About this file

Amendment_0002.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 8(a) Multiple Award Construction Contract (8(a) MACC), NAVFAC Washington, newest first.
File Type Posted
Amendment_0003.pdf PDF
Attachment_D-Safety_Form.docx DOCX document
Site_Visit.pdf PDF
8(a)MACC_General_Construction_Solicitation.pdf PDF
Attachment_C-P311_Specs_Final_Set_(signed).pdf PDF
Attachment_B-NAVFAC_Past_Performance_Questionnaire.docx DOCX document
Attachment_A-Construction_Experience.docx DOCX document
N4008017R0020_Pre-Solicitation_Notice_for_N40080-17-R-0020_8(a)_MACC.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION N40080-17-R-0020-8(a) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) GENERAL CONSTRUCTION, NAVAL

FACILITIES ENGINEERING COMMAND (NAVFAC), WASHINGTON, DC

As an amendment to the solicitation, fhe follow ing is hereby incorporated

CONTINUED ON PAGE 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Nov-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008017R0020

X 9B. DATED (SEE ITEM 11)

27-Oct-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Nov-2017

CODE

NAVAL FACILITIES ENG COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008017R0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

The following have been added by full text:

Amendment 0002

1. Provide RFI Responses

2. Provide Wage Determination

3. Provide Site Visit Sheet

4. Updated Safety Form

RFI REPONSES:

1. Please confirm that CPARS/PPQ evaluations do not count towards the 60-page limit. In many cases the evaluations are 3-4 pages (x 6 projects = 18-24 pages). Also, if an offeror chooses to have their client return a PPQ directly to NAVFAC, other offerors are then at a disadvantage.

GOVERNMENT RESPONSE: CPARS/PPQ EVALUATIONS DOES COUNT

TOWARD THE 60 PAGE LIMIT.

2. RFP, page 19 states submission of 1 original and 1 copy of the Price Proposal. However, the SF 1442 states 1 original and 3 copies. Please confirm that 1 original and 1 copy is the requirement for the Price Proposal.

GOVERNMENT RESPONSE: SEE PROPOSAL ORGANIZATION AND

FORMAT PAGE 19 AND 5252.215 9300 CONTENT OF PROPOSALS (JAN 2003)

ITEM B PAGE 27 OF THE RFP.

3. Would the Government please consider a page limit increase for the “Technical Approach for Safety”. The current 2-page limit is restrictive in adequately addressing all of the items in this subsection (RFP page 17, #3).

GOVERNMENT RESPONSE: NO FOLLOW THE REQUIRMENT OF THE

FACTOR.

4. In Factor 1 Construction Experience, please confirm that acceptable projects for the “exterior building renovations” category includes parking lots, roadways, etc.

GOVERNMENT RESPONSE: NO. EXTERIOR BUILDING

RENOVATION REFERS TO BUILDING ENVELOPE FEATURES,

SUCH AS EXTERIOR WALLS, STOREFRONT, FENESTRATION

(WINDOWS, DOORS), ROOFING, AND BUILDING INGRESS/EGRESS.

5. Reference: Factor 3 Past Performance Question: A previous Attachment B NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0) was completed in March 2015 for a project that we would like to submit in our proposal. May we use this previous PPQ?

GOVERNMENT RESPONSE: YES, HOWEVER, OFFERORS SHALL NOT

INCORPORATE BY REFERENCE INTO THEIR PROPOSAL PPQ OR CPARS

PREVIOUSLY SUBMITTED FOR OTHER RFPS.

6. Is the above refenced solicitation open to 8(a) companies that have bona fide offices with the area of responsibility or must the particular office be “serviced by” the specified SBA for that region?

GOVERNMENT RESPONSE: COMPETITION IS SET-ASIDE FOR 8(A) FIRMS

LOCATED WITHIN THE GEOGRAPHICAL AREA SERVICED BY THE SBA

DISTRICT OFFICES OF EITHER BALTIMORE, WASHINGTON

METROPOLITAN AREA, AND RICHMOND.

7. The EMR and DART form that was part of the solicitation states the following dates:

2013 / 2014 / 2015. Conflict: page 16 of 74, (2) Factor 2 Safety, (1) states: (1) Experience Modification Rate (EMR): Include three previous complete calendar years’ worth of data (2014, 2015, 2016).

GOVERNMENT RESPONSE: SEE REVISED ATTACHMENT D-SAFETY FORM

8. Page 18 of 74, (3) Factor 3, Past Performance, (i) Solicitation Submittal Requirements, paragraph 2, states “Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs.” May we submit actual PPQs from other proposals? In other words, we will not simply reference them. We have actual copies of recently received PPQs. Would this be allowed? We know our clients would certainly appreciate not having to complete multiple PPQs as we are using the referenced projects as experience on numerous proposal submittals. Thank you for your consideration.

GOVERNMENT RESPONSE: SEE RESPONSE TO # 5.

9. Please advise what does not count towards the page count for Volume I Technical (i.e. PPQs, CPARS, Table of Contents, etc.).

GOVERNMENT RESPONSE: THE TABLE OF CONTENTS DOES NOT

COUNT TOWARD THE PAGE COUNT.

10. Attachment “D” Safety Form instructs the offeror to submit EMR and DART for the 3 previous complete calendar years, however blocks #2 and #3 reference years 2013, 2014 and 2015. Please confirm the 3-year timeframe for the requested rates.

GOVERNMENT RESPONSE: SEE RESPONSE TO # 7.

11. Under Technical Factor 1 : Construction Experience – it says that the contractor must have experience in each of the following categories: (i) new building construction, (ii) interior building renovation, and (iii) exterior building renovation. Please elaborate if exterior building renovation experience would include any one of the following elements : sidewalks replacement, entrance ramps, window and/ or door replacements, storefront replacements, roof replacement etc.

GOVERNMENT RESPONSE: YES, EXTERIOR BUILDING

RENOVATION REFERS TO BUILDING ENVELOPE FEATURES,

SUCH AS EXTERIOR WALLS, STOREFRONT, FENESTRATION

(WINDOWS, DOORS), ROOFING, AND BUILDING

INGRESS/EGRESS.

Wage Determination General Decision Number: MD170058 11/17/2017 MD58

Superseded General Decision Number: MD20160058

State: Maryland

Construction Type: Building

County: Prince George's County in Maryland.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 01/13/2017 2 04/21/2017 3 05/05/2017 4 05/26/2017 5 06/09/2017 6 07/14/2017 7 07/21/2017 8 07/28/2017 9 08/18/2017 10 09/08/2017 11 09/29/2017 12 11/17/2017

* ASBE0024-007 10/01/2017

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 35.13 16.22

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems

* ASBE0024-010 10/01/2017

Rates Fringes

ASBESTOS WORKER: HAZARDOUS

MATERIAL HANDLER (Removal of hazardous material from ceilings, floors, mechanical systems, and walls)..............$ 22.81 7.34

BRMD0001-006 04/30/2017

Rates Fringes

TILE SETTER......................$ 27.44 11.44

BRMD0001-011 04/30/2017

Rates Fringes

BRICKLAYER (Excluding Pointing, Caulking and Cleaning)........................$ 30.91 10.24

BRMD0001-012 04/30/2017

Rates Fringes

MASON - STONE....................$ 36.91 16.55

BRMD0001-013 04/30/2017

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 28.19 11.44

CARP0177-011 05/01/2017

CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Metal Stud Installation and Form Work)......$ 28.36 11.53

CARP0219-001 05/01/2017

Rates Fringes

MILLWRIGHT.......................$ 32.49 11.23

ELEC0026-021 09/05/2016

Rates Fringes

ELECTRICIAN (Communication and Sound Equipment).............$ 27.55 10.20

ELEC0026-022 06/05/2017

Rates Fringes

ELECTRICIAN (Including low voltage wiring for and installation of alarms, HVAC controls)........................$ 44.65 16.74+a a.PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after Thanksgiving Day and Christmas Day.

ELEV0010-001 01/01/2017

Rates Fringes

ELEVATOR MECHANIC................$ 42.79 31.585+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.

b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ENGI0077-017 05/01/2013

Rates Fringes

POWER EQUIPMENT OPERATOR:

Backhoe.....................$ 32.40 8.45+a Bulldozer...................$ 31.65 8.45+a

a. PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King's Birthday, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving and Christmas Day.

IRON0005-011 06/01/2017

Rates Fringes

IRONWORKER.......................$ 31.15 20.63

LABO0657-021 06/01/2015

Rates Fringes

LABORER (Common or General)......$ 14.93 7.31 LABORER: Mason Tender - Cement/Concrete..................$ 22.63 7.31 LABORER: Pipelayer..............$ 22.63 7.31

PAIN0051-014 06/01/2017

Rates Fringes

GLAZIER

Glazing Contracts $2 million and under...........$ 25.74 11.55 Glazing Contracts over $2 million.....................$ 29.87 11.55

PAIN0051-019 06/01/2017

PAINTER

Brush, Roller, Spray and Drywall Finisher/Taper......$ 25.06 9.66 Industrial..................$ 30.90 10.49

PLAS0891-005 07/01/2016

Rates Fringes

PLASTERER........................$ 28.83 6.05

PLAS0891-006 02/01/2017

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 27.65 10.08

PLAS0891-008 08/01/2016

Rates Fringes

PLASTERER (Fireproofing Including Sprayer, Mixer, and Handler) Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89

PLUM0005-010 08/01/2017

Rates Fringes

PLUMBER..........................$ 41.67 17.60+a

a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.

PLUM0602-011 08/01/2017

Rates Fringes

PIPEFITTER (Including HVAC Pipe and System Installation)....$ 40.69 21.07+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's

Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

ROOF0030-016 05/01/2016

Rates Fringes

ROOFER...........................$ 28.75 11.74

SFMD0669-001 04/01/2017

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 34.40 19.24

SHEE0100-015 07/01/2017

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 40.27 18.74+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day

SUMD2010-092 08/04/2010

Rates Fringes

LABORER

Grade Checker...............$ 16.00 2.90 Landscape...................$ 9.23 0.00 Mason Tender - Brick........$ 13.28 2.95 Mason Tender - Stone........$ 14.03 0.00 Mason Tender for Pointing, Caulking and Cleaning.......$ 14.15 0.00 Mortar Mixer................$ 16.61 9.08

POINTER, CAULKER, CLEANER,

Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.14

POWER EQUIPMENT OPERATOR:

Asphalt Roller..............$ 21.35 5.38 Bobcat/Skid Loader..........$ 18.05 8.78 Boom........................$ 21.44 8.29 Crane.......................$ 20.95 6.18 Excavator...................$ 20.00 0.00 Forklift....................$ 16.00 5.12 Gradall.....................$ 20.50 8.42 Grader/Blade................$ 14.50 5.18 Loader......................$ 24.00 5.40 Paver.......................$ 17.47 6.36 Roller excluding Asphalt....$ 17.60 3.88

TILE FINISHER....................$ 17.87 7.32

TRUCK DRIVER

Dump Truck..................$ 15.90 1.12 Tractor Haul Truck..........$ 17.87 9.98 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION