Exhibit B CDRL 001-004_Redacted.pdf
PDF 857 KB Posted
- Attached to
- Rental of One (1) Diesel Ultra High Pressure (UHP) Trailer 20K PSI/20 GPM and component parts
- Solicitation number
- N3904027Q3148
About this file
Contract Data Requirements List Summary
This document is a Contract Data Requirements List (CDRL) on DD Form 1423 for a 20K Ultra High Pressure equipment contract (N3904027Q3148) under Contract Line Item 1004. The contract involves four distinct data item requirements distributed to Code 420, Code 230, and Project TSZM, with one final copy and one reproducible copy of each deliverable required.
The four required data items are: (1) Equipment Technical Manual (Sanitized) with technical/operating instructions and Equipment Data Sheets, submitted once at delivery with updates as needed; (2) Contractor's Personnel Roster identifying emergency repair points of contact, submitted at equipment delivery with updates required within one day of any personnel changes; (3) Maintenance Support Plan detailing preventive maintenance schedules with comprehensive component service lists and frequencies, submitted within five days of contract award with updates as needed for new components or Original Equipment Manufacturer revisions; and (4) Maintenance Service Report documenting weekly technical field inspections, submitted within seven days of equipment delivery with subsequent reports due one day after each maintenance/inspection instance. All submissions except the technical manual shall be delivered through Wide Area Workflow (WAWF), with hard copies of the manual affixed to the machine in a waterproof case. The document was prepared by Dennis Ranson and approved by Amanda Kenney on February 2024 (updated March 26, 2026).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED (Updated 20260326)
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
8. EXHIBIT
B
C.CATEGORY:
1004 Drop □TM !ZiOTHERTMSS
D. SYSTEMnTEM I
E. CONTRACT/PR NO. F. CONTRACTOR
20K ULTRA HIGH PRESSURE N3904027Q3 l 48 NIA
1.DATA ITEM NO. 2. TITLE OF DATA ITEM 3.SUBTrn.E 001 EQUIPMENT TECHNICAL MANUAL (SANITIZED) TechnicaVOperating Instructions & EDS
4. AUTHORITY (Data Acq,isition Document No.) 15. CONlRACT REFERENCE DI-TMSS-81675A SOW Para. 6.5.l.
7.00250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION
DD REQUIRED !TIME 5DAC
8.APPCODE A 11.AS OFDATE 13. DATE OF SUBSEQUENT
See Block 16
SUBMISSION
NIA See Block 16
11. REMARKS
Block 11. As of Date shall be the most recent manual, instruction and Equii:ment Data Sheet (EDS).
Block 13. Date of Subsequent Submission shall be if any updates are made to manuals, instructions and
EDS.
Block 14. Distributim shall a hard copy be affixed to the machine in a waterproof case at delivery time and all electronic submissions shall be sul:mitted through Wide Area Workflow (WAWF).
G. PREPARED BY
Dennis Ranson
DD FORM 1423, FEB 2024
RE I. APPROVED BY
ENNI- Amanda Kemey
UNCLASSIFIED
PREVIOUS EDITION MAY BE USED.
&. REQUIRING OFFICE
Code230
14. DISTRIBUTION
a. ADDRESSEE
Code 420 Code230
15. TOTAL 0
J. SIGNATURE
KENNEY.AMAN
DA
b.COPIES Final
Reg Repro
I I
0 0 r
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
Page 1 of2
A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:
1004 B Drop □ TM !ZiOTHERMGMT
D. SYSTEM/ITEM
I
E. CONTRACT/PR NO. F. CONTRACTOR
20K UL1RA HIGH PRESSURE N3904027Q3 l 48 NIA
1.DATA ITEM NO. 2. TITLE OF DATA ITEM 3.SUBTrn.E 002 CONTR.AC'IOR'S PERSONNEL ROSTER Emergeo;y Repair Point of Contact
4. AUTHORITY (Data Acquistion Document No.) &. REQUIRING OF FICE DI- MGMT-81834A 15. CONlRACT REFERENCE
SOW Para. 6.52. Code 230, Project TSZM
7.00250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION
DD REQUIRED !TIME See Block 16
8.APPCODE A 11.AS OFDATE 13. DATE OF SUBSEQUENT
See Block 16
SUBMISSION
NIA See Block 16
11. REMARKS
Block 4. For DI-MGMT81834A, cmit2.l.j-n and p-s.
Block 11. As of Date shall be for date that personnel are assigned and provided for contract points of comact.
Block 12. Date of First Stmmission shall be the date of equipment delivery.
Block 13. Date of Subsequent Submission shall be required if a changes to the Contractor's POC s for this comact are made and shall be provided (1) day upon POC changes.
Block 14. Distribution shall be affixed to the machine in a a waterproof case and any electronic submissions shall be submitted through Wide Area Workfiow (WAWF).
G. PREPARED BY
Dennis Ranson
DD FORM 1423, FEB 2024
H. SIGNATURE I. APPROVED BY
RANSON.DENN!
- Amanda Kenney
UNCLASSIFIED
PREVIOUS EDITION MAY BE USED.
14. DISTRIBUTION
b.COPIES
a. ADDRESSEE Final
Reg Repro
Code420 1 Code230 1 Prqject TSZM 1
15. TOTAL 0 0 0
J. SIGNATURE
KENNE�.AMAN
DA.
17. PRICE GROUP
18. ESTIMATED
A. CONTRACT LINE ITEM NO.
8. EXHIBIT
B
C.CATEGORY:
1004 Drop □ TM !ZiOTHERILSS
D. SYSTEM/ITEM
I
E. CONTRACT/PR NO. F. CONTRACTOR
20K UL 1RA HIGH PRESSURE N3904027Q3 l 48 NIA
1.DATA ITEM NO. 2. TITLE OF DATA ITEM 3.SUBTrn.E 003 MA.IN1ENANCE SUPPORT PLAN Preventive Maintenance with Schedules
4. AUTHORITY (Data Acquistion Document No.) &. REQUIRING OFFICE DI-ILSS-81225 15. CONlRACT REFERENCE
SOW Para. 6.3.2. & 6.5.3. Code 230, Project TSZM
7.00250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION
DD REQUIRED lTIME 5DAC
8.APPCODE A 11.AS OFDATE 13. DATE OF SUBSEQUENT
SUBMISSION
NIA NIA See Block 16
11. REMARKS
Block 4. The routine Preventive Maintenance schedules for each piece of equip:nent shall include a comprehensive list of the components to be serviced as well as identifying the service frequency (e.g. all consumables to be rqiaced, bearing grease points, belt replacement I tensiooing, filta changes, refrigerant charge, oil changes, other lubrication, coolant refills, liquid top-offs, etc.).
Block 13. Subsequent Submission shall be required if any new oomponents are delivered or replaced, and if any updates to the preventive maintenance plan by the Original Equipment Manufacturer.
Block 14. Distribution shall be affJXed to the machine in a waterproof case and any electronic submissions shall be submitted through Wide Area Wcrkflow (WA WF).
G. PREPARED BY
Dennis Ranson
DD FORM 1423, FEB 2024
RE I. APPROVED BY
ENNl- Amanda Kenney
UNCLASSIFIED
PREVIOUS EDITION MAY BE USED.
14. DISTRIBUTION
b.COPIES
a. ADDRESSEE Final
Reg Repro
Code 420 1 Code230 1 Project TSZM 1
15. TOTAL 0 0 0
J. SIGNATURE
KENNEY.AMAN
... DA
17. PRICE GROUP
18. ESTIMATED
A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY:
1004 B Drop □ TM !ZiOTHERMGMT
D. SYSTEM/ITEM
I
E. CONTRACT/PR NO. F. CONTRACTOR
20K UL1RA HIGH PRESSURE N3904027Q3 l 48 NIA
1.DATA ITEM NO. 2. TITLE OF DATA ITEM 3.SUBTrn.E 004 MAINTENANCE SERVICE REPORT Technical Field Inspection Report
4. AUTHORITY (Data Acquistion Document No.) &. REQUIRING OFFICE DI-MGMT-80995A 15. CONlRACT REFERENCE
SOW Para. 6.3.2., 6.3.3. & 6.5.4. Code 230, Project 1SZM
7.00250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION
DD
REQUIRED WEEKLY See Block 16
8.APPCODE A 11.AS OFDATE 13. DATE OF SUBSEQUENT
See Block 16
SUBMISSION
NIA See Block 16
11. REMARKS
See Block 11. As of Date shall be the date of the weekly inspection(s) and any preventive maintenance.
Block 12. Date of First Sulmission shall be seven (7) days after delivery of equipnent and components.
Block 13. Subsequent Submission shall be required one (1) day after each instanoe the maintenance/ inspection is performed
Block 14. Send all electronic submissions through Wide Area Workflow (WAWF).
G. PREPARED BY
Dennis Ranson
DD FORM 1423, FEB 2024
H. SIGNATURE I. APPROVED BY
RANSON.DENN!
,,JIIIIIIIII Amanda Kenney
UNCLASSIFIED
PREVIOUS EDITION MAY BE USED.
14. DISTRIBUTION
b.COPIES
a. ADDRESSEE Final
Reg Repro
Code 420 1 Code 230 1 Project TSZM 1
15. TOTAL 0 0 0
J. SIGNATURE
KENNEY.AMAN-
DA
17. PRICE GROUP
18. ESTIMATED
File details come from the government source that posted it. Updated .