Attachment_1.pdf
PDF 95 KB Posted
- Attached to
- Pure Water Tanks and Mezzanine
- Solicitation number
- N3904018Q0373
About this file
Attachment 1 - Tanks
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement_of_Work_18Q0373.docx | DOCX document | |
| Sole_Source_Justification_Steel-Pro.pdf | ||
| 8113V006_Attachment_2.doc | DOC document | |
| Exhibit_A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQ DOC NO. - 8113V005 ATTACHMENT
CONTINUATION SHEET CONTRACT NO. - PAGE
OF
NAME OF OFFER OR/CONTRACTOR
ITEM # SUPPLIES/SERVICES QTY U/I
TANK 2 EACH
C. DESCRIPTION/SPECIFICATIONS.
C.1 TANK, HORIZONTAL, CYLINDRICAL, 316 STAINLESS STEEL
STORAGE TANK, 5000 GAL NOMINAL CAPACITY, DESIGN PRESSURE
FULL VAUUM. 200OF MAX DESIGN TEMPERATURE. -20OF MIN
DESIGN TEMPERATURE. VESSEL HYDRO PRESSURE 20 PSIG FOR 30
MINUTES. FINAL INTERIOR FINISH OF 125 MICRO INCHES RA., SEE
ATTACHES SPECS
C.1.1 ENGINEER REQUESTS CERTIFICATION OF COMPLIANCE AND
HYDROSTATIC TEST BE EMAIL.
C.2 C528 SPECIFICATION CHANGES.
C.3 C500 MERCURY CONTROL.
C.4 DATA REQUIREMENTS PER EXHIBIT A (DD-1423) & ATTACH #1.
C.4.1 CERTIFICATE OF COMPLIANCE; EXHIBIT A SEQUENCE A001.
C.4.2 HYDROSTATIC TEST CERTIFICATION, EXHIBIT A SEQUENCE
A002.
D. PRESERVATION/PACKAGING/PACKING.
D.1 D4 PREPARATION FOR DELIVERY (COMMERCIALLY PACKAGED).
E. INSPECTION AND ACCEPTANCE.
E.1 E2 INSPECTION AND ACCEPTANCE (DESTINATION).
E.2 G505 VENDOR DISPOSITION OF NON CONFORMING MATERIAL.
File details come from the government source that posted it.