SOW.docx
DOCX document 19 KB Posted
- Attached to
- Rix High Pressure Air Compressor Rebuild
- Solicitation number
- N3904019Q0262
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Justification_for_Sole_Source_Signed_Redacted.pdf | ||
| 52.222-52.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
SCOPE: This Statement of Work covers the requirements for a factory top end rebuild on the Rix high pressure air compressors (Alphas FZC and FZD) bringing them back into proper working order, in building 300 at Portsmouth Naval Shipyard.
BACKGROUND:
These two compressors are thought to have excessive run time and thus excessive wear, requiring full top end rebuilds. Shop 06 currently does not have the manpower to support rebuilding these critical pieces of equipment.
PERFORMANCE REQUIREMENTS:
At the completion of the rebuild, each compressor must meet factory specifications for their respective model (4VX4B-13.4). This includes a 4700 PSIG discharge pressure when connected to a 60 SCFM at 90 PSIG inlet air source. The parts used in the repair of the units must be OEM parts made specifically for the model 4VX5B-13.4 compressors. The following table outlines expected operating pressures:
| Suction |
| Stage 1 |
| Stage 2 |
| Stage 3 |
| Stage 4 |
| PSIG: |
| 90 |
| 300 |
| 950 |
| 2200 |
| 4700 |
4. ADDITIONAL REQUIREMENTS
| 4.1 | OPERATIONAL TEST |
| 4.2.1 | TRAINING shall be timed for completion prior to delivery of the equipment. The contractor shall notify the receiving activity in writing not less than 7 days prior to commencement of training as to the training schedule and the location at which the training is to be conducted. Charges for training shall exclude travel and subsistence costs of the receiving activity's personnel. The representative(s) shall train personnel on site at the receiving activity. Training service shall be for a period of time sufficient to instruct personnel of the journeyman mechanic's level in the proper operation and maintenance of the equipment. Training shall be provided for personnel designated as the operators for the machine. Representative(s) must be an American citizen of good standing and repute. |
4.1.1 The equipment shall be operated in a manner and for a time frame of 2 consecutive hours to demonstrate and verify operation of the equipment and all of its component parts, relative to the performance criteria established under paragraph 3.
5. GENERAL
| 5.1 | OWNERSHIP OF DELIVERABLES: Portsmouth Naval Shipyard shall retain ownership of all deliverables produced by the contractor. |
| 5.2 | PERIOD OF PERFORMANCE: The on-site work must be coordinated with Code 960/06 prior to scheduling. The work has the potential to impact the production environment. The dates may be changed, based on the needs of Portsmouth Naval Shipyard. All deliverables are due within 30 days of completion of the on-site work. |
| 5.3 | HOURS OF WORK: The work will take place in building 300 on Portsmouth Naval Shipyard. All work shall be accomplished during normal working hours of the PNSY, Kittery, ME, 7:00 AM until 3:00 PM, Monday through Friday. The Contractor shall provide 48-hour notice to request permission from Code 960/06 for work on Saturday, Sunday and Holidays. The on-site work must be coordinated with the Code 960/06 as it will impact a production environment. The dates may be changed based on needs of Portsmouth Naval Shipyard. |
| 5.4 | SECURITY: No person not known to be a United States citizen of good standing and repute shall be eligible for access to Portsmouth Naval Shipyard and adjacent areas. Proof of citizenship may be required. |
| 5.5 | WORK SITE OPERATIONAL SAFETY ENVIRONMENT – The work area may be ~10 to 20 feet up on the equipment. All required precautions shall be taken. |
| 5.6 | HAZARD ENERGY CONTROL - The contractor shall be responsible for filling out Reference (a) on the bottom of this statement of work before the on-site visit. This form and any associated documentation will be furnished upon request. |
| 5.7 | CONTRACTOR ASSISTANCE – Portsmouth Naval Shipyard will provide an operator for the mill as needed by the contractor during the evaluation period. A maintenance person will be provided as required. An engineer from Code 982 will be on-site or available as required |
| 5.8 | INSPECTION: Inspection shall be done during and at the completion of the contract. Contact Code 960/06 when work is complete and ready for inspection. The contractor must provide at least one day advance notice to the Government representative of requested inspection time for any inspection desired with the contractor on the site and schedule such inspection to commence at or before 2:00 PM Monday through Friday. Any work deemed unsatisfactory by the Contracting Officer shall be redone until acceptable at no additional cost to the Government. |
| 5.9 | FALL PROTECTION: The contractor shall follow OSHA 1926.501 (Fall Protection) and 1915.159 (Personal Fall Arrest Systems) for fall protection. |