About this file

This amendment modifies an indefinite delivery indefinite quantity small business multiple award construction contract for new construction, repair, and renovation projects at various facilities within the Naval Facilities Engineering Command Washington Area of Responsibility, including locations in Washington D.C., Maryland, and Virginia. The amendment clarifies that the competition is set aside for small businesses only, and provides responses to previously submitted requests for information. The proposal due date remains January 23, 2018, and all other terms and conditions are unchanged.

18R0002_Amendment_0001.pdf

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR4887160

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

INDEFINITE DELIVERY INDEFINITE QUANTITY SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACT FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF VARIOUS FACILITIES AT PUBLIC WORKS DEPARTMENT ANNAPOLIS, PAX RIVER, SOUTH POTOMAC AND ROICC ANDREWS NAVFAC WASHINGTON AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO WASHINGTON, D.C., MARYLAND

AND VIRGINIA

The purpose of this amendment is to provide the follow ing:

1. Clarify competition requirement is 100% small business set-aside

2. Responses to RFIs Proposal due date/time remains 2:00 PM EST JANUARY 23, 2018.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Jan-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R0002

X 9B. DATED (SEE ITEM 11)

22-Dec-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Jan-2018

CODE

NAVAL FACILITIES ENG COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION

SUMMAR

SECTION

The follow

AMEN

INDEFINI

CONSTRU

FACILITIE

ROICC A

LIMITED

The purpos

1. Clarify

2. Respon

Proposal d

All other te

1. This i Comp

R

2. Could

$15,00 correc

FACT

inform best d propos constr below

(ii) Ba projec known constr

“F or st

SF 30 BLOCK

RY OF CHAN

SF 30 - BLO

wing have been

NDMENT 000

ITE DELIVE

UCTION CON

ES AT PUBL

ANDREWS N

TO WASHIN

se of this amen competition re nses to RFIs due date/time re erms and cond s referred to a etition. Is this

Response: This d you please 00,000. Wher ct statement?

TOR 2 – EXPE

mation: Constru emonstrate exp sed for this SB ruction project this stated dol

Response: This asis of Evalua cts submitted un n sources. For ruction or renov

Response: Thi For purposes o r renovation w tated in the sol

K 14 CONTIN

NGES

CK 14 CONTI

n added by full

ERY INDEF

NTRACT FOR

LIC WORKS

NAVFAC WA

GTON, D.C., M

ndment is to pr equirement is 1 emains 2:00 PM itions remain u s “SB MACC, project open t s procurement clarify the fo reas the basis

ERIENCE: (i) uction Experien perience on re

B MACC. For with a final llar range will n s criterion is fo ation: This eva nder Factor 2 – r purposes of vation with a v s is the Basis of the past per with a value of licitation, “The

NUATION PAG

INUATION PA

text:

FINITE QUA

R NEW CONS

DEPARTMEN

ASHINGTON

MARYLAND

rovide the follo

100% small bu

M EST JANUA

unchanged.

Resp

,” yet the SF14 to both small an is 100% small ollowing Facto of evaluation

Solicitation Su nce: Each Offe levant projects purposes of th contract value not be conside or Factor 2 - Ex aluation will c

– Experience a the past perfo value of $1M o of Evaluation rformance eva $1M or greate e distinction be

GE

AGE

ANTITY SM

TRUCTION, R

NT ANNAPOL

AREA OF R

AND VIRGIN

owing:

siness set-aside

ARY 23, 2018.

ponses to RFIs

442 states that nd large busine business set-a or 2 Experien states project ubmittal Requi eror SHALL su s that are simil his evaluation, e of $2,000,00 red relevant.

xperience.

consider how and past perform ormance evalu or greater comp for Factor 4 – aluation, a rel er completed w etween experie

MALL BUS

REPAIR, AND

LIS, PAX RIV

RESPONSIBI

NIA

e s t the Competit esses or to sma aside.

nce calls for ts to be greate irements: The ubmit exactly F lar in size, sco a relevant pro

00 to $15,000, well the Offe rmance on othe uation, a releva pleted within th

– Past Performa levant project i within the past ence and past p

INESS MUL

D RENOVAT

VER, SOUTH

LITY INCLU

tion Requireme all only?

projects betw er than $1,000

Offeror shall s FIVE (5) const ope, and compl oject is defined ,000. Projects eror’s team per er projects curr ant project is he past seven ( ance. As state is defined as b t seven (7) yea performance is

N4008018R

Page

LTIPLE AW

TION OF VAR

H POTOMAC

UDING BUT

ent is Full and ween $2,000,0 0,000. Which submit the foll truction projec lexity to the pr d as follows: S submitted abo rformed on re rently documen defined as bu

7) years.

ed in the solici building constr ars.” Please no s experience pe

R0002

WARD

RIOUS

AND

NOT

d Open

000 to is the lowing cts that rojects

Size: A ove or elevant nted in uilding itation, ruction ote, as ertains

N4008018R0002 to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .