N3904026Q5729 Request For Quote.pdf
PDF 788 KB Posted
- Solicitation number
- N3904026Q5729
About this file
This is a Request for Quote (RFQ) for maintenance, repair, and calibration services for Hexagon Manufacturing Intelligence precision measurement equipment.
Portsmouth Naval Shipyard seeks a firm-fixed-price contractor to provide one-year maintenance and calibration services (July 27, 2026–July 26, 2027) for three Leica laser measurement units: a Laser Tracker Unit, AS1 Scanner Attachment Unit, and T-Probe Attachment Unit. The contractor must be a current certified/accredited vendor with Original Equipment Manufacturer (OEM) certification to perform calibration services per NAVSEA Metrology and Calibration (METCAL) Technical Warrant Holder requirements. Calibration procedures must comply with ANSI/NCSL Z540.1, ANSI/NCSL Z540.3, ISO 17025, or NAVSEA 044734B standards and achieve a minimum Test Accuracy Ratio of 4:1 or Test Uncertainty Ratio of 4:1. The contractor shall deliver an OEM calibration report (CDRL A001) and a Condition Found Report (CDRL A002) documenting any repairs identified during calibration. Services include return freight/shipping responsibility, with work performed at Hexagon's facility in Novi, Michigan (46444 Hexagon Way, MI 48377). Portsmouth Naval Shipyard Calibration Laboratory will verify OEM specifications are maintained and perform final inspection/acceptance. Quotes are due by July 23, 2026, at 12:00 PM ET and must include delivered prices, availability, labor rates/breakdown, applicable procedures, and technical information. Payment terms are firm-fixed-price for all line items (0001–0003). The Government will award to the responsible offeror whose offer is most advantageous considering price and technical acceptability. All quotes must be submitted via email and include SAM registration confirmation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS IS NOT AN ORDER
PLEASE PROVIDE DELIVERED PRICES, AVAILABILITY, AND PRICE SOURCE WITH QUOTE
REFERENCE # N3904026Q5729 DUE DATE: 07/23/2026 12:00 PM ET
From: Portsmouth Naval Shipyard Your company info:
Sheldon.j.desmaratti.civ@us.navy.mil Name:
Contracting, Code 410 POC:
Kittery, ME 03904 (P) PHONE: 207-4381341 Email:
Cage Code:
BUSINESS SIZE (circle one): SMALL LARGE PAYMENT TERMS ______%______DAYS
MOBILIZATION TIME: _________ARO PRICES DERIVED FROM (CHECK ONE)
F.O.B. DESTINATION, Y____N____ ___COMMERCIAL PRICE LIST DATED
IF NO, SHIPPING COST__________. ___INTERNAL PRICE LIST DATED
___OTHER ( PLEASE EXPLAIN )
Please indicate your preferred payment method by checking one of the options below. Payment options available are WAWF and
GCPC: Government Commercial Purchase Card (up to $100,000). Please ensure that you register for WAWF
(www.wawftraining.com) GCPC_____ WAWF (Wide Area Workflow) _____
*Please note that purchase card orders are not paid up front. Once material is received, a Government cardholder may be contacted for purchase card information.
_X__ If checked, to be awarded on an “All or None” basis, and CPARS evaluation procedures apply.
YOUR SIGNATURE___________________________________DATE________________________
ITEM ELIN
Description QTY UNIT
PRICE
TOTAL
Maintenance, Repair, and Calibration Services -Hexagon Manufacturing
Intelligence, LLC., Leica Laser
Tracker Unit; Quantity one.
-Hexagon Manufacturing Intelligence, LLC., Leica AS1
Scanner Attachment Unit; Quantity one.
-Hexagon Manufacturing Intelligence, LLC., Leica T-Probe
Attachment Unit; Quantity one.
1 Job
Exhibit A CDRL 1 Job
A001 CALIBRATION AND
MEASUREMENTS
REQUIREMENTS SUM in accordance with SOW Para. 3.5 http://www.wawftraining.com/ http://www.wawftraining.com/
N3904026Q5729
A002
CONDITION FOUND REPORT in accordance with SOW Para. 7.2
0003 Return Freight/Shipping Contractor shall be responsible for shipping the equipment listed in paragraph 1.3
Required Delivery Date/Period of Performance: 07/27/26-07/26/27 Place of Performance: 46444 Hexagon Way, Novi, Michigan 48377
• For evaluation purposes, please provide any applicable procedures and technical information. If no information is provided, your quotation may be determined to be unresponsive.
• Awards may be made based on adherence to the schedule and/or soonest mobilization.
• Please provide published commercial labor rates and breakdown of total prices, if applicable, for Price Justification purposes.
• See Below for Detailed Statement of Work and Applicable Clauses.
METHOD OF PROPOSAL SUBMISSION:
Offers shall be emailed. All responsible sources may submit a quote which shall be considered by the agency. System for Award
Management (SAM): Vendors must be registered in the SAM database to be considered for award. Registration is free and can be completed on-line at http://www.sam.gov/.
All quotes should include this form filled out in its entirety (highlighted yellow fields are required).
http://www.sam.gov/ http://www.sam.gov/
STATEMENT OF WORK
STATEMENT OF WORK
1. SCOPE
1.1. Title: The maintenance, repair, and calibration service requirements for one Test, Measurement, and
Diagnostic Equipment (TMDE) listed under paragraph 1.3. Identification.
1.2. Location of Work: Maintenance, repair, and calibration services shall be performed at the Contractor’s facility.
1.3. Identification:
1.3.1. Hexagon Manufacturing Intelligence, LLC., Leica Laser Tracker Unit; Quantity one.
1.1.1. Hexagon Manufacturing Intelligence, LLC., Leica AS1 Scanner Attachment Unit; Quantity one.
1.3.2. Hexagon Manufacturing Intelligence, LLC., Leica T-Probe Attachment Unit; Quantity one.
2. REFERENCES
2.1. ANSI/NCSL Z540.1 (1994), ANSI/NCSL Z540.3 (2006), ISO 17025, or NAVSEA 044734B by A2LA, ANAB 17025, IAS, LAB, NVLAP, PERRY JOHNSON, or JNAC.
2.2. U.S. National Standards, Natural Physical Constants, Ratio Type Calibrations, Consensus Standards, or
National Standards of other countries which are correlated to U.S. National Standards.
2.3. NAVSEA Letter Serial Numbers 04RM/4391 and 04RM/4392 dated 24 Feb 2012
3. REQUIREMENTS
3.1. The Contractor shall be a current certified/accredited vendor with the Original Equipment Manufacturer
(OEM) to evidence calibration services set for by the NAVSEA Metrology and Calibration (METCAL)
Technical Warrant Holder (TWH) are met (as directed in NAVSEA Letter Serial Numbers 04RM/4391 and
04RM/4392 dated 24 Feb 2012).
3.2. The Contractor shall be current with their certification/accreditation to reference ANSI/NCSL Z540.1 (1994), ANSI/NCSL Z540.3 (2006), ISO 17025, or NAVSEA 044734B by A2LA, ANAB 17025, IAS, LAB, NVLAP, PERRY JOHNSON, or JNAC at the time of calibration.
3.3. The Contractor's Original Equipment Manufacturer (OEM) certification/accreditation shall encompass the measurement parameters, ranges, and accuracies required for the calibration services specified herein.
3.4. Procedures used by the OEM to calibrate the OEM shall:
3.4.1. Provide a minimum Test Accuracy Ratio (TAR) of 4:1, or a Test Uncertainty Ratio (TUR) equal to or greater than 4:1, or a Probability of False Accept (PFA) not to exceed 2%.
3.4.2. Ensure measurement traceability through an unbroken chain of calibrations to accepted reference (i.e., U.S. National Standards, Natural Physical Constants, Ratio Type Calibrations, Consensus Standards, or
National Standards of other countries which are correlated to U.S. National Standards).
3.5. The Contractor shall provide an OEM report and certification of calibration. (CDRL A001)
4. RESPONSIBILITITES
4.1. Portsmouth Naval Shipyard Calibration Laboratory, prior to final acceptance, will review the calibration/repair documentation provided with the returned TMDE for compliance to this Statement of Work.
4.2. PNSY Calibration Laboratory will perform a calibration/inspection on the TMDE to ensure Original
Equipment Manufacturer (OEM) specifications have been maintained or re-established.
4.3. The maintenance, repair, or calibration service will be considered noncompliant if the Portsmouth Naval
Shipyard Calibration Laboratory finds any unauthorized deviation to this Statement of Work. An
“unauthorized deviation” is considered any deviation that was not specifically allowed by the written consent of the Portsmouth Naval Shipyard. The requirements shall contain a detailed description of work and material required to meet the minimum needs of the Government.
5. DELIVERY / RETURN
5.1. Portsmouth Naval Shipyard (PNSY) Calibration Laboratory representative will be responsible for shipping the equipment listed in paragraph 1.3. to the OEM when any maintenance, repair, and calibration is required.
5.2. The Contractor shall be responsible for shipping the equipment listed in paragraph 1.3. as they are completed with their associated reports to PNSY Calibration Laboratory representative.
6. General
6.1. Prior to final acceptance, the Portsmouth Naval Shipyard Calibration Laboratory will review the calibration/repair documentation provided with the returned TMDE for compliance to this Statement of Work.
PNSY Calibration Laboratory will also perform a calibration and inspection of the TMDE to ensure that the
OEM specifications have been maintained or re-established.
6.2. The maintenance, repair, or calibration service shall be considered non-compliant if the PNSY Calibration
Laboratory finds any unauthorized deviation to this SOW. An unauthorized deviation is considered any deviation that was not specifically allowed by the written consent of PNSY.
7. OVER AND ABOVE WORK
7.1. In addition to the scheduled calibration, the Contractor shall provide over and above repair services if it is identified that current issues with equipment exist that impact the equipment being calibrated to paragraph
3.0. In accordance with DFARS 252.217-7028, the Contractor and the Contracting Officer shall negotiate specific procedures for Government administration and Contractor performance of over and above work requests. During the calibration of the equipment identified in paragraph 1.3, the Contractor is to notify the
Contracting Officer of any necessary repairs that are required to maintain the operability of the equipment or to ensure the calibration of the equipment can be completed to the standards of paragraph 3.0.
7.2. If any components or repairs are identified during the calibration process, the Contractor shall submit a
Condition Found Report (CDRL A002) to the Contracting Officer. The report shall contain data on the repairs required, the specific location of the repair, and the estimated labor hours, material, and time required to correct the repair. Data shall be sufficient to satisfy contract requirements and obtain the authorization of the
Contracting Officer to perform the proposed work.
7.3. Upon receipt of the work request documentation required in paragraph 7.2, the Contracting Officer will review the work request to verify that the work is necessary and not covered under any other line items covered on the contract. The Contracting Officer will verify that the proposed corrective actions are appropriate and authorize the over and above work.
7.4. The Contractor shall not commence over and above work until authorized by the Contracting Officer.
******* END OF REQUEST FOR QUOTE *******
Section A - Solicitation/Contract Form
Hexagon Leica Maintenance and Calibration
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Additional Regulation or Supplemental Clauses Incorporated by Full Text
B-232-H005 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--ALTERNATE I (Oct 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or
"Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost and Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive
Fee" clause, as applicable. Fee paid per hour shall be based on total fee dollars divided by total hours to be provided. Total fee(s) paid to the
Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.
(End of Text)
Section C - Description/Specifications/Statement of Work
Requirements
Hexagon Leica Maintenance and Calibration for Organization
Additional Regulation or Supplemental Clauses Incorporated by Full Text
C-202-H001 ADDITIONAL DEFINITIONS--BASIC (Oct 2018)
(a) Department means the Department of the Navy.
(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal
Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the
Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification
Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(Endof Text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (Oct 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained.
These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as "protected information". File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
(End of Text)
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019) (Jan 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the
Government any liability it would not have had in the absence of such approval.
(End of Text)
C-212-W002 COMMERCIAL SUPPLIER AGREEMENTS (NAVSEA) (MAR 2019) (Mar 2019)
(a) Commercial Supplier Agreement means End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement.
(b) Any Commercial Supplier Agreement must be provided in full text as part of a quote or offer without hyperlinks.
(c) The contract/order Schedule and Federal Acquisition Regulation (FAR) 52.212-4, Contract Terms and Conditions-
Commercial Items, shall take precedence over any conflicting provisions in a Commercial Supplier Agreement.
(d) If any requirement in the Commercial Supplier Agreement conflicts with Federal law or regulations (see FAR 12.212(a)), the following shall apply:
(i) Any such requirement is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such requirement by virtue of it appearing in the Commercial Supplier Agreement. If the Commercial Supplier Agreement is invoked through an "I agree" click box or other comparable mechanism (e.g., "click-wrap" or "browse-wrap" agreements), execution does not bind the Government or any Government authorized end user to such requirement.
(iii) Any such requirement is deemed to be stricken from the Commercial Supplier Agreement.
(e) Automatic renewals. License Agreements will expire at end of the term identified in the Purchase Order/Contract.
Automatic renewals are not permitted and any such provision is void.
(f) Changes to the Commercial Supplier Agreement. Unilateral changes of the Commercial Supplier Agreement are impermissible and any requirement authorizing such changes is unenforceable. Changes must be in writing and executed by both parties to be effective.
(g) Third Part License (Embedded Software).
(i) The Contractor agrees that it has obtained all necessary licenses for the Government for any third party materials
(including without limitation all Open Source licenses) provided within the product.
(ii) Contractor agrees that it complies with and shall continue to comply with all of its obligations under Third Party
Licenses (including without limitation all Open Source licenses) associated with any third party materials provided within each product.
(iii) To the extent that the Government's use of the software products licensed herein is in compliance with the Contractor's
Commercial Supplier Agreement, the Government's use will also be in compliance with any Third Party Licenses.
(h) Audits. In lieu of any audit provisions in the Commercial Supplier Agreement, the Government agrees that, no more than once every twelve (12) months or within a reasonable time after a transfer, the Contractor shall, upon reasonable notice, have the right to require that the Government conduct an internal audit to ascertain and verify the number of licenses in use and to verify that the Government's use of the product is in conformity with this Agreement. The Government is not required to use any tools provided by the Contractor to conduct the audit and shall not be required to pay for any tools provided by the Contractor to conduct the audit. The results of any such audit shall be kept confidential.
If verification discloses that the Government's use is not in conformity with this Agreement, the Government agrees to resolve any noncompliance by either removing or correcting the unlicensed installation and use of the software identified by the audit as not in conformity with this Agreement.
(i) Confidentiality. Commercial Supplier Agreements' terms and the final contract pricing may not be deemed confidential.
Other marked confidential information will be appropriately guarded.
(j) Assignment. The Government shall have the right, without the prior written consent of the Contractor or its authorized resellers, to assign, reassign, or transfer software licenses among Government employees or the Government's rights in the
Contractor's product to any governmental organization that is managed, operated, or controlled by the Government.
Such authorization includes sublicensing, and assignment or transfer among or between authorized users. In the event authorized users are reorganized or restructured such that their responsibilities and operations are transferred to another government agency, the agency shall have the right to assign the affected program licenses to a successor agency. The licensed agency and the successor agency agree to be bound to the Commercial Supplier Agreement as modified. The transferee shall be bound by the license metrics and limitations in this license. Government shall complete any documentation required by the
Contractor to facilitate the transfer of this license, and continuation of support shall be the responsibility of the transferee.
For the avoidance of doubt, any assignment or transfer of licenses of the Contractor's products is also subject to all other terms of the Commercial Supplier Agreement, as well as the Contractor's policies governing product dependencies and version compatibility. Reassignment does not require that the license be under maintenance or support in order to execute a transfer.
(k) Litigation. Any requirement insisting that the commercial supplier or licensor control any litigation arising from the government's use of the contractor's supplies or services is deleted and unenforceable.
(l) Equitable Remedies. Equitable remedies, injunctive relief, and binding arbitration requirements shall not be enforced unless explicitly authorized by agency guidance or statute.
(m) Venue. Any claim or dispute shall be resolved under the Contract Disputes Act and FAR 52.233-1. The forum for resolution of disputes and applicable statutes of limitation shall be governed by federal law.
(n) Applicable law. In accordance with FAR 52.233-4, United States law shall apply to resolve any claim of breach of this contract and such actions shall be handled in the applicable Federal court of jurisdiction.
C-217-H005 GROWTH AND NEW WORK (NAVSEA) (JAN 2019) (Jan 2019)
(a) The Contractor is required to notify the Contracting Officer via email regarding growth and new work within 30 days of discovery:
(1) of any apparent errors or omissions in the contract (SF 33, specifications, drawings, etc.); and,
(2) of any/all conflicts between the contract package and actual conditions observed during ship check(s) and/or contract execution.
(b) Growth work is synonymous with over and above work, which is described in DFARS 252.217-7028, Over and Above
Work and it provides the process for adjudication.
(c) New work is distinguished from over and above work and is outside the scope of the competitively procured requirement. New work will be approved in accordance with FAR Part 6 and associated policies and procedures.
(d) The Government will NOT negotiate modifications to increase the contract price to address errors or omissions to the contract package which were reasonably apparent to the contractor prior to proposal submission.
(End of Text)
C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019) (Mar 2019)
(a) Definitions. As used in this text:
Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and
(iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.
Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.
Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.
Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.
Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.
Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.
(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.
(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).
(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and
Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display
(LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen. No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the LCD screen and seal it in plastic following any evidence that the backlight failed.
(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear Powered Submarine
Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.
(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication 0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair.
Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.
(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination. The existence of external mercury contamination can be determined following MIL-STD-2041D entitled Control of Detrimental Materials.
(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.
(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV Manual (OPNAV
M5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.
(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL-DPC-020/077-2).
For systems covered by the NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear
Propulsion Plant Maintenance and Construction, submit the risk assessment and waiver request, if required to Nuclear
Propulsion (NAVSEA 08).
(c) In all cases where mercury or a mercury compound has contacted hardware surfaces required to be mercury-free the Contractor shall immediately provide a report to the NAVSEA Dry Environmental Systems and Hazardous Materials (NAVSEA 05P5) via the cognizant contract administration safety office. Reports concerning systems covered by NAVSEA Manual 0989064-3000 must include NAVSEA Nuclear Propulsion Directorate (SEA 08) in the distribution. Reports must be in letter form and include the date and details of the contact, the surfaces contacted, the recovery actions taken, and the status of the affected surfaces.
(End of Text)
C-223-N002 RESTRICTIONS ON USE OF YELLOW MATERIAL (NAVSEA) (OCT 2018) (Oct 2018)
Yellow colored items are of special significance within the Shipyard and are subject to strict controls. Accordingly, contractors shall not use yellow or orange-yellow colored materials for the following purposes: protective clothing, hoods, sheeting, tarpaulins, polyethylene bottles or other containers, tapes, bags, banding, identification marks on tools, boundary markers, ribbons, vent ducts, etc. Contractor generated yellow colored waste shall be disposed of by the Contractor off-yard. Shipyard refuse containers shall not be used for disposal of yellow colored waste materials. Yellow colored contract generated debris shall be bagged in non-translucent containers, and promptly removed from the Shipyard.
(End of Text)
C-223-W002 ON-SITE SAFETY REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)
(a) The contractor shall ensure that each contractor employee reads any necessary safety documents within 30 days of commencing performance at any Government facility. Required safety documents can be obtained from the respective safety office. Contractors shall notify the Safety office points of contact below to report completion of the required training via email. The email shall include the contractor employee's name, work site, and contract number.
(b) It is expected that contractor employees will have received training from their employer on hazards associated with the areas in which they will be working and know what to do in order to protect themselves. Contractors are required to adhere to the requirements of 29 CFR 1910, 29 CFR 1926 and applicable state and local requirements while in Government spaces. The contractor shall ensure that all on-site contractor work at the Government facility is in accordance with any local safety instructions as provided via the COR. The contractor shall report all work-related injuries/illnesses that occurred while working at the Government site to the COR.
(c) Contractors whose employees perform work within Government spaces in excess of 1000 hours per calendar quarter during a calendar year shall submit the data elements on OSHA Form 300A, Summary of Work Related Injuries and Illnesses, for those employees to the safety office , via the COR by 15 January for the previous calendar year, even if no work related injuries or illnesses occurred. If a contractor's injury/illness rates are above the Bureau of Labor Statistics industry standards, a safety assessment may be performed by the Safety Office to determine if any administrative or engineering controls can be utilized to prevent further injuries/illnesses, or if any additional Personal Protective Equipment or training will be required.
(d) Any contractor employee exhibiting unsafe behavior may be removed from the Government site. Such removal shall not relieve the contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in
FAR 52.249-14.
(e) The Safety Office points of contacts are as follows:
Mark P. Duffy
(End of Text)
C-246-H001 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (OCT 2018) (Oct 2018)
The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software. Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.
(End of Text)
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018) (Dec 2018)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.
(End of Text)
Section D - Packaging and Marking Additional Regulation or Supplemental Clauses Incorporated by Full Text
D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020) (Dec 2020)
Item(s) 0001 The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for
Commercial Packing.
D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018) (Oct 2018)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.
(End of Text)
D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (FEB 2022) (Feb 2022)
(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM-D-3951-18 approved 1 May
2018, Standard Practice for Commercial Packing.
(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.
(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.
(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack (s) or shipping container by part number and/or national stock number.
(End of Text)
Section E - Inspection and Acceptance
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Source Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: N39040 CountryCode: USA
PORTSMOUTH NAVAL SHIPYARD GF
RECEIVING OFFICER, BUILDING 170
KITTERY, ME 03904-5000
UNITED STATES
James (Jim) Welsh, TECHNICAL poc Email: robert.w.wakefield.civ@us.navy.mil Telephone: 207-451-7303
Section F - Deliveries or Performance
Overall Contract Delivery Period
Government
Destination
Additional Regulation or Supplemental Clauses Incorporated by Full Text
INSTRUCTIONS FOR DELIVERIES TO THE PORTSMOUTH NAVAL SHIPYARD
F-247-N002 (Mar 2019)
(NAVSEA) (MAR 2019)
Mark shipping documents "Notify Receiving Officer, Portsmouth Naval Shipyard prior to arrival for delivery instructions. Telephone (207) 438-5521/5206.
"All drivers must either have a NCAC or Defense Biometric Identification System (DBIDS) card in addition they must have proof of US citizenship with them (birth certificate or US passport or state enhanced driver's license
[only issued by WA, NY, VT, & MI])." OVERSIZED CALL 24 HRS IN ADVANCE, (207) 438-5521. NO
ANIMALS ALLOWED ON BASE.
Except by special arrangement, shipments will be delivered only between the hours of 7:30 AM and 3:00 PM local time, Monday through Friday. (Federal Holidays excepted.)
(End of Text)
Section G - Contract Administration Data Property Administrator POC:
Chris Soloniewicz, PNSY Kittery, ME
O: (207) 438-3227 C: (207) 532-8043 Email: christian.j.soloniewicz.civ@us.navy.mil
DFARS Clauses Incorporated by Reference
Number Title Effective Alternate/ Date Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018
Delivery Schedule Job Daily 1 Calendar Days 1
1 Expected Shipments
Period of Performance From 27 Jul 2026 To
2027 26 Jul
1 Job Place of Performance Cage: 1WUK4 CountryCode: USA
HEXAGON MANUFACTURING INTELLIGENCE, INC.
250 Circuit Dr North Kingstown, RI 02852-7441
UNITED STATES
Jeff Elmer, Primary POC Email: jeffrey.elmer@hexagon.com Telephone: 7328326809
252.236-7000 Modification Proposals--Price Breakdown.
DFARS Clauses Incorporated by Full Text
Dec 1991
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving
Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training
Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in
WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Anthony Barker
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Anthony Barker
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N50082
Issue By DoDAAC N39040
Admin DoDAAC N39040
Inspect By DoDAAC N39040
Ship To Code N39040
Ship From Code N/A
Mark For Code N39040
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
usn.ncr.sea-01.mbx.wawf-hq-functional-mail-box@us.navy.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Additional Regulation or Supplemental Clauses Incorporated by Full Text
SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN
G-232-H005 (Jan 2019)
2019)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level.
Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost break down of other direct costs (ODCs), materials, and travel, by technical instruction
(TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Shouldthe subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting
Officer.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange
(EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and
Contracting Officer email notification as required herein.
(End of Text)
G-232-H002 H002 PAYMENT INSTRUCTIONS (NAVSEA) (FEB 2024) (Feb 2024)
Payment office allocation methods can be found in the table at DFARS PGI 204.7108(b)(2) (https://www.acq.osd.mil/dpap
/dars/pgi/pgi_htm/current/PGI204_71.htm#payment_instructions).
(End of text)
G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021) (Jul 2021)
(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting
Officer or his duly appointed representative will be returned to the contractor at the contractor's expense with no cost or liability to the U. S. Government.
(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.
(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave
(administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility.
Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company's established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting
Standards, and the Contractor's established accounting policy and procedures.
(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.
(f) The hours of operation are as follows:
AREA C920 FROM 27 JULY 2026 TO 26 JULY 2027
(g) All deliveries to the Receiving Officer, James (Jim) Welsh ,shall be made Monday through Friday from 06:00 AM [ to 04:30 PM , local time. Deliveries will not be accepted after 04:30 pm. No deliveries will be accepted on federal government holidays.
(End of Text)
GOVERNMENT CONTRACTADMINISTRATION POINTS-OF-CONTACT AND
G-242-H001 (Oct 2023)
RESPONSIBILITIES (NAVSEA) (OCT 2023)
(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.
(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.
(c) The points of contact are as follows:
(i) The Procuring Contracting Officer (PCO) is:
Name: Anthony Barker Address: Contracting, Code 400 Kittery, ME 03904 E-mail: anthony.j.barker24.civ@us.navy.mil
(ii) The Contract Specialist is:
Name: Sheldon J. Desmaratti Address: Contracting, Code 400 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
Kittery, ME 03904 Phone: 207-438-1341 E-mail: sheldon.j.desmaratti.civ@us.navy.mil
(d) The Contracting Officer's Representative (COR) is the contracting officer's appointed representative for technical matters.
The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.
The Contracting Officer's Representative (COR) is:
Name: Mark P. Duffy Address: Contracting, Code 400 Kittery, ME 03904 E-mail: mark.p.duffy.civ@us.navy.mil
(e) The Technical Point of Contact (TPOC) is the contracting officer's representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment
(GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.
The Technical Point of Contact (TPOC) is:
Name: James (Jim) Welsh Address: C920 Kittery, ME 03904
Phone: 207-438-1119 E-mail: robert.w.wakefield.civ@us.navy.mil
(f) The Authorized Ordering Person(s) for Per-Call Maintenance is responsible for issuing and maintaining records for any per-call orders for remedial maintenance placed under this contract.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .