Attachment_2_-_FY19_QASP_Matrix_for_Barge_Maintenance.pdf

PDF 250 KB Posted

Attached to
Barge Maintenance Services 9/23/19-9/22/20 Federal contract opportunity
Solicitation number
N3904019Q0251
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Barge Maintenance Services 9/23/19-9/22/20, newest first.
File Type Posted
Attachment_1_-_Performance_Work_Statement.pdf PDF
Attachment_4_-_Past_Performance_Information_Form.pdf PDF
Exhibit_A-E_2019.xlsx XLSX spreadsheet
N3904019Q0251_Request_for_Quotations.pdf PDF
Attachment_3_-_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN,(MATRIX)

BARGE MAINTENANCE

Deliverable or Service

Requirement

Measurement/

Metric

Performance Standards Maximum Error Rate

Method of Surveillance

Procedures to be taken when performance standards are met/not met

Planned

Maintenance

ELIN A101

Quality

Timeliness

Responsiveness

Contractor’s ability to satisfactorily meet the customer’s expectations of completed work.

On time delivery of products, status reports, invoicing

Contractor’s written response within 3 days of CDR(s)

How well the contractor responds to customer concerns and the approach used to resolve problems.

0% -Contracting Officer’s

Representative (COR) review of Barge Trouble

Log

-Announced and unannounced inspections

-Customer feedback

FAR Clause 52.212-4 “Contract Terms and

Conditions – Inspection /Acceptancce

Positive: Letters of Commendation and/or

Appreciation, Favorable Performance

Reviews.

Negative: Performance will be documented on

CPARS.

In Addition, FAR 52.246-6 (f), (g) and (h).

Cleaning and

Sanitizing

ELIN A102

concerns and the approach used to resolve problems.

0%

-COR inspection before and after cleaning

Conditions – Inspection /Acceptance

Test and Inspections

ELIN A103

concerns and the approach used to

0% -COR review survey inspection results.

- Customer feedback

Fire Fighting

Equipment

Repair/Replace, Maintenance

ELIN A104

0% -Unannounced inspections conducted by the COR

Conditions – Inspection /Acceptancce

Laundry Equipment, replace

ELIN A105

How well the contractor responds to customer concerns and the approach used to resolve problems.

0% -COR inspection of operational equipment

Habitability Repairs

ELIN A106

-COR inspection of operational equipment or completed work

Electrical Repairs

ELIN A107

How well the contractor responds to customer concerns and the approach used to resolve problems.

0%

-COR inspection of

Miscellaneous

Repairs

ELIN A108

0%

Negative: Performance will be documented on CPARS.

Unplanned Parts and

Repairs

ELIN A110

0% -Unannounced inspections conducted by the COR

-COR/KO review of price quote for recommended repair

Negative: Performance will be documented on CPARS.

File details come from the government source that posted it.