AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N40080-18-R-3513 Repair Roof at Bilding 558, Naval Support Facility Indian Head, Naval Support Activity South Potomac, Maryland.
Description of Amendment 0001 continues on page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 18
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R3513
X 9B. DATED (SEE ITEM 11)
01-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Mar-2018
CODE
NAVAL FACILITIES ENG COMMAND
1314 HARWOOD STREET SE
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008018R3513
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
Changes to the Invitation for Bid (IFB) dated 01 February 2018 are as follows:
1. The Bid due date is changed from “Monday, 5 March 2018, 1400 EST” to “Tuesday, 13 March 2018, 1400
EST”.
For Bidders needing access to the base on bid opening day, please follow the instructions provided in Paragraph 4.
Site Visit Instructions.
2. DELETE/ADD the following to IFB dated 01 February 2018:
DELETE
Construction Wage Rate Requirements General Decision Number: MD180055 01/12/2018 MD55, Modification Number 01
ADD
Construction Wage Rate Requirements General Decision Number: MD180055 02/23/2018 MD55, Modification Number 03 which is attached and hereby made part of this IFB.
3. ADD by attachment, Site Visit Attendees
4. ADD Building 558 Existing Condition Photos
5 Revisions to Drawings dated 03/01/2018 as follows:
PROJECT REPAIR ROOF BUILDING - 558 Drawings
A- SD101: Note 5 has been revised
FROM: REMOVE AND REINSTALL ALL MECHANICAL ROOFTOP UNITS
TO: DEMOLISH AND REMOVE ALL MECHANICAL ROOFTOP UNITS, DUCTING, CURBS,
SUPPORTS AND POWER CONNECTIONS. SEAL ALL OPENINGS.
B- SD102: Various callouts have been revised to reflect “A” above.
C- SD103: Various callouts have been revised to reflect “A” above
D- SD104: Callout has been changed to clarify repair of shed on roof. Revise callout
FROM: EXISTING SHED ON ROOF TO REMAIN – PROVIDE NEW FLASHING
TO: EXISTING SHED ON ROOF TO REMAIN – PROVIDE NEW ROOFING, (TYPE I), NEW
SOFFIT, AND FASCIA
E- SD105: Various callouts have been revised to reflect “A” above.
F- S-105: METAL DECK ON PLYWOOD FASTENING has been revised
G- S-301, S-304: Callouts have been revised to change Simpson StrongTie “H2.5Z OR EQUAL” TO “L70
OR EQUAL” at wall; change Simpson StrongTie “H2.5Z OR EQUAL” to “GA2 or EQUAL” at eave.
H- A-301: Callout has been changed
FROM: “26 GAUGE PREFINISHED EXTERIOR STEEL SOFFIT”
TO: “1/2” THICK, AERATED COMPOSITE BOARD SOFFIT, EXTERIOR GRADE, WITH WOOD
GRAIN FINISH”
I- NAVFAC Drawing Number 3156562 Existing Drawing: Redlines have been removed.
J- S-001: Callout has been changed
FROM: “A. CONCRETE MIX DESIGN
“B. REINFORCING STEEL SHOP DRAWING
TO: “A. “
“B. STEEL SHOP DRAWINGS”
6. Answers to Request for Information (RFIs) provided as follows:
QUESTION #1: Under Specification Section 1.2.1 Project Description it states that “… the contractor shall provide lead and asbestos testings prior to commencing of construction, provide lead and asbestos abatement plans and building demolition plan in lead and asbestos construction …”. In order to include the cost and time required for hazardous material abatement a hazardous material survey is required. Please provide a copy of any hazardous materials surveys completed by the Government to allow the abatement to be priced. If there is no current survey, please confirm that if asbestos, lead, mercury, or other hazardous materials are encountered, the cost for a hazardous material survey and the added cost and time for disposal of any hazardous materials will be considered to be, out of scope, and addressed as an unforeseen condition.
ANSWER #1: The contractor shall use the entire project package to prepare a bid. In addition, see existing drawing in the project package: Drawings Number 3156562/A-1 (last drawing sheet) and the EXISTING MATERIAL NOTES on the drawing for information on existing conditions on previously identified and confirmed lead and asbestos contaminated areas. The contractor shall use the entire project package, including all drawings and specification, to prepare his bid.
QUESTION #2: Under Specification Section 1.2.1 Project Description, quantities for lights, electrical cndt., gas line and HVAC ducting are provided for bidding purposes. Please confirm that any quantities beyond those listed, will be considered to be out of scope and subject to an adjustment in contract price.
ANSWER #2: Contractors shall follow specification, drawings and contract documents.
QUESTION #3: Under Specification Section 1.2.1 Project Description, quantities for exterior lights, electrical cndt., gas line and HVAC ducting are provided for bidding purposes. We do not see any quantities of interior light fixtures and conduit to be included in the base bid. Please provide a quantity of interior lights fixtures and conduit to be included in the base bid.
ANSWER #3: Interior (not exposed to weather) light and conduit replacement are not part of this project. Light and conduits replacement shall be as identified in the drawings and specification. See contract drawings and specifications.
QUESTION #4: Specification Section 01 14 00, paragraph 1.4.1 states no employees will be permitted access without proof they are US Citizens. Please confirm that all employees accessing the site must be US Citizens.
ANSWER #4: Contractors are not required to be US Citizens to access the base. US Citizenship is not required to process contractor’s access badge applications.
QUESTION #5: Specification SECTION 01 35 26, paragraph 1.6.1.2, states the Quality Control Manager may not also be the Site Safety Health Officer. Please advise if the Project Superintendent is allowed (if they are qualified) to act as the Quality Control Manager.
ANSWER #5: The Project Superintendent may not be the QC Manager.
QUESTION #6: Specification SECTION 01 35 26, paragraph 1.6.1.1, provides information on the Site Safety Health Officer duties. Can the Project Superintendent, as long as they are qualified, also act as the SSHO? In addition, can the PS act as the SSHO and QCM at the same time (wear -3-hats)?
ANSWER #6: The Project Superintendent and SSHO may not be the same person. The Project Superintendent, SSHO and QC Manager may not be the same person.
QUESTION #7: Please confirm, that for the purposes of bidding, the Contractors can assume that the current sprinklers and fire alarm system comply with all applicable code requirements and that any required upgrades are considered to be out of scope.
ANSWER #7: Building 558 Fire Protection upgrade is not part of this project.
QUESTION#8: Please confirm the entire bldg. will be made available at one time, that phasing of the work is not required and that a temporary fire alarm system is not required.
ANSWER #8: Phasing is not required in this project. Building 558 Fire Protection upgrade is not part of this project.
QUESTION #9: Drawing SD102, note 8 states photos will be made available upon request. Please provide copies of any available photos.
ANSWER #9: See attachment -Site Photos.
QUESTION #10: Drawing SD104, please confirm the replacement of the roof on the existing shed is included in the work scope.
ANSWER #10: The replacement of the roof on the existing shed is part of this specification. See Revised Drawings.
QUESTION #11: Drawing SD105, please confirm that the existing metal stairs on the roof going over the existing piping, is to be removed, replaced and if it is to be painted.
ANSWER #11: Remove and reinstall stairs as indicated in the drawings.
QUESTION #12: Drawing S-101, note 1 refers to removal and reinstallation of utilities as indicated on sheet “SDXXX”. Please provide the drawing number.
ANSWER #12: “SDXXX” refers to demolitions sheets SD101, SD102, SD103, SD104, SD105.
QUESTION #13: Drawing A-601, Roof Scuttle detail on the top right corner of the sheet, calls for a new roof scuttle. Please provide the size of the scuttle the location on the roof and if an access ladder will be required.
ANSWER #13: See drawing package for the location of the roof scuttles. Exact size of the roof scuttles shall be field measured prior to ordering. For bidding purposes, the contractor shall assume (2) scuttles 5’x5’ each. No access latter is required.
QUESTION #14: Drawing SD-105, the soffit detail in the bottom right calls for the demo of the existing soffit and vents and to provide new soffit without vents. The existing soffit has a small architectural crown molding at the wall. Please confirm the new soffit will not require crown molding or other trim where it butts up the wall. If a trim piece is required please provide a detail.
ANSWER #14: Vents are required. See specification and revised drawings for soffit requirement. Crown molding is not required.
QUESTION #15: Drawing SD-101 shows the roof demolition. Drawing S-301 shows the new roof framing. Not shown in the demolition drawing is the existing acoustical ceiling tile under the existing roofing. It appears that the existing ceiling tiles are failing and in some locations falling down. In a number of locations, the existing ceiling will need to be removed in order to access and install the new roof framing. Please confirm the existing ceiling are to be removed and are not to be replaced.
ANSWER #15: The existing ceilings may be removed to the extent required to complete this project. Existing ceilings that require removal to complete this project are not required to be replaced except in the areas shown on sheet S-104.
QUESTION #16: During the pre-bid site visit it was observed that the existing paint on most of the existing walls and ceilings was failing. This paint is suspected to contain lead. Abatement of the existing walls and ceilings is not included in the current work scope. Accessing the work to do the demolition as well as the new work after the demolition, will result in workers being exposed to the failing paint. As a result, it appears that the workers will be required wear PPE equipment, level C, for exposure to lead and full-time air monitoring will also be required.
Please confirm the contractors are to include these costs in their proposals.
ANSWER #16: See answer to RFI QUESTION #1. Work shall be conducted in accordance with all safety requirements and regulations as specified in the projects package.
QUESTION #17: Are electronic bid proposals emailed to Kennett.morris@navy.mil acceptable or only hard copies?
ANSWER #17: Electronic Bid Proposals are not acceptable.
QUESTION #18: If only hard copies of bid proposals are acceptable please clarify what is meant in the solicitation where it says, “one original and one hard copy”, is this a proposal with original signatures and then a copy of the proposal for a total of two proposals?
ANSWER #18: Bid with original signatures and a copy of the bid is allowed.
QUESTION #19: On the site walk it was noted by the customer that the existing mechanical equipment on the roof was not working or was badly damaged or heavily damaged by water/mold and that it would be a cost saving measure to remove and demolish versus remove and replace. Please confirm we are to remove and demolish the mechanical and electrical associated with mechanical elements on the roof.
ANSWER #19: See Revised Drawings.
QUESTION #20: Drawing G-001, General Note 5, says, “…contractor shall verify that items to be removed do not support adjacent existing structures to remain. Contractor shall provide temporary shoring and bracing to adjacent structures to remain prior to continuing work.” Drawing S-001, General Note 3, is also similar. Is the contractor responsible to provide an engineered shoring/bracing plan?
ANSWER #20: See Specifications, including 02 41 00 Demolition.
QUESTION #21: Are we required to provide an engineered demolition plan?
ANSWER #21: See Specifications, including 02 41 00 Demolition.
QUESTION #22: If an engineered shoring plan is not required confirm we are to shore the existing structure with “good effort”.
ANSWER #22: See Specifications, including 02 41 00 Demolition.
QUESTION #23: Will NAVFAC remove any of the equipment/materials/furniture below the roof to be removed and replaced or are we expected to work over and around the existing items?
ANSWER #23: See Specifications, including 02 41 00 Demolition.
QUESTION #24: Drawing G-001, General Note 6, says, “the contractor shall provide dust protection and air quality control measures as required.” Please provide the required air quality control measures.
ANSWER #24: See Specifications, including 02 41 00 Demolition.
QUESTION #25: How many asbestos and lead samples do you want taken?
ANSWER #25: See Specifications.
QUESTION #26: Asbestos and lead was very obviously covering a large bulk of the demolition work to be performed, for example drawing SD102 the picture that says “demolish soffit” all of the soffit is transite board.
Also, asbestos has broken off and fallen on the ground/concrete slab throughout the project. Should we include a price for asbestos and lead abatement for the elements to be demolished?
ANSWER #26: See Specifications and Drawings. Also see ANSWER #1.
QUESTION #27: If we are to include abatement please provide an additional site walk time so abatement contractors can visit the project.
ANSWER #27: See Specifications. Also see ANSWER #1.
QUESTION #28: For the asbestos that has fallen off the building and is laying all over the ground is it acceptable to have construction working work around, walk over, and potentially disturb the asbestos through normal access of the space or do workers need to wear proper protection from asbestos like respirators?
ANSWER #28: See Specifications and Drawings.
QUESTION #29: Drawing S-001, General Note 6, is a material representative required to be onsite when the material is being installed to verify proper installation of the specific material?
ANSWER #29: See Specifications, including 07 22 00 Roof and Deck Insulation.
QUESTION #30: Drawing S-001, General Note 10, says we are to submit concrete mix designs. Where are we installing concrete on the project?
ANSWER #30: There is no concrete work on this project. See Revised Drawings.
QUESTION #31: Drawing S-001, General Note 11, says special inspections will be required. Please provide the special inspections that are required.
ANSWER #31: Special Inspection is not required on this project, except as required in Specification 07 22 00 Roof and Deck Insulation.
QUESTION #32: Drawing S-001, general Note 12, says, “Contractors shall visit the site prior to bid to ascertain conditions which may adversely affect the work or cost thereof.” Please confirm that only the contractors that were present at the site walk are able to bid this project.
ANSWER #32: No; all small businesses meeting the requirements of the solicitation are allowed to bid this project.
QUESTION #33: Drawing SD101, Sheet Note 2, please explain what “the contractor shall discrepancies” mean?
ANSWER #33: Delete : THE CONTRACTOR SHALL DISCREPANCIES.
QUESTION #34: Drawing SD101, Sheet Note 5, please confirm NAVFAC can demonstrate that the equipment is in working condition prior to the removal of the roof top units.
ANSWER #34: See Revised Drawings.
QUESTION #35: Drawing SD101, Sheet Note 5, after the roof top units are reinstalled do they need to have startup performed by the unit manufacture or does any commissioning need to be performed?
ANSWER #35: See Revised Drawings.
QUESTION #36: Drawing SD101, Sheet Note 9, what type of fire alarm system is existing?
ANSWER #36: Only removal and reinstall of the existing fire alarm components, to the extent necessary for completion of this project, is required.
QUESTION #37: Drawing SD101, Sheet Note 9, does the fire alarm panel show any troubles?
ANSWER #37: Fire alarm systems to be affected by this project will be tested prior to commencing construction and after completion of the project.
QUESTION #38: Drawing SD101, Sheet Note 9, please provide pictures of the outside and inside of the fire alarm panel.
ANSWER #38: Fire alarm systems to be affected by this project will be tested prior to commencing construction and after completion of the project.
QUESTION #39: Please confirm the warranty length of the roofing?
ANSWER #39: See Specifications, including section 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER
ROOFING.
QUESTION #40: Please confirm one person can act at the superintendent, SSHO, and QC manager onsite, if not please provide how many site supervisors are required.
ANSWER #40: See Specifications. The Superintendent, SSHO and QC Manager shall all be different persons.
QUESTION #41: Are we required to submit a construction schedule with our proposal?
ANSWER #41: See IFB Solicitation documents and specifications. Construction schedule is not required with bids.
QUESTION #42: Does this project require a cost loaded schedule post award that links project payments with project tasks and is updated regularly?
ANSWER #42: See IFB Solicitation documents and specifications.
QUESTION #43: Does this project require escorts? If so confirm adequate escorts will be provided by the NAVFAC/the customer?
ANSWER #43: Escorts are not required.
QUESTION #44: Confirm all work is during standard working hours or provide the activities that you want performed after standard hours (nights & weekends).
ANSWER #44: See IFB Solicitation documents and specifications.
QUESTION #45: Does this project require the contractor to complete an eOMSI Manual for this project?
ANSWER #45: eOMSI manual is not required.
QUESTION #46: Drawing S-301 say, “provide blocking as required”, what is the blocking for and how often is it required? Please provide the quantity of the blocking.
ANSWER #46: See IFB Solicitation documents, specifications and drawings, including drawing sheet S-105.
QUESTION #47: The contract confirms asbestos in the soffit asbestos transient board and strongly suspected in several other building components, and lead is strongly suspected in the interior and exterior building paint. Can the government provide a quantity for asbestos and lead abatement?
ANSWER #47: See answer to RFI QUESTION#1.
QUESTION #48: #12 denotes, Demolish and Dispose extensively rotten and loose rafter and joist and replace with New Joist as shown in the drawings. Can the government provide a quantity for the extensively rotten and loose rafters?
ANSWER #48: Contract drawings indicate the quantity of rafters and joists to be replaced. See drawings and specifications.
QUESTION #49: During the site visit we were not permitted to access the roof. Can the government provide more details with regards to number of roof penetration including size and type?
ANSWER #49: Response provided in previous RFIs. See revised Drawings.
QUESTION #50: With regards to existing HVAC equipment on the roof. Can the government provide a detail or a drawing showing exactly what equipment is to remain and what is getting removed and not reinstalled?
ANSWER #50: See contract drawings and Revised Drawings.
QUESTION #51: It appears in the specs as if this project will require separate SSHO, Superintendent and QC Manager (No double or triple hatting) which seems like a lot of supervision for a project of this size/complexity.
Please provide/confirm the site supervision requirements for this project.
ANSWER #51: Separate Superintendent, QC Manager and SSHO are required in accordance with specifications.
QUESTION #52: The drawings and specs make mention of lead abatement and many areas of the building have peeling paint but drawings do not specify a quantity. For bidding purposes, should it be assumed that all painted items scheduled to be removed contain lead and therefore will have to be removed by an abatement crew?
ANSWER #52: See notes on existing drawing sheet A-1, last drawing sheet, for existing conditions. Also See answers to RFI QUESTION #1.
QUESTION #53: Does the insulation on the rooftop ductwork, which is scheduled to be replaced, contain asbestos?
If this is unknown, should it be assumed to contain asbestos for bidding purposes?
ANSWER #53: The rooftop ductwork’s insulation should be assumed to contain asbestos.
QUESTION #54: Are there any other known or assumed hazmat containing materials, which were NOT mentioned/described as hazmat containing in the drawings, that should be included as part of this proposal?
ANSWER #54: All known or suspected hazmat have been identified in the scope of work and drawings.
QUESTION #55: The specifications include mold remediation and duct cleaning but I didn’t notice anything about mold in the drawings/SOW. Should mold remediation/duct cleaning be included in this proposal? If so, please quantify.
ANSWER #55: Mold remediation is not part of this project. Duct cleaning is not part of this project.
QUESTION #56: Please provide required sizes and specifications for all rooftop items scheduled to be replaced including skylights, ventilation fans (CFMs?), hoods and hatches.
ANSWER #56: Se Revised Drawings and response to RFI QUESTION #1.
ANSWER #57: The drawings say to remove and replace 2 existing rooftop HVAC units. Even if these units are found to be operational, it will be impossible to guarantee they will operate properly after reinstallation and impossible to warrantee. Please advise on how these units should be handled.
ANSWER #57: See Revised Drawings.
QUESTION #58: Please provide the preferred type of duct insulation and jacketing for the rooftop ducting. (vinyl or aluminum jacket?)
ANSWER #58: See Revised Drawings.
QUESTION #59: Please provide power requirements (voltage) for the new LED lighting and location/s of panels and breakers which feed lights.
ANSWER #59: 120V. Location will be shown at beginning of construction.
QUESTION #60: Please confirm shop drawings will only be required to be submitted for the new steel sections of roof framing. If this is incorrect, please advise which other areas will require shop drawings/additional design submissions.
ANSWER #60: Shop drawings will be required only for the steel sections of roof framing.
QUESTION #61: Please confirm 3rd party inspections for the roof framing will be required.
ANSWER #61: See specification, including 07 53 23.
QUESTION #62: Some areas of the building have existing suspended ceilings which I assume are suspended from some of the framing members scheduled to be replaced. Most of the ceilings are in bad shape… will ceiling replacement be required if removal is necessary for roofing replacement?
ANSWER #62: In areas where ceiling demolition is necessary for roof replacement, ceiling replacement will not be required. See drawing S-104 for areas where ceiling replacement is required.
QUESTION #63: Regarding ACM removal costs: Sheet G-001 provides an Asbestos Disclosure Statement that states “the fee proposal for this project shall include the cost for sampling and analysis”. Based on this information, it appears the Contractor should only include the cost associated with sampling (and the cost to abate any asbestos on the job would be a negotiated change order after award). However, Section 01 11 00 of the Spec (Summary of Work) states “The soffit is made up of painted asbestos transient board and the entire building is painted with strongly suspected lead paint.” The SOW further states this soffit material is to be removed and says “since asbestos is confirmed in the soffit asbestos transient board and strongly suspected in several other building components, and lead is strongly suspected in the interior and exterior building paint, the contractor shall provide lead and asbestos testings prior to commencing of construction, provide lead and asbestos abatement plans and building demolition plan in lead and asbestos construction, as applicable.”
Are we to include ANY asbestos abatement costs with our bid, knowing we will definitely encounter asbestos in the soffit? Or are we still just supposed to provide pricing to include testing only (knowing a change order will be issued to remove the ACM soffit materials).
ANSWER #63: See answer to RFI QUESTION#1.
End RFI’s Responses
7. Contractors must acknowledge ALL amendments when submitting their bids.
8. All other clauses and provisions remain unchanged.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
ATTACHMENTS
1. Amendment – 1 Revised Drawings
2. Building 558 Existing Condition Photos
3. Site Visit Attendees Building 558
WAGE DETERMINATION
General Decision Number: MD180055 02/23/2018 MD55
Superseded General Decision Number: MD20170055
State: Maryland
Construction Type: Building
County: Charles County in Maryland.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/09/2018 3 02/23/2018
ASBE0024-007 10/01/2017
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 35.13 16.22
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
ASBE0024-010 10/01/2017
Rates Fringes
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER (Removal of hazardous material from ceilings, floors, mechanical systems, and walls)..............$ 22.81 7.34
BRMD0001-006 04/30/2017
Rates Fringes
TILE SETTER......................$ 27.44 11.44
BRMD0001-009 04/30/2017
Rates Fringes
TILE FINISHER....................$ 22.51 10.50
BRMD0001-011 04/30/2017
Rates Fringes
BRICKLAYER (Excluding
Pointing, Caulking and Cleaning)........................$ 30.91 10.24
BRMD0001-012 04/30/2017
Rates Fringes
MASON - STONE....................$ 36.91 16.55
BRMD0001-013 04/30/2017
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 28.19 11.44
CARP0177-011 01/01/2018
Rates Fringes
CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Metal Stud Installation and Form Work)......$ 28.46 11.53
CARP0219-001 05/01/2017
Rates Fringes
MILLWRIGHT.......................$ 32.49 11.23
ELEC0026-021 09/05/2016
Rates Fringes
ELECTRICIAN (Communication and Sound Equipment).............$ 27.55 10.20
ELEC0026-022 06/05/2017
Rates Fringes
ELECTRICIAN (Including low voltage wiring for and installation of alarms, HVAC controls)........................$ 44.65 16.74+a a.PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after Thanksgiving Day and Christmas Day.
ELEV0010-001 01/01/2018
Rates Fringes
ELEVATOR MECHANIC................$ 44.12 32.645+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
* ENGI0077-017 05/01/2017
Rates Fringes
POWER EQUIPMENT OPERATOR:
Backhoe.....................$ 30.56 8.95+a Bulldozer...................$ 30.56 8.95+a
a. PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King's Birthday, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving and Christmas Day.
IRON0005-011 06/01/2017
Rates Fringes
IRONWORKER.......................$ 31.15 20.63
LABO0657-017 06/01/2015
Rates Fringes
LABORER: Mason Tender - Cement/Concrete..................$ 22.63 7.31 LABORER: Pipelayer..............$ 22.63 7.31
PAIN0051-014 06/01/2017
Rates Fringes
GLAZIER
Glazing Contracts $2 million and under...........$ 25.74 11.55 Glazing Contracts over $2 million.....................$ 29.87 11.55
PAIN0051-019 06/01/2017
Rates Fringes
PAINTER
Brush, Roller, Spray and Drywall Finisher/Taper......$ 25.06 9.66 Industrial..................$ 30.90 10.49
PLAS0891-005 07/01/2016
Rates Fringes
PLASTERER........................$ 28.83 6.05
PLAS0891-006 02/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.15 10.58
PLAS0891-008 08/01/2016
Rates Fringes
PLASTERER (Fireproofing Including Sprayer, Mixer, and Handler) Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89
PLUM0005-010 08/01/2017
Rates Fringes
PLUMBER..........................$ 41.67 17.60+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.
PLUM0602-013 08/01/2017
Rates Fringes
PIPEFITTER (HVAC Pipe and System Installation Only)........$ 40.69 21.07+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.
ROOF0030-016 05/01/2016
Rates Fringes
ROOFER...........................$ 28.75 11.74
SFMD0669-001 04/01/2017
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 34.40 19.24
SHEE0100-015 07/01/2017
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 40.27 18.74+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day
SUMD2010-089 08/20/2010
Rates Fringes
LABORERS
Common or General...........$ 11.38 Grade Checker...............$ 16.00 2.90 Landscape...................$ 9.23 Mason Tender - Brick........$ 13.00 Mason Tender - Stone........$ 14.03 Mason Tender for Pointing, Caulking and Cleaning.......$ 13.25 Mortar Mixer................$ 16.61 9.09
PIPEFITTER (Excluding HVAC Pipe and System Installation)....$ 28.96 11.35
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.17
POWER EQUIPMENT OPERATOR:
Asphalt Roller..............$ 21.35 5.38 Bobcat/Skid Loader..........$ 18.05 8.78 Boom........................$ 21.44 8.29 Crane.......................$ 20.95 6.18 Excavator...................$ 20.00 Forklift....................$ 16.00 5.12 Gradall.....................$ 20.50 8.42 Grader/Blade................$ 14.50 5.18 Loader......................$ 22.75 4.91 Paver.......................$ 17.47 6.36 Roller excluding Asphalt....$ 17.60 3.88
TRUCK DRIVER
Dump Truck..................$ 15.90 1.12 Tractor Haul Truck..........$ 17.87 9.98
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)