eProject No. 1376644
Contract No.
DEMOLISH AND REPLACE WAREHOUSE, B6100075
At the
HACHINOHE POL DEPOT, HACHINOHE, JAPAN
PREPARED BY:
NAVAL FACILITIES ENGINEERING COMMAND, FAR EAST
CAPITAL IMPROVEMENTS DEPARTMENT
CI4 IN-HOUSE DIVISION
Architectural: Mechanical:
Civil: Electrical:
Structural: Fire Protection:
Geotechnical: N/A Safety: N/A
Submitted By: K.MATSUZAKI (NAVFAC FE CI4) Date:
APPROVED BY:
Specifications: K.MATSUZAKI (NAVFAC FE CI4)
For Commander, NAVFAC: NOREN KAWAKAMI (NAVFAC FE CI4)
Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
Demolish and Replace Warehouse, B6100075 eProject No. 1376644
TABLE OF CONTENTS PAGE 1
TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE & PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 16.00 33 CONSTRUCTION PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.00 20 QUALITY CONTROL
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00.00.20 DEMOLITION
02 83 13.00 20 LEAD IN CONSTRUCTION
DIVISION 03 – CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 12 00.00 33 STRUCTURAL STEEL FRAMING AND
MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES
06 20 00.00 33 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16.00 33 INSULATION
07 41 13 METAL ROOF PANELS
07 42 13 METAL WALL PANELS
07 92 00.00 33 SEALANT
DIVISION 08 – OPENINGS
08 11 00.00 33 DOOR AND FRAME
08 51 13.00 33 WINDOW AND FRAME
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 – FINISHES
TABLE OF CONTENTS PAGE 2
09 22 00.00 33 METAL SUPPORT ASSEMBLIES
09 29 00.00 33 GYPSUM BOARD
09 90 00 PAINTS AND COATINGS
DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING
23 00 00.00 33 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST
SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 31 – EARTHWORK
31 23 00.00 20 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 10 00.00 33 ASPHALT CONCRETE PAVEMENT
32 13 13.06 33 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 17 23.00 20 PAVEMENT MARKINGS
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 40 00.00 33 STORM DRAINAGE UTILITIES
33 71 02.00 20 UNDERGROUND ELECTRICAL DISTRIBUTION
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
10/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. The latest version of the publication at time of award shall be used.
HEADQUARTERS, US FORCES JAPAN, DEPARTMENT OF DEFENSE (DOD)
JEGS Japan Environmental Governing Standards
1.2 DEFINITIONS
Definitions pertaining to sustainable development are as defined in JEGS, Section 01 57 19.00 20 “TEMPORARY ENVIRONMENTAL CONTROLS”, and as specified.
a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.
b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.
c. "Operational performance" is the functional behavior of the building as a whole or of the building components.
d. "Sustainability" is the balance of environmental, economic, and societal considerations.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Utility Outage Requests; G (CME)
Utility Connection Requests; G (CME)
SECTION 01 11 00 Page 2
Excavation Permits; G (CME)
1.4 WORK COVERED BY CONTRACT DOCUMENTS
1.4.1 Project Description
The work includes demolishing existing building, providing steel structural building, including mechanical system, electrical system, and incidental related works, as described on plans and specifications. Related work is defined as temporary work and relevant work which is required to accomplish this project. This work does not include unforeseen site conditions.
1.4.1.1 Manage and dispose of Material Containing Lead/Paint with Lead
(MCL/PWL)
Existing material known to contain lead are existing as described in Section
02 41 00.00 20 “Demolition”. The Contractor shall be managed and disposed of the MCL/PWL in accordance with applicable codes, rules, and regulations, and Section 02 83 13.00 20 “Lead in Construction”.
1.4.1.2 Specifications and Standards
The specifications and standards referenced in this project specification, including addenda, amendments, and errata listed, will govern in all cases where references thereto are made. Apply the latest edition to the referenced standards and codes. In case of differences between these specifications or standards and this project specification or its accompanying drawings, this project specification and its accompanying drawings will govern to the extent of such differences. Otherwise, the referenced specifications and standards will apply. The requirement for packaging, packing, marking, and preparation for shipment or delivery included in the referenced specifications will apply only to materials and equipment that are furnished directly to the Government and not to materials and equipment that are to be furnished and installed by the Contractor.
1.4.2 Location
The work shall be located at the HACHINOHE POL DEPOT, HACHINOHE, JAPAN, approximately as indicated. The exact location will be shown by the
Contracting Officer.
1.5 CONTRACT DRAWINGS
The following drawings accompany this specification and are a part thereof.
a. Index of Contract Drawings:
NAVFAC DRAWING NO. TITLE
17212951 TITLE SHEET
17212952 GENERAL DESCRIPTION OF WORK, LOCATION MAP AND
FINISH SCHEDULES
17212953 REMOVAL PLANS, ELEVATIONS, SECTION AND FINISH
SCHEDULES
17212954 FLOOR PLAN
SECTION 01 11 00 Page 3
17212955 ROOF PLAN, DOOR AND WINDOW SCHEDULES
17212956 ELEVATIONS
17212957 ENLARGE FLOOR PLAN AND SECTIONS NO.1
17212958 SECTIONS NO.2
17212959 DETAILS NO.1
17212960 DETAILS NO.2
17212961 DETAILS NO.3
17212962 NOTES, SYMBOLS, ABBREVIATIONS, LEGENDS, SCHEDULE,
WELD DETAILS AND BOLT LAYOUT
17212963 FOOTING AND ROOF PLANS
17212964 "Y1" AND "Y2" FRAMING ELEVATIONS
17212965 "X1" AND "X6" FRAMING ELEVATIONS
17212966 DETAIL FRAMING PLAN
17212967 DETAIL FRAMING ELEVATION OF “Y2-X1”
17212968 DETAIL FRAMING ELEVATION OF “Y2-X6” AND “X1-Y1”
17212969 DETAILS (BASE PL AND FOOTING GIRDER)
17212970 BOLT JOINT LIST
17212971 GENERAL DESCRIPTION OF WORK AND FLOOR PLAN
17212972 ELEVATIONS AND DETAIL
17212973 GENERAL DESCRIPTION OF WORK, NOTES, AND LEGEND
17212974 EXST AND REMOVAL ELECTRICAL WIRING PLAN
17212975 ELECTRICAL WIRING PLAN
17212976 DETAILS
17212977 CONNECTION DIAGRAM
17212978 PANELBOARD SCHEDULE
17212979 SINGLE LINE DIAGRAM
17212980 GENERAL DESCRIPTION OF WORK AND PLANS
17212981 PROFILE OF FIRE HYDRANT LINE
17212982 DETAILS
1.5.1 Reference Drawings Accompanying Specification
The following reference drawings accompany this specification and are intended only to show valve location of the fire protection water line.
TITLE
FIRE-PUMP HOUSE PIPING PLAN
1.5.2 Reference Publications
The following reference publications accompany this specification and are intended only for reference.
PUBLICATION TITLE
Control Point
1.6 PROJECT SCHEDULE AND TIME CONSTRAINTS
1.6.1 Commencement, and Completion of Work
The Contractor shall be required to complete the entire work, ready for use, not later than 255 calendar days, including the mailing period, after the date of Award. The mailing period includes the days for mailing of the
Notice of Award and the submission of the required bonds, Certificate of
SECTION 01 11 00 Page 4
Insurance, and pre-construction activities. The time for completion shall include final clean-up of the premises.
1.6.2 Sequence work
This contract is sequence work and shall be done by following numerical order of WORK SEQUENCE.
WORK
SEQUENCE
Conducted by
1 Contractor
Providing temporary 3(*1) containers 2weeks prior to commencement of on-site work
2 Government
Moving materials from existing
B6100075 to temporary containers
3 Contractor
Moving metal racks and a dust collector from existing storage to temporary containers
4 Contractor Demolish and Construction
5 Contractor
Moving metal racks and a dust collector from temporary containers to new B6100075
6 Government Final acceptance of B6100075
7 Government
Moving materials from temporary containers to new
B6100075
8 Contractor
Removing temporary 3 containers 2 weeks after final acceptance of B6100075
(*1) See section 01 50 00 “TEMPORARY FACILITIES AND CONTROLS” for allocation of storing items.
1.7 PROJECT ENVIRONMENTAL GOALS
Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability.
Specifically:
a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.
b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.
c. Use environmentally preferable products and decrease toxicity level of materials used.
d. Use renewable energy and material resources.
SECTION 01 11 00 Page 5
e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.
Consider the durability, maintainability, and flexibility of building systems.
f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.
g. Reduce construction waste through reuse, recycling, and supplier take-back.
1.8 OCCUPANCY OF PREMISES
As specified in Section 01 14 00 “Work Restrictions.”
1.9 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
c. Unless otherwise specified or indicated, existing objects which interfere to accomplish new work shall be removed temporarily and reinstall them upon completion of the work.
1.10 ON-SITE PERMITS
1.10.1 Utility Outage Requests and Utility Connection Requests
Work shall be scheduled to hold outages to a minimum. Restrictions to utility outage and/or Government operation are/is specified in section 01 14
00 “Work Restrictions.”
Utility outages and connections required during the prosecution of work that affect existing systems shall be arranged for at the convenience of the
Government.
Contracting Officer may permit utility outages at his/her discretion.
Requests for utility outages and connections shall be made in writing to the
Contracting Officer at least 15 calendar days in advance of the time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.
1.10.2 Burning and Excavation Permits
ACTIVITY SUBMISSION DATE SUBMISSION FORM
Excavation Permits 15 calendar days prior to work CME
SECTION 01 11 00 Page 6
Permits shall be posted at a conspicuous location in the construction area.
Burning of trash or rubbish is not permitted on project site.
1.11 LOCATION OF UNDERGROUND FACILITIES
Obtain digging permits prior to start of excavation by contacting the
Contracting Officer 15 calendar days in advance.
Contractor is responsible for marking and verifying all utilities not marked.
The Contractor shall verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed. But indicated in locations to be transversed by piping, ducts, and other work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.11.1 Notification and Permission Prior to Excavation
The Contractor shall request and receive written permission from the
Contracting Officer whenever digging is required to perform this contract.
The request will provide a sketch of the area, limits of the excavation and expected depths .
Any unforeseen discovery of soils suspected of being contaminated with oil or other hazardous materials shall be handled and reported as required by
Section 01 35 26 Paragraph “Unforeseen Hazardous Material”, in addition, after notifying the Contracting Officer, the Contractor shall also notify the station’s Environment Office and shall, at no additional cost to the
Government, take reasonable measures to protect the excavation from erosion and prevent the spread of suspected contaminants until testing can be accomplished.
1.12 CONCILIATION CLAUSE
a. Any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the U.S.-Japan Joint
Committee for Conciliation in accordance with paragraph 10, Article
XVIII, of the Status of Forces Agreement under Article VI, of the
Treaty of Mutual Cooperation and Security between Japan and the
United States of America.
b. Recourse to the Joint Committee for Conciliation for resolving disputes is available in addition to the procedures set forth in the
Contract Disputes Act of 1978 and the Disputes Clause of this contract, 52.233-1. A request for conciliation by the Joint Committee, however, shall not toll the time periods allowed under the Contract
Disputes Act for appealing a contracting officer’s final decision to either the Armed Services Board of Contract Appeals or U.S. Court of
Federal Claims.
c. Upon filing a request for conciliation with the Joint Committee, the
Contractor shall immediately notify the Contracting Officer in writing of the request.
SECTION 01 11 00 Page 7
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Before beginning any work, survey the site and examine the drawings and specifications to determine the extent of the work.
-- End of Section --
加 藤
K A T O U
野 中
N O N A K A
T O A
C O R P O R A T I O N
東 亜
建 設
工 業
株 式
会 社
施 工
業 者
縮
尺 検
図
製
図 図
番
図 面
名 称
工
事
名
S C A L E
C H E C K E D
M A K E R
D R A W I N G
N o
CO
NS
TR
A
CT
OR
DR
AW
IN
G
NA
ME
NA
ME
O F
WO
RK
S
米 軍 6貯
油 所 消
防 施 設 改 修 工
事 八 戸 貯 油
所
IN
U
.S F
UE
L
TE
RM
IN
AL
O F
SI
X
LO
CA
TI
ON
S
HA
CH
IN
OH
E
PO
L)
F I R E
P R O T E C T I O N
E Q U I P M E N T
R E P A I R
W O R K
F I R E P U M P
H O U S E
P I P I N G
P L A N
消 火 ポ ン プ 室 平 面 図
消 火
ポ ン
プ 室
平 面
図 F I R E P U M P
H O U S E
P I P I N G
P L A N
A
A
SUS316PT
G V
C V
F J
C H E C K
V A L V E
チ ャ
ッ キ
バ ル
ブ
F L E X I B L E
J O I N T
フ レ
キ シ
ブ ル
継 手
G A T E
V A L V E
ゲ ー
ト バ
ル ブ
B V
B A L L
V A L V E
ボ ー
ル バ
ル ブ
M G V
M O T O R
G A T E
V A L V E
電 動
ゲ ー
ト バ
ル ブ
M B V
M O T O R
B A L L
V A L V E
電 動
ボ ー
ル バ
ル ブ
N O T E
記
載 な
き 配
管 は
S G P と
す る
注 記
Y S T
Y T Y P E
S T R A I N E R
Y型 ス
ト レ
ー ナ
ー
F M
F L O W
M E T E R
流 量
計
2.
A ll m ad e in J ap an
2.
全
て 日
本 製
と す
る or N
C
No rm al ly
C lo se or N
O No rm al ly O pe n
3.
F la ng e=
JI
S1
0K
フ
ラ ン
ジ J I S K
T S T
T T Y P E
S T R A I N E R
T型 ス
ト レ
ー ナ
ー
混合器 Proportioning Controller
泡原液タンク (4000L型)
Foam Concentrate Storage Tank
(4000LType)
Overheating Prevention Line 加熱防止ライン
Priming Water Line 呼び水ライン
Priming Water Line 呼び水ライン
Overheating Prevention Line 加熱防止ライン
送 液
口 Fi re D ep ar tm en t Fo am C on ne ct io n
Foam Fire Extinguishing System Control Panel 泡消火設備制御盤
エンジンポンプ盤 Engine Pump Control Panel
C C
海へ
TO SEA
海へ
TO SEA
FROM SUCTION
サクションから
Flow Test Line 流量試験ライン
Flow Test Line 流量試験ライン
TO NEW FIXED FOAM DISCHARGE OUTLET
新設固定泡放出口へ
TO EXST FOAM HEAD
既設フォームヘッドへ
L m i n m k w
Wa te r Fi re P um p
水 消
火 ポ
ン プ
FROM SUCTION
サクションから
L m i n m k w
泡 消
火 ポ
ン プ
Fo am
F ir e Pu mp
TO NEW WATER HYDRANT
新設給水栓兼消火栓へ
TO EXST WATER HYDRANT
既設消火栓へ
一斉開放弁 (加圧開型)
Deluge Valve (Pressurizing Open Type)
FR
OM
F
RE
SH
W
AT
ER
T
AN
K 清
水 タ
ン ク
か ら
200A
G V
C V
A
GV
GV
A
A
150A
GV NO
GV
150A
A
A
300A
300A
A
A
300A
A
100A
GV
T-ST
GV
GV
A
200A
A
T-ST
A
150A
150A
250A
50A M
MGV
FM
200A
GV
F J
A
50A
GV CV MBV
NC
CV MBV
NC
M
M
A
A
CVGV
GVCV
CV GV
F J
F J
50A
MGV
M
CVGV
FM
A
A
40A
A
C V
C V
G V
GV
NO
NC
NC
N O
N O
GV NC150A
NC
NC
GV
65A
NO
A
A
GV
25A
NC
G V
G V
N O
N O
50A
GV
CV NO
NC
NC
NC
NO
テスト用吐出口(65 A )
N O
N O
G V
A
G V
A
A
A
A
A
GV NC
25A
A
A
21 8,0 0 0
B
C
D
A
分 電
盤 基
礎
H
消 火
設 備
制 御
盤 基
礎
H
消火ポンプ起動盤基礎
H=100
万 能
ホ ー
ム 水
栓
掃 除
用 洗
面 器
DCIP φ300
DCIP φ150
DCIP φ150
DCIP φ150
SGP-VS 65A
DCIP φ300
DCIP φ200
DCIP φ200
D C I P φ
SGP 250A
D C I P φ
DCIP φ150
D C I P φ
D C I P φ
AB
B' A'
Tetsujirou.Yagi.JA Line
Tetsujirou.Yagi.JA Line
Tetsujirou.Yagi.JA Polygonal Line
Tetsujirou.Yagi.JA Line
Tetsujirou.Yagi.JA Text Box Stop this valve
Tetsujirou.Yagi.JA Oval
Ryouta.Matsumoto.JA Typewritten Text
Ryouta.Matsumoto.JA Text Box Control Point
Ryouta.Matsumoto.JA
Ryouta.Matsumoto.JA
SECTION 01 14 00 Page 1
SECTION 01 14 00
WORK RESTRICTIONS
1.1 SUBMITTALS
approval. When used, a designation following the "G" designation identifies
SD-01 Preconstruction Submittals:
List of Contact Personnel; G (CME)
Vehicle list; G (CME)
1.2 RESTRICTIONS ON OPERATIONS
1.2.1 Coordination with Other Work
The Contract Clause entitled FAR 52.236-8 "Other Contracts".
1.3 SPECIAL SCHEDULING REQUIREMENTS
a. Permission to interrupt any Activity roads, and/or utility service shall be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including access, safety, environment, fire, traffic and security regulations. Provide written "General
Authorization to Work on Base" to the Security Office. Keep within the limits of the work and avenues of ingress and egress. Wear safety gears
(such as hard hats, high visibility vest) with the Contractor's name prominently displayed, in construction site and designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.
1.4.1.1 Subcontractors and Personnel Contacts
SECTION 01 14 00 Page 2
Within 15 days after the date of Award, furnish a list of contact personnel of the Contractor and subcontractors including the names, job titles, addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.1.2 Vehicle List
Submit an original list of vehicles to be utilized at the work site with the following information for each vehicle:
a. Make
b. Year
c. Model
d. License number
e. Registered owner
f. Current BASE pass expiration date.
1.4.1.3 Fuel Storage Area Requirement:
Request hot work permits to the Base Fire Department through the Contracting
Officer at least two weeks prior to performing hot work for approval. After approval by the Base Fire Department, submit a copy of the permit to the
Follow AFI 91-203, AIR FORCE CONSOLIDATED OCCUPATIONAL SAFETY INSTRUCTION
1.4.1.4 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installations under the cognizance of the Government except in designated smoking areas.
This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.4.2 Working Hours
The project site will be available during regular working hours established by the Contracting Officer between 8:00 a.m. and 4:45 p.m., Monday through
Friday, excluding all U.S. legal holidays.
1.4.2.1 Working Hours for Excavation Road
Excavation, installation hydrant line, and restoration work where hydrant line crosses road shall be limited between 8:00 a.m. and 4:45 p.m., on
Saturday and Sunday. The road shall be available for vehicle to pass through any time including emergency traffic requirement on Saturday and Sunday.
The contractor shall prepare steel plates for temporary and emergency traffic requirement.
SECTION 01 14 00 Page 3
1.4.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
If the Contractor desires to carry on work outside regular hours, including
Saturdays, Sundays, and Government holidays, submit a written justification giving the benefit to the Government, specific dates, hours, location, type of work to be performed, contract number and project title for approval, and submit request outside regular hours 96 hours in advance of the date the work will start. During periods of darkness, light the different parts of the work in an approved manner. All work outside of regular hours is subject to approval by the Contracting Officer. All work outside of regular hours must be able to demonstrate a benefit to the Government. The
Contractor must attach a Safety Brief and the Activity Hazard Analysis (AHA) for work that will be done outside regular working hours. The Safety Brief will be signed by the employees performing the work and submitted to the
Government’s Representative.
1.4.4 Occupied and Existing Buildings
a. The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the
Contracting Officer. Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
a. Do not interrupt the Government operation in areas where the Contractor does not perform the work. Provide temporary protections and enclosure for secure safety and convenience. Provide watch man to secure occupancy safety during construction.
b. Minimize parking outages. Requests for parking outages shall be made in writing to the Contracting Officer at least 15 calendar days in advance of the time required.
c. Prevent the spread of dust and debris to occupied portions of the project area and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Vacuum and dust the work area daily.
1.4.5 Utility Cutovers and Interruptions
This project will not permit interruptions to utility services and the
Government’s regular operations, except the following items and restriction items specified herein before;
a. Ensure that new fire protection water line is complete, except for the connection, before interrupting existing service.
b. Interruption to fire protection water line shall be considered utility cutovers. Such interruption shall be further limited to consecutive two days. This time limit includes time for deactivation and reactivation.
Notify the Contracting Officer and fire department at least two weeks prior to the interruption.
1.4.6 Restrictions on Equipment
SECTION 01 14 00 Page 4
1.4.6.1 Restrictions on Radio Transmitter Equipment
Conform to the restrictions and procedures for the use of radio transmitting equipment, as directed. Do not use transmitters without prior approval.
1.4.6.2 Prohibition of Radiographic Operations on NAVFAC Projects
No radiographic operations including radiographical tests are allowed on
NAVFAC projects. This includes machine and equipment that produce ionizing radiation such as industrial x-ray machines, particle accelerators, electron microscopes, laboratory analytical devices, and all other equipment capable of producing ionizing radiation.
1.5 FORCE PROTECTION
All vehicles, hand carried items, and persons are subject to searches upon entering and/or exiting U.S. Military installations and at any time while on the U.S. military installations. Random searches are conducted at all gates, during increased security or force protection conditions (FPCONs)
SECTION 01 20 00.00 20 Page 1
SECTION 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. The latest version of the publication at time of award shall be used.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP-1110-1-8 Construction Equipment Ownership and
Operating Expense Schedule, Vol 1-12
1.2 SUBMITTALS
approval. When used, a designation following the "G" designation identifies
Schedule of Prices; G (CME)
1.3 SCHEDULE OF PRICES
1.3.1 Data Required
Within 15 calendar days of notice of award, prepare and deliver to the
Contracting Officer a Schedule of Prices (construction contract) as directed by the Contracting Officer. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices. Costs shall be summarized and totals provided for each construction category.
1.3.2 Schedule Instructions
Payments will not be made until the Schedule of Prices has been submitted to and accepted by the Contracting Officer. Identify the cost for site work, and include incidental work to the 1.5 m (5 ft) line. Identify costs for the building(s), and include work out to the 1.5 m (5 ft) line. Work out to the
1.5 m (5 ft) line shall include construction encompassed within a
SECTION 01 20 00.00 20 Page 2 theoretical line 1.5 m (5 ft) from the face of exterior walls and shall include attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 1.5 m (5 ft) line.
1.3.3 Real Property Assets
The Government will provide the Draft DD Form 1354, Transfer and Acceptance of Military Real Property filled in with the appropriate Real Property
Unique Identifiers (RPUID) and related construction Category Codes to summarize the designed real property assets that apply to this contract. The
Contractor shall meet with the Contracting Officer and the Real Property
Accounting Officer during the Pre Construction Meeting and the Project
Closeout Meetings to modify and include any necessary changes to the DD Form
1354. The Contractor shall provide the Interim DD Form 1354 that uses the appropriate division of the RPUIDs/ Category Codes to represent the final constructed facility and include all associated cost. Coordinate the
Contractor's Price and Payment structure with the structure of the RPUIDs/
Category Codes.
Divide detailed asset breakdown into the RPUIDs and related construction
Category Codes and populate associated costs which represent all aspects of the work. Where assets diverge into multiple RPUID/ Category Codes, divide the asset and provide the proportion of the assets in each RPUID/ Category
Code. Assets and related RPUID/ Category Codes may be modified by the
Contracting Officer as necessary during the course of the work. Coordinate identification and proportion of these assets with the Government Real
Property Accounting Officer.
Cost data accumulated under this section are required in the preparation of
DD Form 1354.
1.4 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause "DFARS 252.236-7000, Modification
Proposals-Price Breakdown," and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, equipment use rates shall be based upon the applicable provisions of the EP-1110-1-8.
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.5.1 Content of Invoice
Requests for payment will be processed in accordance with the Contract
Clause FAR 52.232-27, Prompt Payment Construction Contracts and FAR 52.232-
5, Payments Under Fixed-Price Construction Contracts. The Requests for payment shall include the documents listed below:
a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the
Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 shall include certification by
Quality Control (QC) Manager as required by the contract.
b. The Estimate for Voucher/ Contract Performance Statement on NAVFAC Form
7300/31 furnished by the Government, showing in detail: the estimated cost, percentage of completion, and value of completed performance for each of the construction categories stated in this contract.
SECTION 01 20 00.00 20 Page 3
c. Updated Project Schedule and reports required by the contract
d. Contractor Safety Self Evaluation Checklist
e. Other supporting documents as requested
f. Updated copy of submittal register.
g. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies.
h. Monthly Work-hour report
i. Solid Waste Disposal Report
1.5.2 Submission of Invoices
Submit invoices in accordance with the Contract Clauses “DFARS 252.232-7003
Electronic Submission of Payment Requests and Receiving Reports” and “DFARS
252.232-7006 Wide Area Workflow Payment Instructions”. The documents listed in paragraph titled "Content of Invoice" above shall be provided in their entirety as an attachment in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction it shall be provided as instructed by the Contracting Officer.
1.5.3 Final Invoice
a. A final invoice shall be accompanied by the certification required by
DFARS 252.247.7023 TRANSPORTATION OF SUPPLIES BY SEA, and the
Contractor's Final Release. If the Contractor is incorporated, the Final
Release shall contain the corporate seal. An officer of the corporation shall sign and the corporate secretary shall certify the Final Release.
b. For final invoices being submitted via WAWF or as instructed by the
Contracting Officer, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final
Release Form and required certification of Transportation of Supplies by
Sea has been confirmed by the Contracting Officer, the Contractor shall then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF or as instructed by the Contracting Officer.
c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.
1.6 PAYMENTS TO THE CONTRACTOR
Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.
SECTION 01 20 00.00 20 Page 4
1.6.1 Obligation of Government Payments
The obligation of the Government to make payments required under the provisions of this contract will, at the discretion of the Contracting
Officer, be subject to reductions and/or suspensions permitted under the FAR and agency regulations including the following in accordance with "FAR
32.503-6:
a. Reasonable deductions due to defects in material or workmanship;
b. Claims which the Government may have against the Contractor under or in connection with this contract;
c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and
d. Failure to provide up to date record drawings not current as stated in
Contract Clause "NFAS 5252.236-9310, Record Drawings."
1.6.2 Payment for Onsite and Offsite Materials
Progress payments may be made to the contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:
a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.
b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress payment shall be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings, precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs) and high-voltage electrical cable.
Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.
c. Materials to be considered for progress payment prior to installation shall be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with Schedule of Prices requirement of this contract.
Requests for progress payment consideration for such items shall be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 have been met.
d. Materials are adequately insured and protected from theft and exposure.
e. Provide a written consent from the surety company with each payment request for offsite materials.
f. Materials to be considered for progress payments prior to installation shall be stored either in Hawaii, Guam, Puerto Rico, or the Continental
SECTION 01 20 00.00 20 Page 5
United States. Other locations are subject to written approval of the
SECTION 01 30 00 Page 1
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
approval. When used, a designation following the "G" designation identifies
Certificate of Insurance; G (Contract Specialist)
View location map;
Progress and completion pictures;
Limited Authorization for Use of Hardcopy Data and Electronic Data;
1.2 VIEW LOCATION MAP
Submit to the Contracting Officer, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.
1.3 PROGRESS AND COMPLETION PICTURES
Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in
JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project in accordance with “Eizen Kouji Shashin Satsuei Youryo” (published by Japanese
Ministry of Land Infrastructure and Transport), except specified herein.
Submit with the monthly invoice two sets of digital photographs each set on a separate CD-R, cumulative of all photos to date. Indicate photographs demonstrating environmental procedures.
Photographs for each month shall be in a separate monthly directory and each file shall be named to indicate its location on the view location sketch.
The view location sketch shall also be provided on the CD as digital file.
All file names shall include a date designator. Cross reference submittals in the appropriate daily report. Photographs shall be provided for unrestricted use by the Government.
1.4 MINIMUM INSURANCE REQUIREMENTS
Procure and maintain during the entire period of performance under this contract the following minimum insurance coverage:
SECTION 01 30 00 Page 2
a. Comprehensive general liability: ¥50,000,000 per occurrence
(1) Certificate of Insurance for Comprehensive general liability
Certificate of insurance shall indicate Contract Number, Contract
Title, Insurance Limit, and Insurance coverage.
Certificate of insurance shall provide for at least 30 days written notice to the Contracting Officer by the insurance company prior to cancellation or material change in policy coverage.
b. Automobile liability: ¥20,000,000 per person, ¥50,000,000 per occurrence for bodily injury, ¥2,000,000 per occurrence for property damage
c. Workmen's compensation as required by Japanese law or Federal and State workers' compensation and occupational disease laws.
d. Employer's liability coverage of ¥10,000,000,
e. Others as required by Japanese law.
1.5 PERFORMANCE EVALUATION
Contractor’s performance will be evaluated using the contractor performance evaluation report entry system located on the website http://www.cpars.gov/cparsmain.htm On-line training for Contractor’s personnel is available on the website. Prior to commencement of work, the Contractor is required to provide the government with the name, phone number and e-mail address of the “Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the government. It is the Contractor’s responsibility to keep this contact information current. After contractor performance evaluation is completed, it will be placed in the Federal Government’s Past Performance Information
Retrieval System (PPIRS) for use by source selection officials when considering contractors for award of new contracts.
1.6 INTERPRETER
The Contractor shall furnish the service of an interpreter on the job. This interpreter shall have strong knowledge of the English language in terms of writing, listening, speaking and reading skills. Interpreter's English skills shall also be well suited to the construction industry. If at any time the Contracting Officer feels the Contractor's interpreter is unable to perform the duties required of him/her, the Contracting Officer will ask for his/her immediate replacement. When the QC manager or the project superintendent talks with the Government representative, on-site or off-site, they shall be accompanied by their interpreter.
1.7 PRECONSTRUCTION CONFERENCE
After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule prices, shop drawings, and other submittals, scheduling programming, and prosecution of the work.
Major subcontractors who will engage in the work shall also attend.
http://www.cpars.gov/cparsmain.htm
SECTION 01 30 00 Page 3
1.8 FACILITY TURNOVER PLANNING MEETINGS (NAVFAC RED ZONE - NRZ)
Key personnel will meet to identify strategies to ensure the project is carried to expeditious closure and turnover to the Client. Start the turnover process at the Pre Construction Conference meeting and convene at the Facility Turnover Meetings once the project has reached approximately 75 percent completion or three to six months prior to Beneficial Occupancy Date
(BOD), whichever comes first. The Contracting Officer's Representative will lead the meetings and guide discussions based on an agenda provided by the
Government. The facility Turnover effort shall include the following:
a. Pre Construction Meeting - Contracting Officer's Technical
Representative (COTR) will provide the NRZ Checklist and the Contractor, Client, and NAVFAC Representatives will compare Contractor's schedule to
NRZ Checklist items.
b. Facility Turnover Meetings
(1) Fill in the NRZ Checklist including Contractor, Client, and NAVFAC
Checklist Items and assign a person responsible for each item and a due date. The Contractor's Representative will facilitate the assignment of responsibilities, fill out the NRZ Checklist, and discuss "Interim DD From 1354" requirements.
(2) Review the Contractor's updated schedule. The Contractor shall develop a POAM (Plan of Action Millstone) for the completion of all Contractor, Client, and NAVFAC Checklist items.
(3) Confirm that all NRZ Checklist items will be completed on time for the scheduled Facility Turnover.
1.9 PARTNERING
To most effectively accomplish this contract, the Government requires the formation of a cohesive partnership within the Project Team whose members are from the Government, the Contractor and their Subcontractors. Key personnel from the Supported Command, the End User (who will occupy the facility), NAVFAC (Echelon III and IV), the Navy and Marine Corps
Region/Installation, the Contractor and Subcontractors, and the Designer of
Record will be invited to participate in the Partnering process. The
Partnership will draw on the strength of each organization in an effort to achieve a project that is without any safety mishaps, conforms to the
Contract, and stays within budget and on schedule. The Contracting Officer will provide Information on the Partnering Process and a list of key and optional personnel who should attend the Partnering meeting.
1.9.1 Informal Partnering
The Contracting Officer will organize the Partnering Sessions with key personnel of the project team, including Contractor personnel and Government personnel.
The Initial Partnering session should be a part of the Pre-Construction
Meeting. Partnering sessions will be held at a location agreed to by the
Contracting Officer and the Contractor (typically a conference room provided by the Contracting Officer or the Contractor).
SECTION 01 30 00 Page 4
The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by the
The Partners will determine the frequency of the follow-on sessions.
1.10 AVAILABILITY OF CADD DRAWING FILES
After award and upon request, the electronic "Computer-Aided Drafting and
Design (CADD)" drawing files, AUTOCADD U.S version will only be made available to the Contractor for use in preparation of construction data related to the referenced contract subject to the following terms and conditions. Request specific drawing numbers of files required with purpose; the entire set of drawing files will not be provided.
Data contained on these electronic files shall not be used for any purpose other than as a convenience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the
Contractor and without liability or legal exposure to the Government. The
Contractor shall make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor shall, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
These electronic CADD drawing files are not construction documents.
Differences may exist between the CADD files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic CADD files, nor does it make representation to the compatibility of these files with the Contractors hardware or software. In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished CADD files, the signed and sealed construction documents shall govern. The Contractor is responsible for determining if any conflict exists. Use of these CADD files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project.
If the Contractor uses, duplicates and/or modifies these electronic CADD files for use in producing construction data related to this contract, all previous indicia of ownership (seals, logos, signatures, initials and dates) shall be removed.
1.11 LIMITED AUTHORIZATION FOR USE OF HARDCOPY DATA AND ELECTRONIC DATA
The Contractor shall sign the “Limited Authorization for Use of Hardcopy
Data” and the “Limited Authorization for Use of Electronic Data” attached end of this section, before the AUTOCAD files are released to the
Contractor.
1.12 ELECTRONIC MAIL (E-MAIL) ADDRESS
SECTION 01 30 00 Page 5
The Contractor shall establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments in Microsoft, Adobe Acrobat, and other similar formats. Within 10 days after contract award, the Contractor shall provide the Contracting Officer a single (only one) e-mail address for electronic communications from the
Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the
Contractor of base access conditions when emergency conditions warrant, such as hurricanes, terrorist threats, etc. Multiple email address will not be allowed.
It is the Contractor's responsibility to make timely distribution of all
Contracting Officer initiated e-mail with its own organization including field office(s). The Contractor shall promptly notify the Contracting
Officer, in writing, of any changes to this email address.
SECTION 01 30 00 Attachment Page 1
NAVFAC Red Zone (NRZ) Checklist/POAM
The NRZ Checklist/POAM is a tool to track the status of critical activities required for BOD to help ensure their timely completion to prevent delays with the facility acceptance and turnover.
The critical activities are organized by section according to the responsible party (i.e. Contractor, Client, and NAVFAC)
Critical items missing from this list should be added as necessary to ensure the list is comprehensive. Likewise, unnecessary items should be deleted.
Any critical items left off the NRZ Checklist that are later identified after initial NRZ meeting is conducted should be added immediately so their progress can be tracked.
A copy of the NRZ Checklist/POAM shall be maintained in the contract file.
Section 1
Contractor Responsibility Critical Activities
Point of
Contact
Sched
Comp
Date
Actual
Comp
Date
Notes
A. Required for Facility Delivery:
Final Electrical Connections
Final Water Connections
Final Gas Connections
Critical System Start-up:
System:
System:
DALT (duct leakage) Testing
TABS (air balancing) Testing
ACATS (controls) Testing
Electrical Systems Testing
Generator Testing
Superchlorination of potable water systems
Plumbing/backflow Testing
Elevator Testing
Boiler Testing
Crane Testing
Fire Alarm/Sprinkler Testing
Keying Plan Meeting
Deliver Lockset Cores
NMCI Connections/IT Systems Testing
IDS & SCIF Testing
Telecommunications Connections & Test
Final Commissioning
System Training of Government Personnel
System:
System:
Pre-Warranty Conference
Contractor’s Pre Final Punch List Complete
Pre Final Inspection
Punch List
Final Inspection
BOD/Use and Possession
B. Required for Contract Close-out:
Delivery of O&M Manuals
Delivery of Product Warranties
LEED Documentation
SECTION 01 30 00 Attachment Page 2
Energy & Sustainability Record Card
Site Restoration
Final Landscaping
Spare Parts, Extra Stock, Special Tools, etc
As-Built Drawings
Final Demobilization and Clean-up
Temp Construction Fence Removed
Project Close-out Meeting
Complete DD1354
Close-out Storm Water Permit
2nd Season TABS
Section 2
Client Responsibility Critical Activities
Point of
Contact
Sched
Comp
Date
Actual
Comp
Date
Notes
A. Required for Facility Delivery:
Keying Plan Meeting
Telecommunication install
Mod service contracts for
Phone/Utilities/ Custodial/Grounds
NMCI Installations or other networks
GFE status/delivery schedule (GFCI, GFGI)
Client provided equipment SELF installed
Client provided equipment KTR installed
Intrusion Detection Systems Test
Secure Network Installations
Attend Training
Planned User Move-in
Ribbon-cutting ceremony
Section 3
NAVFAC Responsibility Critical Activities
Point of
Contact
Sched
Comp
Date
Actual
Comp
Date
Notes
A. Required for Facility Delivery:
Coordinate Final Utility Connections
Generator Performance Verification
Transformer Performance Verification
DALT Verification
1st Season TABs Verification
ACATS Performance Verification
Elevator Certification
Crane Certification
Boiler Certification
Fire Alarm/Sprinkler Test
SECTION 01 30 00 Attachment Page 3
IDS & SCIF Test
Keying plan to contractor
Locket Cores installed
Training Coordinated/Scheduled with FMS
O&Ms to FMS
Client walk-thru Inspection
Pre-Final Inspection
Final Inspection
BOD/Use and Possession
BOD Letter to Contractor
Acceptance Letter to Client
DD 1354 Signed & turned over to RPAO
Closeout permits (e.g., NPDES)
Contractor Evaluations (CCASS) Complete
Finalize Outstanding Contract Mods
Process recycled/recovered materials report
BOD (A) entered into eContracts
Inform PM of BOD
Assist PM with AE Evaluation (ACASS)
Warranty documentation to FMS
As-Builts to FMS
2nd Season TABs Report Review
Annual Elevator Maintenance Complete
SECTION 01 30 00 Attachment Page 4
SECTION 01 30 00 Attachment Page 5
SECTION 01 31 23.13 20 Page 1
SECTION 01 31 23.13 20
ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM
1.1 CONTRACT ADMINISTRATION
Utilize the Naval Facilities Engineering Command's (NAVFAC's) Electronic