N3904027Q0117_LSJ_Redacted.pdf
PDF 268 KB Posted
- Attached to
- Brand Name HEISE MODEL CME PRESSURE GAGE
- Solicitation number
- N3904027Q0117
About this file
This is a Justification for Use of Other Than Full and Open Competition for a procurement under the Simplified Acquisition Threshold.
The requirement is for six (6) Heise Model CME pressure gages with 0-1500 PSIG range, 8-1/2 inch diameter dial, 5 PSI maximum graduation increments, and specific technical specifications including ASME B40.100-2013 Grade 4A accuracy, stainless steel components, and oxygen cleanliness at Level IV per ASME standards. The procurement is justified as a brand name sole source acquisition based on Nuclear Test Equipment Catalog (NTEC), NAVSEA Technical Manual, and NAVSEA Corporate Test Equipment Standardization Effort requirements. The equipment is used in nuclear contaminated applications requiring Resource Conservation Recovery Act (RCRA) compliance and vendor-specific compatibility warranties. The justification explains that using a different part would require the shipyard to request Contracted Design Agency (CDA) approval for interchangeability, a process that typically takes 6 months to 1 year, and would require additional testing and technical documentation updates with significant time, administrative effort, and financial impact without meaningful cost savings through competition.
The justification was certified by Matthew R. Wurtz on October 20, 2026, and approved by Contracting Officer Victoria MacLellan on the same date. The procurement is authorized under FAR 13.106-1(b)(1)(i) for simplified acquisition threshold purchases.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(This is only applicable to acquisitions under the Simplified Acquisition Threshold. Acquisition using FAR Subpart 13.5 shall follow the special documentation requirements at FAR 13.501.)
USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION
UNDER THE SIMPLIFIED ACQUISITION THRESHOLD
I. BACKGROUND:
1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
DD-1348: 6211E410 SIX (6) 0-1500 PSIG PRESSURE GAGES
HEISE MODEL CME
0-1500 PSIG RANGE
8-1/2 INCH DIAMETER DIAL
5 PSI (MAX) GRADUATION INCREMENTS
SOLID FRONT CASE WITH BLOW-OUT REAR COVER
LAMINATED SAFETY GLASS WINDOW
SLOTTED LINK MOVEMENT PROTECTION AGAINST SUDDEN PRESSURE
DECREASE
STAINLESS STEEL BOURDON TUBE
WORKING MEDIUM: WATER
9/16-18UNF-3A STAINLESS STEEL MALE STRAIGHT THREAD O-RING
SEAL BOTTOM (6 O’CLOCK POSITION) CONNECTION PER ASHCROFT
DWG 70A100 & MIL-G-18997E
ASME B40.100-2013, GRADE 4A ACCURACY
ACCURACY TESTING SHALL INCLUDE THE FOLLOWING TEST POINTS
(AT A MINIMUM):
ASCENDING: 10%, 20%, 30%, 40%, 50%, 60%, 70%, 80%, 90%, AND
100% OF FULL SCALE
DESCENDING: 90%, 80%, 70%, 60%, 50%, 40%, 30%, 20%, AND 10% OF
FULL SCALE; AND ZERO
OXYGEN CLEANLINESS AND MARKING PER ASME B40.100-2013, LEVEL
IV CLEANLINESS; MERCURY-FREE
THE WARRANTY IS FOR THE GAGES TO PERFORM ACCORDING TO THE
HEISE GAGE SPECIFICATIONS.
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN
COMPETITION IS BASED ON THE FOLLOWING (select all that apply):
A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):
1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.
Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government’s need.
2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.
Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
OR
Identify the distributor(s)/authorized technical representative(s) for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank).
3. OTHER REASONS. Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.
B. X BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer.
A SPECIFIC MANUFACTURER MODEL IS REQUIRED DUE TO NUCLEAR
TEST EQUIPMENT CATALOG (NTEC), NAVSEA TECHNICAL MANUAL
AND NAVSEA CORPORATE TEST EQUIPMENT STANDARDIZTION
EFFORT REQUIREMENTS. THIS EQUIPMENT IS USED IN NUCLEAR
CONTAMINATED APPLICATIONS AND REQUIRES RESOURCE
CONSERVATION RECOVERY ACT (RCRA) COMPLIANCE IN ADDITION TO
VENDOR SPECIFIC COMPATIBILITY WARRANTEES.
A DIFFERENT PART WOULD REQUIRE THE SHIPYARD TO REQUEST
PERMISSION TO USE THE NEW PART FROM THE CONTRACTED DESIGN
AGENCY (CDA). THE CDA WILL MAKE THE TECHNICAL DECISION IF
THE PART IS INTERCHANGEABLE WITH THE PART LISTED ON THE
DRAWING. THIS PROCEDURE CAN TAKE BETWEEN 6 MONTHS TO A
YEAR TO RECEIVE AN ANSWER. IN ORDER TO CONSIDER AN NEW
PRODUCT THE SAME TESTING WOULD BE REQUIRED AND IF THE ITEM
WAS ACCEPTABLE WOULD HAVE TO BE ADDED INTO CURRENT
TECHNICAL DOCUMENTATION AS AN ACCEPTABLE ALTERNATIVE.
THIS PROCESS WOULD TAKE A SIGNIFICANT AMOUNT OF TIME,
ADMINISTRATIVE EFFORTS, AND FINANCIAL IMPACT, NONE OF WHICH
WOULD RESULT IN ANY SIGNIFICANT RELIZED COST SAVINGS
THROUGH COMPETITION.
C. ___UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.
Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:
1. Date on which the requirement was first identified:
2. Required delivery date/period of performance:
3. Explanation of why delivery/commencement of services by the date mentioned above is required: Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.
4. If appropriate, include any additional pertinent information:
IV. CERTIFICATIONS/APPROVALS:
A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
File details come from the government source that posted it. Updated .