N3904024R0019 TC.pdf
PDF 271 KB Posted
- Attached to
- N3904024R0019 Railcar Inspections IDIQ Amended
- Solicitation number
- N3904024R0019
About this file
This document appears to be a continuation sheet for a solicitation (N3904024R0019) issued by the Department of the Navy Naval Sea Systems Command for railcar inspections. The key details are:
The contractor will be required to perform a minimum of 28 and a maximum of 45 railcar inspections on UFC-3 railcars over a 5-year period. The railcars will have 8 or 12 axles, and the contractor must be capable of jacking the railcars and performing minor maintenance. The contractor must have knowledge and ability to inspect railcars for compliance with relevant CFR Title 49 regulations and the Association of American Railroad-Interchange Rules. The contractor must provide a copy of the UFC-3 inspection record with all applicable data entries and sign-offs. Additional data requirements are specified in Exhibit A and Attachment #1.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQ DOC NO. - 4019V112 ATTACHMENT _________
CONTINUATION SHEET CONTRACT NO. - _______________ PAGE ___ OF ___
NAME OF OFFER OR/CONTRACTOR
SERVICE 1 JO
C. DESCRIPTION/SPECIFICATIONS
C.1 RAILCAR INSPECTIONS: MINIMUM OF 28 UFC-3 RAINCARS
INSPECTIONS WITH A MAXIMUM OF 45 RAILCAR INSPECTIONS.
C.1.1 PERFORM IN ACCORDANCE WITH ATTACHED STATEMENT OF
WORK.
C.1.2 THESE INSPECTIONS WILL HAPPEN OVER A FIVE (5) YEAR
PERIOD.
C.2 THE RAILCARS WILL EACH HAVE 8 OR 12 AXELS.
C.2.1 THE CONTRACTOR MUST BE CAPABLE OF JACKING THESE
RAILCARS.
C.2.2 THE CONTRACTOR MUST BE ABLE TO PERFORM MINOR
RAILCAR MAINTENANCE.
C.2.3 THE CONTRACTOR MUST HAVE KNOWLEDGE AND ABILITY TO
INSPECT RAILCARS FOR COMPLIANCE WITH CFR TITLE 49,
PART 215, CRT TITLE 49, PART 231 AND THE ASSOCIATION OF
AMERICAN RAILROAD-INTERCHANGE RULES.
C.2.4 SEE STATEMENT OF WORK FOR ADDITIONAL INFORMATION
AND SPECIFICATIONS.
C.3 A COPY OF THE UFC-3 INSPECION RECORD AND SIGN-OFF WITH ALL
APPLICABLE DATA ENTRIES AND SIGNOFFS COMPLETE.
ITEM # SUPPLIES/SERVICES QTY U/I
C.4 DATA REQUIREMENTS PER EXHIBIT A (DD-1423) & ATTCHMENT #1.
C.4.1 CERTIFICATION OF COMPLIANCE; EXHIBIT A SEQUENCE A001.
C.4.1.1 UFC-3 INSPECTION RECORD AND APPLICABLE DATA
ENTRIES AND SIGNOFFS.
File details come from the government source that posted it. Updated .