PROJECT TITLE: B2121 Replace Roof H84 REFERENCE NUMBER: E Projects #1616614

SPECIFICATIONS AND CONDITIONS SECTION 1: GENERAL

1.1 GENERAL DESCRIPTION:

Project Title: B2121 Replace Roof H84

PW PIMARY POC: Ronald Swarthout

PW PRIMARY PHONE: (301) 995-1786

TEAM: CAT III & IV

LOCATION: PAX

FACILITY: B2121 Patuxent River MD REVISED DATE: 20 November 2018 CUSTOMER POC: Gary Oliver

CUSTOMER POC PHONE: (301) 757-2430

PW REQUIREMENTS POC: Brian Langhorne

PW REQUIREMENTS PHONE: (301) 757-3044

SPECIAL REQUIREMENTS:

1) Safety EM-385-1-1, Current Edition.

2) Escort is not required. Work schedule must be submitted to PW POC.

3) All workers must check into the duty office, B2537, daily prior to entering the job site location.

PROJECT DESCRIPTION: Remove and properly dispose of existing shingles, felt paper, water and snow dams and drip edge. Install 30lb felt paper, drip edge, architectural 80 asphalt shingles, asphalt ridge cap shingles, rain gutter, rain gutter guards, down spouts, splash blocks and ice dams.

1.2 LOCATION: NAS Patuxent River MD, B2121.

1.3 TIME OF COMPLETION: Work shall be prosecuted diligently and shall be completed for use within the time indicated in the award document. (90 Calendar Days or Negotiated duration time/calendar days not work days)

1.4 Contractor is required to furnish proof of any cause for delay and must request an extension of the completion date in writing through the Contracting Officer.

1.5 SITE VISIT: Contact the Government Representative to arrange a site visit if one has not already been scheduled. Contractor shall verify all conditions, dimensions and methods at time of site visit.

1.6 PAYMENT: Payment will be made in one lump sum after completion and acceptance of the work by the Government Representative. Progress payment decisions will be on a case-by-case basis. All invoices shall be submitted through WAWF.

1.7 CONTRACTOR FURNISHED MATERIALS /U TILITIES: All material, equipment, labor, and supervision will be supplied by the contractor. The Contractor shall provide and maintain, at his/her expense, the necessary service lines from existing Government outlets to the site of the work.

1.8 GOVERNMENT FURNISHED MATERIALS /U TILITIES: Utilities specified above will be furnished at no cost to the Contractor. In the event that the Government is unable to provide the required types of utilities, the Contractor shall, at his/her expense arrange for the required utilities.

1.9 PROSECUTION OF WORK: Work shall be performed during normal duty hours 0700-1600, Monday through Friday or after normal working hours. No work shall be performed on Government holidays or weekends unless expressly allowed by the Officer in Charge, NAVFAC Contracts.

1.10 CONTRACTOR'S PRODUCTION REPORT: The Contractor is required to submit a "Contractor Production Report" on the form furnished by the Government Quality Assurance Representative/Engineering Tech (ET) for this purpose. The form shall be completed daily and be provided electronically to the Government Quality Assurance Representative/ET, by 10:00 AM the following day.

1.11 SUBMITTALS:

The Contractor shall submit the following within: 15 days of Award.

1. Fall protection plan.

2. Site specific Safety Plan.

1.11.1 Activity Hazard Analysis in accordance with EM 385-1-1. See Attachment I for blank form and sample. See paragraph 3.6.2 for additional information.

1.11.2 Manufacturer’s Data / Catalog Cut sheets for equipment/materials.

1.11.3 Work Schedule.

Submittals shall be approved by the Government Representative prior to the start of work.

1.12 CLEAN-UP OF SITE: Shall be performed on a daily basis. Contractors are not permitted to use Government dumpsters or other Contractor dumpsters for disposal of debris.

1.13 DUST CONTROL: The amount of dust resulting from demolition shall be controlled to prevent the spread of dust to occupied portions of the construction site and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.

1.15 LIST OF ATTACHMENTS:

1.15.1 Attachment 2: Site map, CATAX

1.16 INSPECTION OF WORK: Contractor shall inspect all work in accordance with FAR 52.246-12 "Inspection of Construction."

SECTION 2: DETAI LE D DESCRIPTION:

Contractor shall provide all labor and equipment necessary to:

Remove and properly dispose of existing shingles, felt paper, water and snow dams and drip edge. Install 30lb felt paper, drip edge, architectural 80 asphalt shingles, asphalt ridge cap shingles, rain gutter, rain gutter guards, down spouts, splash blocks and ice dams.

Contractor will coordinate with the PW POC prior to commencement of work to ensure all scheduling and access issues have been worked out properly. Any questions will be directed to the PW POC and not through the customer.

Work to be performed during normal working hours.

DEMOLITION:

Civil Civil:

1. Demo asphalt shingles.

2. Demo felt paper.

3. Demo drip edge.

INSTALL

Civil

1. Install 30lb felt paper.

2. Install metal drip edge.

3. Lay Architectural 80 asphalt shingles.

4. Lay asphalt shingle ridge cap.

5. Install snow guards.

6. Install snow/ice dam.

7. Install vinyl/PVC rain gutter.

8. Install vinyl/PVC rain gutter guard.

9. Install vinyl/PVC downspout with elbows.

10. Install concrete splash blocks.

SUBMITTALS:

1. Shingle type and color. Color to be chosen by the NAVFAC POC.

2. Gutter style and color. Color to be chosen by the NAVFAC POC.

3. Fall protection plan.

4. Site specific Safety plan.

General requirements note: Contractors to verify all field measurements.

TIME SCHEDULE

Project duration 90 Calendar days

GENERAL CONDITIONS

1. Work to be performed at B2121 NAS Patuxent River.

1. Work to be performed in accordance with scope of work.

1. Work to be done during normal working hours.

1. Daily and final clean up required.

1. Customer to provide staging area for materials and equipment near work area.

1. Customer to provide access to area for workers, material deliveries, and equipment.

1. All Work to be in accordance with OSHA and Army Corp of Engineers Safety Manual, EM-385-1-1 Safety requirements.

1. Request Anne Bailey for Safety Planner. (301-342-4835)

1. Safety and Health Standards for Construction Industry (29 CFR PART 1929 2007)

1. Comply with the Approved Asbestos Remediation Plan submitted.

CATAX

RECORD OF CATEGORICAL EXCLUSION

SUBJECT PROPOSED ACTION:

B_2121 Replace Roof

DESCRIPTION OF THE PROPOSED ACTION:

Remove and properly dispose of existing shingles, felt paper, water and snow dams and drip edge. Demolish approximately 900 SF of asphalt shingles and felt paper, and approximately 106 LF of drip edge. Install 30lb felt paper, drip edge, architectural 80 asphalt shingles, asphalt shingle ridge cap, rain gutter, rain gutter guards, down spouts, splash blocks and ice dams.

SUMMARY OF ADDITIONAL ENVIRONMENTAL REQUIREMENTS:

Solid Waste and Recycling The Contractor shall recycle all metal being removed from this project. This would include any fascia, gutters, downspouts and flashing. These items shall be brought to the base Recycling Center located in Bldg 604. Please contact William Stewart at 301-342-1509 to make arrangements for drop off.

Air Quality and Emissions Take all reasonable precautions necessary to prevent particulate matter (i.e., dust) generated from the demolition, renovation, and construction activities from becoming airborne, per COMAR 26.11.06.03(D).*

If cutback or emulsified asphalt is used, the project must comply with asphalt paving requirements described at COMAR 26.11.11.02. Contact the Air Quality Program Manager, Leslie Churilla 301-757-4930 for assistance and additional information.

Do not apply an architectural coating with a VOC content in excess of the corresponding limit specified in COMAR 26.11.39.05*. Coatings of this nature include paints and other coatings that are applied to stationary structures, portable buildings at the site of installation, pavements, and curbs. Contact the Air Quality Program Manager, Leslie Churilla 301-757-4930 for assistance and additional information.

Do not apply an adhesive/sealant with a VOC content in excess of the corresponding limit specified in COMAR 26.11.35.04. These include adhesives, sealants, adhesive primers, and sealant primers. This chapter contains additional requirements for adhesives, sealants, as well as associated surface prep and cleanup solvents. Contact the Air Quality Program Manager, Leslie Churilla 301-757-4930 for assistance and additional information.

Follow the above action items and incorporate as appropriate into all specifications (e.g., RFPs SOWs) associated with this project. Additional information is provided below:

*“These reasonable precautions [for preventing dusts from becoming airborne] shall include, but not be limited to, the following when appropriate as determined by the control officer: 1) Use of water or chemicals for control of dust in the demolition of existing buildings or structures, construction operations, the grading of roads, or the clearing of land. 2) Application of asphalt, oil, water, or suitable chemicals on dirt roads, materials stockpiles, and other surfaces which can create airborne dusts. 3) Installation and use of hoods, fans, and dust collectors to enclose and vent the handling of dusty materials. Adequate containment methods shall be employed during sandblasting of buildings or other similar operations. 4) Covering, at all times when in motion, open-bodied vehicles transporting materials likely to create air pollution. Alternate means may be employed to achieve the same results as would covering the vehicles…” [COMAR 26.11.06.03(D)] *Example architectural coating VOC content limits (Note: These were lowered from previous limit, effective January 1, 2017):

Flat Coatings - 0.42 pound VOC per gallon coating (lb/gal) (50 grams per liter (g/L)) Non-Flat Coatings - 0.83 lb/gal (100 g/L) Non-Flat High-Gloss Coatings - 1.2 lbs/gal (150 g/L) Roof Coatings – 2.1 lbs/gal (250 g/L) Bituminous Roof Coatings – 2.3 lbs/gal (270 g/L) Bituminous Roof Primers – 2.9 lbs/gal (350 g/L) Traffic Marking Coatings - 0.83 lb/gal (100 g/L) For other coating categories and associated VOC content limitations, refer to COMAR 26.11.39.05 or contact the Air Program Manager, Leslie Churilla at 301-757-4930 with questions.

*Example adhesive/sealant VOC content limits:

Cove Base Installation Adhesives – 1.25 pounds VOC per gallon product (lbs/gal) (150 grams per liter (g/L)) Multipurpose Construction Adhesives – 1.67 lbs/gal (200 g/L) Architectural Sealants – 2.08 lbs/gal (250 g/L) Nonmembrane roof installation/repair – 2.50 lbs/gal (300 g/L) Single-ply Roof Membrane Sealants – 2.08 lbs/gal (250 g/L) For other adhesive/sealant categories and associated VOC content limitations, refer to COMAR 26.11.35.04 or contact the Air Program Manager, Leslie Churilla at 301-757-4930 with questions.

PRESENCE OF NORMAL CIRCUMSTANCES:

This proposed action will not affect public health or safety. No wetlands or migratory bird populations will be affected by this action, and no listed threatened or endangered species are located in the vicinity. No structures in the vicinity are potentially eligible for the National Register of Historic Places (NRHP). According to various archeological surveys, no archeological sites are known to exist in this area. The proposed action does not have the B_2121 Replace Roof potential for significant environmental effects on hazardous waste sites, according to the Federal Facilities Agreement. This action will not involve effects on the human environment that are highly uncertain, involve unique or unknown risks, or that are scientifically controversial. Finally, the proposed action does not establish a precedent nor threaten a violation of Federal, State, or local environmental law.

GENERAL CONFORMITY RULE DETERMINATION:

(1) In accordance with Section 176(c) of the Clean Air Act, the action is located in an attainment area (St. Mary’s County, MD) for NAAQS levels PM10, NO2, SO2, Carbon Monoxide, Ozone, and Pb, and is not subject to the conformity rule. This project will also meet the Northeastern Transport Region levels of 50 tons/year for Ozone.

CONCLUSION:

Subject proposed action can be categorically excluded from further National Environmental Policy Act (NEPA) processes per OPNAVINST 5090.1D, Reference (c), Chapter 10, Section 3.14 Table 10-6: (8)
Routine repair and maintenance of buildings, facilities, vessels, aircraft and equipment associated with existing operations and activities (e.g., localized pest management activities, minor erosion control measures, painting, and refitting).

NOTE: Any changes must be submitted back to a contracting official for approval prior to execution of any changes. Refer any questions to PW POC.

2.2 LOCKOUT/TAGOUT: The Contractor shall apply, monitor and remove (upon completion of work) proper lockout and tag out devices on all equipment undergoing repairs in accordance with the latest version of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM-385-1-1.

2.15 WARRANTY: The Contractor shall ensure that all trash and debris created by this project is cleaned up and removed off site.

2.16 All equipment and parts furnished and installed by the Contractor shall be warranted against defects and workmanship for a period of not less than one year from the date of acceptance at no additional cost to the Government during regular working hours. Manufacturer's warranty for all parts will take effect upon the expiration date of the Contractor's one-year warranty.

SECTION 3: ADMINISTRATIVE AN D SAFETY REQUIREMENTS

3.1 Directives: The Contractor and his employees shall comply with all referenced regulations, directives, and Instructions. Applicable Department of Defense (DOD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other directives, instructions, and regulations are available from the Contracting Officer.

3.2 Station Regulations:

3.2. l The Contractor and his employees shall become acquainted with and obey all Government regulations as Posted or as requested by the Contracting Officer.

3.2.2 The Contractor shall participate actively in the activity energy conservation program. The Contractor shall comply with the base energy conservation program and shall become familiar with its requirements. Use of high-energy consuming tools or equipment must be approved by the Contracting Officer prior to use.

3.3 Fire Protection: The Contractor and his employees shall know where fire alarms are located and how to turn them on. The Contractor shall handle and store all combustible supplies, materials, waste and trash in a manner that prevents fire or hazards to persons, facilities, and materials. Contractor employees operating critical equipment shall be trained to properly respond during a fire alarm or fire in accordance with activity instructions.

3.4 Environmental Protection: The Contractor shall comply with all federal, state and local environmental Protection laws and the regulations and standards. The Contractor shall coordinate all environmental protection matters with the Contracting Officer. If a regulatory agency assesses a monetary fine against the Government for violations resulting from Contractor actions, the Contractor shall reimburse the Government for the amount of the fine and related costs. The Contractor shall clean up any oil or chemical spills resulting from his operations at his own expense. The Contractor shall not create a nuisance or hazard to the health of military or civilian personnel.

3.5 Disposal: Debris, rubbish, non-hazardous waste and non-u sable material resulting from the work under this s contract shall be disposed of by the Contractor at his expense off Government property, unless otherwise directed. In either case, the Contractor must dispose of all hazardous waste in accordance with all applicable environmental law, including but not limited to, the Resource Conservation and Recovery Act and its associated state and local regulations. Prior to disposal of any hazardous waste, the Contractor shall obtain approval from the Contracting Officer.

3.5.1 Segregate and recycle all debris generated by the work and remove off station to a licensed facility. Debris shall be removed and transported in such a manner that prevents spillage on streets or adjacent areas. Local regulations regarding hauling and disposal shall apply.

3.5.2 Submit a report with invoice that includes the following:

a. Amount (by weight) and type of waste material s disposed of in a landfill or incinerator. Provide destination and the tip fee per ton.

b. Amount (by weight) and type of materials salvaged for sale, salvaged for reuse, and recycled. Provide destination and revenue generated for each material.

3.6 Safety Requirements and Reports:

3.6.1 All work shall be conducted in a safe manner and shall comply with all requirements of the latest version of the U. S. Army Corps of Engineers Safety and Health Requirements Manual, EM-385-1-1. The Contractor shall be responsible for instructing his employees in appropriate safety measures and shall not permit them to place machines and other equipment in traffic lanes or other locations in such a manner as to create safety hazards. The Contractor shall employ a competent person as defined in EM-385-1-1 to function as the Site Safety and Health Officer (SSHO). The following paragraphs denote minimum safety requirements. Contractor shall consult EM-385-1-1 for additional information or any safety issues not discussed in this specification.

3.6.1.1 Personal Protective Equipment Minimum Requirements:

a. Head Protection: All persons working in or visiting hard-hat areas shall be provided with and required to wear Type, I or Type II, Cl ass G meeting the requirements of ANSI Z89. l. Hardhat areas are those areas with potential hazard of head injury.

b. Clothing: Employees shall wear clothing suitable for the weather and work conditions: the minimum for construction sites shall be short sleeve shirt, long pants (excessively long or baggy pants are prohibited).

c. Protective Footwear: Employees shall wear safety-toed boots meeting ANSI Z4 1 while working on Construction sites.

d. Eye and Face Protection: All eye and face protection shall meet the requirements of ANS I/ASSE Z87 .1, employees shall also use eye side protection.

e. High visibility vests will be worn when working around construction equipment or when working on highways.

3.6.1.2. Display of Safety Information: Within one calendar day after commencement of work, erect a safety bulletin board at the job site. The following information shall be displayed on the safety bulletin board in clear view of the on-site construct ion personnel, maintained current, and protected against the elements and unauthorized removal.

a. Map denoting the route to the nearest emergency care facility.

b. Emergency phone numbers.

c. Copy of AHA’s.

d. OSHA 300A form.

3.6.1.3 Emergency Medical Treatment: Contractor shall arrange for their own emergency medical treatment. The Government has no responsibility to provide emergency medical treatment.

3.6.1.4 Use of Hand and Power Tools: Hand and power tools shall be of a manufacturer listed by a nationally recognized testing laboratory for the specific application for which they are to be u sed.

Use, inspection and maintenance:

a. Hand and power tools shall be used, inspected, and maintained in accordance with the manufacturer’s instructions and recommendations and shall be used only for the purpose for which designed.

b. Hand and power tools shall be inspected, tested, and determined to be in safe operating condition before u se. Continued periodic inspections shall be made to assure safe operating condition and proper maintenance.

c. Hand and power tools shall be in good repair and with all required safety devices installed and properly adjusted. Tools having defects that will impair their strength or render them unsafe shall be removed from service.

d. Loose and frayed clothing, loose long hair and dangling jewelry (including dangling earrings, chains and wristwatches) shall not be worn while working with any power tools.

e. Guarding - Power tools designed to accommodate guards shall be equipped with such guard s:

f. All guards must be functional.

g. Reciprocating, rotating, and moving part s of equipment shall be guarded if exposed to contact by

h. Employees or otherwise create a hazard.

3.6.1.5 Portable Extension Cords: Portable extension cords shall be sized in accordance with manufacturer ratings for the tool to be used and shall be protected from damage. All damaged extension cords shall be immediately Removed from service. Portable extension cord s shall meet the requirements of NFPA 70.

3.6.1.6 Ladders: All portable ladders shall be of sufficient length and shall be placed so that workers will not stretch or assume a hazardous position. The top or top step of a stepladder shall not be used as a step unless it has been designed to be so used by the manufacturer. Ladders may be used as work platforms only when u se of small hand tools or hand ling of light material is involved.

3.6.1.7 Lockout/Tag Out: Coordinate all control activities with the Designated Government Representative.

Apply, monitor and remove proper lockout and tag out devices.

3.6.1.8 Sanitation Requirements: Provide drinking water and toilets as needed for construction personnel.

3.6.1.9 Fire Protection: Provide two ABC fire extinguishers at the work site to guard against potential tires.

3.6. 1 .10 Fuel-Powered Tools: When fuel-powered tool s is used, they will not be fueled while running, while hot, or near an open flame.

3.6.1.11 Machinery and Mobile Equipment: The Contractor shall complete an equipment checklist for any construction equipment (backhoes, lift trucks, bobcats) that will be used on site.

3.6.1.12 Excavation: All d igging requires the Contractor to contact the

3.6.1.13 Confined Space: For Confined Space areas follow procedures outlined in Section 34 of EM-385-1- 1.

3.6.1.14 Activity Hazard Analysis:

The principle purpose of an Activity Hazard Analysis (AHA) is to reduce the overall risk of the hazards associated with construct ion work. An AHA will be developed by the Contractor for every operation involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work.

The analysis must identify and evaluate hazards and outline the proposed methods and techniques for the safe completion of each phase of work. At a minimum, define activity being performed (can u se the Definable Features of Work). A Definable Feature of Work (DFOW) is a task, which is separate and distinct from other tasks, has the same control requirements and work crews, sequence of work , specific safety and health hazards anticipated (slip or trips, cuts, dust or chips in eyes), control measures (to include personal protective equipment) to eliminate or reduce each hazard to acceptable levels, equipment to be used (hand tools, backhoe), inspection requirements (list the inspect ion requirements for the activity to ensure the controls are working, an d equipment is inspected to ensure proper operation), training requirements for all involved (any unique training required to make the established controls work) and the competent person in charge of that phase of work.

The AHA shall be continuously reviewed and, when appropriate, modified to address changing site conditions or operations. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls. Activity Hazard Analysis shall be updated as necessary to provide an effective response to changing work conditions and activities.

3.6.2 Accident Reports and Notifications:

3.6.2.1 Accident Reports: For recordable injuries and illnesses, and property dam age accidents resulting in a least $2,000 in damages, the prime Contractor shall conduct an accident investigation to establish the root cause of the accident, complete the Navy Contractor Significant Incident Report (CSIR) and provide the report to the Contracting Officer within five calendar days of the accident. The Contracting Officer will provide copies of any Required or special forms.

3.6.2.2 Accident Notification: Notify the Contracting Officer as soon as practical, but not later than four hours after any accident meeting the definition of recordable injuries or illnesses or high visibility accidents, property damage equal to or greater than $2,000. Information shall include Contractor name, contract title, type of contract, name of activity, installation or location where accident occurred, date and time of accident, names of personnel injured, extent of property damage (if any), extent of injury (if known) and brief description of accident (to include Type of construction equipment used, PPE used, etc.). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on site and Government investigation is conducted.

3.6.2.3 Definition of a Recordable Injury or Illness: Any work related injury or ill ness that results in:

a. Death, regardless of the time between the injury and death, or the length of the ill ness;

b. Days away from work;

c. Restricted work;

d. Transfer to another job;

e. Medical treatment beyond first aid;

f. Loss of consciousness;

g. A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in a. through f. listed above.

3.4 Monthly Exposure Report: This report is a compilation of employee-hours worked each month for all site workers, bot h prime and subcontractors, and shall be recorded daily on the Contractor Production Report The Contractor's workspace may be inspected periodically for OSHA and Navy violations. Abatement of violation s will be the responsibility of the Contractor and/or the Government as determined by the Contracting Officer. The Contractor shall provide assistance to the Safety Office escort and the federal or state OSHA inspector if a complaint is filed. Any fines levied on the Contractor by federal or state OSHA offices due to safety/health violations shall be paid promptly.

3.6.5 If the Contractor fails or refuses to promptly comply with safety requirements, the Contracting Office may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of claim for extension of time or for excess costs or damages to the Contractor.

3.6.6 The Safety Office will investigate all complaint s of u n safe or unhealthful working conditions received from Contractor’s employees, federal civilian employees, or military personnel. The Safety Office will notify the Contracting Officer of the results of such investigations.

3.7 Passes and Badges:

3.7.1 Passes and Badges: Contractor employees and representatives performing work under this contract are required to be either United States citizens or documented legal residents (status verified by prime contractor). All Contractor employees must obtain the required employee and vehicle passes. Each employee is required to wear the Government issued badge over the front of the outer clothing. Failure to obtain security and base access passes must not be a cause for contract performance time extension. The Contractor is required to immediately turn in all terminated employee's badges to the issuing office. Application for and use of badges will be as directed. Obtain access to the installation by participating in the Defense Biometrics Identification System (DBIDS) credentials. Information on DBIDS requirements can be found here: <https://www.cnic.navy.mil/om/dbids.html>. Immediately report instances of lost or stolen badges to the Contracting Officer.

3.7.2 All Contractor employees, including subcontractors, and subcontractors' employees, suppliers, and suppliers' employees shall be required to comply with the latest edition of NASPAXRIVINST 5510.15 "REGULATIONS FOR ADMISSIONS TO THE NAVAL AIR STATION, PATUXENT RIVER, MARYLAND COMPLEX". A copy of the regulations may be obtained from the PAX RIVER Pass and ID Office. Nothing in the contract shall be construed in any way to limit the authority of the Commanding Officer to prescribe new, or to enforce existing security regulations governing the admission or exclusion of persons and the conduct of persons while aboard the station, including but not limited to, the rights of search of all persons or vehicles aboard the station. Coordinate with the Contracting Officer for specific security and access requirements.

3.7.3 Access to Buildings/Occupied Buildings: The Contractor may work in or around existing occupied buildings. The Contractor is responsible, via the Contracting Officer, to obtain access to building and facilities and arrange for them to be opened and closed. Do not enter the building(s) without prior approval of the Contracting Officer. Keep the existing buildings and their contents secure at all times. Provide temporary closures as required to maintain security. Contract personnel will not be permitted in security-regulated buildings or areas unless cleared by the Security Officer.

3.8 Identification of Contractor Employees:

3.8.1 The Contractor shall provide to the Contracting Officer the name or names of the responsible supervisory Person or persons authorized to act for the Contractor.

3.8.2 The Contractor shall furnish sufficient personnel to perform all work specified within the contract.

3.8.3 Contractor employees shall con duct themselves in a p roper, efficient, courteous a d businesslike manner.

3.8.4 The Contractor shall remove from the site any individual whose continued employment is deemed by the Contracting Officer to be contrary to the public interest or inconsistent with the best interests of National Security.

3.8.5 All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.

3.9 Identification of Contractor Vehicles: The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate and safety inspection sticker, if applicable, and shall be maintained in good repair.

3.10 Permits: The Contractor shall, without additional expense to the Government, obtain all appointments, licenses, and permits required for the prosecution of the work. The Contractor shall comply with all applicable federal, state, and local laws. Evidence of such permits an d licenses shall be provided to the Contracting Officer before work commences.

3.11 Proof of Citizenship: No employee or representative of the Contractor will be admitted to the site of work unless satisfactory proof of citizenship is furnished, or, if an alien, legal residency with in the United States is confirmed.