PRP265UCLASS WO# 1356682
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC), WASHINGTON
AMENDMENT 1, SOLICITATION N40080-18-R-2003 P265 UCLASS RDT&E HANGAR.
The purpose of this solicitation amendment is in accordance w ith the page 2 Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Apr-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R2003
X 9B. DATED (SEE ITEM 11)
10-Apr-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Apr-2018
CODE
NAVAL FACILITIES ENG COMMAND
1314 HARWOOD STREET SE
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008018R2003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 1
NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC), WASHINGTON
SOLICITATION N40080-18-R-2003 P265 UCLASS RDT&E HANGAR.
As an amendment to the solicitation this Summary Changes is hereby incorporated into the solicitation.
1. Change SF1442 Block 10 (pg.1)
From: "The Design Build budget is $35,743,000, and is inclusive of CLINs 0001 through 0005."
To: "The Magnitude of Construction is More than $10,000,000.00."
2. Change Section 00 10 00 – Solicitation Option Item 8 – ESS (pg.8)
From: " Price for provision, design, installation, testing, and associated training for the Electronic Security System (ESS) equipment necessary for this facility" To: "Price for provision, installation, testing, and associated training for the Electronic Security System (ESS) equipment necessary for this facility"
3. Change Section 00 10 00 – Solicitation REQUIREMENT INFORMATION 4. (pg.9)
From: "The Design Build Budget amount is $35,743,000.00 which is inclusive of the Basic Requirement (CLIN 0001) and Option Items 1 through 4) (CLINs 0002 through 0005)."
To: "The Magnitude of Construction is More than $10,000,000.00."
4. Change Section 00 10 00 – Solicitation REQUIREMENT INFORMATION 7. (pg.10)
From: "The project will include sustainable design principles in the construction of the facility in accordance with Executive Order 13123 and other laws and Executive Orders."
To: "The project will include sustainable design principles in the construction of the facility in accordance with Executive Order 13123 and other laws and Executive Orders."
5. Change Section 00 10 00 – Solicitation REQUIREMENT INFORMATION 8. (pg.10)
From: "The documents listed below Incorporates Design Specifications for the Basic Requirement and Option Items
1. P265 Hangar_IFC Submittal - SPECS.pdf 14 MB
2. P265 Hangar_IFC Submittal - Drawings Vol 1A of 3.pdf 16 MB
3. P265 Hangar_IFC Submittal - Drawings Vol 1B of 3.pdf 7 MB
4. P265 Hangar_IFC Submittal - Drawings Vol 1C of 3.pdf 17 MB
5. P265 Hangar_IFC Submittal - Drawings Vol 2A of 3.pdf 17 MB
6. P265 Hangar_IFC Submittal - Drawings Vol 2B of 3.pdf 9 MB
7. P265 Hangar_IFC Submittal - Drawings Vol 3A of 3.pdf 16 MB
8. P265 culvert drawings.pdf 6 MB" To: "The documents listed below Incorporates 100% or Full Design Specifications for the Basic Requirement and Option Items
P265 culvert drawings.pdf 6 MB P265 Hangar_IFC Submittal - SPECS.pdf 14 MB P265 Hangar_IFC Submittal - Drawings Vol 1A.1 - 12 MB P265 Hangar_IFC Submittal - Drawings Vol 1A.2 - 5 MB P265 Hangar_IFC Submittal - Drawings Vol 1B - 8 MB P265 Hangar_IFC Submittal - Drawings Vol 1C.1 - 9 MB P265 Hangar_IFC Submittal - Drawings Vol 1C.2 - 7 MB P265 Hangar_IFC Submittal - Drawings Vol 2A.1 - 9 MB P265 Hangar_IFC Submittal - Drawings Vol 2A.2 - 8 MB P265 Hangar_IFC Submittal - Drawings Vol 2B - 9 MB P265 Hangar_IFC Submittal - Drawings Vol 3A.1 - 9 MB P265 Hangar_IFC Submittal - Drawings Vol 3A.2 - 7 MB
6. ADD to Section 00 20 00 - Instructions for Procurement
INSTRUCTIONS TO OFFERORS
7. PPC/SV Attendance Restriction (pg.12)
ADD:
7.1 Three (3) Government Transportation (14-passenger, transport vans) shall be provided to assist with transport to the PPC/SV, and shall be located at the SAIC location, at 45310 Abell House Ln, California, MD 20619
7.2 The Attachment G Visitor Request – used to access Preproposal conference / Site Visit shall be collected at the SAIC location
7.3 All PPC/SV Participants are required to sign-in as directed, at the SAIC location
7. Change Section 00 20 00 - Instructions for Procurement
EVALUATION FACTORS FOR AWARD
FACTOR 4 PAST PERFORMANCE
(i) Solicitation Submittal Requirements: (pg.21)
From: "If there is not a completed CCAS or CPARS evaluation, then submit Past Performance Questionnaires for each project included in Factor 2 for both Construction Experience and Design Experience."
To: "If there is not a completed CCAS or CPARS evaluation, then submit Past Performance Questionnaires for each project included in Factor 2 for Construction Experience."
8. Change Section 01 00 00 - General Requirements
ATTACHMENTS
ATTACHMENT A, PROJECT PRICE SCHEDULE
1. CONTRACT LINE ITEMS
i. CLIN 0009 Option Item No. (pg.71)
From: "Price for provision, design, installation, testing, and associated training for the Electronic Security System (ESS) equipment necessary for this facility."
To: "Price for provision, installation, testing, and associated training for the Electronic Security System (ESS) equipment necessary for this facility."
9. Change Section 01 00 00 - General Requirements
ATTACHMENTS
ATTACHMENT A, PROJECT PRICE SCHEDULE
2. GENERAL PRICING NOTES (pg.72)
From:
"c. The Design Build budget is $35,743,000 is inclusive of Items 0001 through 0005."
To:
"c. The Magnitude of Construction is more than $10,000,000.00"
All other Terms and Conditions remain unchanged
(End of Summary of Changes)