N3904027Q3160 Attachment 3- QASP matrix.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- PNSY- Sanitary Tank Cleaning
- Solicitation number
- N3904027Q3160
About this file
This is a Quality Assurance Surveillance Plan (QASP) matrix for sanitary tank cleaning and sanitation services at Portsmouth Naval Shipyard. The document establishes performance standards, acceptable quality levels (AQL), surveillance methods, and government actions for contract non-compliance across three sanitary tanks.
The cleaning requirements mandate removal of all wastes and loose materials using only pressure washing and hand tools—no power tools permitted. Tanks must be cleaned to Society for Protective Coatings Surface Preparation Standard No. 1 (SSPC-SP 1). Tank-specific requirements include calcium buildup removal from Tank #1, removal of 100-400 square feet of loose and flaking epoxy paint from Tank #2 requiring exposure to steel substrate, and extensive degreasing via hand wiping with rags and degreasing agents on Tank #3. All anodes must be removed prior to final cleaning and turned over to Portsmouth Naval Shipyard personnel. Sanitization requires 24-hour advance notification to the Project Management Team and Code 133 Inspector, with the inspector observing the addition of specified quantities of sodium hypochlorite solution (5% or 10% concentrations vary by tank size). Tanks must sit for a minimum four hours with sanitizing solution, then either refilled with potable water for one hour or low-pressure washed. Bacteriological testing of washwater runoff is mandatory, with limits set at less than 235 CFU/100 mL for E. coli and less than 61 CFU/100 mL for enterococci. The Government action for any AQL failure includes requiring re-work at contractor expense, with an additional 5% penalty of the total Contract Line Item Number value assessed for each failure after the first inspection. Acceptable performance is rated on a descriptive scale ranging from Exceptional to Unsatisfactory, with Satisfactory defined as meeting all contractual requirements with only minor non-conformances and timely corrective actions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Quality Assurance Surveillance Plan, Matrix | |||||||
| Sanitation Tank Cleaning and Sanitation | |||||||
| Deliverable or Service Requirement | Performance Standards | Acceptable Quality Level (AQL) | Method of Surveillance | Government action for Failure to Meet AQL | |||
| Clean all tanks listed in contract. | Clean all tanks to Society for Protective Coatings Surface Preparation Standard No. 1 (SSPC-SP 1). Clean using non-petroleum based Solvents/Cleaners to achieve the cleanliness level of SSPC-SP 1. At a minimum the Sanitary Tanks shall be cleaned as outlined below: | ||||||
| 1 Clean all tanks to be free of all wastes and all loose material. All piping, hangers, backside of access cover (including hinges) and tank level indicator (TLI) coil shall be free of all wastes and all loose material. | 2. Use only pressure washing and hand tools to clean the sanitary tanks. Power tools (needle guns, etc.) are not permitted. | Per Project Management Team, C133 Inspector, or if assign, C250 Inspector | COR/TPOC inspections | Require re-work and possibly CDR | |||
| Clean Tank # 1 | 1. Calcium type buildup should be expected throughout the tank. Remove all debris from the bottom of the tank. | Per Project Management Team, C133 Inspector, or if assign, C250 Inspector | COR/TPOC inspections | Require re-work and possibly CDR | |||
| Clean Tank # 2 | 2. It should be expected that 100 to 400 square feet of loose and flaking epoxy paint on the tank's steel structure requires removal to the steel substrate. | Per Project Management Team, C133 Inspector, or if assign, C250 Inspector | COR/TPOC inspections | Require re-work and possibly CDR | |||
| 2.a. Light scraping with putty knives, steel bristle brushes and/or similar tools shall be accomplished, as required, to ensure removal of all grease and grease film on the interior surfaces as well as underlying grease behind loose and flaking paint. | |||||||
| 2.b. Loose, flaking and blistering paint is sufficient cause to suspect underlying grease and shall be removed as part of the cleaning process. | |||||||
| 2.c. In addition to power washing, hand wiping with rags and degreasing agents shall be required to achieve the desired level of cleanliness in Sanitary Tank | |||||||
| Clean Tank # 3 | 3. Light scraping with putty knives, steel bristle brushes and/or similar tools shall be accomplished, as required, to ensure removal of all grease and grease film on the interior surfaces as well as underlying grease behind loose and flaking paint. | Per Project Management Team, C133 Inspector, or if assign, C250 Inspector | COR/TPOC inspections | Require re-work and possibly CDR | |||
| 3.a.. Loose, flaking and blistering paint is sufficient cause to suspect underlying grease and shall be removed as part of the cleaning process. | |||||||
| 3.b.. In addition to power washing, hand wiping with rags and degreasing agents shall be required to achieve the desired level of cleanliness in Sanitary Tank No. 3. | |||||||
| Sanitation / Disinfection of the Tanks | 4. | Notify PNS Project Management Team and Code 133 Inspector 24 hours prior to the addition of the disinfecting/sanitizing solution to each Sanitary Tank. Provide follow-up confirmation to Code 133 Inspector at the start of the shift of the day of the inspection request. | Per Project Management Team, C133 Inspector, or if assign, C250 Inspector | COR/TPOC inspections | Require re-work and possibly CDR | ||
| 4.a. | Code 133 Inspector will observe addition of the sanitizing/disinfecting solution to each Sanitary Tank. | ||||||
| 4.b. Each tank shall be pumped to low suction and then filled 1/2 full with fresh (potable) water prior to being sanitized/disinfected. | |||||||
| 4.c. The sanitizing/disinfecting solution shall be added to a tank only after the tank is filled 1/2 full of fresh (potable) water. | |||||||
| Required Amounts of Sanitizing / Disinfacting Solution: | |||||||
| 4.d. Sanitary Tank no. 1: A minimum of 14 gallons 3 qt of 5% liquid sodium hypochlorite or 7 gallons 2 qt of 10% liquid sodium hypochlorite shall be used. | |||||||
| 4.e. Sanitary Tank no. 2: A minimum of 18 gallons 3 qt of 5% liquid sodium hypochlorite or 9 gallons 2 qt of 10% liquid sodium hypochlorite shall be used. | |||||||
| 4.f. Sanitary Tank no. 3: A minimum of 6 gallons 2 qt of 5% liquid sodium hypochlorite or 3 gallons 1 qt of 10% liquid sodium hypochlorite shall be used. | |||||||
| 4.g. After adding the sanitizing/disinfecting solution to a tank, the tank shall be filled with fresh (potable) water to full capacity and allowed to sit for a minimum of four (4) hours. | |||||||
| 4.h. Ensure that the sanitizing/disinfecting solution is evenly mixed into all the water in a tank so that all surfaces are sanitized/disinfected for the entire hold period of four (4) hours. | |||||||
| 4.i. Following pump down, the tank shall be either filled with fresh (potable) water and allowed to sit for a minimum of one (1) hour or washed down with a low- pressure wash to remove remaining sanitizing/disinfecting solution. | |||||||
| Restrictions on use of alternative santizing / disinfacting processes | Restrictions on use of alternative sanitizing/disinfecting processes. No alternative sanitizing / disinfecting process may be used without written approval by PNS. Any alternative sanitizing / disinfecting process must be submitted to Portsmouth for review by PNS Contracts and Engineering. | Per Project Management Team, C133 Inspector, or if assign, C250 Inspector | COR/TPOC inspections | Require re-work and possibly CDR | |||
| Bacteriological Testing | 5.a. After sanitization/disinfection and low-pressure wash down, Contractor is to have samples taken of the washwater runoff in each tank for bacteriological testing. | Per Project Management Team, C133 Inspector, or if assign, C250 Inspector | COR/TPOC inspections | Require re-work and possibly CDR | |||
| 5.b. The samples shall be taken from washwater runoff at or near the bottom of each tank so that the sample(s) for each tank contains washwater from all parts of the tank. | |||||||
| 5.c. Notify PNS Project Management Team and Code 133 Inspector 24 hours prior to taking samples for bacteriological testing for each tank. Provide follow-up confirmation to Code 133 Inspector at the start of the shift of the day of the sample extraction. | |||||||
| 5.d. The Code 133 Inspector will observe the taking of samples for bacteriological testing for each tank. | |||||||
| 5.e. Contractor is to submit the samples to an independent testing laboratory for bacteriological testing to certify that sanitization/disinfection of each Sanitary Tank has been satisfactorily accomplished and is safe for personnel. The results of bacteriological testing for each tank shall be reported. | |||||||
| 5.f. Do not test for Total Coliform. Test for the presence of E.COLI or ENTEROCOCCI. Limits for CFU : |
5.f.(1): Level of E.COLI must be less than 235 CFU / 100 mL 5.f.(2): Level of ENTEROCOCCI must be less than 61 CFU / 100 mL.
| 5.g. Certified copies of the bacteriological test results shall be provided to the PNS Project Management Team, the C420 surveillance POC, the PNS Code 133 Inspector prior to inspection of each Sanitary Tank cleanliness by the PNS Code 133 Inspector. | ||||
| Inspection | 6.a. Acceptance or re-work/re-cleaning of a Sanitary Tank will be based on inspection by PNS C133 or, if assigned, C250 Inspector. | Per Project Management Team, C133 Inspector, or if assign, C250 Inspector | COR/TPOC inspections | Require re-work and possibly CDR |
| 6.b. Contractor shall be present at the Sanitary Tank during the PNS Code 133 inspection of the tank. | ||||
| 6.c. Rework/re-cleaning of a Sanitary Tank, to meet minimum acceptable standards, shall be at the Contractor’s expense. | ||||
| 6.d. PNS C133 Inspectors shall not be requested until the Contractor has all cleaning work complete for a Sanitary Tank. | ||||
| 6.d.(1): Contractor may request one inspection per tank per day. Notify the PNS Project Management Team when each tank is ready for inspection. | ||||
| 6.e. If a tank fails Code 133 inspection more than once, a penalty of 5% of total CLIN value will be charged to the vendor per failure. | ||||
| Removal of Anodes | 7. If anodes are present in a Sanitary Tank, the Contractor shall be required to remove the anodes prior to final cleaning. | Per Project Management Team, C133 Inspector, or if assign, C250 Inspector | COR/TPOC inspections | Require re-work and possibly CDR |
| 7.a. The anodes are approximately 3” W x 12” L x 1-1/4” thick and weigh approximately 12 pounds. | ||||
| 7.b. The anodes are bolted in place by 1/2” nuts and washers. | ||||
| 7.c. Anodes removed to facilitate work shall be turned over to PNS project personnel for proper handling, storage and disposal if necessary. | ||||
| 7.c.(1): Sanitary Tank No. 1: If anodes are installed in Sanitary Tank No. 1 there will be approximately 10 anodes. | ||||
| 7.c.(2): Sanitary Tank No. 2: If anodes are installed in Sanitary Tank No. 2 there will be approximately 19 anodes. | ||||
| 7.c.(3): 2.7.4. | Sanitary Tank No. 3: If anodes are installed in Sanitary Tank No. 3 there will be approximately 3 anodes. |
| Ratings | Descriptive Rating System |
| Exceptional | Performance meets all contractual requirements and exceeds many to the Government’s benefit. Problems are rare, and the contractor takes highly effective corrective action. For this SOW, an "Exceptional" rating would require flawless execution, proactive communication of potential issues with well-researched solutions, and delivery of all components and documentation ahead of schedule. |
| Very Good | Performance meets all contractual requirements and exceeds some to the Government’s benefit. Problems are infrequent, and the contractor demonstrates effective corrective action. For example, all technical requirements are met, and the contractor provides exceptionally clear and well-organized documentation that facilitates rapid government review. |
| Satisfactory | Performance meets all contractual requirements. This is the expected level of performance. Any non-conformances are minor, and the contractor's proposed corrective actions are timely and effective. The work is technically sound, and all deliverables are submitted on time. |
| Marginal | Performance does not meet some contractual requirements. A "Marginal" rating may be assigned if a significant non-conformance is identified (e.g., failure to meet a key test parameter like breakaway torque) or if required documentation is repeatedly late or incomplete. This reflects a need for increased government oversight. |
| Unsatisfactory | Performance does not meet most contractual requirements, and recovery is not likely in a timely manner. This rating would be assigned for multiple significant failures, a critical uncorrected deficiency, or a failure to provide required OQE, which jeopardizes the entire project. |