This is a Vendor Compliance Checklist that outlines technical and operational requirements for a diesel-powered Ultra High Pressure (UHP) waterblast system rental supporting Portsmouth Naval Shipyard in Kittery, Maine. The checklist specifies that vendors must deliver one trailer-mounted UHP unit capable of operating at 0-20,000 PSI with a 20 GPM flow rate, powered by a single diesel engine with a properly sized fuel tank and secondary containment meeting UL-142 or 110% capacity standards. The system must include six 50-foot hoses rated for 20,000 PSI working pressure, three 24K PSI burst discs, three 28K PSI burst discs, and an emergency stop system with up to 1,500 feet of heavy-duty cabling and a protective cover.
The contractor is responsible for providing comprehensive support throughout the rental period (15 weeks from January 4, 2027, to April 18, 2027, with a 4-week option through May 16, 2027). Required deliverables include start-up and commissioning services, operator training, preventative maintenance scheduling, weekly inspections, qualified service technician support, all consumables (oil, filters, coolant, lubricant), technical documentation in waterproof cases, equipment data sheets, and 24/7 emergency repair contact information. All equipment must be newly manufactured or completely refurbished within ten years, conform to NEMA 3 electrical standards for outdoor use, meet NEC and ASME codes, include dual rupture discs at 120% and 140% of operating pressure, and feature an operator control panel with automatic shutdown capabilities for low inlet water pressure and low pump oil conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
table
| Category | Requirement | SOW Reference | Compliant (Yes/No) | Explanation (If No) |
| Component List | Qty 1: Trailer mounted UHP waterblast unit | 3.1, PC-01 | ||
| Qty 6: Hoses, 50ft, 20K WP | 3.1, PC-02 | |||
| Qty 3: Burst Discs 24K PSI | 3.1, PC-03 | |||
| Qty 3: Burst Discs 28K PSI | 3.1, PC-04 | |||
| Qty 1: E-stop and cabling | 3.1, PC-05 | |||
| UHP System | Diesel Powered | 3.2 | ||
| Operating Pressure: 0-20,000 PSI | 3.2 | |||
| Flow Rate: 20 GPM | 3.2 | |||
| Powered by a single diesel engine with a fuel tank sized to run the equipment. | 3.2 | |||
| Diesel tanks must be either of double wall construction (UL-142) or have approved secondary containment of 110% capacity. | 3.2 | |||
| Operator control panel with warning displays and automatic shutdown for low inlet water pressure and low pump oil. | 3.2 | |||
| Emergency stop button that stops all functions and relieves system pressure to 0 PSI within 5 seconds. | 3.2 | |||
| Inlet water shall pass through a booster pump and be filtered. | 3.2 | |||
| Pressure gauges on inlet and outlet side of the filter. | 3.2 | |||
| Pre-wired for and compatible with a Remote Emergency Stop (E-stop) Switch. | 3.2 | |||
| Contractor to provide & route up to 1500 FT of E-stop cable (heavy-duty, type SO or equivalent). | 3.2 | |||
| E-stop switch equipped with protective Plexiglas or acrylic style clear cover. | 3.2 | |||
| Physical Dimension | Trailer Mounted. | 3.3 | ||
| Safety Controls | Pump shall have two rupture discs: one at 120% and one at 140% of operating pressure. | 3.4 | ||
| Hose Requirements | Contractor to make all hose connections on delivery. | 3.5 | ||
| All hoses must have safety cables (Safety Restraint Devices) installed. | 3.5 | |||
| All system components must be properly rated for the intended operating pressure. | 3.5 | |||
| Provide all adequately sized hoses, elbows, hardware, and fittings for initial startup and operation. | 3.5 | |||
| Services | Provide start-up and commissioning services (energizing, pressurizing, leak check, setpoint adjustment, etc.). | 3.6 | ||
| Provide training to Government operators in equipment function, control, and alarms. | 3.6, 6.4 | |||
| Construction | Machines shall meet State and federal requirements (NEC, ASME). | 4.1 | ||
| Modular, compact, portable by crane, and ruggedly constructed for a marine industrial environment. | 4.1 | |||
| Newly manufactured / completely refurbished and factory tested within ten (10) years. | 4.1 | |||
| Electrical | Components conform to NEMA 3 standard for unsheltered outdoor use. | 4.2 | ||
| Requires only one type/source of electrical power (460VAC or 120VAC). | 4.2 | |||
| Electrical power type (voltage & amperage) clearly indicated on the equipment. | 4.2 | |||
| Contractor Resp. | Install any required State approved safety features with applicable State certification. | 6.2 | ||
| Maintenance | Responsible for all preventative maintenance (except daily liquid level checks), weekly inspections, and repairs. | 6.2, 6.3 | ||
| Provide oil, filters, coolant, and lubricant for the engine during the rental period. | 6.2 | |||
| Provide a Preventative Maintenance (PM) schedule. | 6.3.2 | |||
| Provide a qualified service technician for weekly inspections and repairs. | 6.3.2, 6.3.3, 6.3.4 | |||
| Deliverables | Provide Technical Instructions (Operations & Maintenance Manuals, Schematics, etc.) in a waterproof case on each machine. | 6.5 | ||
| Provide points of contact with telephone numbers for 24/7 emergency repairs. | 6.5 | |||
| Provide Equipment Data Sheet (EDS). | 6.5 | |||
| Provide Preventative Maintenance Schedules | 6.5 | |||
| Provide Technical Inspection Reports | 6.5. |