Justification_for_Sole_Source_Signed_Redacted.pdf

PDF 91 KB Posted

Attached to
Rix High Pressure Air Compressor Rebuild
Solicitation number
N3904019Q0262
Issued by

About this file

Justification for Sole Source

View the file

Other files

File Type Posted
SOW.docx DOCX document
52.222-52.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR SOLE SOURCE (Simplified Acquisitions <$250K)

The service or material listed on Funding is sole source and competition is precluded for reasons indicated below. There are no substitutes available for this material or service.

Restricted to the following source. Rix Industries (If a sole source manufacturer distributes via dealers, ALSO provide dealer information.)

Manufacturer:

Manufacturer POC & phone nr:

Mfr. Address:

Dealer I Rep:

Dealer I Rep address I phone nr:

Rix Industries

4900 Industrial Way

Benicia, CA 94510

_x_ Description of the item or service required, the estimated cost, and required delivery date.

The service required is to disassemble, inspect, repair, and perform an operation test test of the following compressors:

Model: 4VX4B-13.4

SN: 14690 & 14691

this service is required as soon as possible, as it supports all shipyard availabilities.

_2L Specific characteristics of the material or service that limit the availability to a sole source (unique features, function of the item, etc.). Describe in detail why only this suggested source can furnish the requirements to the exclusion of other sources.

Rix Industries is the original equipment manufacturer and is the only provider of direct replacement parts for this machine. Upon identifying what is damaged, only Rix Industries can supply parts for this machine.

__ The requested material or service represents the minimum requirements of the government.

I of2

CHECK & FILL IN ALL APPLICABLE BLANKS BELOW

_X_ The material/service must be compatible in all aspects (form, fit and function) with existing systems presently installed/perfonning. Describe the equipment/function you have now and how the new item/service must coordinate, connect, or interface with the existing system.

Any repair parts identified will be direct replacement parts for an existing machine. Upon repair, 2 hour run test will be conducted and the machines will be and factory certified.

_ A patent, copyright or proprietary data limits competition.

_X_ These are "direct replacements" parts/components for existing equipment.

Any repair parts identified will be direct replacement parts for an existing machine.

_Other infonnation to support a sole source buy:

I CERTIFY THAT STATEMENTS CHECKED, AND INFORMATION PROVIDED ABOVE, ARE

COMPLETE AND CORRECT TO THE BEST OF MY KNOWLEDGE. I UNDERSTAND THAT THE

PROCESSING OF THIS SOLE SOURCE JUSTIFICATION PRECLUDES THE USE OF FULL AND

OPEN COMPETITION.

Si~•~% Activi ~ Sif, /;. 'J

I Date _~+r-z~,¢~?~· ____ _

-------------------------------------------'ij------------------------------------------------------------------------------

Contracting Officer Si~ature ~ - Date L1/3o / i q

' I SAP Sole Source

2 of2

File details come from the government source that posted it.