Attachemtn.B.ELIN.excel.xls
XLS spreadsheet 780 KB Posted
- Solicitation number
- N4008419R8701
About this file
Attachemtn.B.ELIN.excel.xls
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008419R8701_19R8701_PreSolAmentment.docx | DOCX document | |
| SF30.19R8701.Amendment.0002.pdf | ||
| SF30_19R8701_Amed0001.pdf | ||
| 19R8701_PreQuotationInquiry.Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Rec
| ATTACHMENT J-0200000-08 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION/CONTRACT # | |||||
| EXHIBIT A - CLIN 9000 | |||||
| Line Item 0001 Recurring Work - Base Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC | |||||
| ITEM 3 | |||||
| ELINs A001 through A009. | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price (¥) | Total (¥) |
| A001 | HOUSING FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| A001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| A001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| A001AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| A001AD | Preventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.1 | 12 | MO | ¥0 | |
| A001AE | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO | ¥0 | |
| A001AF | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 11 | MO | ¥0 | |
| A001AG | Other Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.1 | 12 | MO | ¥0 | |
| A001AH | Other Recurring Services Program, HVAC Systems Opepration, Spec Item 3.4.2 | 12 | MO | ¥0 | |
| A001AJ | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO | ¥0 | |
| A001AK | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO | ¥0 | |
| A001 Housing Fund, Sub Total | ¥0 | ||||
| A002 | STATION FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| A002AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| A002AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| A002AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| A002AD | Preventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.1 | 12 | MO | ¥0 | |
| A002AE | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO | ¥0 | |
| A002AF | Preventive Maintenance (PM) Program, Fan Convectors and Unit Heaters, Spec Item 3.2.3 | 12 | MO | ¥0 | |
| A002AG | Preventive Maintenance (PM) Program, Low Pressure Compressed Air System (for Breathing Air) (for Spray Painting), Spec Item 3.2.4 | 12 | MO | ¥0 | |
| A002AH | Preventive Maintenance (PM) Program, Paint Spray Booth Systems Including Outside Air Units, Spec Item 3.2.5 | 12 | MO | ¥0 | |
| A002AJ | Preventive Maintenance (PM) Program, Air Intake Hangar Doors (for Corrosion Control Hangar Bldg. 1502), Spec Item 3.2.6 | 12 | MO | ¥0 | |
| A002AK | Preventive Maintenance (PM) Program, Hangar Doors, Spec Item 3.2.7 | 12 | MO | ¥0 | |
| A002AL | Inspection, Testing, and Certification Program, Underground Storage Tank, Spec Item 3.3.1 | 11 | MO | ¥0 | |
| A002AM | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 11 | MO | ¥0 | |
| A002AN | Other Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.1 | 12 | MO | ¥0 | |
| A002AP | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO | ¥0 | |
| A002AQ | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO | ¥0 | |
| A002AR | Other Recurring Services Program, Steam Equipment Seasonal Start-Up and Shutdown (for Corrosion Control Hangar), Spec Item 3.4.5 | 12 | MO | ¥0 | |
| A002AS | Other Recurring Services Program, Cooling Water's Water Testing and Treatmnet Services (for Corrosion Control Hangar), Spec Item 3.4.6 | 12 | MO | ¥0 | |
| A002 Station Fund, Sub Total | ¥0 | ||||
| A003 | DoDEA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| A003AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| A003AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| A003AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| A003AD | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO | ¥0 | |
| A003AE | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO | ¥0 | |
| A003AF | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO | ¥0 | |
| A003 DoDEA Fund, Sub Total | ¥0 | ||||
| A004 | USNH (BUMED) FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| A004AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| A004AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| A004AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| A004AD | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO | ¥0 | |
| A004AE | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 11 | MO | ¥0 | |
| A004AF | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO | ¥0 | |
| A004AG | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO | ¥0 | |
| A004 USNH (BUMED) Fund, Sub Total | ¥0 | ||||
| A005 | NAVFAC FE UEM FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| A005AA | Emergency Service Orders, Spec Item 3.1.1 | 11 | MO | ¥0 | |
| A005AB | Urgent Service Orders, Spec Item 3.1.2 | 11 | MO | ¥0 | |
| A005AC | Routine Service Orders, Spec Item 3.1.3 | 11 | MO | ¥0 | |
| A005AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 11 | MO | ¥0 | |
| A005 NAVFAC FE UEM Fund, Sub Total | ¥0 | ||||
| A006 | FRCWP FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| A006AA | Emergency Service Orders, Spec Item 3.1.1 | 11 | MO | ¥0 | |
| A006AB | Urgent Service Orders, Spec Item 3.1.2 | 11 | MO | ¥0 | |
| A006AC | Routine Service Orders, Spec Item 3.1.3 | 11 | MO | ¥0 | |
| A006AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 11 | MO | ¥0 | |
| A006 FRCWP Fund, Sub Total | ¥0 | ||||
| A007 | MWR FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| A007AA | Emergency Service Orders, Spec Item 3.1.1 | 11 | MO | ¥0 | |
| A007AB | Urgent Service Orders, Spec Item 3.1.2 | 11 | MO | ¥0 | |
| A007AC | Routine Service Orders, Spec Item 3.1.3 | 11 | MO | ¥0 | |
| A007AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 11 | MO | ¥0 | |
| A007 MWR Fund, Sub Total | ¥0 | ||||
| A008 | DeCA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| A008AA | Emergency Service Orders, Spec Item 3.1.1 | 11 | MO | ¥0 | |
| A008AB | Urgent Service Orders, Spec Item 3.1.2 | 11 | MO | ¥0 | |
| A008AC | Routine Service Orders, Spec Item 3.1.3 | 11 | MO | ¥0 | |
| A008AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 11 | MO | ¥0 | |
| A008 DeCA Fund, Sub Total | ¥0 | ||||
| A009 | NAVFAC FE NWCF FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| A009AA | Emergency Service Orders, Spec Item 3.1.1 | 11 | MO | ¥0 | |
| A009AB | Urgent Service Orders, Spec Item 3.1.2 | 11 | MO | ¥0 | |
| A009AC | Routine Service Orders, Spec Item 3.1.3 | 11 | MO | ¥0 | |
| A009AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 11 | MO | ¥0 | |
| A009 NAVFAC FE NWCF Fund, Sub Total | ¥0 | ||||
| TOTAL RECURRING WORK PRICE - BASE PERIOD | TOTAL ¥ | ¥0 | |||
| NOTES: | |||||
| (1) Abbreviation : MO = Month LS = Lump Sum | |||||
| (2) The Offeror/Contractor will be requested to submit approximate cost breakdown per system and per building and/or per command | |||||
| (facility.) |
&RSRN13163177
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing
Base Non
| ATTACHMENT J-0200000-08 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # | |||||||
| EXHIBIT A - CLIN 9000 | |||||||
| Line Item 0002 Non-Recurring Work - Base Period | |||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT, CUSTODIAL - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs A700 through A717 | |||||||
| Name of Offeror/Contractor: | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity (Maximum) | Unit of Issue | Unit Price (¥) | Extended (Total) Price (¥) | |
| A700 | Unit Priced Labor Work - During Regular Working Hours (Negotiated) | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | 300 | HR | ¥0 | ||
| A701 | Unit Priced Labor Work - Outside Regular Working Hours (Negotiated) | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | 100 | HR | ¥0 | ||
| A702 | Material Costs- (Negotiated) | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 85,000,000 | Yen | - | ¥85,000,000 | |
| A703 | Lease of Temporary Air Conditioner (Cooling capacity; approx. 30kW) | Provide a lease service of a temporary air conditioner (cooling capacity; approx. 30kW or more) for the Government facility use. Exact location and duration will be specified when this item is used. The unit shall be; fuel operated (or Provide with sound-proof generator for the unit), outdoor type. Fuel shall be provided to its full by the Contractor upon initial delivery. Unit price shall include insurance. After both the Government and the Contractor confirm the unit is applicable to the subject facility, this item will be issued. (UPT Work) | 10 | Week | ¥0 | ||
| A704 | Delivery of Temporary Air Conditioner | This item is for transporation (one round trip), installing (hook up) work and removal work of Lease of air conditioner (above A703). Up to ¥25,000 for materials and up to 12 hours labor respectively to hook up and remove the duct to subject facility's system (only when the modification to facility system is required) is also included. One round trip is counted as “1 EA.” (UPT Work) | 3 | EA | ¥0 | ||
| A705 | Trouble Shooting (on NAF Atsugi) | Respond to and perform trouble shooting, to investigate the trouble. The Government, using this line item, may ask for the Contractor’s trouble shooting work for HVAC or hangar systems/equipment or AST/UST not listed in Attachment J but located on NAF Atsugi. | |||||
| Provide 4-hour on-site labor per trouble shooting to perform the trouble shooting requested within two (2) working days after the issurance of this item. The labor hour shall not include any hours for travel and administrative work. The Contractor may be requested to submit proposal and estimate for the repair/replacement, as specified in Annex 2 (Section C, Sub Annex 0200000.) Submit the trouble shooting report. (UPT Work) | 15 | EA | ¥0 | ||||
| A706 | Replacement of FCU, Cooling; 1.1 kW ~ 1.99 kW, Heating; 2.03 kW ~ 2.99 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.1 kW and 1.99 kW, and approximate heating capacity is around between 2.03 kW ~ 2.99 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (1) HVAC System From Bldg. 3115 (g) (i), (2) HVAC System From Bldg. 3125 (g) (i), (4) HVAC System From Bldg. 3142 (f) (i), (9) Bldg. 3102 (g) (i), (3) HVAC System From Bldg. 3145 (e) (i), (5) HVAC System From Bldg. 3136 (e) (iv), (7) Bldg. 3050 (g) (i) and (ii), (8) Bldg. 3069 (g) (i). (UPT Work) | 125 | EA | ¥0 | |
| A707 | Replacement of FCU, Cooling; 2.0 kW ~ 2.99 kW, Heating; 3.5 kW ~ 4.99 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 2.0 kW and 2.99 kW, and approximate heating capacity is around between 3.5 kW ~ 4.99 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (1) HVAC System from Bldg. 3115 (g) (ii) and (iii), (2) HVAC System from Bldg. 3125 (g) (ii) and (iii), (3) HVAC System Bldg. 3145 (e) (ii), (4) HVAC System from Bldg. 3142 (f) (ii) and (iii), (8) Bldg. 3069 (g) (ii), (9) Bldg. 3102 (g) (ii) and (iii), (5) HVAC System from Bldg. 3136 (e) (iii), (7) Bldg. 3050 (g) (iii). (UPT Work) | 40 | EA | ¥0 | |
| A708 | Replacement of FCU, Cooling; 3.5 kW ~ 3.99 kW, Heating; 5.5 kW ~ 6.5 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 3.5 kW and 3.99 kW, and approximate heating capacity is around between 5.5 kW ~ 6.5 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (5) HVAC System from Bldg. 3136 (e) (ii) and (iv), (8) Bldg. 3069 (g) (iii). (UPT Work) | 10 | EA | ¥0 | |
| A709 | Replacement of FCU, Cooling; 4.4 kW ~ 4.99 kW, Heating; 7.0 kW ~ 7.9 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 4.4 kW and 4.99 kW, and approximate heating capacity is around between 7.0 kW ~ 7.9 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (4) HVAC System from Bldg. 3142 (f) (iv), (5) HVAC System from Bldg. 3136 (e) (i), (8) Bldg. 3069 (g) (iv). (UPT Work) | 5 | EA | ¥0 | |
| A710 | Replacement of FCU, Cooling; 5.0 kW ~ 5.99 kW, Heating; 9.0 kW ~ 9.9 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 5.0 kW and 5.99 kW, and approximate heating capacity is around between 9.0 kW ~ 9.9 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (4) HVAC System from Bldg. 3142 (f) (v). (UPT Work) | 2 | EA | ¥0 | |
| A711 | Replacement of FCU, Cooling; 1.8 kW ~ 2.0 kW, Heating; 3.09 kW ~ 4.1 kW, Ceiling Mounted, Cassette, 4 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.8 kW and 2.0 kW, and approximate heating capacity is around between 3.09 kW ~ 4.1 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (i). (UPT Work) | 2 | EA | ¥0 | |
| A712 | Replacement of FCU, Cooling; 1.7 kW ~ 2.0 kW, Heating; 3.1 kW ~ 3.5 kW, Ceiling Suspended (Exposed) | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.7 kW and 2.0 kW, and approximate heating capacity is around between 3.1 kW ~ 3.5 kW. Type; Ceiling suspended (exposed), 2 piping. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (ii). (UPT Work) | 2 | EA | ¥0 | |
| A713 | Replacement of FCU, Cooling; 2.6 kW ~ 2.99 kW, Heating; 4.5 kW ~ 4.99 kW, Ceiling Suspended (Exposed) | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 2.6 kW and 2.99 kW, and approximate heating capacity is around between 4.5 kW ~ 4.99 kW. Type; Ceiling suspended (exposed), 2 piping. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (ii). (UPT Work) | 2 | EA | ¥0 | |
| A714 | Replacement of FCU, Cooling; 3.7 kW ~ 5.1 kW, Heating; 6.7 kW ~ 8.9 kW, Ceiling Mounted, Cassette, 4 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 3.7 kW and 5.1 kW, and approximate heating capacity is around between 6.7 kW and 8.9 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (iii). (UPT Work) | 5 | EA | ¥0 | |
| A715 | Replacement of FCU, Cooling; 1.1 kW ~ 1.7 kW, Heating; 2.8 ~ 3.1 kW, Ceiling Mounted, Cassette, 4 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.1 kW and 1.7 kW, and approximate heating capacity is around between 2.8 kW and 3.1 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (iv). (UPT Work) | 2 | EA | ¥0 | |||
| A716 | Replacement of All After-Filters for Paint Spray Booth, Hagar Bay 1, Bldg. 1502 | Remove and dispose of existing all after-filters located in hangar bay 1, Bldg. 1502, and Provide new after-filters. (32 ea. x 3 = 96 ea.) Refer to J-1502000-11 Part 1 for material information. (UPT Work) | 2 | EA | ¥0 | |
| A717 | Replacement of All After-Filters for Paint Spray Booth, Hagar Bay 2, Bldg. 1502 | Remove and dispose of existing all after-filters located in hangar bay 2, Bldg. 1502, and Provide new after-filters. (32 ea. x 4 = 128 ea.) Refer to J-1502000-11 Part 1 for material information. (UPT Work) | 2 | EA | ¥0 | |
| TOTAL NON-RECURRING WORK PRICE BASE PERIOD (MAX AMOUNT) | ¥85,000,000 | |||||
| Notes: | ||||||
| Note 1: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price. | ||||||
| Note 2: Abbreviation - LS = Lump Sum EA = Each HR = Hour | ||||||
| Note 3: A705 through A717 are uploaded at FedMall. | ||||||
| Note 4: For replacement of FCU, the Governement may consult with the Contractor to identify exact line item that matches the requested site. |
&R&9SRN13163177
1st Rec
| ATTACHMENT J-0200000-08 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION/CONTRACT # | |||||
| EXHIBIT B - CLIN 9001 | |||||
| Line Item 0003 Recurring Work - First Option Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC | |||||
| ITEM 3 | |||||
| ELINs B001 through B009. | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price (¥) | Total (¥) |
| B001 | HOUSING FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| B001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| B001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| B001AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| B001AD | Preventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.1 | 12 | MO | ¥0 | |
| B001AE | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO | ¥0 | |
| B001AF | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO | ¥0 | |
| B001AG | Other Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.1 | 12 | MO | ¥0 | |
| B001AH | Other Recurring Services Program, HVAC Systems Opepration, Spec Item 3.4.2 | 12 | MO | ¥0 | |
| B001AJ | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO | ¥0 | |
| B001AK | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO | ¥0 | |
| B001 Housing Fund, Sub Total | ¥0 | ||||
| B002 | STATION FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| B002AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| B002AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| B002AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| B002AD | Preventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.1 | 12 | MO | ¥0 | |
| B002AE | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO | ¥0 | |
| B002AF | Preventive Maintenance (PM) Program, Fan Convectors and Unit Heaters, Spec Item 3.2.3 | 12 | MO | ¥0 | |
| B002AG | Preventive Maintenance (PM) Program, Low Pressure Compressed Air System (for Breathing Air) (for Spray Painting), Spec Item 3.2.4 | 12 | MO | ¥0 | |
| B002AH | Preventive Maintenance (PM) Program, Paint Spray Booth Systems Including Outside Air Units, Spec Item 3.2.5 | 12 | MO | ¥0 | |
| B002AJ | Preventive Maintenance (PM) Program, Air Intake Hangar Doors (for Corrosion Control Hangar Bldg. 1502), Spec Item 3.2.6 | 12 | MO | ¥0 | |
| B002AK | Preventive Maintenance (PM) Program, Hangar Doors, Spec Item 3.2.7 | 12 | MO | ¥0 | |
| B002AL | Inspection, Testing, and Certification Program, Underground Storage Tank, Spec Item 3.3.1 | 12 | MO | ¥0 | |
| B002AM | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO | ¥0 | |
| B002AN | Other Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.1 | 12 | MO | ¥0 | |
| B002AP | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO | ¥0 | |
| B002AQ | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO | ¥0 | |
| B002AR | Other Recurring Services Program, Steam Equipment Seasonal Start-Up and Shutdown (for Corrosion Control Hangar), Spec Item 3.4.5 | 12 | MO | ¥0 | |
| B002AS | Other Recurring Services Program, Cooling Water's Water Testing and Treatmnet Services (for Corrosion Control Hangar), Spec Item 3.4.6 | 12 | MO | ¥0 | |
| B002 Station Fund, Sub Total | ¥0 | ||||
| B003 | DoDEA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| B003AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| B003AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| B003AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| B003AD | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO | ¥0 | |
| B003AE | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO | ¥0 | |
| B003AF | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO | ¥0 | |
| B003 DoDEA Fund, Sub Total | ¥0 | ||||
| B004 | USNH (BUMED) FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| B004AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| B004AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| B004AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| B004AD | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO | ¥0 | |
| B004AE | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO | ¥0 | |
| B004AF | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO | ¥0 | |
| B004AG | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO | ¥0 | |
| B004 USNH (BUMED) Fund, Sub Total | ¥0 | ||||
| B005 | NAVFAC FE UEM FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| B005AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| B005AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| B005AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| B005AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO | ¥0 | |
| B005 NAVFAC FE UEM Fund, Sub Total | ¥0 | ||||
| B006 | FRCWP FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| B006AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| B006AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| B006AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| B006AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO | ¥0 | |
| B006 FRCWP Fund, Sub Total | ¥0 | ||||
| B007 | MWR FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| B007AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| B007AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| B007AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| B007AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO | ¥0 | |
| B007 MWR Fund, Sub Total | ¥0 | ||||
| B008 | DeCA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| B008AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| B008AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| B008AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| B008AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO | ¥0 | |
| B008 DeCA Fund, Sub Total | ¥0 | ||||
| B009 | NAVFAC FE NWCF FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| B009AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | ¥0 | |
| B009AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | ¥0 | |
| B009AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | ¥0 | |
| B009AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO | ¥0 | |
| B009 NAVFAC FE NWCF Fund, Sub Total | ¥0 | ||||
| TOTAL RECURRING WORK PRICE - FIRST OPTION PERIOD | TOTAL ¥ | ¥0 | |||
| NOTES: | |||||
| (1) Abbreviation : MO = Month LS = Lump Sum | |||||
| (2) The Offeror/Contractor will be requested to submit approximate cost breakdown per system and per building and/or per command | |||||
| (facility.) |
&RSRN13163177
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing
1st Non
| ATTACHMENT J-0200000-08 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # | |||||||
| EXHIBIT B - CLIN 9001 | |||||||
| Line Item 0004 Non-Recurring Work - First Option Period | |||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT, CUSTODIAL - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs B700 through B717 | |||||||
| Name of Offeror/Contractor: | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity (Maximum) | Unit of Issue | Unit Price (¥) | Extended (Total) Price (¥) | |
| B700 | Unit Priced Labor Work - During Regular Working Hours (Negotiated) | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | 300 | HR | ¥0 | ||
| B701 | Unit Priced Labor Work - Outside Regular Working Hours (Negotiated) | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | 100 | HR | ¥0 | ||
| B702 | Material Costs- (Negotiated) | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 85,000,000 | Yen | - | ¥85,000,000 | |
| B703 | Lease of Temporary Air Conditioner (Cooling capacity; approx. 30kW) | Provide a lease service of a temporary air conditioner (cooling capacity; approx. 30kW or more) for the Government facility use. Exact location and duration will be specified when this item is used. The unit shall be; fuel operated (or Provide with sound-proof generator for the unit), outdoor type. Fuel shall be provided to its full by the Contractor upon initial delivery. Unit price shall include insurance. After both the Government and the Contractor confirm the unit is applicable to the subject facility, this item will be issued. (UPT Work) | 10 | Week | ¥0 | ||
| B704 | Delivery of Temporary Air Conditioner | This item is for transporation (one round trip), installing (hook up) work and removal work of Lease of air conditioner (above B703). Up to ¥25,000 for materials and up to 12 hours labor respectively to hook up and remove the duct to subject facility's system (only when the modification to facility system is required) is also included. One round trip is counted as “1 EA.” (UPT Work) | 3 | EA | ¥0 | ||
| B705 | Trouble Shooting (on NAF Atsugi) | Respond to and perform trouble shooting, to investigate the trouble. The Government, using this line item, may ask for the Contractor’s trouble shooting work for HVAC or hangar systems/equipment or AST/UST not listed in Attachment J but located on NAF Atsugi. | |||||
| Provide 4-hour on-site labor per trouble shooting to perform the trouble shooting requested within two (2) working days after the issurance of this item. The labor hour shall not include any hours for travel and administrative work. The Contractor may be requested to submit proposal and estimate for the repair/replacement, as specified in Annex 2 (Section C, Sub Annex 0200000.) Submit the trouble shooting report. (UPT Work) | 15 | EA | ¥0 | ||||
| B706 | Replacement of FCU, Cooling; 1.1 kW ~ 1.99 kW, Heating; 2.03 kW ~ 2.99 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.1 kW and 1.99 kW, and approximate heating capacity is around between 2.03 kW ~ 2.99 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (1) HVAC System From Bldg. 3115 (g) (i), (2) HVAC System From Bldg. 3125 (g) (i), (4) HVAC System From Bldg. 3142 (f) (i), (9) Bldg. 3102 (g) (i), (3) HVAC System From Bldg. 3145 (e) (i), (5) HVAC System From Bldg. 3136 (e) (iv), (7) Bldg. 3050 (g) (i) and (ii), (8) Bldg. 3069 (g) (i). (UPT Work) | 125 | EA | ¥0 | |
| B707 | Replacement of FCU, Cooling; 2.0 kW ~ 2.99 kW, Heating; 3.5 kW ~ 4.99 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 2.0 kW and 2.99 kW, and approximate heating capacity is around between 3.5 kW ~ 4.99 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (1) HVAC System from Bldg. 3115 (g) (ii) and (iii), (2) HVAC System from Bldg. 3125 (g) (ii) and (iii), (3) HVAC System Bldg. 3145 (e) (ii), (4) HVAC System from Bldg. 3142 (f) (ii) and (iii), (8) Bldg. 3069 (g) (ii), (9) Bldg. 3102 (g) (ii) and (iii), (5) HVAC System from Bldg. 3136 (e) (iii), (7) Bldg. 3050 (g) (iii). (UPT Work) | 40 | EA | ¥0 | |
| B708 | Replacement of FCU, Cooling; 3.5 kW ~ 3.99 kW, Heating; 5.5 kW ~ 6.5 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 3.5 kW and 3.99 kW, and approximate heating capacity is around between 5.5 kW ~ 6.5 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (5) HVAC System from Bldg. 3136 (e) (ii) and (iv), (8) Bldg. 3069 (g) (iii). (UPT Work) | 10 | EA | ¥0 | |
| B709 | Replacement of FCU, Cooling; 4.4 kW ~ 4.99 kW, Heating; 7.0 kW ~ 7.9 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 4.4 kW and 4.99 kW, and approximate heating capacity is around between 7.0 kW ~ 7.9 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (4) HVAC System from Bldg. 3142 (f) (iv), (5) HVAC System from Bldg. 3136 (e) (i), (8) Bldg. 3069 (g) (iv). (UPT Work) | 5 | EA | ¥0 | |
| B710 | Replacement of FCU, Cooling; 5.0 kW ~ 5.99 kW, Heating; 9.0 kW ~ 9.9 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 5.0 kW and 5.99 kW, and approximate heating capacity is around between 9.0 kW ~ 9.9 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (4) HVAC System from Bldg. 3142 (f) (v). (UPT Work) | 2 | EA | ¥0 | |
| B711 | Replacement of FCU, Cooling; 1.8 kW ~ 2.0 kW, Heating; 3.09 kW ~ 4.1 kW, Ceiling Mounted, Cassette, 4 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.8 kW and 2.0 kW, and approximate heating capacity is around between 3.09 kW ~ 4.1 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (i). (UPT Work) | 2 | EA | ¥0 | |
| B712 | Replacement of FCU, Cooling; 1.7 kW ~ 2.0 kW, Heating; 3.1 kW ~ 3.5 kW, Ceiling Suspended (Exposed) | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.7 kW and 2.0 kW, and approximate heating capacity is around between 3.1 kW ~ 3.5 kW. Type; Ceiling suspended (exposed), 2 piping. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (ii). (UPT Work) | 2 | EA | ¥0 | |
| B713 | Replacement of FCU, Cooling; 2.6 kW ~ 2.99 kW, Heating; 4.5 kW ~ 4.99 kW, Ceiling Suspended (Exposed) | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 2.6 kW and 2.99 kW, and approximate heating capacity is around between 4.5 kW ~ 4.99 kW. Type; Ceiling suspended (exposed), 2 piping. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (ii). (UPT Work) | 2 | EA | ¥0 | |
| B714 | Replacement of FCU, Cooling; 3.7 kW ~ 5.1 kW, Heating; 6.7 kW ~ 8.9 kW, Ceiling Mounted, Cassette, 4 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 3.7 kW and 5.1 kW, and approximate heating capacity is around between6.7 kW and 8.9 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (iii). (UPT Work) | 5 | EA | ¥0 | |
| B715 | Replacement of FCU, Cooling; 1.1 kW ~ 1.7 kW, Heating; 2.8 ~ 3.1 kW, Ceiling Mounted, Cassette, 4 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.1 kW and 1.7 kW, and approximate heating capacity is around between 2.8 kW and 3.1 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-06 Part 1 (6) Bldg. 3042 (d) (iv). (UPT Work) | 2 | EA | ¥0 | |||
| B716 | Replacement of All After-Filters for Paint Spray Booth, Hagar Bay 1, Bldg. 1502 | Remove and dispose of existing all after-filters located in hangar bay 1, Bldg. 1502, and Provide new after-filters. (32 ea. x 3 = 96 ea.) Refer to J-1502000-11 Part 1 for material information. (UPT Work) | 2 | EA | ¥0 |