N3904024Q0086 Attachment 1 to Exhibit A.pdf

PDF 72 KB Posted

Attached to
Rental (32) & Fill of Nitrogen Bottles
Solicitation number
N3904024Q0086
Issued by

About this file

This document is an attachment to a federal contract solicitation for the rental and filling of 32 nitrogen gas bottles for support of a critical service at the Point Loma Shipyard in San Diego, CA. The contract period of performance is from July 1, 2024 to February 28, 2025, with two optional 30-day extensions.

The contractor is required to supply oil-free nitrogen gas per specific industry standards and specifications, and to coordinate delivery schedules with the government. The government will provide the bottle racks and related equipment, and will monitor bottle levels and provide access for the contractor. Security requirements include obtaining proper badges and access passes. The contract will be awarded as a firm-fixed-price contract, with evaluation factors including adherence to the schedule and soonest mobilization. This is a small business set-aside acquisition under NAICS code 325120, with a size standard of 1,200 employees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT N3904024P0086

PRINTED 25 JANURAY 2025 _______

ATTACHMENT 1 TO EXHIBIT A (DD FORM 1423)

CONTRACT/SOLICITATION ________________________________________________________________

ITEM ___________________________________________ (DATE FOR ITEM) ___________________

REQUIRED CERTIFICATION

A. CERTIFICATION SHALL BE SUPPLIED WITH EACH SHIPMENT OF MATERIAL.

CERTIFICATION (CERTIFICATE OF COMPLIANCE) SHALL BE SUPPLIED AS OUTLINED IN

PARAGRAPH B. THE VENDOR IS LIABLE FOR CONDUCTING ALL TESTS, ANALYSES,

INSPECTIONS, AND EXAMINATIONS, ETC., AS SPECIFIED BY THE CONTRACT AND

SPECIFICATIONS WHETHER CERTIFICATIONS ARE REQUIRED OR NOT.

CERTIFICATE OF COMPLIANCE (PROVIDE THE FOLLOWING VERBATIM STATEMENT OR

COMPLETE THE OPTIONAL FORM AT THE END OF THIS PART)

"I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH

ALL CONTRACT REQUIREMENTS".

B. CERTIFICATION SHALL BE SUPPLIED PER THE FOLLOWING INSTRUCTIONS:

1. THE CERTIFICATION OF COMPLIANCE SHALL CONTAIN THE SIGNATURE AND TITLE OF

THE VENDOR OFFICIAL DESIGNATED RESPONSIBLE FOR QUALITY ASSURANCE.

2. THE MATERIAL IDENTIFICATION (E.G. LOT, BATCH, PART #, ETC.) SHALL BE INCLUDED

ON THE CERTIFICATE OF COMPLIANCE.

CONTRACT N3904024P0086

PRINTED 25 JANURAY 2025 _______

ATTACHMENT 1 TO EXHIBIT A (DD FORM 1423)

CERTIFICATE OF COMPLIANCE

COMPANY NAME

MATERIAL IDENTIFICATION (COMPLETE APPLICABLE ITEMS)

CONTRACT NO. N3904024P0086 ORDER NO. ________________ ITEM NO. ____________________ NATIONAL/LOCAL STOCK NO. NSN/LSN ____________________________________________________ MANUFACTURER’S PART NO. _____________________________________________________________ MANUFACTURER’S SERIAL NO. ___________________________________________________________ DRAWING AND PIECE NO. _________________________________________________________________

MANUFACTURER’S LOT/HEAT NOS. AS MARKED ON THE MATERIAL _________________________

ALL INSPECTIONS AND TEST REPORTS REQUIRED BY ATTACHMENT I TO EXHIBIT A (DD FORM

1423) FOR TRACEABILITY TO EACH CONTRACT ITEM MUST ACCOMPANY THIS SIGNED

STATEMENT:

THE INSPECTION AND TEST REPORTS (AS APPLICABLE) PROVIDED REPRESENT THE ACTUAL

ATTRIBUTES OF THE ITEMS FURNISHED ON THIS CONTRACT AND INDICATE FULL

COMPLIANCE WITH ALL CONTRACT REQUIREMENTS. I ATTEST ALL ITEMS FURNISHED ON

THIS CONTRACT ARE IN FULL COMPLIANCE WITH ALL CONTRACT REQUIREMENTS.

SIGNATURE ___________________________________________________ DATE _______________

QUALITY ASSURANCE OFFICIAL

File details come from the government source that posted it. Updated .