N3943018S2086_AppendixA_ProposalSubEvalGuide_rev082818.pdf
PDF 675 KB Posted
- Attached to
- FY19 LIVING MARINE RESOURCES (LMR) PROGRAM ENVIRONMENTAL NEED TOPICS Federal contract opportunity
- Solicitation number
- N3943018S2086
About this file
This document is a Broad Agency Announcement from the Department of the Navy seeking pre-proposals for the Living Marine Resources Program. The Navy is soliciting pre-proposals for eight need topics related to improving tag attachment duration on marine mammals, validating passive acoustic monitoring methods for density estimation, investigating cue rates and stability for density estimates, demonstrating sparse array techniques for large whale density, identifying monitoring priorities to study population consequences of disturbance, conducting a sea turtle temporary threshold shift feasibility study, and assessing Navy marine species monitoring data. Pre-proposals are due by October 22, 2018 and should be less than ten pages. Successful offerors will be invited to submit full proposals which are due 30 days after notification. Evaluation criteria for both pre-proposals and full proposals include technical approach, offeror experience, key personnel experience, cost, project benefits, and product implementation. Awards will be in the form of contracts to non-government entities. Proposals less than $300,000 per year are more likely to be funded given program budget constraints.
N3943018S2086_AppendixA_ProposalSubEvalGuide_rev082818.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3943018S2086_AppendixD_LMR_Ocean_Observing_System_Notification_Procedures.pdf | ||
| N3943018S2086_AppendixC_GeospatialDataRequirements_rev082818.pdf | ||
| N3943018S2086_AppendixB_DataRightsHandlingAgreement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Living Marine
Resources Program
PROPOSAL SUBMISSION
AND EVALUATION GUIDE
August 2018
Proposal Submission and Evaluation Guide
1 Introduction
The Living Marine Resources (LMR) program’s fundamental mission is to support the Navy’s ability to conduct uninterrupted training and testing, which preserve core Navy readiness capabilities. The LMR program meets its mission and responsibilities by:
Improving the best available science regarding the potential impacts to marine species from Navy activities, available for use in at-sea environmental compliance documentation;
Demonstrating and validating basic research projects that are ready for applied research investment; and
Broadening the use of or improving the technology and methods available to the U.S. Navy marine species monitoring program.
Research funded by the LMR program is needed to support the Navy’s at-sea environmental compliance and permitting processes. Without permits and associated environmental compliance, the Navy risks not being able to train or test. Without training and testing, the Navy cannot be ready to meet its mission.
Environmental compliance is fundamental to continued uninterrupted training and testing, and ultimately, to Navy readiness.
What Are The LMR Priority Species?
The LMR program is interested in increasing knowledge and understanding of all marine mammal species. However, in order to provide some guidance on research priorities, below is a list of priority marine mammal species:
Deep diving species (Cuvier’s beaked whale, other beaked whales, and other deep diving species)
ESA-listed species (large whales)
In addition to marine mammal species, the LMR program is also interested in increasing knowledge and understanding of the potential impacts to sea turtles, diving sea birds, and fish when specifically requested in the need.
What Are The LMR Priority Geographic Regions?
The LMR program is primarily interested in funding research that is applicable to geographic regions that are important to the U.S. Navy. Figure 1 shows a map of the LMR program priority geographic regions. It is important to note that the LMR program acknowledges that some field research may be better suited outside of these geographic regions due to a variety of factors.
Figure 1. LMR Priority Geographic Regions
2 Pre-Proposals
What Is a Pre-proposal?
The LMR program bases its investments on environmental needs that are announced as specific topics in the Broad Agency Announcement (BAA) solicitation. The BAA solicitation, which is posted on Navy Electronic Commerce Online (https://www.neco.navy.mil) and on Federal Business Opportunities (http://www.fbo.gov), specifies the need topics for the current funding cycle.
All qualified applicants interested in responding to a specific need topic in the BAA solicitation are required to submit a pre-proposal. Pre-proposals allow for the quick evaluation of the technical merit, appropriateness, feasibility, and overall budget of the proposed project. After the evaluation of the pre-proposals, each author will be notified via email of the results. If the LMR Program is interested in a pre-proposal, we will request a full proposal including a detailed plan and budget.
When Can I Submit My Pre-proposal?
The LMR program accepts pre-proposals only during open season, which will be specified on the website http://navysustainability.dodlive.mil/environment/lmrproposals/. Typically, the submission period starts in late summer, or early fall, and is open for approximately 45 days.
How Do I Submit My Pre-proposal?
Please note the website address and proposal submission procedures have changed. Instructions, forms, and reference documents can be found on the LMR website at http://navysustainability.dodlive.mil/environment/lmrproposals/.
There is no specific format required for the pre-proposal, however, the pre-proposal should be consolidated into one single file and should not exceed 10 pages in length. The required information that should be contained in the pre-proposal submission is specified below. All pre-proposals should be submitted via email to exwc_lmr_program@navy.mil and must be received before the deadline specified.
What Information Is Required In a Pre-proposal?
On the first page of the pre-proposal, provide the following information:
1. Your Contact Information Name, Phone, and Email
2. Organization Information
Organization Type (indicate Navy, DoD (Non-Navy), Federal (Non-DoD), Academia, Private (profit), Private (non-profit), or Other), Name, and Address
3. Need Addressed Provide the applicable need topic number that your proposal addresses.
4. Project Title Provide the title of your proposed project.
5. Cost Estimate (by Calendar Year) Provide total costs estimated to execute the project to completion broken out by calendar year
(January-December).
In addition to any other relevant travel required for the project, please include a trip (3 days) for the
PI to attend the In-Progress Review (IPR) meeting each year (fall) in Port Hueneme, CA to present on the progress of the project.
Assume for Year 1 of your project that effort will begin in September due to the time it takes to get a contract in place. For Year 1 (September-December) of the project your cost estimate should only include labor/travel costs associated with the LMR In-Progress Review. The actual project effort would take place in Year 2 and beyond.
In the remaining pages of the pre-proposal, provide the following information:
6. Technical Approach Describe the proposed project and any relevant supporting background information.
Clearly state how the proposed project addresses the BAA need topic.
If applicable, discuss the demonstration and validation phase of the research effort.
Provide supporting information that the approach or technology is mature enough for applied research funding (include any references). If the proposed project includes basic research elements, clearly break out the basic vs. applied aspects of the project.
Describe performance criteria to measure success of the research effort.
Discuss any aspects of the project that include leveraged funding from other programs.
Describe the potential limitations or technical risks that may pose a challenge to the success of the project.
7. Offeror’s Related Experience Provide evidence/examples the offeror has experience related to the solution being proposed.
8. Principal Investigator's and Key Team Member's Related Experience Provide in a table the names, highest degree, organization/affiliations, location, and years of experience for each Principal Investigator (PI) and key team member.
9. Navy Benefits Describe the expected benefits of the proposed project to the Navy and the key issues it addresses in the BAA need topic.
Describe the potential application of the results from the project.
Discuss the advantages of the proposed project over current approaches (technology, methods, costs, etc.).
10. Product Implementation (3 Elements)
a) Products and Deliverables:
Describe the intended product(s) and all associated deliverables.
b) Implementation Requirements:
Identify the intended end user of the product (i.e. Navy marine species monitoring program, Navy environmental compliance community [MMPA, ESA, NEPA, etc.], general scientific community, etc.).
Describe the planned method by which the product will be transitioned to end users (i.e.
publication, technology, method, etc.).
Specify how implementation methods may differ to reach appropriate audiences (i.e. Navy, regulators, scientific community, etc.) and any restrictions that may apply (i.e. permits, patents, proprietary technology or data, existing agreements, etc.).
Describe any proposed guidance documentation that will assist in future implementation.
c) Technical Risks:
Describe the potential technical risks that may pose a challenge to successful implementation of the product(s).
What Happens After I Submit My Pre-proposal?
Once your pre-proposal is submitted, the following actions occur:
1. You will receive a confirmation email.
2. After the pre-proposal submission deadline, the LMR program manager notifies members of the LMR
Advisory Committee (LMRAC), and any applicable Technical Review Committee (TRC) members, to evaluate your pre-proposal. LMRAC members and any assigned TRC members submit their evaluations. The evaluation criteria used is standardized and is described in detail below.
3. The LMR program manager schedules a final evaluation meeting with all LMRAC members. This meeting leverages all LMRAC/TRC evaluations previously submitted on your pre-proposal to arrive at a final evaluation.
4. Final pre-proposal evaluations are typically completed within 2 months and you will be notified of the results via e-mail.
5. Authors of successful pre-proposals are then invited to submit full proposals which provide more detailed information. The full proposal process is described in detail in Section 3.
How is my Pre-proposal Evaluated?
The LMR program uses the following five criteria for each LMRAC (and any applicable TRC) member to evaluate a pre-proposal:
1. Does the proposal adequately address the BAA need topic?
2. Do the qualifications, capabilities, and experience of the offeror, principal investigator, and key team members meet the requirements for achieving the proposal’s objectives?
3. Are the costs relative to the proposal’s approach reasonable?
4. What is the anticipated benefit of the project to the Navy?
5. How feasible is it to implement the products/results of the project?
Each LMRAC member is asked to provide a description of the strengths and weaknesses pertaining to these five criteria. Then the following overall disposition is given:
-Request a Full Proposal -Do NOT Request a Full Proposal
Once all evaluations are complete, the LMRAC members discuss the results and rank the pre-proposals that were given a disposition of “Request a Full Proposal” in order of preference based on strengths and weaknesses. The LMR program manager and OPNAV N45 sponsor then determine the number of full proposals that should be requested based on the available budget and associated costs estimated in the top pre-proposals. Authors of successful pre-proposals are then invited to submit full proposals.
3 Full Proposals
What Is a Full Proposal?
A full proposal is a more detailed version of the pre-proposal, including additional items such as project tasks, milestones, and a detailed budget. In addition, the full proposal gives the offeror the opportunity to address comments received from the LMRAC on their pre-proposal.
How Do I Submit My Full Proposal?
Successful pre-proposal offerors will receive an email with additional instructions on how to submit a full proposal. Once invited, the offeror has a specified number of days to submit a full proposal via email. The LMR program has developed a required full-proposal form. All full-proposal submissions must be received before the deadline specified.
What Additional Information Is Required In a Full Proposal?
All word limits have been removed for the full proposal submission process, so additional information can be added if necessary. The full proposal requires all of the same information as during the pre-proposal process, along with some additional requirements. Below is a description of each section and what changes may be applicable or required:
1. Your Contact Information
Update as needed.
2. Organization Information
3. Need Addressed
4. Project Title
5. Cost Estimate This section includes additional required information.
If applicable, revise your pre-proposal cost estimate based on any changes to the proposed project or feedback/questions from the LMRAC on the pre-proposal.
Provide a breakdown of the project costs by quarter for each applicable year. If your effort is assumed to be constant, then just evenly distribute the costs amongst the quarters. However, if your project includes field tests or other spikes in effort at particular points in the project, please do your best to estimate which quarters that will occur in.
Submit (as an email attachment) a spreadsheet with details regarding the financials of the project.
It is not a requirement to use the financial template provided, but you do have to provide all of the information requested in the template.
Provide contact information for your financial POC.
6. Technical Approach
If applicable, revise information based on any changes to the proposed project or feedback/questions from the LMRAC on the pre-proposal.
7. Offeror’s Related Experience
8. EMR/DART
For private (non-government) offerors, provide your Experience Modification Rate (EMR) and
Days Away, Restricted and Transferred (DART) rate. If a private offeror does not have an EMR/DART rating, explain why. This field does not apply to government offerors.
9. Principal Investigator’s and Key Team Member’s Related Experience
If applicable, revise information based on any changes to the proposed project or
Submit the Curriculum Vitaes (CVs) or a short biography for each team member listed.
10. Navy Benefits
11. Schedule/Milestones
Provide the overall proposed project start and completion date.
Provide a detailed task/milestone (e.g. significant stage of development/progress, field tests/studies, deliverables, and publications) breakdown for the entire project with proposed dates.
12. Product Implementation
13. Supporting Files
Submit any additional supporting files (e.g. figures, tables) as appropriate. Please note that the size of the entire email should be limited to a total of 15 MB or less.
How is my Full Proposal Evaluated?
The LMR program uses the same five criteria outlined for a pre-proposal to evaluate a full proposal. The only exception is that the following additional criterion is used for non-government submissions:
Did the Offeror provide acceptable EMR/DART ratings or a valid reason why they were not provided (non-government submissions only)?
-Yes -No
Each LMRAC member is asked to provide a description of the strengths and weaknesses pertaining to these six criteria. Then the following overall disposition is given:
-Recommend Funding the Effort -Do NOT Recommend Funding the Effort -On Hold
Once all evaluations are complete, the LMRAC members discuss the results and rank the full proposals that were given a disposition of “Recommend Funding the Effort” in order of preference based on strengths and weaknesses. The LMR program manager and OPNAV N45 sponsor then determine the number of full proposals that should be funded based on the available budget and associated costs estimated in the top full proposals. Authors of successful full proposals are notified via email.
File details come from the government source that posted it. Updated .