SOW Encl (2) Description of Order - IGCE Spreadsheet 101-20 REV 1_2-5-20.xls

XLS spreadsheet 55 KB Posted

Attached to
eQ Technologic Corporation eQube-MI and SharePoint Connectors Software Support – PoP 1 Mar 2020 to 28 February 2021.
Solicitation number
N3904020Q0053
Issued by

View the file

Other files

File Type Posted
Justification for Brand Name 101-20_Redacted_2-5.pdf PDF
RFQ COMBINED SYNOPSIS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template

CONTRACTOR REQUIRED INFORMATION
Contractor Contract # (SEWP / GSA):
CONTRACTOR POC Name:
POC Email:
POC Phone #:
CAGE Code
DUNS #
SEE INSTRUCTIONS FOR COMPLETING THIS TEMPLATE ON THE 2ND WORKSHEET TAB
ITEM # (Proposed CLIN)Brand Name (BN) or Equal?Manufacturer NameManufactuer Part NumberDescriptionQTYUNIT OF ISSUEUNIT PRICEEXTENDED AMOUNTPromised Delivery (ARO)Covered by OEM Warranty (type and duration)HW Serial Number/Key CodeHW Unique Item Identifier (See DFARS 252.211-7003)Software License Included (Duration)SW Serial Number/Key CodeUID of Parent IAW DFARS 252.211-7003 (5)(e)Contract NumberDelivery Order Number (if applicable)Funding Document NumberContract Line Item No. (CLIN) SubCLIN (SLIN)Customer OrganizationDelivery AddressTracking NoCarrierIUID TypeIssuing Agency CodeEnterprise IdentifierLot or Batch NumberType DesignationSpecial Tooling or Special Test Equip
SUBMEPP; PoP 3/1/2020 to 2/28/2021
0001BNeQ Technologic, Inc.MI-SP-02MI Starter pack #2 (*per server): Includes 1 Production environment license and 2 non-production licenses1EA
0002BNeQ Technologic, Inc.MI-FN-01-HACLONE: MI Foundation bundle, includes MI Server with BPM (*per server)1EA
0003BNeQ Technologic, Inc.MI-C-FILESFile System Connection (**per connection)1EA
0004BNeQ Technologic, Inc.MI-C-FILES-NPFile System Connection non-prod (**per connection)2EA
0005BNeQ Technologic, Inc.MI-C-STDStandard MI ConnectorsA (**per connection)1EA
0006BNeQ Technologic, Inc.MI-C-STDStandard MI Connectors (**per connection)1EA
0007BNeQ Technologic, Inc.MI-C-STD-NPStandard MI Connectors non-prodA (**per connection)2EA
0008BNeQ Technologic, Inc.MI-C-STD-NPStandard MI Connectors non-prod (**per connection)2EA
0009BNeQ Technologic, Inc.MI-C-ShPSharePoint Connector productionA (**per connection)1EA
0010BNeQ Technologic, Inc.MI-C-ShPSharePoint Connector production (**per connection)1EA
0011BNeQ Technologic, Inc.MI-C-ShP-NPSharePoint Connector production non productionA (**per connection)2EA
0012BNeQ Technologic, Inc.MI-C-ShP-NPSharePoint Connector production non production(**per connection)2EA
0013BNeQ Technologic, Inc.TM-SV-01EQUBE TM Server (*per server)1EA
0014BNeQ Technologic, Inc.TM-SV-01-NPEQUBE TM Server non production (*per server)1EA
0015BNeQ Technologic, Inc.MI-GMP-01Generic migration process module (*per server)1EA
0016BNeQ Technologic, Inc.MI-GMP-01-NPNon-Production Generic migration process module (*per server)1EA
0017BNeQ Technologic, Inc.BI-AM-EMS-B1Includes EMS module + export to pdf + attaching the pdf (*per server)1EA
0018BNeQ Technologic, Inc.BI-AM-S-EXLExport to x-cel from Scheduler (*per server)1EA
0019BNeQ Technologic, Inc.BI-AM-P-B2Export to x-cel, PPT and PDT from Portal (*per server)1EA
GRAND TOTAL
REQUESTED DELIVERY DATE:3/1/20
DELIVER ITEMS TO:SUBMEPP
Office Name/SymbolDoDAAC N45404
AddressBldg. 86/2
City, State and Zip+4Portsmouth, NH 03804
POC Name, Phone, Fax and Email

&L &CEncl 2a, Consolidated Product List 4Jun2018/v2

Instructions

Instructions for Completing Consolidated Product Listing to be used for IGCE/RFQ/EPL/MI&RR
Customers shall work with their respective Property Accountability Office in order to determine in advanced which of the requested item(s) require assignment of an Item Unique Identification (IUID) valuation tag in accordance with the guidance contained in DFARS 252.2011-7003. Each item that requires an IUID tag and collection/submission of required information must be clearly identified on the spreadsheet by leaving column M blank. If the contractor will not be required to provide either an IUID tag and/or IUID information, column M shall be blacked out.
Note for DISA requirements only: DISA property accountability manager has determined it to be in the best interest of the Government to upload the required information into the Defense Property Accountability System (DPAS) in order to generate and affix IUID tags on items after delivery. Contractors will NOT be required to generate or provide IUID tags. However, all information outlined on the EPL MUST be provided with each shipment in order to allow for generation of the physical IUID tag.
When customer is submitting requirements for a specific brand name item (accompanied by the appropriate Justification for Other than Full and Open Competition), those items should be marked as “BN” in column B. Items which are to be competed on an “or equal” basis should be marked accordingly so vendors understand how to respond. Column B should be completed for each Contract Line Item (CLIN).
If the customer is purchasing a complete configurable system, a single CLIN may be used to identify all components associated with the top level assembly. Orders will be placed for a single system based upon the configuration using the Unit of Measure (UoM) of each. Multiple systems can be ordered on a single line item on the contract as long as all will have the exact same configuration. The configuration Bill of Materials (BOM) will be incorporated into the resulting contract as an attached document.
If an IUID tag is required for a component or subassembly of a configurable product, the per unit price of the item must be collected and reported. Whenever the need for an IUID tag is indicated, the offeror cannot decline to provide a per unit price by listing the item as not separately priced (NSP).
Within a CLIN for single system, sub elements/subassemblies may also require serial numbers and/or IUID tags. When required, the customer shall leave the appropriate columns blank to indicate to the contractors that information must be provided. If information is not required, columns L through N should be blacked out.
If a serial number is not required (or not provided in accordance with industry standards), column L should be blacked out.
Customers will be allowed to group together small dollar items such as spares or peripheral equipment for a tech refresh (estimated per unit price of $5K or less) into one BOM for ordering purposes.
The completed spreadsheet shall be submitted to Procurement Services (PS) along with all required documentation for review. One copy of the document will be retained in the contract file marked “IGCE”. Another copy will be created with the per unit prices removed and labeled as “RFQ Proposal Template”. This copy will be included in the RFQ and shall be the basis for the offeror’s proposal. At the time the spreadsheet is forwarded in an RFQ, columns O through AB will be hidden. Instructions to offerors will explain use of these columns after award.
During the evaluation process, the Contract Specialist and Contracting Officer will review proposed CLIN structure with the customer to determine if additional changes are necessary before contract award.
Columns Q, R and S will be completed by PS and the remaining columns unhidden for distribution with the award documents. Contractors will be instructed to submit a completed document with each shipment in order to meet the requirements for submission of an Electronic Parts List IAW DARS 52.211-9000. When more than one item is shipped per CLIN, all serial numbers and IUID tag information shall be inserted in the appropriate columns separated by semi-colons.
In order to assist in identifying a specific shipment to a specific order, contractors are required to provide the name of the carrier and the tracking number for each shipment on the completed EPL. When items are drop shipped from the Original Equipment Manufacturer (OEM), the contractor shall obtain the necessary information from the OEM and submit the completed EPL so that it is received on/before shipment arrives at the destination outlined in the contract.
In addition to submission of DD250, Material Inspection and Receiving Report, contractors shall attach a copy of the consolidated EPL with each shipment. To meet the information requirements for this document, columns T through AB must also be completed. IAW DFARS 252.211-7003, completed DD250 and the attachment must be included with invoices submitted in WAWF.
For further guidance, please reference the IGCE Desk book located at https://www.ditco.disa.mil/hq/deskbooks.asp