N3904026Q2982 Attachment 3- QASP.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
PNSY-Sanitary Tank Cleaning Federal contract opportunity
Solicitation number
N3904026Q2982
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for a sanitary tank cleaning contract at Portsmouth Naval Shipyard. The contract involves cleaning and sanitizing sanitary tanks aboard a US Submarine while in dry dock, with a performance period from March 3, 2026 to June 2, 2026. The QASP outlines detailed performance objectives, surveillance methods, and specific acceptance criteria for the contractor, including strict requirements for personal electronic device prohibitions, tank cleaning standards, disinfection processes, bacteriological testing, and waste disposal.

The plan includes rigorous performance standards with associated risk levels, ranging from low to high, and potential consequences for non-compliance such as corrective action reports, negative contractor performance assessments, work stoppages, financial penalties, and potential contract termination. Key performance requirements include maintaining zero tolerance for personal electronic devices, achieving specific cleanliness standards (SSPC-SP 1), conducting proper disinfection with precise chemical quantities, ensuring bacteriological test results meet EPA standards, and maintaining strict safety protocols including marine chemist certification, proper ventilation, and personal protective equipment usage.

View the file

Other files for this federal contract opportunity

Other files attached to PNSY-Sanitary Tank Cleaning, newest first.
File Type Posted
N3904026Q2982 Attachment 2- Wage Determination 2015-4011.pdf PDF
N3904026Q2982 Exhibit A.pdf PDF
N3904026Q2982 Attachment 1- OPSEC Encl 2_Redacted.pdf PDF
N3904026Q2982 Combined Synopsis Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

The contractor’s failure to comply with these requirements may result in but are not limited to:
1. If the Contractor fails to meet the performance standards, the COR/KO will issue a Contractor Deficiency Report (CDR) and/or a Corrective Action Request (CAR). The Contractor will be required to submit a corrective action plan within 7 days days outlining the steps that will be taken to address the deficiency and prevent recurrence.

2. Negative CPAR Ratings that can affect future awards

3. Contract Termination (as last resort) In extreme cases of persistent and significant failures.

Performance Objective/Requirement (From SOW Section)Method of SurveillanceFrequency of SurveillanceAcceptance CriteriaPerformance StandardIncentive/DisincentiveRisk Level (H/M/L)
2. PEDs ProhibitionVisual Observation, Unannounced Spot ChecksSporadicNo personal electronic devices with cameras are present on site or aboard the submarine. No PEDs of any kind present on submarines.Zero tolerance. No cameras or PEDs permittedPersonnel removed.H
2.3.2 No Damage to Tank StructureVisual InspectionAfter Cleaning, During PNS InspectionNo damage to underlying paint, tank structure, hangers, piping, hinges, TLI.Structure intact.Contractor responsible for repair.M
2.3.3 Cleanliness Standard SSPC-SP 1Visual InspectionDuring PNS InspectionTanks cleaned to SSPC-SP 1 standard. No loose wastes, grease film, or flaking paint.Acceptable visual appearanceRework at Contractor's expense.M
2.4.1 Notification of Disinfectant AdditionCommunication Verification24 hours prior to sanitizationEvidence of notification of PNS Project Management and Inspector.Timely notificationWork stoppage until proper notification occurs.M
2.4.2 Disinfection Process AdherenceObservation (PNS Inspector)During SanitizationCorrect amount of disinfecting solution used (17.5 gallons of 5% or 8.8 gallons of 10% sodium hypochlorite). Correct fill levels maintained. Soak time of 4 hours. Rinsing/washdown performed correctly. HWAA emptied on time.Exact adherence to steps and quantitiesRework required if non-compliantH
2.5.1 Bacteriological TestingDocument ReviewAfter Sanitization/DisinfectionSamples taken correctly. Runoff at bottom of tank used.Runoff from all parts of tankRetesting required if incorrectM
2.5.3 Bacteriological Test ResultsDocument ReviewPrior to PNS InspectionCertified copies of test results submitted to PNS personnel (Project Management, COR, Inspector, TPOC) before PNS inspection. Density of E.COLI must be less than 235 / 100 mL. Density of ENTEROCOCCI must be less than 61 / 100 mL.Test results meet EPA standards.Rework required if test failsH
2.6.1 Tank Inspection by PNSPNS InspectionAfter Contractor CleaningTank cleanliness accepted by PNS Inspector or Structural Engineer TPOC.PNS Inspectors acceptance of cleanlinessRework at Contractor's expense. 5% penalty per tank failureH
2.7.1 Anode Removal & TurnoverVisual Inspection & Turnover VerificationIf Required, Before CleaningAnodes, if present, removed and turned over to PNS project personnel.All anodes removedDelay in cleaning until removed.L
2.8.1 Marine Chemist CertificationDocument Review & Visual PostingBefore Tank EntryValid Marine Chemist Certification posted outside the tank.Certification posted.Work stoppage until certified.H
2.8.2 VentilationObservation & Document ReviewDuring all phases of cleaningVentilation is sufficient and exhausts outside the ship without recirculation. Conforms to confined space certificate.Adequate ventilation in place.Work stoppage until ventilation meets requirements.H
2.8.3 PPE UsageVisual ObservationDuring WorkContractor personnel wear appropriate PPE (respiratory protection, gloves, boots, body protection, eye/face/head protection).100% PPE compliancePersonnel removed until compliant.H
2.8.6 Waste DisposalDocument Review & Spot ChecksAfter disposal of wasteProper disposal methods used in accordance with all applicable federal, state and local regulations. Approval from PNS Environmental Engineer Department.Regulations adhered to.Financial penalties/legal action.H
2.8.7 Waste StorageVisual observationDuring work. RandomHazardous materials/waste not stored on board longer than 1 hour without contractor personnel present.No long-term storage of wasteWork Stoppage. Non-compliance.H
2.8.8 Spill ResponseVisual observationAfter incident. RandomSpill properly cleaned up immediately. Notifications made to PNS Project Management Team and Navy Faire and Emergency Services.No spills left unattendedContractor is financially responsible for any clean-up costsH
2.8.9 Work Area ProtectionVisual observationDuring work. RandomWork area protected with waterproof cover-up to prevent spills/splashes. Area kept clean of trade litter.Adequate work area protectionWork stoppage and cleanup required.H
4.3 Coordination with PNS Project TeamCommunication VerificationDailyContractor coordinates work daily with PNS Project Management Team.Demonstrated communicationSchedule delaysM