This is a federal contracting justification memorandum for a single-source acquisition under the Simplified Acquisition Threshold. The procurement is for three (3) temporary power distribution panels manufactured by Power Temp Systems, Inc. (JML Docs: 5098V100, 5098V101, 5098V102) to support refueling operations at a new facility designated DD#2.

The justification for other-than-full-and-open competition is based on brand name requirements. The panels must match existing units deployed at the DD#1 facility to ensure compatibility with current infrastructure, support operational requirements for stud heating and welding operations, and enable emergent replacement capability between refueling complexes. The contracting officer determined that requiring matching panels is necessary to avoid considerable modifications to equipment layout and connections, and to minimize delays to critical path work. The technical representative certified the facts and representations as complete and accurate as of March 31, 2026, and the Contracting Officer approval section is present but unsigned in this document.

View the file

Other files

File Type Posted
N3904026Q5536 U00001 Combined Synopsis Solicitation.docx DOCX document
N3904026Q5536 Attachment 1 - TC.docx DOCX document
N3904026Q5536 Attachment 3 - OPSEC.pdf PDF
N3904026Q5536 Combined Synopsis Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(This is only applicable to acquisitions under the Simplified Acquisition Threshold. Acquisition using FAR Subpart 13.5 shall follow the special documentation requirements at FAR 13.501.)

USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION

UNDER THE SIMPLIFIED ACQUISITION THRESHOLD

I. BACKGROUND:

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

JML Docs: 5098V100, 5098V101, 5098V102

Manufacturer: Power Temp Systems, Inc.

This purchase is for (3) Temporary power distribution panels to support refueling operations.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION IS BASED ON THE FOLLOWING (select all that apply):

A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government’s need.

2. __ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

OR

Identify the distributor(s)/authorized technical representative(s) for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank).

3. _X_ OTHER REASONS.

B. _X_ BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer. The temporary power distribution panels to be used at the new DD#2 work facility will be similar units as used at DD#1. It was designed this way so that an emergent replacement could be used which could fit each complex if needed. The additional panels must be a match to the existing arrangement and be capable of connecting to the existing infrastructure. This is to ensure they are consistent between refueling complexes to support operational requirements for stud heating and welding operations, as well as to avoid considerable modifications to the layout and connections of existing equipment, and minimize any delays to critical path work.

C. ___UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.

Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified:

2. Required delivery date/period of performance:

3. Explanation of why delivery/commencement of services by the date mentioned above is required: Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.

4. If appropriate, include any additional pertinent information:

IV. CERTIFICATIONS/APPROVALS:

A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

3/31/26

Signature Name (Printed) / Phone # Date

B. Contracting Officer Approval:

Signature Name (Printed) / Phone # Date

File details come from the government source that posted it. Updated .