractor:
ELINProduct NameDescription ExtendedEstimated Quantity (Maximum)Unit of IssueUnit Price (¥)Extended (Total) Price (¥)
B700Unit Priced Labor Work - During Regular Working Hours (Negotiated)Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order.300HR¥0
B701Unit Priced Labor Work - Outside Regular Working Hours (Negotiated)Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order.100HR¥0
B702Material Costs- (Negotiated)Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.85,000,000Yen-¥85,000,000
B703Lease of Temporary Air Conditioner (Cooling capacity; approx. 30kW)Provide a lease service of a temporary air conditioner (cooling capacity; approx. 30kW or more) for the Government facility use. Exact location and duration will be specified when this item is used. The unit shall be; fuel operated (or Provide with sound-proof generator for the unit), outdoor type. Fuel shall be provided to its full by the Contractor upon initial delivery. Unit price shall include insurance. After both the Government and the Contractor confirm the unit is applicable to the subject facility, this item will be issued. (UPT Work)10Week¥0
B704Delivery of Temporary Air ConditionerThis item is for transporation (one round trip), installing (hook up) work and removal work of Lease of air conditioner (above B703). Up to ¥25,000 for materials and up to 12 hours labor respectively to hook up and remove the duct to subject facility's system (only when the modification to facility system is required) is also included. One round trip is counted as “1 EA.” (UPT Work)3EA¥0
B705Trouble Shooting (on NAF Atsugi)Respond to and perform trouble shooting, to investigate the trouble. The Government, using this line item, may ask for the Contractor’s trouble shooting work for HVAC or hangar systems/equipment or AST/UST not listed in Attachment J but located on NAF Atsugi.
Provide 4-hour on-site labor per trouble shooting to perform the trouble shooting requested within two (2) working days after the issurance of this item. The labor hour shall not include any hours for travel and administrative work. The Contractor may be requested to submit proposal and estimate for the repair/replacement, as specified in Annex 2 (Section C, Sub Annex 0200000.) Submit the trouble shooting report. (UPT Work)15EA¥0
B706Replacement of FCU, Cooling; 1.1 kW ~ 1.99 kW, Heating; 2.03 kW ~ 2.99 kW, Ceiling Mounted, Cassette, 2 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.1 kW and 1.99 kW, and approximate heating capacity is around between 2.03 kW ~ 2.99 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (1) HVAC System From Bldg. 3115 (g) (i), (2) HVAC System From Bldg. 3125 (g) (i), (4) HVAC System From Bldg. 3142 (f) (i), (9) Bldg. 3102 (g) (i), (3) HVAC System From Bldg. 3145 (e) (i), (5) HVAC System From Bldg. 3136 (e) (iv), (7) Bldg. 3050 (g) (i) and (ii), (8) Bldg. 3069 (g) (i). (UPT Work)125EA¥0
B707Replacement of FCU, Cooling; 2.0 kW ~ 2.99 kW, Heating; 3.5 kW ~ 4.99 kW, Ceiling Mounted, Cassette, 2 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 2.0 kW and 2.99 kW, and approximate heating capacity is around between 3.5 kW ~ 4.99 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (1) HVAC System from Bldg. 3115 (g) (ii) and (iii), (2) HVAC System from Bldg. 3125 (g) (ii) and (iii), (3) HVAC System Bldg. 3145 (e) (ii), (4) HVAC System from Bldg. 3142 (f) (ii) and (iii), (8) Bldg. 3069 (g) (ii), (9) Bldg. 3102 (g) (ii) and (iii), (5) HVAC System from Bldg. 3136 (e) (iii), (7) Bldg. 3050 (g) (iii). (UPT Work)40EA¥0
B708Replacement of FCU, Cooling; 3.5 kW ~ 3.99 kW, Heating; 5.5 kW ~ 6.5 kW, Ceiling Mounted, Cassette, 2 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 3.5 kW and 3.99 kW, and approximate heating capacity is around between 5.5 kW ~ 6.5 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (5) HVAC System from Bldg. 3136 (e) (ii) and (iv), (8) Bldg. 3069 (g) (iii). (UPT Work)10EA¥0
B709Replacement of FCU, Cooling; 4.4 kW ~ 4.99 kW, Heating; 7.0 kW ~ 7.9 kW, Ceiling Mounted, Cassette, 2 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 4.4 kW and 4.99 kW, and approximate heating capacity is around between 7.0 kW ~ 7.9 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (4) HVAC System from Bldg. 3142 (f) (iv), (5) HVAC System from Bldg. 3136 (e) (i), (8) Bldg. 3069 (g) (iv). (UPT Work)5EA¥0
B710Replacement of FCU, Cooling; 5.0 kW ~ 5.99 kW, Heating; 9.0 kW ~ 9.9 kW, Ceiling Mounted, Cassette, 2 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 5.0 kW and 5.99 kW, and approximate heating capacity is around between 9.0 kW ~ 9.9 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (4) HVAC System from Bldg. 3142 (f) (v). (UPT Work)2EA¥0
B711Replacement of FCU, Cooling; 1.8 kW ~ 2.0 kW, Heating; 3.09 kW ~ 4.1 kW, Ceiling Mounted, Cassette, 4 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.8 kW and 2.0 kW, and approximate heating capacity is around between 3.09 kW ~ 4.1 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (i). (UPT Work)2EA¥0
B712Replacement of FCU, Cooling; 1.7 kW ~ 2.0 kW, Heating; 3.1 kW ~ 3.5 kW, Ceiling Suspended (Exposed)Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.7 kW and 2.0 kW, and approximate heating capacity is around between 3.1 kW ~ 3.5 kW. Type; Ceiling suspended (exposed), 2 piping. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (ii). (UPT Work)2EA¥0
B713Replacement of FCU, Cooling; 2.6 kW ~ 2.99 kW, Heating; 4.5 kW ~ 4.99 kW, Ceiling Suspended (Exposed)Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 2.6 kW and 2.99 kW, and approximate heating capacity is around between 4.5 kW ~ 4.99 kW. Type; Ceiling suspended (exposed), 2 piping. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (ii). (UPT Work)2EA¥0
B714Replacement of FCU, Cooling; 3.7 kW ~ 5.1 kW, Heating; 6.7 kW ~ 8.9 kW, Ceiling Mounted, Cassette, 4 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 3.7 kW and 5.1 kW, and approximate heating capacity is around between6.7 kW and 8.9 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (iii). (UPT Work)5EA¥0
B715Replacement of FCU, Cooling; 1.1 kW ~ 1.7 kW, Heating; 2.8 ~ 3.1 kW, Ceiling Mounted, Cassette, 4 WayReplace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.1 kW and 1.7 kW, and approximate heating capacity is around between 2.8 kW and 3.1 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling.

Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.

Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (iv). (UPT Work)2EA¥0
B716Replacement of All After-Filters for Paint Spray Booth, Hagar Bay 1, Bldg. 1502Remove and dispose of existing all after-filters located in hangar bay 1, Bldg. 1502, and Provide new after-filters. (32 ea. x 3 = 96 ea.) Refer to J-1502000-11 Part 1 for material information. (UPT Work)2EA¥0