QASP_MATRIX_-_19R0294_TVENT.pdf

PDF 39 KB Posted

Attached to
Temporary Ventilation and Exhaust Equipment for Kittery, ME to start 9/24/19
Solicitation number
N3904019R0294
Issued by

About this file

QASP Matrix

View the file

Other files

File Type Posted
TVENT_Spec_Rev_A_-_19R0294.pdf PDF
Solicitation.pdf PDF
19R0294_CAP.pdf PDF
WD_15-4015_v12.pdf PDF
QASP_-_19R0294_TVENT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) MATRIX

TEMPORARY VENTILATION, MACHINERY AND EQUIPMENT RENTAL

IN SUPPORT OF USS SANTA FE (SSN 763) ENGINEERING OVERHAUL

Deliverable or Service Requirement

Measurement/ Metric

Performance Standards Maximum Error Rate

Method of Surveillance

Procedures to be taken when performance standards are met/not met

Temporary Ventilation

(TVENT)

Quality

Timeliness

Responsiveness

All equipment provided shall perform in accordance with requirements identified in Table V of Specification.

Delivery of equipment and required technical documentation must be on time per the specifications.

Within twenty-four (24) hours of initial notification of the need for repair, the Contractor shall send a technician to the job-site to repair the equipment. The defective unit(s) shall be repaired within forty-eight (48) hours of initial notification or, if the original defective unit(s) cannot be made operational, replaced within seventy-two (72) hours of initial notification.

0%

Inspections conducted by Contracting Officer’s Representative (COR) and/or Surveillance / Technical POC

Customer feedback

Positive and negative performance by the Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past performance.

File details come from the government source that posted it.