Solicitation N3904025Q4369 QandA as of 7.14.2025.docx

DOCX document 16 KB Posted

Attached to
Solar powered Crosswalk Lights With Installation; Q&A as of 7-14-25 attached
Solicitation number
N3904025Q4369
Issued by

About this file

This document is a Questions and Answers (Q&A) file for Solicitation N3904025Q4369 regarding Solar Powered Crosswalk Lights with Installation. The solicitation is issued by the Department of the Navy Naval Sea Systems Command for the Portsmouth Naval Shipyard in Kittery, Maine, seeking to procure and install twelve (12) pairs of solar-powered crosswalk lights. Key details from the Q&A include clarifications on manufacturing requirements (65% domestic content per Buy American Act is acceptable), no specific photometric code requirements, and no need for 24/7 remote monitoring of the lights.

The solicitation specifies payment terms of Net 30 Days and does not mandate US-only manufacturing, provided the domestic content threshold is met. Vendors requesting additional information, such as crosswalk location drawings, can do so by request. The procurement involves full operational testing of the lights to ensure an effective pedestrian crossing solution at the naval shipyard location.

View the file

Other files

File Type Posted
N3904025Q4369 Combined Synopsis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation N3904025Q4369 Solar Powered Crosswalk Lights with Installation Questions and Answers as of 7/14/2025

Q1. Please could you provide the location of the crosswalks for us to prepare a photometric study?

A1. Drawing available upon request.

Q2. Do we need to respect the AASHTO light level for the crosswalk or any specific requirements?

A2. No, this is not a Code 100TO.3 requirement.

Q3. Does the product need to be manufactured and assembled in the US?

A3. No, provided 65% of the manufactured item is domestic content, per the Buy American Act and Federal Acquisition Regulation.

Q4. Do you want the manufacturer to provide remote monitoring of the lights 24/7?

A4. No.

Q5. What are the payment terms for this requirement?

A5. Net 30 Days.

File details come from the government source that posted it. Updated .