This is a combined synopsis and solicitation for commercial items seeking quotes for the rental of portable vacuum recovery units for abrasive blast grit at Portsmouth Naval Shipyard in Kittery, Maine. The solicitation requires quotes for one base unit from February 28, 2022 to February 26, 2023, with options to extend to November 19, 2023. Optional quotes are also requested for two additional units from May 2, 2022 to April 30, 2023 and July 1, 2022 to June 29, 2023, with optional extensions to November 19 and 23, 2023 respectively. Quotes are due by December 17, 2021 and shall include pricing, contact information, specifications demonstrating the ability to meet requirements, and business size. The NAICS code is 532490 and small business size standard is $35 million. The solicitation is issued by the Department of the Navy Naval Sea Systems Command.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

N3904022R0008 17-Nov-2021

b. TELEPHONE NUMBER

207-994-0448

8. OFFER DUE DATE/LOCAL TIME

11:00 AM 17 Dec 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

N390409. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TANA L ANDERSON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

N3904022RC20058

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

PORTSMOUTH NAVAL SHIPYARD

CONTRACTING DIVISION, CODE 410

BLDG 156, PNS

KITTERY ME 03904

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS AX

13b. RATING

DO-A3

CODE15. DELIVER TO CODE N39040 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

TEL: 207-438-5206 FAX:

FAX:

TEL: 207-438-1000 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$35,000,000

NAICS:

532490

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF37

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

N3904022R0008

Section SF 1449 - CONTINUATION SHEET

STATEMENT OF WORK

EQUIPMENT SPECIFICATION FOR

PORTABLE VACUUM RECOVERY UNIT FOR ABRASIVE BLAST GRIT

1. SCOPE

1.1 Scope. This specification covers the general design and performance requirements for the rental of a portable vacuum recovery unit supplied complete and ready for use with equipment, accessories, machine installation, testing, training, and other services as described herein.

1.2 Intended Application. This equipment will be used to recover spent grit used in abrasive blasting. The grit may be up to 200 feet away from the equipment, and recovered using a six (6) inch industry standard vacuum recovery hose at the inlet to the equipment.

2. APPLICABLE DOCUMENTS

2.1 Issues of Publications. The following documents of the issue date in effect on the date of request for proposal form a part of this specification to the extent applicable, or as specified herein. Within the specification, they shall be referred to by their basic designation only.

2.1.1 Government Publications.

Code of Federal Regulations 29 CFR 1910 – Occupational Safety and Health Standards 29 CFR 1926 – Safety and Health Regulations for Construction 40 CFR 261 – Identification and Listing of Hazardous Waste

Federal Standards

FED-STD-313D – Material Safety Data, Transportation Data, And Disposal Data For Hazardous Materials Furnished To Government Activities

2.2 Other publications. The following documents form a part of this specification to the extent specified herein. Unless a specific issue is identified, the issue in effect on the date of invitation for bids or request for proposal shall apply.

American National Standards institute Inc. (ANSI) ANSI/AMT B11.19 – Performance Criteria for Safeguarding

(Application for copies should be addressed to American National Standards Institute (ANSI), 1899 L Street, NW, 11th Floor, Washington, DC 20036. Electronic copies may be obtained from https://www.ansi.org/.)

American Welding Society AWS AWS-D1.1 – Structural Welding Code

(Application for copies should be addressed to American Welding Society (AWS), 8669 NW 36st, Suite 130, Miami, FL 33166. Electronic copies may be obtained from https://www.aws.org/.)

National Electrical Manufacturer’s Association (NEMA) NEMA ICS 1 – Industrial Controls and Systems NEMA MG 1 – Motors and Generators NEMA 250 – Enclosures for Electrical Equipment

(Application for copies should be addressed to National Electrical Manufacturers Association (NEMA), 1300 N 17th St., Suite 900, Rosslyn, VA 22209. Electronic copies may be obtained from https://www.nema.org/.)

National Fire Protection Association (NFPA) NFPA 70 – National Electrical Code NFPA 70E – Electrical Safety NFPA 79 – Electrical Standards for Industrial Equipment

(Application for copies should be addressed to National Fire Protection Association (NFPA), 1 Batterymarch Park, Quincy, MA 02169-7474. Electronic copies may be obtained from https://www.nfpa.org/.)

2.3 Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence.

Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

3. REQUIREMENTS

3.1 General Description of System. The equipment shall meet all the performance and construction characteristics herein. The equipment shall be portable and provide for full recovery of abrasive sandblast grit, which may be located up to 200 feet way from the equipment. See Table (1) and Figure (1) for additional performance information. All values given are intended as the actual value, unless specified as a range, maximum or minimum.

Table (1) Oven Characteristics and Performance

CHARACTERISTIC VALUE COMMENT

Depth (MAX) 9 Feet Width (MAX) 25 feet Weight (MAX) Motor HP 200 HP Must be exact Motor FLA 245 A Maximum value Audible Noise at Full Load 84 dBA See section 3.8 Vacuum Air Flow 4500 CFM Vacuum Static Pressure 27”Hg Operation Continuous Shall incorporate provisions to protect blower from overheating.

The system shall not require water for cooling or for vacuum operation

Output filters HEPA compliant Physical performance The vacuum system shall be capable of moving a minimum of eleven (11) tons per hour of coal boiler slag (black beauty) or steel shot grit (density 237 Lbs.

per Cu. Ft.).

Hose Distance The vacuum will transport the grit through approximately 400 feet of 6 inch diameter hose to a vacuum roll-off collection tank 70 feet above the system.

FIGURE (1) Typical Vacuum Recovery Setup

3.2 General Equipment Requirements. All materials and parts comprising the system shall be new, of current design and manufacture, and shall not have been in prior service except as required for factory testing. Standard, off the shelf components with proven reliability shall be used wherever possible to increase performance, reliability and cost. The equipment shall be one of the manufacturer’s current production models which, on the day this solicitation is issued, has been designed, engineered and sold, or is being offered for sale through advertisements or manufacturer’s published catalogs or brochures.

Products such as prototype unit, preproduction model, or experimental unit do not qualify as meeting this requirement. The equipment shall be complete, so that when connected to the utilities identified herein, it can be used for the function for which it is designed and constructed.

3.3 Operating Environment and Freeze Protection. The proposed system will be operated in a heavy industrial environment and shall be capable of continuous operation over an extended period of time with minimal maintenance and upkeep. The equipment shall be suitable for operation in an outdoor salt-water marine industrial environment, at variable ambient temperatures of -10oF to 100oF, with high humidity. All pneumatic systems shall have adequate protection against buildup of moisture in lines that could create blockages when frozen. Freeze protection systems must not use flammable materials.

3.4 Electrical. All electrical equipment shall conform to the appropriate standards listed in Section 2 of this document, as well as industry accepted norms.

3.4.1 Source. The equipment delivered and all accessary parts shall operate from a single source of primary power.

3.4.2 Grounding. All exposed, non-current carrying metal parts on the equipment shall be maintained at common, zero ground potential. None of the primary circuits in the equipment shall be connected to ground. A grounding stud/lug on the equipment shall provide a means for grounding the equipment.

3.4.3 Overcurrent Protection. All electrical components shall be fused or circuit breaker protected in each phase conductor for AC circuits and both DC circuit conductors. Overloads, fuses and circuit breakers shall be coordinated for maximum component protection and minimum circuit disruption.

3.4.4 NRTL Approval. The control system shall be housed in a NEMA rated electrical enclosure that is NRTL approved per OSHA 29CFR1910. A standard NRTL field evaluation is allowed for approval.

3.4.5 Energy Isolating Devices. Equipment provided by the contract shall provide energy isolating devices (e.g. safety switches, valves, etc.), to protect personnel from hazardous energy. The devices shall be designed and manufactured such that the device can be locked in the user selected position (ON/OFF) to prevent inadvertent or unauthorized change. The contractor shall ensure that all energy isolating devices installed or modified are capable of being locked. This includes both mechanical and electrical devices.

3.4.6 Exposed Receptacle Oultlets and Connectors. All electrical receptacle outlets, connectors, and and plugs exposed to environmental contidions shall be NEMA rated one of the following: 4, 4X, 12, 6, 6P.

3.5 Motors. The motors shall conform to the appropriate standards listed in Section 2 of this document, as well as industry accepted norms. The intended application for this equipment shall be evaluated to determine the required motor type, along with the requirements below. Servomotors are servomechanisms and shall not be required to be in accordance with NEMA MG-1.

3.5.1 Enclosures. All electric motors shall be the totally enclosed, fan cooled style.

3.5.2 Mountings. The motor shall be mounted for vibration isolation.

3.5.3 Duty Cycle. The motor shall have a duty cycle that is appropriate for the intended application and usage.

3.5.4 Efficiency. The motor shall be a premium efficiency motor for energy efficiency.

3.5.5 Bearings. The motor bearings shall be of the sealed for life and permanently lubricated type.

Unnecessary grease fittings or plug holes shall be removed. The bearings shall provide the proper lubrication to support intermittent use and long-term storage.

3.5.6 Motor Controller. The motor controller shall be designed to allow for a reduced voltage or soft start, at less than full load current to reduce the electric current surge of the motor during start-up.

3.6 Personnel Safety and Health Requirements. All machine parts, components, mechanisms, and assemblies furnished on the unit shall comply with all specific requirements of “OSHA Safety and Health Standard (29CFR1910), General Industry” , ANSI/AMT B11.19, ANSI/AMT B11.22, and ANSI/AMT B11.23, and ANSI/AMT B20.1 that are applicable to the equipment itself. Covers, platforms, guard rails, belt guards, and safety devices shall be provided for all parts of the equipment that present a safety hazard.

The safety devices shall not interfere with the operation or maintenance of the equipment. The safety devices shall be removable to facilitate inspection, maintenance, and repair of the part. Additional safety and health requirements shall be as specified in other paragraphs of this specification.

3.7 Material Safety Data Sheets (MSDS). Offeror's and contractors are required to submit Material Safety Data Sheets (MSDS’s) whenever the supplies being acquired or supplies used during performance are identified as hazardous materials. Hazardous Materials shall include any material which, by virtue of its potentially dangerous nature (e.g., toxic, flammable, corrosive, oxidizing,p irritating, sensitizing, reactive), requires controls in its use, packaging, handling, storage, or stowage, to assure adequate safety to life and property. This definition is intended to apply to proprietary industrial, commercial, or locally prepared blends, mixtures, formulations, or compounds of gases, liquids, and solids intended for use at the job site.

Any other material that has been designated by a Government technical representative as potentially hazardous and requiring safety controls shall also be supplied with a MSDS. MSDS’s are to be available at work sites where materials are being used.

3.8 Audible Noise Levels. During normal operation, the equipment shall not produce noise levels greater than 84 dB(A) at the hearing zone of the operator's work position (In this case "hearing zone" is defined as a sphere within a two foot diameter surrounding the head) nor at any other point at a distance of three (3) feet from the equipment, as measured on the "A" weighted scale of a calibrated Type II or better sound level meter at slow response under all operating and service conditions.

3.9 Environmental Protection. The unit shall be designed and constructed so that during operation, service, transportation and storage conditions described herein, including final disposal, the equipment will comply with all applicable Environmental Protection Agency (EPA) and Occupational Safety and Health Agency (OSHA) (and their state and local counterpart's) requirements.'

3.10 Hazardous Material Exclusions. Supplies being used in the performance of this contract, or materials being provided as part of the equipment shall be free of known hazardous materials. Definitions of hazardous materials are specified in the latest version, including revisions adopted during the term of the contract, of Federal Standard No. 313. Notwithstanding any other hazardous material usage permitted in this contract, radioactive materials or instruments capable of producing ionizing radiation as well as materials which contain asbestos, mercury, cadmium, lithium, methylene chloride, lead (=or>0.06%), or polychlorinated biphenyls (PCB’s) are prohibited.

3.11 Painting. The exterior and interior of all enclosures, and all components, shall be painted or fabricated of materials which are corrosion resistant. The painting may be in accordance with the manufacturer’s standard practice provided it results in a highly wear resistant finish which ensures continued protection against the shipyards salt water marine operating environment under all service conditions. Prior to painting, surfaces shall be properly cleaned, prepared and primed. Lead base or chromium base paints are prohibited.

3.12 Caution - Warning Plates. Corrosion resistant “Caution” or “Warning” plates or labels shall be securely attached to the equipment in visible locations, with any safety precautions to be observed by the operator or maintenance personnel permanently marked on the plates.

3.13 Identification Plate. An identification plate shall be furnished with the equipment. A nameplate shall be affixed to each major component of the system showing the manufacturer’s name, equipment model, year of manufacture, amp rating of largest motor, and any other pertinent information for identifying the part as a unique component of the system.

3.14 Equipment weight. The total weight of the unit shall be stenciled on each side of the unit with 2" high lettering with a contrasting paint (yellow unacceptable).

3.15 Handling Devices.

3.16 Lugs or lifting eyes. The equipment shall be provided with lugs or lifting eyes arranged with the vertical center of gravity for and shall result in a stable, balanced and level lift when lifted with four slings of equal length which are supported by a single strong back or lifting beam by overhead crane.

3.16.1 Lifting Points. The lifting points shall be located no lower than the top of the unit unless approved in writing by the responsible technical code at PNS, with concurrence of Code 700.

Each lifting point must be permanently identified with its Working Load Limit (i.e. Stenciled, stamped or etched). The lifting points shall allow the use of screw pin shackles.

3.17 Tine guide openings. The equipment shall be provided with box-section, tine-guide openings in the base for safe handling and transport by forklift truck. The box sections shall extend through the entire length or width of the equipment, completely enclosing the forklift tines. They shall be fabricated from metal having a minimum thickness of 0.25 inch. The base shall also have forklift slots (5” high x 10” wide) for handling with a forklift truck; the slots should be 72” apart from inner rail to rail, or 82” center to center. Forklift slots shall extend completely through the length or width of the unit and be constructed of metal. They shall be welded to the base and so spaced apart, center-to-center, that while transporting the equipment, a forklift truck can pass over pavement obstructions causing dynamic stresses representing five times the equipment's weight without causing the box sections to fracture or part from the base.

3.18 Specific Characteristics for Equipment and Services to be Provided. The equipment specified herein shall include, but is not limited to the following components, attachments, and accessories.

3.18.1 Utilities. The equipment shall be designed and constructed to be complete for operation on following available utilities:

Electric: Single Service , 460 volts (+10%), 3 phase, 60 Hertz

Compressed Air: 100 PSI regulated, (+ 10 %)

3.18.2 Condition Upon Receipt – The machinery shall be in a fully-charged, fully-assembled, ready-to-use, and in a first-class-operating condition. Machines shall be functionally tested prior to its delivery. The machinery with its support equipment shall be delivered to the site on or prior to the request date. It is incumbent and the responsibility of the Contractor to either confirm or coordinate the date and time of delivery prior to each shipment via the Point-of-Contact (POC) as designated on the Contract and/or the Contracting Officer's Representative (COR). The Government can provide forklift services for removing machinery from Vendor’s transport during work hours. Documentation with Shipyard copies shall accompany each delivery.

3.18.3 General.

3.18.3.1 Meter. The equipment shall be fitted with a meter(s) to measure operating time of the: System/unit. The time totalizing meter shall be of the non-resetting type and shall have a range of 0 to 100,000 hours in increments of 1 hour and 99999 shall be the maximum readout. The least significant digit on the meter readout shall be 1 hour.

Lesser increments are not acceptable. Upon reaching the maximum accumulative hours, the meter readout shall automatically revert to zero and continue to totalize time. The meter shall be designed to prevent the entrance of dust and moisture and shall be mounted to withstand shock and vibration generated by the equipment. The meter shall be located as to be readily visible, but not subject to abuse relative to the operating environment of the equipment.

3.19 Adapters. The units must be supplied with adapters to allow hose diameters to vary 4”, 5”, and 6” interchangeably.

3.19.1 Lubrication chart or plate. A lubrication plate or chart shall be securely attached to the equipment. If a chart is furnished, it shall be placed in a transparent plastic folder or laminated between clear plastic permanently sealed sheets. The following information shall be furnished on the chart of plate:

Points of application Service interval Type of lubricant Viscosity Federal or Military Specification Number (if available)

3.19.2 Structural.

3.19.2.1 Base. For portability, the entire unit shall be mounted on a single heavy-duty skid base of steel construction. The skid base shall provide adequate bracing and support to permit placing the entire assembly on uneven surfaces without causing equipment damage, distortion or overstress. The base and associated framework shall be gusseted and cross braced as necessary to withstand the stresses, vibration and shock associated with rough handling and transport of the unit by overhead crane or flatbed truck over rough surfaces. The footprint shall be no greater than 8’ 3” wide and 24’6” long. The skid base and framework shall be welded in accordance with ANSI/AWS D1.1.

3.19.3 Mechanical.

3.19.3.1 (PD) Blower. The blower shall be of the electric powered rotary positive displacement type (i.e. “ROOTS” or equivalent) The inlet connection shall be compatible with adaptors for 4”,5”,& 6" ID vacuum recovery hose and have the following characteristics:

a. Free air capacity of 4500 CFM (minimum) and a capped vacuum capacity of 27” Hg.

The blower shall be designed for continuous operation, and incorporate provisions to protect blower from overheating. The system shall not require water for cooling or for vacuum operation.

Outlet filters shall be HEPA (.3 micron) compliant.

3.19.3.2 Baghouse. The filter bags shall provide for a quick change out of all bags. The filters shall be cleaned by reverse pulse cleaning and cyclonic separation.

3.19.4 Electrical.

3.19.4.1 Power supply connection. The power supply connection is to be separate phase, male, CAMLOCK Duraline E-1016 connectors. There shall be two Duraline E-1016 connectors per phase for each of the three phases for a total of six (6) connectors, box mounted in or near the main control panel. The electrical cords penetrating the panel must have strain relief adaptors to prevent the power supply cords from being pulled out of the control panel.

3.19.5 Control System.

3.19.5.1 Main Control Panel. A main control panel, housed in a NEMA 4 enclosure, shall be mounted on the equipment in a location convenient to the operator and shall contain all electrical components except those needed at point(s) of operation. All controls, push buttons, warning lights, etc., shall be labeled in the English language, identifying their function, sensor location or other pertinent data. Separate warning or indicator lights, clearly labeled, are required for each operation mode or fault detector system specified below and are to have a lamp test feature.

The panel shall include the following:

1. Fused main disconnect switch or circuit breaker for single point electrical disconnect to the entire system.

2. Motor starter and main disconnect with power on light

3. Start/stop push-button with run light

4. Circuit breaker overload protection

5. Circuitry for main motor "soft start" to limit inrush current.

6. Control transformer and circuits.

7. Non reset hour meter for the main motor

8. Capacitance sensor connected to the vacuum with interchangeable extensions cords of 50’, each vacuum shall be supplied with five 50’ lengths for a total of 250’ of cord per vacuum unit. The mechanical type sensor will be supplied with a 1 ¼” quick coupler to connect the unit to the vacuum box quickly, without the use of tools. The 1 ¼” quick coupler mounted on the sensor’s female end must screw onto a 1 ¼” NPT threaded pipe on the vacuum box. The sensor will shut the vacuum down when a loading bin is full.

3.19.6 Training.

3.19.7 Maintenance. The equipment will be operating around-the-clock under a rigorous deployment performance schedule. Within twenty-four (24) hours (one-day) of initial notification of the need for repair, the Contractor shall have a knowledgeable and equipped technician on the job-site fully prepared to repair the rental equipment. The defective unit(s) shall be repaired within forty-eight (48) hours (two day) of initial notification or, if the original defective unit(s) cannot be made operational, replaced within seventy-two (72) hours (three days) of initial notification. If the equipment failure is not the fault of the Government, the Contractor shall bear all costs associated with its repair and/or replacement.

3.20 Technical Data to be Provided.

3.20.1 Data required for review. All the performance characteristics identified and requirements specified in section 3.0, following sections and in the list below shall be provided for technical review.

A picture or drawing showing a similar unit Footprint Area Working Area Static pressure requirements Vacuum Performance Noise decibel readings at full load Electrical Requirements of all equipment. Including, HP and FLA to size CB Approximate Time to Deliver Description of Operator Control Panel Controller and software description

3.20.2 Requirements for technical proposals. Offerors shall submit, technical proposals written in the English language with the data requested. The proposal shall enable government personnel to make a thorough evaluation and determination as to whether or not the proposed equipment fully meets the requirements of the solicitation. To this end, each proposal shall be as specific, detailed and complete as to demonstrate that the offeror has a thorough knowledge and understanding of the requirements. Statements that paraphrase the specifications or attest that "standard procedures will be employed", etc., are inadequate. Each proposal must be sufficiently adequate to demonstrate full compliance with the technical requirements of the specifications. Failure to comply with these instructions may result in rejection of an offer.

4. QUALITY ASSURANCE PROVISIONS

4.1 Responsibility for inspection. Unless otherwise specified in the contract, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the government. The government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure that supplies and services conform to prescribed requirements.

4.2 Acceptance Testing at Destination. The equipment shall be supplied FOB Destination (Portsmouth Naval Shipyard). Upon receipt, the equipment shall be inspected for shipping damage, verification of quantities, mechanical and electrical integrity, and the requirements of section 3. Within fifteen (15) days of delivery, the equipment will be connected to the appropriate utilities, and operated to sufficiently demonstrate conformance to the requirements of the specification. Any discrepancies on any item of equipment supplied shall be promptly corrected by the manufacturer at no cost to the government.

4.3 Final Acceptance – Upon satisfactory completion of inspection and test of the equipment, the authorized Government Representative (Portsmouth Naval Shipyard) will sign and forward the acceptance document(s) to the paying office.

5. PACKAGING

5.1 Special Delivery Instructions. The contractor shall notify the receiving activity of the scheduled arrival date of the equipment and any special handling requirements. Notification shall be made not less than 72 hours prior to the delivery date. This notification is necessary to ensure off-loading services are arranged.

If proper notification is not given, the Government will not responsible for any delays and expenses caused by the inability to off-load the supplies upon delivery. Portsmouth Naval Shipyard will not accept deliveries after 1500 hours Monday through Friday. No deliveries will be accepted on Saturday or Sunday.

6. NOTES

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 52 Week Unit #1 VAC Recovery Unit

FFP

Rental of one (1) VAC Recovery Unit in accordance to the Statement of Work.

FOB: Destination

PURCHASE REQUEST NUMBER: N3904022RC20058

PSC CD: W036

NET AMT

1001 38 Week OPTION Unit #1 Option VAC Recovery Unit

FFP

Unit #1 Option Rental of one (1) VAC Recovery Unit in accordance to the Statement of Work.

FOB: Destination

1002 52 Week OPTION Optional Unit #2 VAC Recovery Unit

FFP

Operational Unit #2 Rental of one (1) VAC Recovery Unit in accordance to the Statement of Work.

1003 52 Week OPTION Optional Unit #3 VAC Recovery Unit

FFP

Operational Unit #3 Rental of one (1) VAC Recovery Unit in accordance to the Statement of Work.

2002 29 Week OPTION Option Unit #2 VAC Recovery Unit

FFP

Operation Unit #2 Rental of one (1) VAC Recovery Unit in accordance to the Statement of Work.

2003 21 Week OPTION Option Unit #3 VAC Recovery Unit

FFP

Operation Unit #3 Rental of one (1) VAC Recovery Unit in accordance to the Statement of Work.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government

1003 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 28-FEB-2022 TO

26-FEB-2023

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N39040

1001 POP 27-FEB-2023 TO

19-NOV-2023

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 02-MAY-2022 TO

30-APR-2023

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 01-JUL-2022 TO

29-JUN-2023

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 01-MAY-2022 TO

19-NOV-2023

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 30-JUN-2023 TO

23-NOV-2023

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

JUN 2020

52.204-7 System for Award Management OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-22 Alternative Line Item Proposal JAN 2017 52.211-15 Defense Priority And Allocation Requirements APR 2008 52.212-1 Instructions to Offerors--Commercial Items SEP 2021 52.212-3 Alt I Offeror Representations and Certifications--Commercial

Items (FEB 2021) Alternate I

OCT 2014

52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.217-5 Evaluation Of Options JUL 1990 52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION

2020-O0008).

OCT 2020

52.223-6 Drug-Free Workplace MAY 2001 52.232-25 Prompt Payment JAN 2017 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.243-1 Changes--Fixed Price AUG 1987 52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.247-34 F.O.B. Destination NOV 1991 52.249-1 Termination For Convenience Of The Government (Fixed

Price) (Short Form)

APR 1984

52.252-2 Clauses Incorporated By Reference FEB 1998 52.252-6 Authorized Deviations In Clauses NOV 2020 52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7006 Billing Instructions OCT 2005 252.204-7015 Notice of Authorized Disclosure of Information for Litigation

Support

MAY 2016

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation

MAY 2021

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

JAN 2021

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.

JAN 2018

252.223-7001 Hazard Warning Labels DEC 1991 252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7048 Export-Controlled Items JUN 2013 252.232-7006 Wide Area WorkFlow Payment Instructions DEC 2018 252.232-7010 Levies on Contract Payments DEC 2006 252.244-7000 Subcontracts for Commercial Items JAN 2021 252.247-7023 Transportation of Supplies by Sea FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be DX rated order; X DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]

(End of provision)

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

The Government will award a contract resulting from this solicitation to the responsible vendor whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The contract will be awarded to the vendor with the Lowest Price Technically Acceptable. Quotes will be evaluated based on the following criteria:

- Technical Acceptability

Must meet specifications and document capabilities to include, Adherence to Schedule (Award may be made based on delivery and ability to meet the requested schedule.)

- Price Lowest Price Technically Acceptable, after adherence to other factors

Vendors will be required to submit a quote that will be evaluated in accordance with the specifications provided in the solicitation, FAR 52.212-1 Instruction to Offerors. Failure to include pricing for all line items shall be cause for rejection of the quote for all line items.

Technical:

Please provide

Documentation demonstrating your capabilities in fulfilling the SOW.

Documentation demonstrating or stating your ability to adhere to the provided schedule.

Technical Evaluation Ratings Rating Description

Acceptable Submission clearly meets the minimum requirements of the solicitation, to include Adherence to Schedule

Unacceptable Submission does not clearly meet the minimum requirements of the solicitation

If the technical submittal is determined “Unacceptable”, it renders the entire quote technically unacceptable.

Technical submissions that do not meet the minimum requirements will be rated as “Unacceptable” and will no longer be considered for further competition or award.

Price:

The Price will be evaluated as Lowest Price Technically Acceptable, however, the Contracting Officer reserves the right to award based on ability to meet the required schedule.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (SEP 2021)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).

___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L.

109-282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.

L. 111-117, section 743 of Div. C).

X (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101 note).

___ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).

____ (10) [Reserved]

____ (11) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (SEP 2021) (15 U.S.C. 657a).

____ (12) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (SEP 2021) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (13) [Reserved]

____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

____ (ii) Alternate I (MAR 2020) of 52.219-6.

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

____ (ii) Alternate I (MAR 2020) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (NOV 2016) of 52.219-9.

____ (iii) Alternate II (NOV 2016) of 52.219-9.

____ (iv) Alternate III (JUN 2020) of 52.219-9.

____ (v) Alternate IV (SEP 2021) of 52.219-9.

____ (18) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

____ (ii) Alternate I (MAR 2020) of 52.219-13.

____ (19) 52.219-14, Limitations on Subcontracting (SEP 2021) (15 U.S.C. 657s).

____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (SEP 2021) (15 U.S.C.

657f).

X (22) (i) 52.219-28, Post-Award Small Business Program Rerepresentation (SEP 2021) (15 U.S.C. 632(a)(2)).

____ (ii) Alternate I (MAR 2020) of 52.219-28.

____ (23) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (SEP 2021) (15 U.S.C. 637(m)).

____ (24) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (SEP 2021) (15 U.S.C. 637(m)).

____ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

____ (26) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).

____ (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

____(28) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JAN 2020) (E.O. 13126).

X (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

X (30)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

____ (ii) Alternate I (FEB 1999) of 52.222-26.

____ (31)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

____ (ii) Alternate I (JUL 2014) of 52.222-35.

____ (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

____ (ii) Alternate I (JUL 2014) of 52.222-36.

____ (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

____ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.

13496).

X (35)(i) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

____ (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

____ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners

(JUN 2016) (E.O. 13693).

____ (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (OCT 2015) of 52.223-13.

____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (JUN 2014) of 52.223-14.

____ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).

____ (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

____ (ii) Alternate I (JUN 2014) of 52.223-16.

X (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.

13513).

____ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

____ (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).

____ (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

____ (ii) Alternate I (JAN 2017) of 52.224-3.

____ (48) 52.225-1, Buy American--Supplies (JAN 2021) (41 U.S.C. chapter 83).

____ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (JAN 2021) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I (JAN 2021) of 52.225-3.

____ (iii) Alternate II (JAN 2021) of 52.225-3.

____ (iv) Alternate III (JAN 2021) of 52.225-3.

____ (50) 52.225-5, Trade Agreements (OCT 2019) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

____ (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

____ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150

____ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.

5150).

____ (55) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).

____ (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

____ (57) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

X (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (31 U.S.C. 3332).

____ (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).

____ (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

____ (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

____ (62) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).

____ (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C.

55305 and 10 U.S.C. 2631).

____ (ii) Alternate I (APR 2003) of 52.247-64.

____ (iii) Alternate II (FEB 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

_____ (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

_____ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.

chapter 67).

_____ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

_____ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (7) 52.222-55, Minimum Wages Under Executive Order 13658 (NOV 2020) (E.O. 13658).

_____ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph

(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment…

This is the start of the file's text. The full file is on GovTribe.