Statement of Work - applies to CLINs 0001 and 0002 (tanks and mezzanine)

View the file

Other files

File Type Posted
Attachment_1.pdf PDF
Sole_Source_Justification_Steel-Pro.pdf PDF
8113V006_Attachment_2.doc DOC document
Exhibit_A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dry Dock #1 Pure Water Facility Portsmouth Navy Shipyard, Kittery ME

PURE WATER STORAGE VESSELS 08/18

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASME INTERNATIONAL (ASME)

ASME B16.5 (2017) Pipe Flanges and Flanged Fittings: NPS 1/2 Through NPS 24 Metric/Inch Standard

ASME BPVC SEC IX (2017) BPVC Section IX-Welding and Brazing Qualifications

ASME BPVC SEC VIII D1 (2017) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1 INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO) ISO 7005-2 (1995) Metallic Flanges Part 2: Cast Iron Flanges

1.2 ADMINISTRATIVE REQUIREMENTS

1.2.1 Preconstruction Requirements

1.2.1.1 Fabrication Drawings

Submit fabrication drawings for horizontal cylindrical 316L stainless steel storage vessels, including construction and support details, 30 days prior to start of fabrication.

Drawings shall show the locations of weld seams, sizes and types of welds, piping arrangements, nozzle reinforcement, method of nozzle attachment, plate and head thicknesses, vessel weights, details of lifting lugs, manways, details required for fabrication of the vessels, and a complete list of materials. Include Design Calculations for vessels with the drawings, including chemical composition and mechanical properties of the steels used, and including reference to ASME BPVC SEC VIII D1.

Clearly show on drawings:

a. Locations of platform supports, allowable load at each support, and external reinforcement if required. Show locations of all factory installed nozzles and connections.

1.3 SUBMITTALS

Test

Test reports for liquid penetrant, magnetic particle, and hydrostatic tests performed to prove compliance with specified criteria, upon completion and testing of the installed system.

Procedure for Welding Vessels

Certified copies of performance test records indicating that the welders have passed qualification test in conformance with ASME BPVC SEC IX, prior to work on piping or vessel fabrication. Each welder shall be qualified for the position and type of material assigned.

PART 2 PRODUCTS

2.1 STAINLESS STEEL VESSELS

Provide horizontal cylindrical 316L stainless steel vessels and accessories conforming to loading conditions specified herein and as indicated on the drawings. Maximum allowable carbon content is 0.08 percent. vessels shall be in accordance with ASME Section VIII.

Manufacturer must provide certification of compliance that: "For ALL hardware, contact between final (wetted) surfaces and mercury, mercury compounds, low melting point metals (antimony, bismuth, cadmium, lead, tin, and zinc), and alloys of these metals was prohibited"

Vessels shall be designed to withstand complete vacuum plus loads as indicated on the drawings. Reinforcement, if required, shall be external to the vessels. Locate any reinforcement so that existing pure water piping can be connected by the Government in its' existing location without modification. The vessels have very limited space in which to be placed.

Locate any reinforcement so that vessels may be placed as indicated on the drawings without interference.

Use a nameplate on vessels except when stamping is directly applied.A nameplate plainly stamped in letters not less than 3/8-inch-high shall be permanently attached to vessel or vessel assembly structure at a conspicuous location.Attachment to shell or head portions or around the nozzle openings of vessel shall be by welding, brazing, soldering, or by tamper-resistant mechanical fasteners of suitable metal construction.
Attachment by pressure sensitive adhesives of any type is not acceptable. Stamping shall show serial number, symbols of the manufacturer, specification number, date of manufacture, design pressure, test pressure, maximum allowable working pressure at operating temperature, minimum working temperature for vessels that operate, and water volume capacity in cubic feet to nearest tenth.Manifolds shall be identified by a stainless steel plate or tag attached by stainless steel bands or clamps and shall show serial number, if any, symbols of the manufacturer, specification number, date of manufacture, design pressure, and test pressure.Vessels shall be code stamped in accordance with ASME BPVC SEC VIII D1.Asbestos and asbestos-containing products will not be allowed.

2.1.6 Supports and Attachments

Structural steel for supports or structural attachments shall conform to requirements specified for vessel or to ASTM A 36/A 36M. Where legs of ASTM A 36/A 36M steel are attached to stainless steel vessels, pads of ASTM A 240/A 240M steel shall be used to make the attachment.

2.2 DESIGN AND FABRICATION

Design and fabrication of vessels shall conform to ASME BPVC SEC VIII D1, except as modified herein. Vessels shall be welded cylinders or spheres, seamless cylinders, or cylinders of multiple-layered or banded construction. Vessels shall be suitable for stationary, aboveground horizontal installation, exposed to atmospheric elements. Capacities of vessels shall be as shown. Submit complete calculations.

2.2.1 Design Pressure

Vessels shall be designed for a pressure of 0 psig.

2.2.2 Design Temperature

Vessels shall be designed for a temperature range of plus 120 to minus 40 degrees F.

2.2.3 Nozzles

Nozzles and outlets shall be fully reinforced regardless of size.Flanged outlets shall conform to ASME B16.5 or to ASME BPVC SEC VIII D1.Nozzles or outlets shall be suitable for the pressures specified for vessels.
Material for nozzles, outlets and flanges shall be the same as that of the vessel material.All nozzles shall be flanged with raised face and have smooth transitions without projections or protrusions.Nozzles shall be subjected to the same cleanliness and inspection criteria as the vessels.

2.2.4 Structural Attachments

Permanent structural attachments, including lifting lugs and erection brackets, shall not be welded to vessel parts subject to pressure stress, unless otherwise approved. If approved, such welds shall be full penetration and shall have welded layers inspected progressively by the magnetic particle method. No welding shall be performed after final stress relief or hydrostatic testing.

2.2.5 Shell and Head Thickness

Shell and head thickness shall be calculated in conformance with ASME BPVC SEC VIII D1.

2.2.6 Procedure for Welding Vessels

Welding procedures shall conform to requirements of ASME BPVC SEC IX and to requirements specified below.Information required by recommended Form
QW-483, Article IV, of ASME BPVC SEC IX shall be submitted for approval. An inert-gas shielded welding process with an inert-gas backup shall be used for the first pass of all manifold welds.Separate qualification tests shall be made on maximum joint thickness of each material and each
procedure used in production of double-welded butt joints and single-welded joints.Procedures qualified for thickness greater than those specified shall be acceptable without requalification.Joint design used in test plates shall be the same as for joints used in production.A requalification test shall be made for any change in the nominal weld metal composition and for changes in any essential variables listed in
ASME BPVC SEC IX.A separate qualification test shall be made for each joint design.For multiple-layered or banded vessels, the tension and guided-bend tests shall be performed on inner shell and outer layer thicknesses.For girth welds between multiple-layered shells and heads, the test specimen shall include head material as well as layered shell material.In addition to tests specified in ASME BPVC SEC IX, procedure qualification test plates shall be radiographed following the same
heat-treating procedure used in production.Using radiographic procedures specified for production welds, radiographs shall conform to requirements specified.

2.2.6.1 Weld Layer Thickness

Individual layer thickness of production welds shall not exceed 1.1 times that of individual layer thickness deposited in the performance qualification.

2.3 CAPACITY AND DIMENSIONAL REQUIREMENTS

Provide 5000-gallon nominal capacity vessels as indicated on the drawings.

2.3.1 Liquid Level Gauge

Provide tank with liquid level armored gauge glass sight tube with flanges, indicating 5 to 90 percent of tank capacity.

2.4 TANK CONSTRUCTION REQUIREMENTS

a. The vessels must have final interior finish at all locations with a surface roughness of 125µinches RA (rough average) or smoother.

b. The surface must not snag a cleanliness cloth while performing a swipe test. See "Inspection" paragraph below. Construction must not result in any internal crevices or discontinuities or inward projections.

c. Provide tank with bracketed flat surfaces for identification plate, and liquid-level gage. The identification plate shall indicate the allowable pressure of the vessels.

d. The new vessels shall be used to support the new steel mezzanine framing. Provide stainless steel supports for mezzanine framing as indicated on the drawings. Ensure that a galvanic barrier is placed between the stainless steel support plates and the carbon steel framing.

2.5 ACCESSORIES

2.5.1 Flanged Manways

Provide stainless steel top-flanged manway.

Conform flange diameter and drilling to ASME B16.5, ISO 7005-2, 150 pounds per square inch.

2.5.2 Removable Cover

Provide flat style cover, with lifting ring at center of cover.

PART 3 EXECUTION

3.1 HYDROSTATIC TEST

Perform in-factory hydrostatic tests witnessed by the Government to determine if leak proof storage is provided, and correct deficiencies.

Submit written manufacturer's field reports of all test data made at the job site for review and final approval no later than 30 calendar days prior to contract completion. Repair or replace unsatisfactory vessels and retest at no additional cost to the Government until leak proof systems are obtained.

3.2 INSPECTION

Notify the Government 30 days prior delivery for final inspection of the tank for acceptance.A Government representative shall visit the factory, inspect the vessels and perform swipe tests on the interior of the tank.
Failure of the swipe tests shall constitute failure of the vessels and non-acceptance by the Government.The vessels shall be repaired to pass the the swipe tests at no additional cost to the Government.All costs

associated for additional site visits to the factory by the Government for acceptance testing shall be paid for by the Contractor.

Visual inspection: shall be performed without magnification verifying that critical surfaces are free of foreign material. Discrete lint fibers less than 1/4 inch in length are acceptable.

Wiping inspection: shall be performed by wiping the surface being inspected with a wet or dry lint free cloth. Cleanliness shall be evaluated by comparing the wiping cloth with one used to wipe a visually acceptable surface of similar area and finish which has been previously cleaned. If the wiping cloth exhibits more entrapped or captured foreign material or more discoloration than the comparison cloth, the hardware surface shall be cleaned and re-inspected. An inspection cloth that is free of discoloration and foreign material is acceptable.

Perform Liquid Penetrant Examination and magnetic particle testing for all welds.

After acceptance by the Government, the tanks shall be completely drained and dried.

3.3 RECORD DRAWINGS

Submit record drawings of completed installation no later than 30 days prior to final completion.

Acceptance of the completed drawings by the Contractor certifies accuracy and completeness of the documents.

-- End of Section -- Page