N3904027Q3209 Questions and Answers-rev1.pdf
PDF 562 KB Posted
- Attached to
- Rental- Nitrogen Trailer- Groton, CT
- Solicitation number
- N3904027Q3209
About this file
This is a Questions and Answers document for Solicitation N3904027Q3209 addressing the rental of one nitrogen trailer. The document clarifies seven key procurement requirements without establishing specific response or award dates.
Regarding technical specifications, vendors must ensure trailers conform to UIPI 0505-908 Level II cleanliness, defined as surfaces visually free of grease, oil, flux, scale, dirt, loose particles, and other contamination foreign to the base metal or system fluid, with A-A-59155 Grade A purity certificates of compliance. For past performance evaluation (Factor 2), offerors without prior nitrogen-trailer rental contracts will be rated Acceptable under the unknown-record provision; only the prime contractor's past performance qualifies, not subcontractor performance. Refill methodology involves delivery of fully charged replacement trailers per SOW paragraphs 3.3.1 and 3.1.2. CLIN 0003 (freight) is a single job inclusive of all shipping costs for initial delivery, refill/replacement transportation, and final trailer retrieval. CLIN 0002 similarly encompasses all related costs as a single job. The firm-fixed price contract must include 12-hour expedited replacement capability without requiring separate authorization. Delivery coordination requires contractors to notify the receiving activity at least 72 hours before arrival, with the Contracting Officer Representative assisting in delivery and return logistics. Specific receiving points, authorized delivery hours, and installation-access procedures will be provided post-award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QuesƟons and Answers
SolicitaƟon: N3904027Q3209
Procurement: Rental of (1) Nitrogen trailer
1. Cleanliness. The requirement calls for UIPI 0505-908 Level II cleanliness with a certificate of compliance per trailer. UIPI 0505-908 is not publicly available, so an offeror cannot confirm its supplier's certification against it. Could you provide an extract of the Level II requirements as they apply to a rented tube trailer, or confirm that a supplier's standard oil-free, dry, moisture-controlled cleanliness certification together with the A-A-59155 Grade A purity certificate of compliance satisfies CDRL A003/B003?
This is our definition of Level II Clean taken (taken from UIPI 0505-908B):
“Level II Clean A degree of cleanliness in which a surface is visually free of grease, oil flux, scale, dirt, loose particles, and any other contamination foreign to the base metal or system fluid (e.g., water, oil, lubricant, air, etc.).”
Pleasure ensure vendors conform to this definition provided, all other instructions of the UIPI are not required.
2. The Factor 2 instruction asks vendors to submit two projects or contracts involving the rental of nitrogen trailers. The adjectival table rates a submission "Acceptable" where "the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror's performance record is unknown." Please confirm that an offeror without two prior nitrogen-trailer rental contracts is rated Acceptable under the unknown-record provision, consistent with FAR 15.305(a)(2)(iv), rather than Unacceptable.
If a vendor has an unknown past experience, it will be regarded as Acceptable
3. If prior nitrogen-trailer experience is required, may the past performance of a proposed subcontractor performing the rental and gas supply be submitted to satisfy Factor 2?
Any past performance proposed shall be based on the vendors role as the prime on the contract. Using the past performance of a subcontractor is not considered.
4. Refill/replacement: Does CLIN 0002 cover delivery of one fully charged replacement tube trailer upon depletion, or is a different refill method intended?
- Per SOW pgh 3.3.1. and 3.1.2. the method of refill will be to deliver a new fully charged replacement tube trailer
5. Freight: Should CLIN 0003 include initial delivery, transportation associated with the refill/replacement, and final retrieval of the trailer after release by the Government?
CLIN 0003 is slated as 1 job and shall be considered inclusive of all shipping cost (delivery and pick up) of the rental under CLIN 0001. CLIN 0002 should be assessed as 1 job with all related costs to that CLIN as a whole.
6. Expedited replacement: Must the capability to replace within 12 hours be included in the firm-fixed price, or would expedited service require separate written authorization?
A FFP contract would indicate that this should be all inclusive
7. Delivery access: Will the final receiving point, authorized delivery hours, and installation-specific access procedures be provided after award?
- Per SOW pgh 5.1.4. “The Contractor shall notify the receiving activity of the scheduled arrival date of the equipment … Notification shall be made not less than 72 hours prior to the delivery date”. The Contracting Officer Representative (COR) for the contract will assist in the delivery/return coordination.
File details come from the government source that posted it. Updated .