AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of amendment #0002 is to inform interested parties the RFI responses have been posted to https://w w w .neco.navy.mil/

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018B0507

X 9B. DATED (SEE ITEM 11)

15-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Aug-2018

CODE

PUBLIC WORKS DEPARTMENT

US NAVAL ACADEMY/FEAD

181 WAINWRIGHT RD

ANNAPOLIS MD 21402

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008018B0507

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT#0002 RFI'S

WO# N40080-18-1557713

PROVIDE ADEQUATE GORUND PROTECTION USNA WATER TREATMENT PLANT

RFI – 1 August 27, 2018 – RESPONSE

ITEM 1: The steel housing is currently being used but the resistance to ground is greater than what would be provided by the copper conductors. The tower was constructed in 1966 and it was anecdotally said the original grounding of the tower included a copper down conductor that was removed when the tower was painted but was not reinstalled. This design is based on the recommendations of The Lightning Protection Institute LPI 175-2017. This is a robust design to comply with the mission critical requirements of this tower.

Existing Ground Rod Bonding Exterior of Tower to Earth Typical of Four.

Base on the history and damage of past lightning appear to be inadequate.

Based on the age and construction of tower the steel housing does not provide a continuous low resistance to ground.

ITEM – 2 Agree with comment. Provide required fasteners at a minimum of three (3) feet intervals

ITEM – 3 DRAWING CLARIFICATION:

A. PROVIDE RING GROUND ELECTRODE SYSTEM. THE GROUND ELECTRODE SYSTEM

SHALL BE A MAIN SIZE COPPER LIGHTINING CONDUCTOR. A GROUND RING

ELECTRODE SYSTEM SHALL ENCIRCLE THE STRUCTURE AND SHALL BE IN DIRECT

CONTACT WITH THE EARTH AT A DEPTH OF 18 INCHES (457MM) OR MORE.

B. The down conductor is to be connected to one down rod. The two (2) rod detail is meant show the connection of the ring between the down rods.

(End of Summary of Changes)