N39040Q4312V106 Attachment 2 4312V106 DEMINERALIZER SPEC TC.pdf
PDF 184 KB Posted
- Attached to
- Nuclear Demineralizers with Overpacks
- Solicitation number
- N39040Q4312V106
About this file
This file is an attachment containing detailed technical specifications and data requirements for 10 7-cubic foot demineralizers for the Naval Sea Systems Command. The demineralizer specifications include a 24-inch vessel with 1-inch NPT inlet/outlet connections, 150 PSI design pressure, 140°F design temperature, 25 GPM flow rate, and maximum dimensions of 24-inch outside diameter with 45.25-inch height. The units must include lifting attachments and have a maximum gross weight of 2500 lbs.
The document outlines extensive testing, inspection, and certification requirements including hydrostatic testing to 135% of design pressure, magnetic particle inspections, load testing of lifting points, and detailed documentation requirements. Key certifications required include design compliance with ANSI N14.6-1993, 10:1 safety factors for lifting points and shackles, dewatering procedures, and material composition certifications. The contractor must obtain drawing approval from Portsmouth Naval Shipyard Code 2310.3 prior to fabrication and provide comprehensive documentation for each demineralizer before shipment. Government inspection is required during manufacture and prior to shipment, with the Defense Contract Management Agency (DCMA) or Naval Special Emphasis Program oversight specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQ DOC NO. - __42312V106 ATTACHMENT 2
CONTINUATION SHEET CONTRACT NO. - N39040DEMIN
NAME OF OFFER OR/CONTRACTOR
7 CU FT DEMINERALIZER 10 EA
C. DESCRIPTION/SPECIFICATIONS
C.1 7 CUBIC FOOT DEMINERALIZER: 24 INCH DEMINERALIZER, 7 CUBIC
FOOT VESSEL
C.1.1 1 INCH NPT INLET, OUTLET AND VENT CONNECTION WITH
MALE CAMLOK FITTINGS AND MATING CAPS.
C.1.2 DESIGN PRESSURE: 150 PSI AND 29 INCH Hg VACUUM.
C.1.3 DESIGN TEMP: 140OF
C.1.4 DESIGN FLOW RATE: 25 GPM
C.1.5 DESIGN SIZE: 7 CUBIC FEET OF RESIN/MEDIA VOLUME
C.1.6 DESIGN DIMENSIONS: 24 INCH OUTSIDE DIAMETER MAX
HIEGHT WITH FITTINGS 45.25 INCHES PLUS 0 INCHES MINUS 1/8
INCH
C.1.7 LIFTING ATTACHMENTS: TWO 1/2"-13UNC-2B TABBED LIFTING
HOLES WITH A MINIMUM USABLE DEPTH OF 7/8 INCH.
C.1.8 WEIGHT: MAXIMUM GROSS WEIGHT SHALL BE 2500 LBS
C.2 OVERPACK/HIC CONTAINER
ITEM # SUPPLIES/SERVICES QTY U/I
C.2.1 DIMENSIONS: DIAMETER: 33 INCHES PLUS 1/4 INCH
MAXIMUM OUTSIDE DIAMETER.
C.2.2 HEIGHT: 57 INCHES PLUS 0 INCHES MAXIMUM
C.2.3 LIFTING ATTACHMENTS: FOUR (4) LIFTING POINTS WITH
SHACKLES RATED TO 10:1 SAFETY FACTOR BASED ON MATERIAL
YIELD STRENGTH.
C.2.3.1 THE LIFTING POINTS SHALL BE DESIGNED THAT TWO
ATTACHMENTS CARRY THE LOAD.
C.3 SEE STATEMENT OF WORK (SOW) FOR ADDITIONAL REQUIREMENTS
AND INFORMATION.
C.4 DCMA OR NAVAL SPECIAL EMPHASIS PROGRAM REQUIRED.
C.5 GOVERNMENT INSPECTION IS REQUIRED DURING MANUFACTURE
AND PRIOR TO SHIPMENT FROM THIS FACILITY. UPON RECEIPT OF
THIS ORDER, PROMPTLY NOTIFY THE REPRESENTATIVE OF THE
GOVERNMENT OFFICE WHO NORMALLY SERVES YOUR FACILITY SO
THAT APPROPRIATE PLANNING FOR GOVERNMENT INSPECTION CAN
BE ACCOMPLISHED. IN THE EVENT A REPRESENTATIVE OF THE
GOVERNMENT OFFICE CANNOT BE LOCATED, THE PURCHASING
AGENT SHOULD BE NOTIFIED PROMPTLY.
C.6 THE CONTRACTOR SHALL PROVIDE A DRAWING THAT SPECIFIES
THE SPECIFIC MANUFACTURING/ASSEMBLY DETAILS OF THE
DEMINERALIZER AND HIC/OVERPACK CONTAINER INCORPORATING
THE REQUIREMENTS OF THE SOW. THE CONTRACTOR SHALL
OBTAIN APPROVAL OF THE DRAWING(S) FROM PORTSMOUTH
NAVAL SHIPYARD, CODE 2310.3 PRIOR TO FABRICATION OF THE
DEMINERALIZER ASSEMBLY.
C.7 DOCUMENTATION FOR EACH INDIVIDUAL DEMINERALIZERS ARE
REQUIRED TO BE SENT TO CODE 2310.3 PRIOR TO THE
DEMINERALIZERS BEING SHIPPED.
C.7.1 ABSENCE OF THESE DOCUMENTS SHALL BE CAUSE FOR
REJECTION.
C.8 THE CONTRACTOR SHALL HYDROSTATICALLY TEST EACH
DEMINERALIZER TO A MINIMUM OF 135% OF THE DESIGN PRESSURE
(203 PSIG) FOR 30 MINUTES PRIOR TO INSTALLATION INTO THE HIGH
INTEGRITY CONTAINER (HIC) OR STEEL OVERPACK.
C.8.1 ACCEPTANCE CRITERIA: NO LEAKAGE AND NO VISABLE
PERMANENT DEFORMATION OF PRESSURE BOUNDRY PARTS.
C.9 THE CONTRACTOR SHALL PROVIDE WRITTEN STORAGE
REQUIREMENTS FOR THE AS SHIPPED CONDITION OF THE
DEMINERALIZER AND HOW TIME WILL AFFECT THE RESIN FOR
THE FOLLOWING CONDITIONS; AS SHIPPED, FILLED WITH
WATER AND PARTIALLY DEWATERED AFTER USE.
C.9.1 ABSENCE OF THE DOCUMENTS LISTED ABOVE SHALL BE
CAUSE FOR REJECTION.
C.10 THE DEMINERALIZER SHALL BE ABLE TO BE DEWATERED TO LESS
THAN 0.5% OF THE VOLUME OF THE WASTE AS SPECIFIED IN
10CFR61.56.
C.10.1 A CERTIFIED DEWATERING PROCEDURE SHALL BE PROVIDED
FOR THE DEMINERALIZER.
C.11 HIC/OVERPACK LIFT GEAR AND SHACKLES:
C.11.1 THE LIFTING BASKET LIFTING POINTS SHALL MEET THE
DESIGN REQUIREMENTS OF ANSI N14.6-1933. A CERTIFICATION OF
DESIGN REQUIREMENTS IN ACCORDANCE WITH ANSI N14.6-1993 IS
REQUIRED.
C.11.2 THE LIFTING BASKET LIFTING POINT AND SHACKLES MUST BE
DESIGNED TO A SAFETY FACTOR OF 10:1 BASED ON MATERIAL
YIELD STRENGTH (MUST SUPPORT TEN TIMES THE MAXIMUM
GROSS WEIGHT OF THE ENTIRE PACKAGE).
C.11.2.1 THE LIFTING POINTS SHALL BE DESIGNED TO
ACCOUNT FOR TWO POINTS CARRY THE LOAD AND A MINIMUM
SLING ANGLE OF 60 DEGREES FROM HORIZONTAL.
C.11.3 BEFORE THE LOAD TEST, THE LIFTING BASKET LIFTING
POINTS SHALL BE VISUALLY INSPECTED TO THE MAXIMUM EXTENT
PRACTICAL FOR CRACKS, CRUSHED THREADS, GOUGES AND OTHER
DEFICIENCIES THAT WOULD AFFECT LOAD BEARING CAPABILITY.
C.11.3.1 PROOF OF COMPLETION OF THE VISUAL INSPECTION
PRIOR TO LOAD TEST MUST BE SUBMITTED TO THE SHIPYARD FOR
EACH LIFTING POINT.
C.11.4 A LOAD TEST SHALL BE PERFORMED TO 150% (+5%, -0%) OF
THE WORKING LOAD LIMIT (I.E. IF THE WORKING LOAD LIMIT OF
THE ATTACHMENT IS 2500 LBS, LOAD TEST IS 3750 LBS – 3937LBS) AT
AN ANGLE OF 60(+5, -0) DEGREES FROM HORIZONAL.
C.11.5 AFTER THE LOAD TEST, THE LIFTING BASKET LIFTING POINTS
SHALL BE VISUALLY INSPECTED TO THE MAXIMUM EXTENT
PRACTICAL FOR CRACKS, CRUSHED THREADS, GOUGES AND OTHER
DEFICIENCIES THAT WOULD AFFECT LOAD BEARING CAPABILITY.
C.11.5.1 PROOF OF COMPLETION OF THE VISUAL INSPECTION
FOLLOWING LOAD TEST MUST BE SUBMITTED TO THE SHIPYARD
FOR EACH LIFTING POINT.
C.11.6 AFTER LOAD TESTING, A MAGNETIC PARTICLE (MT)
INSPECTION SHALL BE PERFORMED ON EACH LIFTING POINT, THE
WELD, THE AREA SURROUNDING EACH LIFTING POINT (HEAT
AFFECTED ZONE), AND EACH SHACKLE.
C.11.6.1 THIS SHALL BE PERFORMED IN ACCORDANCE WITH
NAVSEA TECHNICAL PUBLICATION TP T9074-AS-GIB-010/271.
C.11.6.2 THE ACCEPTANCE CRITERIA FOR THE MAGNETIC
PARTICLE INSPECTION SHALL BE MIL-STD-2035A, FOR WROUGHT
MATERIAL.
C.11.6.3 THE VENDOR SHALL SUBMIT DOCUMENTATION OF
SATISFACTORY RESULTS OF ALL MT INSPECTIONS PRIOR TO
SHIPMENT OF THE DEMINERALIZERS.
C.11.7 THE MATERIAL COMPOSITION, FOR SHACKLES, MUST MEET
THE TECHNICAL REQUIREMENTS OF FEDERAL SPECIFICATION RR-C-
271H (GRADE A OR B) FOR CARBON AND ALLOY STEEL OR ASTM
A314-23 FOR STAINLESS STEEL.
C.12 DEMINERALIZER/PRESSURE VESSEL LIFTING POINT CERTIFICATION
C.12.1 THE TAPPED LIFTING HOLES SHALL MEET THE DESIGN
REQUIREMENTS OF ANSI N14.6-1993. A CERTIFICATION OF DESIGN
REQUIREMENTS IN ACCORDANCE WITH ANSI N14.6-1993 IS
REQUIRED.
C.12.2 BEFORE A LOAD TEST, THE TAPPED LIFTING HOLES SHALL BE
VISUALLY INSPECTED TO THE MAXIMUM EXTENT PRACTICAL FOR
CRACKS, CRUSHED THREADS, GOUGES AND OTHER DEFICIENCIES
THAT WOULD AFFECT LOAD BEARING CAPABILITY.
C.12.2.1 PROOF OF COMPLETION OF THE VISUAL INSPECTION
PRIOR TO LOAD TEST MUST BE SUBMITTED TO THE SHIPYARD FOR
EACH TAPPED LIFTING HOLE.
C.12.3 AFTER LOAD TEST, THE TAPPED LIFTING HOLES SHALL BE
VISUALLY INSPECTED TO THE MAXIMUM EXTENT PRACTICAL FOR
CRACKS, CRUSHED THREADS, GOUGES AND OTHER DEFICIENCIES
THAT WOULD AFFECT LOAD BEARING CAPABILITY AND SHALLBE
INSPECTED USING GO, NO-GO GAGES.
C.12.3.1 PROOF OF COMPLETION OF THE VISUAL INSPECTION
FOLLOWING LOAD TEST MUST BE SUBMITTED TO THE SHIPYARD
FOR EACH LIFTING HOLE.
C.12.4 AFTER THE LOAD TEST A MAGNETIC PARTICLE INSPECTION
SHALL BE PERFORMED ON THE BASE MATERIAL AROUND THE
TAPPED LIFTING HOLES, BEGINNING AT THE EDGE OF THE HOLE
AND EXTENDING OUT 1/2 INCH.
C.12.4.1 THIS SHALL BE PERFORMED IN ACCORDANCE WITH
NAVSEA TECHNICAL PUBLICATION TP T9074-AS-GIB-010/271.
C.12.4.2 THE ACCEPTANCE CRITERIA FOR THE MAGNETIC
PARTICLE INSPECTION SHALL BE MIL-STD-2034A, FOR WROUGHT
MATERIAL.
C.12.4.3 THE VENDOR SHALL SUBMIT DOCUMENTATION OF
SATISFACTORY RESULTS OF ALL MAGNETIC PARTICLE TESTS PRIOR
TO SHIPMENT OF THE DEMINERALIZER.
C.13 DATA REQUIREMENTS PER EXHIBIT A (DD-1423) & ATTACHMENT #1.
C.13.1 DRAWING APPROVAL, PRIOR TO FABRICATION; EXHIBIT A
SEQUENCE A001.
C.13.2 CERTIFICATION OF HYDROSTATIC TEST: EXHIBIT A
SEQUENCE A002.
C.13.3 CERTIFIED DEWATERING PROCEDURE: EXHIBIT A SEQUENCE
A003.
C.13.4 CERTIFICATION OF DESIGN REQUIREMENTS, ANSI N14.6-1993:
EXHIBIT A SEQUENCE A004.
C.13.5 CERTIFICATION OF 10:1 FACTOR OF SAFETY, LIFTING POINTS:
EXHIBIT A SEQUENCE A005.
C.13.6 CERTIFICATION OF 10:1 FACTOR OF SAFETY, SHACKLES:
EXHIBIT A SEQUENCE A006.
C.13.7 PROOF OF COMPLETION, VISUAL INSPECTIONS PRIOR TO
LOAD TEST, LIFTING POINTS: EXHIBIT A SEQUENCE A007.
C.13.8 CERTIFICATION OF LOAD TEST, LIFTING POINTS: EXHIBIT A
SEQUENCE A008.
C.13.9 CERTIFICATION OF LOAD TEST, SHACKLES: EXHIBIT A
SEQUENCE A009.
C.13.10 PROOF OF COMPLETION, VISUAL INSPECTIONS AFTER LOAD
TEST, LIFTING POINTS: EXHIBIT A SEQUENCE A010.
C.13.11 CERTIFICATION OF MAGNETIC PARTIICLE INSPECTIONS,
LIFTING POINTS: EXHIBIT A SEQUENCE A011.
C.13.12 CERTIFICATION OF MAGNETIC PARTICLE INSPECTIONS,
SHACKLES: EXHIBIT A SEQUENCE A012.
C.13.13 CERTIFICATION OF MATERIAL COMPOSITION, RR-C-271H OR
ASTM A314-23: EXHIBIT A SEQUENCE A013.
C.13.14 CERTIFICATION OF DESIGN REQUIREMENTS, ANSI N14.6-1993:
EXHIBIT A SEQUENCE A014.
C.13.15 PROOF OF COMPLETION, VISUAL INSPECTIONS PRIOR TO
LOAD TEST, TAPPED LIFTING HOLE: EXHIBIT A SEQUENCE
A015.
C.13.16 PROOF OF COMPLETION, VISUAL INSPECTIONS AFTER LOAD
TEST, TAPPED LIFTING HOLE: EXHIBIT A SEQUENCE A016.
C.13.17 CERTIFICATION OF MAGNETIC PARTICLE INSPECTIONS, BASE
MATERIAL: EXHIBIT A SEQUENCE A017.
CONTRACT __________________
PRINTED 13 NOVEMBER 2024 PAGE _______
EXHIBIT A
(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)
CONTRACT DATA REQUIREMENTS LIST
SYSTEM/ITEM: 7CU FT DEMINERALIZER CATEGORY ____________
ITEM NO CONTRACTOR
01 SEQ NO A001
02 DATA DESC DRAWING APPROVAL
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.1
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO FABRICATION
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
15 TOTAL __
16 REMARKS
SEQ. NO. A001
PREPARED BY ________________________________________________ DATE__________________ APPROVED BY ________________________________________________ DATE__________________
DD FORM 1423
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A002
02 DATA DESC CERTIFICATE OF HYDROSTATIC TEST
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.2
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A002
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A003
02 DATA DESC CERTIFIED DEWATERING PROCEDURE
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.3
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A003
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A004
02 DATA DESC CERTIFICATION OF DESIGN REQUIREMENTS
03 SUBTITLE ANSI N14.6-1993
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.4
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A004
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A005
02 DATA DESC CERTIFICATION OF 10:1 FACTOR OF SAFETY
03 SUBTITLE LIFTING POINTS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.5
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A005
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A006
02 DATA DESC CERTIFICATION OF 10:1 FACTOR OF SAFETY
03 SUBTITLE SHACKLES
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.6
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A006
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A007
02 DATA DESC PROOF OF INSPECTION, PRIOR TO LOAD TEST
03 SUBTITLE LIFTING POINTS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.7
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A007
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A008
02 DATA DESC CERTIFICATION OF LOAD TEST
03 SUBTITLE LIFTING POINTS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.8
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A008
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A009
02 DATA DESC CERTIFICATION OF LOAD TEST
03 SUBTITLE SHACKLES
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.9
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A009
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A010
02 DATA DESC PROOF OF INSPECTION, AFTER LOAD TEST
03 SUBTITLE LIFTING POINTS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.10
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A010
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A011
02 DATA DESC CERTIFICATION OF MAGNETIC PARTICLE INSPECTION
03 SUBTITLE LIFTING POINTS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.11
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A0011
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A012
03 SUBTITLE SHACKLES
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.12
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO SHIPMENT OF DEMINERALIZER
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A012
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A013
02 DATA DESC CERTIFICATION OF MATERIAL COMPOSITION
03 SUBTITLE RR-C-271H/ASTM A314-23
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.13
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A013
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A014
02 DATA DESC CERTIFICATION OF MATERIAL COMPOSITION
03 SUBTITLE RR-C-271H/ASTM A314-23
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.14
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A014
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A015
02 DATA DESC PROOF OF INSPECTION, PRIOR TO LOAD TEST
03 SUBTITLE TAPPED LIFTING HOLES
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.15
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A015
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A016
02 DATA DESC PROOF OF INSPECTION, AFTER LOAD TEST
03 SUBTITLE TAPPED LIFTING HOLES
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.16
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A0016
PRINTED 13 NOVEMBER 2024 PAGE _______
01 SEQ NO A017
03 SUBTITLE BASE MATERIAL
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.13.17
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM PRIOR TO DEMINERALIZER SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A0017
PRINTED 13 NOVEMBER 2023 PAGE _______
ATTACHMENT 1 TO EXHIBIT A (DD FORM 1423)
CONTRACT/SOLICITATION ________________________________________________________________
ITEM ___________________________________________ (DATE FOR ITEM) ___________________
REQUIRED CERTIFICATION
A. CERTIFICATION SHALL BE SUPPLIED WITH EACH SHIPMENT OF MATERIAL.
CERTIFICATION (CERTIFICATE OF COMPLIANCE) SHALL BE SUPPLIED AS OUTLINED IN
PARAGRAPH B. THE VENDOR IS LIABLE FOR CONDUCTING ALL TESTS, ANALYSES,
INSPECTIONS, AND EXAMINATIONS, ETC., AS SPECIFIED BY THE CONTRACT AND
SPECIFICATIONS WHETHER CERTIFICATIONS ARE REQUIRED OR NOT.
CERTIFICATE OF COMPLIANCE (PROVIDE THE FOLLOWING VERBATIM STATEMENT OR
COMPLETE THE OPTIONAL FORM AT THE END OF THIS PART)
"I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH
ALL CONTRACT REQUIREMENTS".
B. CERTIFICATION SHALL BE SUPPLIED PER THE FOLLOWING INSTRUCTIONS:
1. THE CERTIFICATION OF COMPLIANCE SHALL CONTAIN THE SIGNATURE AND TITLE OF
THE VENDOR OFFICIAL DESIGNATED RESPONSIBLE FOR QUALITY ASSURANCE.
2. THE MATERIAL IDENTIFICATION (E.G. LOT, BATCH, PART #, ETC.) SHALL BE INCLUDED
ON THE CERTIFICATE OF COMPLIANCE.
PRINTED 13 NOVEMBER 2023 PAGE _______
ATTACHMENT 1 TO EXHIBIT A (DD FORM 1423)
CERTIFICATE OF COMPLIANCE
COMPANY NAME
MATERIAL IDENTIFICATION (COMPLETE APPLICABLE ITEMS)
CONTRACT NO. ______________ ORDER NO. ________________ ITEM NO. ____________________ NATIONAL/LOCAL STOCK NO. NSN/LSN ____________________________________________________ MANUFACTURER’S PART NO. _____________________________________________________________ MANUFACTURER’S SERIAL NO. ___________________________________________________________ DRAWING AND PIECE NO. _________________________________________________________________
MANUFACTURER’S LOT/HEAT NOS. AS MARKED ON THE MATERIAL _________________________
ALL INSPECTIONS AND TEST REPORTS REQUIRED BY ATTACHMENT I TO EXHIBIT A (DD FORM
1423) FOR TRACEABILITY TO EACH CONTRACT ITEM MUST ACCOMPANY THIS SIGNED
STATEMENT:
THE INSPECTION AND TEST REPORTS (AS APPLICABLE) PROVIDED REPRESENT THE ACTUAL
ATTRIBUTES OF THE ITEMS FURNISHED ON THIS CONTRACT AND INDICATE FULL
COMPLIANCE WITH ALL CONTRACT REQUIREMENTS. I ATTEST ALL ITEMS FURNISHED ON
THIS CONTRACT ARE IN FULL COMPLIANCE WITH ALL CONTRACT REQUIREMENTS.
SIGNATURE ___________________________________________________ DATE _______________
QUALITY ASSURANCE OFFICIAL