SEE ADDENDUM

(No Collect Calls)

N3904018Q0346 17-Aug-2018

b. TELEPHONE NUMBER

207-438-6819

8. OFFER DUE DATE/LOCAL TIME

04:00 PM 30 Aug 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

N390409. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

EMILY K BATEMAN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

N3904018RC80418

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

PORTSMOUTH NAVAL SHIPYARD

CONTRACTING DIVISION, CODE 410

BLDG 153, 6TH FLOOR

KITTERY ME 03904

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS AX

13b. RATING

DO-C9

CODE15. DELIVER TO CODE N39040 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

TEL: 207-438-5206 FAX:

FAX:

TEL: (207) 438-5253 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

336611

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF60

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

N3904018Q0346

Section SF 30 - BLOCK 14 CONTINUATION PAGE

SECTION A

ADDITIONAL INFORMATION

Contracting Officer's point of contact is:

Emily Bateman, Code 410.1 Tel: 207-438-6819 Emily.Bateman@navy.mil

Technical Point of Contact is:

POC: Tel:

Contracting Officer’s Representative is:

COR: Tel:

Vendor’s Point of Contact is:

POC: ____________________ Tel: ____________________

Email: ____________________

Alt: ____________________ Tel: ____________________

Email: ____________________

INVOICING AND PAYMENT INSTRUCTIONS:

For invoices under Wide Area Work Flow (WAWF) see clause HQ G-2-0009 Supplemental Instructions Regarding Electronic Invoicing.

Calls inquiring on payments can be made to DFAS-Customer Service Dept. at 800-756-4571 Option 2 then option 4)

Inquiries can also be made at DFAS MY INVOICE, a web application available at:

https://myinvoice.csd.disa.mil/ Registration requires a CAGE code, DUNS number and TIN.

Section SF 1449 - CONTINUATION SHEET

SECTION B

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Barge Maintenance Services

FFP

Barge Maintenance Services required in support of a full range of intermediate level troubleshooting, repair, renewal, refurbishment, modernization, maintenance and testing of U.S. Navy Living Barges and their auxiliary systems (hull, mechanical, and electrical) in accordance with Section C and Exhibit A.

Period of Performance to be 23 September 2018 through 22 September 2019.

Place of Performance is Portsmouth Naval Shipyard, Kittery, ME.

FOB: Destination

MILSTRIP: N3904018RC80418

PURCHASE REQUEST NUMBER: N3904018RC80418

PSC CD: J019

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job Unplanned Parts & Repairs

FFP

Unplanned Parts & Repairs in accordance with Section C and Exhibit A.

Period of Performance to be 23 September 2018 through 22 September 2019.

Place of Performance is Portsmouth Naval Shipyard, Kittery, ME.

FOB: Destination

MILSTRIP: N3904018RC80418

PSC CD: J019

NET AMT

CLAUSES INCORPORATED BY FULL TEXT

HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)

This entire contract is fixed price.

52.213-3 NOTICE TO SUPPLIER (APR 1984)

This is a firm order ONLY if your price does not exceed the maximum line item or total price in the Schedule.

Submit invoices to the Contracting Officer. If you cannot perform in exact accordance with this order, WITHHOLD PERFORMANCE and notify the Contracting Officer immediately, giving your quotation.

(End of clause)

SECTION C

PERFORMANCE WORK STATEMENT

C.1. SCOPE OF WORK

C.1.1. The contractor shall furnish the necessary non-personal management, administrative and production services, materials, tools, equipment, facilities, and required support to accomplish a full range of intermediate level troubleshooting, repair, renewal, refurbishment, modernization, maintenance, and testing of Messing/Berthing Barge systems (hull, mechanical, and electrical). Repair personnel shall be qualified MASTER level mechanics and technicians, with current state certifications. Journeyman level mechanics may be utilized under the direct supervision of a master.

C.1.2. It may be in the best interest of the Government to procure/provide materials to complete tasks under any ELIN. The Government reserves the right to identify those instances where Government Furnished Material (GFM) will be utilized. In these instances, the contractor may only invoice for labor costs.

C.1.3. Work shall be accomplished by personnel meeting at least the minimum qualifications set forth elsewhere herein and shall be provided onboard the barge as required. Mechanical and electrical repair and maintenance efforts shall include all areas, hull, mechanical and electrical (HM&E) equipment and systems. Particular emphasis shall be put on quality workmanship in effecting rapid repairs, reinforcement of high standards in maintenance and enhancement of personnel safety. The contractor will provide a firm-fixed hourly labor rate for all diagnosis and repairs, which will be firm-fixed for the life of the contract. The Department of Labor Wage Determination applicable at the beginning of any period will be the basis for the firm-fixed hourly labor rates. The Government has estimated the parts on Exhibit A, based on actual history of the parts used. The quantities and use factor is an estimate.

Contractor shall insert unit pricing for the prices on Exhibit A. Government Furnished Parts/Materials GFP/GFM may be used during execution in lieu of Contractor furnished parts.

CLIN 0001 – Preventative Maintenance & Repairs IAW Exhibit A, PM’s will be required under this contract and will be scheduled by the POC/COR.

CLIN 0002 – Unplanned Parts & Repairs IAW Exhibit A.

Any Unplanned repairs on barges will require the contractor to submit an Unplanned Parts and Repair

Form (ELIN 110) to the COR/ACOR for review prior to proceeding with the work. All parts/materials used on each repair will be priced and listed on the Unplanned Parts & Repairs Form by ELIN, Description, Part Number, Quantity, Rate and Price IAW Exhibit A. Once work has been completed, the Contractor will submit the completed Unplanned Parts & Repair Form to the COR/ACOR for review and acceptance of repairs. Government Furnished Parts/Materials GFP/GFM may be used in lieu of Contractor Furnished Parts and will be identified by annotating GFM or GFP in lieu of an ELIN. All labor for unplanned repairs will be listed on the Unplanned Parts & Repair form by Description (Labor), Quantity (Number of Hours), Rate (Firm Fixed Hourly labor Rate). The parts/material prices on Exhibit A shall be firm fixed for the life of the contract. The labor rate shall be firm fixed for the life of the contract.

Unpriced Parts/Material – It is understood that some parts and material required will not be identified and pre-priced on the Unplanned Parts & Material Exhibit A. If a part and/or material required for repairs is not identified on Exhibit A, the contractor shall provide a quote (if authorized) or an invoice from a reputable parts vendor in lieu of an ELIN with the Unplanned Parts & Repair Form to the COR/ACOR for approval. There shall be no added profit on unpriced parts/material; however, the Contractor may include a reasonable shipping/handling fee. The COR/ACOR will forward a copy of the parts quote or invoice to the Contracting Officer for negotiation and approval. The parts will be added to Exhibit A during the next contract modification. In the interim, the Contractor will continue to use a copy of the negotiated parts quote or invoice on subsequent repair’s requiring the same part until such time the part is added to the Exhibit A by the Contracting Officer.

a. Definition of Repair Requirements - The contractor may be required to identify repair requirements. These efforts, when required, will include, but are not limited to the following: inspect equipment and/or systems to determine repair options and alternatives, and make recommendations to the PNSY Barge Point of Contact (POC), or Contracting Officer’s Representative (COR).

b. Repair Implementation. The contractor shall provide MASTER level qualified technicians and tradesman to perform equipment repairs, maintenance, renewal, and refurbishment. This effort shall include, but is not limited to, the following:

(1) Conduct liaison barge visits to coordinate schedules for barge repairs, equipment removal for repair, and refurbishment or replacement. Repair actions will include the removal and reinstallation of all interferences.

(2) Correct deficiencies identified during barge visits and/or surveys when authorized by the purchase order.

(3) Provide qualified MASTER level mechanics, and technicians, to accomplish repairs onboard barge.

(4) Provide subcontracting capabilities, administration, and management to accomplish repairs that may require specialized skills beyond the contractor’s internal workforce. These repairs shall also be accomplished by MASTER level mechanics and technicians.

(5) Conduct completion inspections, accompanied by the POC or COR after all repair and/or replacement actions have been accomplished.

(6) Provide Quality Assurance Inspections and Certifications for all repair actions accomplished in accordance with this contract and standard industry practices, to include NAVSEA Standard Item 009-04.

(7) During the barge visits, the contractor shall work closely with the POC or COR to expeditiously fulfill planned or emergent work requirements and keep the Government fully informed of the status of work.

(8) Provide the necessary tools, rigs, and test equipment to perform repairs.

(9) Provide written reports to POC or COR on all work performed, and test documentation of those results.

C.1.4. Except as otherwise provided in this contract, the contractor shall provide all material, labor, services, equipment, supplies, accessories, and such other things and services as necessary for accomplishing assigned tasks.

C.1.5. The contractor shall notify the POC or COR verbally and in writing if an established task completion date is in jeopardy.

C.1.6. The contractor shall perform the services listed in the ELINs as ordered by the contract. The services shall be in accordance with the requirements outlined in this contract. Services shall be performed at Portsmouth Naval Shipyard, Portsmouth, NH.

C.2. REFERENCES

In performing the requirements of this contract, the contractor shall comply with all the following references and attachments to this solicitation:

a. The following Category I and II NAVSEA STANDARD ITEMS (NSI) may be viewed on the Internet at http://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/NSI/FY18-NSI/ and will be invoked on all ELINs:

009-01 General Criteria, accomplish 18 NOV 2016 009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 18 NOV 2016 009-03 Toxic and Hazardous Substances; control 18 NOV 2016 009-04 Quality Management System; provide 18 NOV 2016 009-05 Temporary Accesses; provide 18 NOV 2016 009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish 18 NOV 2016 009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;

accomplish 18 NOV 2016 009-08 Shipboard Fire Protection; accomplish 18 NOV 2016 009-09 Process Control Procedure (PCP); provide and accomplish 18 NOV 2016 009-10 Shipboard Asbestos-Containing Material (ACM); control 18 NOV 2016 009-14 Gages and Thermometers; repair and certify calibration 18 NOV 2016 009-20 Government Property; control 18 JUL 2014 009-21 Logistics and Technical Data; provide 18 JUL 2014 009-23 Interferences; remove and install 18 NOV 2016 009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements;

accomplish 18 NOV 2016 009-32 Cleaning and Painting Requirements; accomplish 12 MAY 2016 009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material

Handling Equipment at Naval Facilities; accomplish 18 NOV 2016 009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage 01 SEP 2015 009-71 Testing Requirements for Piping Systems; accomplish 18 NOV 2016 009-72 Physical Security at Private Contractor’s Facility; accomplish 18 NOV 2016 009-74 Occupational, Safety and Health Requirements; accomplish 18 NOV 2016 009-80 Ship’s Facilities; provide 18 NOV 2016 009-87 Chemical Disinfection Procedures; accomplish 18 NOV 2016 009-88 Collection, Holding, and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping, certify 18 NOV 2016 009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide 18 NOV 2016 009-94 General Environmental Requirements for Work at Contractor’s Facility;

accomplish 18 NOV 2016 009-99 Ship Departure Report; provide 18 JUL 2014

b. The following Category I and II NAVSEA STANDARD ITEMS (NSI) may be viewed on the internet at http://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/NSI/FY18-NSI/ and will be invoked on individual ELINs as required:

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish 18 NOV 2016

009-11 Insulation and Lagging Requirements; accomplish 18 NOV 2016 009-12 Welding, Fabrication, and Inspection Requirements; accomplish 18 NOV 2016 009-17 Rotating Electrical Equipment; repair 18 NOV 2016 009-19 Provisioning Technical Documentation (PTD); provide 30 JUL 2015 009-29 Asbestos-Free Pipe Hanger Liner Material; install 29 JUL 2004 009-33 Rotating Electrical Equipment; rewind 18 NOV 2016 009-36 Controller; repair 18 NOV 2016 009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for

Commercial Equipment/Component; provide 18 NOV 2016 009-59 Organotin Antifouling Materials; control 18 NOV 2016 009-61 Shipboard Use of Fluorocarbons; control 18 JUL 2014 009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 18 NOV 2016 009-65 Polychlorinated Biphenyls (PCB’s); control 29 JUL 2011 009-67 Integrated Total Ship Testing; manage 18 NOV 2016 009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 18 NOV 2016 009-79 Government Owned Material (GOM); status reporting 18 NOV 2016 009-82 Data Requirements When Installing an Equal Component Vice Specified

Component; provide 18 NOV 2016 009-83 Wire Rope Fitting Verification; provide 18 NOV 2016 009-84 Threaded Fastener Requirements; Accomplish 18 NOV 2016 009-86 Recovery and Turn-In of Ozone Depleting Substance (ODS); accomplish 18 NOV 2016 009-95 Mechanically Attached Fittings (MAFs) for Piping Systems; install 18 NOV 2016 009-97 Ship Building and Ship Repair Operations National Emission Standard for

Hazardous Air Pollutants (NESHAPS) for Surface Coatings Information; provide. 17 JAN 2013

C.3. FACILITY REQUIREMENTS

a. Facilities. Although facility requirements may vary with the work authorized for a specific task, the successful offeror shall have sufficient facilities in appropriate locations to fully support the work intended by this contract. Barges are berthed at Portsmouth Naval Shipyard, Portsmouth, NH.

C.4. GENERAL REQUIREMENTS

The following are applicable to the extent they apply to all repairs, modifications, testing and adjustments.

Any cost to comply with these requirements shall be included in the price of the CLINs listed in Section B.

C.4.1. The Contractor Shall:

a. Exercise own judgment and expertise to assure the successful completion of all tasks hereunder.

b. Designate those persons authorized to accept/reject verbal orders.

c. Coordinate schedules in the work affected areas with the PNSY Barge Point of Contact (POC), or the

Contracting Officer’s Representative (COR) during the performance period of the contract. The work effort on tasks shall be coordinated on a daily basis with the POC to allow for changing situations aboard barge to minimize delays and disruptions.

d. Not respond to new performance requirements until a modification has been signed or verbal authorization has been given by the Contracting Officer.

e. Not respond to any requests requiring deviations in technical performance as specified in the contract without obtaining prior approval of the Contracting Officer

f. Be responsible for inspection of workspaces prior to manning to ensure spaces are available for work to avoid unnecessary delays in day to day work schedule.

g. Comply with NSI 009-24 in accomplishing isolation, blanking and tagging of equipment, systems, circuits, components, piping and valves.

h. Provide protection during contamination-producing operations and maintain cleanliness in accordance with NSI 009-06. Remove and properly dispose of all debris or trash resulting from cleaning, removal, installation or any other aspect of task performance.

i. Include within the price for applicable ELINs the cost of any required lifting, handling, on-loading/off-loading, and transporting of equipment or materials “off site”. Lifting, handling, on-loading/off-loading of materials on PNSY will be accomplished with coordination by PNSY lifting/handling department.

j. Except as otherwise provided in this contract, the Contractor shall provide all material, labor services, equipment, supplies, accessories, and such other supplies and services as necessary for accomplishing assigned tasks.

k. Ensure that persons assigned to render services hereunder are at all times under the direction and control of the contractor and are not employees of the Government.

l. Remove and dispose of all debris or trash resulting from cleaning, removal, installation or any other aspects of task performance.

m. Follow all applicable federal, state, and local laws concerning safety, health, and welfare of his personnel and equipment as well as other personnel and equipment within a close proximity of the ongoing work.

n. Contact the PNSY Barge POC when problems are encountered after normal working hours.

o. Provide a verbal weekly report detailing significant events and the progress made during the course of each week to the PNSY POC. Time and location for weekly report shall be agreed upon at the beginning of contract execution, and adjusted, as required, by the POC.

p. The contractor shall be responsible for tag out of systems to be repaired and the removal of all interferences.

The contractor shall coordinate with the Barge POC to verify that systems have been properly tagged-out and secured prior to any production effort. The contractor shall reinstall and perform necessary test(s) to all removed interferences/equipment upon completion of all installations specified herein. NSI 009-23 shall apply.

q. Accomplish the requirements of NSI 009-29 where hangers and pipe are removed, disturbed, or new hangers are being installed.

r. Accomplish preservation of the new and disturbed normally painted surfaces in accordance with NSI 009-32, “Cleaning and Painting Requirements; accomplish.”

s. Provide the necessary tools and test equipment to perform the repairs/maintenance actions.

t. Develop and implement test and quality assurance techniques in the performance of maintenance actions. Conduct operational tests and provide written, legible copies of all test results to the Barge POC.

u. Accomplish the requirements of NSI 009-84 when using any temporary fasteners and NSI 009-95 when using any mechanically attached fittings.

v. As soon as practical after contract award date, the contractor’s On-Site Supervisor will meet with the COR/POC to review the contract details, equipment, and schedules.

w. Accomplish the requirements of NSI 009-12 when any welding or brazing services are required.

C.4.2. Environmental and Safety Requirements. The contractor shall:

a. Consider all insulation, lagging, deck tile, underlayment, gasket shipboard cabling and mastic to be asbestos-containing material (ACM) until it can be established by laboratory analysis, or other reliable methods, that the material does not contain asbestos, in accordance with 29 CFR 1915.1001. Removal, disturbance or disposal of ACM shall be accomplished IAW the requirements of NSI 009-10.

b Not enter any confined space without the appropriate certification of PNSY Marine Chemist.

Accomplish fire prevention and housekeeping requirements of NSI 009-07. Maintain area cleanliness and ensure all residues and refuse are removed daily and ensure that general housekeeping is maintained in the work areas for the duration of each task.

c. Consider all solid waste to be removed from a barge under repair to be potentially hazardous waste. The contractor shall review and evaluate all solid waste to determine if that waste is hazardous IAW 40 CFR 262.11.

d. All solid waste with the known potential to be hazardous, including, but not limited to, non-skid debris, paint chip debris, flooring/debris, and all liquid waste water removed from the barge shall be tested by a certified laboratory for metals IAW 40 CFR 261.24 using the Toxicity Characteristic Leaching Procedure (TCLP), Method 1311 in EPA Publication SW-846. Contractor shall submit all laboratory analysis reports to the COR as soon as possible upon receipt from the laboratory. No solid waste removed from the ship shall be transported off the facility until authorized by the COR.

e. Contractor shall prepare, provide and affix labels/placards for all containers of solid waste accumulated on the land, pier, and/or the vessel, including solid waste that is “Pending Analysis.” Labels/placards shall be weatherproof, large enough to provide ready identification, and provide the following information:

- Contractor Name

- Contractor POC: (name, cell phone number, phone number)

- Vessel

- Contract Number

- Shipyard POC or COR: (name, cell phone number, phone number)

- Description of waste

- Analysis Pending/Sample date (if applicable)

f. In the event that a solid waste is determined to be non-hazardous, the contractor shall dispose of the waste in accordance with federal, state, and local regulations.

g. When pumping wastewater from the barge to a tank truck, the contractor shall provide a minimum of three (3) personnel to monitor pumping operations as follows: one person on the tank truck receiving the wastewater, one person walking the piping/hoses from the pumping site to the tank truck, and one person at the pumping site. The three personnel shall be in constant radio contact so the pumping operations can be ceased immediately in the event of a leak or a spill.

C.5. DETAILED REQUIREMENTS

C.5.1 ELIN A101 – Planned maintenance.

AA-AJ: Report daily, Mon-Fri, excluding holidays to Ships Force Living Barge to review barge Trouble Log, maintained by Ships Force. Identify work requirements by Trouble Log. Report to Contracting Officers Representative (COR). Develop daily work priorities with COR. Perform tests and inspections as detailed in

ELINS.

AK: Perform “Annual” inspection, IAW NFPA 10, Portable Fire Extinguisher Inspection and Maintenance Schedule, on approximately (15) 20lb ABC, dry chemical, fire extinguishers.

C.5.2. ELIN A102 – Cleaning and Sanitizing (Including waxing and buffing of tile decks, if applicable)

AA-AD: Provide services/materials to deep clean and sanitize the entire craft. Entire craft defined as all interior surfaces of each compartment including decks (waxing and buffing of tile decks, if applicable), ventilation, piping, bulkheads, bathrooms, laundry facilities, galley, galley equipment, mess area, mess area equipment, desks, chairs, bunks, lockers, tables, mirrors and windows. Clean the interior surfaces of each compartment including decks, ventilation, piping, bulkheads, overheads, bathrooms, laundry facilities, and galley to include equipment and messing area, desks, chairs, bunks, lockers, and tables in accordance with the following:

a. Prior to the start of cleaning, run exhaust ventilation system to preclude introduction of debris into cleaned areas.

b. Remove and dispose of water, trash, grease, and debris from the barge.

c. Clean the bulkheads, overheads, outside of piping, and ventilation free of dirt, grease, loose paint and foreign matter, using clean fresh water, detergent, and disinfectant.

d. Clean decks with detergent and hot water.

e. Strip decks covered with deck tile of old wax. Apply two coats of slip resistant liquid floor wax and buff.

f. Clean bathroom facilities including sinks, commodes, urinals, showers, and mirrors using hot water and detergent and sanitize.

g. Clean galley and scullery equipment, reefers, dishwasher equipment, and laundry equipment with hot water and detergent.

h. Wipe down chairs, tables, bunks, and lockers and remove dust and foreign matter.

i. Clean accessible windows and port holes inside and outside with glass cleaner, remove all paint from glass.

j. Where cleaning agents, detergents, or disinfectants are used, these items shall meet the requirements of the PNSY Non-tracked items list, items exempt from CHRIMP tracking.

k. Accomplish a joint inspection of the barge with the COR and verify cleanliness.

l. When required, following a sewage spill inside the barge, deep clean and sanitize area affected by contact with sewage.

m. When required, open Collection, Holding, and Transfer tank, pressure wash tank interior, cleaning interior areas of tank only accessible from tank opening.

C.5.3. CLINS A103 – Test and Inspections

AA: Provide services/materials and accomplish preliminary and final visual/operational inspection of all systems and equipment.

Where discrepancies are identified during inspection, cost of labor and material associated with this ELIN to correct discrepancies will be covered by either a pre-identified ELIN, or the Undisclosed Work (Correct Discrepancies) ELIN.

C.5.4. ELIN A104 – Fire Fighting Equipment: Replace, Repair and Maintenance

AA-AC: Install new dry chemical fire extinguishers and recharge existing fire extinguishers. All materials shall be in accordance with NFPA 10. When required, replace smoke detectors.

C.5.5. ELIN A105 – Laundry Equipment, Replace

AA-AC: Provide services/materials to remove existing and install new commercial style washers and dryers.

Accomplish operational test. Prices to include cost of labor, equipment and material.

C.5.6. ELINS A106 – Habitability Repairs

AA-EO: Provide services/materials for repairs/replacement of equipment in all habitability areas to include, but not limited to, repair or replacement of urinals, toilets, sinks, shower heads, valves, flushometers, curtains (including hooks), soap dishes, mats, mini blinds, water fountains, flushometer hoses, lock sets and keys, open/re-set combinations on high security/classified locks, automatic door closures, bulkhead insulation, hanging fixtures on bulkheads, and clearing deck drains. Provide services/materials for replacement of piping and valves up to four inches including CU-NI, Carbon Steel, and all associated insulation/lagging/pads.

Install/replace in-line potable water filters. Repair/replace commercial galley equipment. For bidding purposes replacement of piping shall be per linear foot. Prices to include cost of labor, equipment and material.

C.5.7. ELIN A107 – Electrical Repairs

AA-BD: Provide services/materials for replacement/repair of interior and exterior electrical system components, which could include, but not limited to LED tubes, fluorescent tubes, bulbs, light switches/covers, receptacles/covers, LED Force Protection light fixtures, exit light fixtures, fuses, nickel cadmium rechargeable emergency light fixtures, batteries, starters, halogen light bulbs, breakers, wiring, light photo cells, and telephone system repairs.

Prices to include cost of labor, equipment and material.

C.5.8. ELIN A108 – Miscellaneous Repairs

AA-BN: Provide services/materials for repair/replacement of miscellaneous items to include, but not limited to, decking and bulkhead plating, hull plating, support structure, hand rails, rubber based PRC (including underlayment), vinyl tile (including underlayment), terrazzo decking, sand and reseal terrazzo decking, sand and reseal PRC decking, sand, colorcoat, re-flake and reseal PRC decking, terrazzo overlay and non-skid, pressure wash exterior decking, clean/dewater voids, repair/replace void cover gaskets/hardware, provide services/materials for interior and exterior preservation. Provide services/materials for office furniture repair/replacement.

For ELIN 108AW, Clean/Dewater voids, voids will be certified “Gas Free” by PNSY Marine Chemist.

Provide service to include dewatering <2” water by way of submersible pump. Cleaning to include sweeping, mopping. Prices to include cost of labor and material.

C.5.9. ELIN A110 – Unplanned Parts and Repairs

AA-AB: The Unplanned Parts and Repairs ELIN is to be used to correct any discrepancies that are not represented in another defined ELIN. It includes labor hour and material SUBELINs to cover the requirements. The Unplanned Parts and Repairs ELIN is to be used for unique type requirements that are non-repetitive and no ELIN exists to cover that work. The Unplanned Parts and Repairs ELIN includes labor hour and material SUBELINs.

C

VENDOR ACCESS TO SHIPYARD

Vendor access to Shipyard: No person not known to be an American citizen of good standing and repute shall be eligible for access to Portsmouth Naval Shipyard and adjacent areas.

Proof of citizenship shall be required. Entrance of foreign nationals requires approval.

SAFETY/SECURITY

SAFETY: All representatives who have a need to enter the Controlled Industrial Area, or other areas specifically designated as safety hazardous, should provide themselves with safety head wear to be worn while in the area.

Vendors and/or subcontractors performing work on vendor-owned or government-owned plant facilities and equipment shall ensure that all OSHA safety regulations are followed. Prior to working on the Shipyard, all vendors shall view the Code 106 safety video.

SECURITY: Commercial vehicles (automobiles) must have conspicuous contractor (company) identification (such as magnetic door-type signs) affixed to the outside of the vehicle if it is to enter the Controlled Industrial Area

RESTRICTIONS ON USE OF YELLOW MATERIAL

Yellow colored items such as those described below are of special significance within the Shipyard and are subject to strict controls. Accordingly, contractors shall not use yellow or orange-yellow colored materials for the following purposes: protective clothing, hoods, sheeting, tarpaulins, polyethylene bottles or other containers, tapes, bags, banding, identification marks on tools, boundary markers, ribbons, vent ducts, etc. Contractor generated yellow colored waste shall be disposed of by the Contractor off-yard. Shipyard refuse containers shall not be used for disposal of yellow colored waste materials. Yellow colored contract generated debris shall be bagged in non-translucent containers, and promptly removed from the Shipyard.

RADIOLOGICAL INDOCTRINATION

All Contractor employees performing work within the Shipyard must view a radiological video. Contractor employees who are expected to be on the Shipyard for greater than thirty (30) calendar days must attend a one-half hour indoctrination briefing. Attendance at the briefing will be required prior to being issued a permanent Shipyard badge. The indoctrination briefing will provide radiological fundamentals and information on radiological postings and controls at the Shipyard.

RADIOLOGICAL POSTINGS AND INSTRUCTIONS

Any contractor employee who disregards, alters, moves or otherwise tampers with a radiological posting, or who disobeys a radiological instruction, will not be allowed to continue working at the Shipyard.

ACCESS TO THE VESSEL(S) (NAVSEA) (SEP 2016)

Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.

HQ C-2-0007 APPROVAL BY THE GOVERNMENT (AT) (NAVSEA) (JAN 1983)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

HQ C-2-0016 DEPARTMENT OF LABOR SAFETY AND HEALTH STANDARDS FOR SHIP REPAIR

(NAVSEA) (SEP 1990) (MODIFIED) (SEP 2012)

Attention of the Contractor is directed to the Occupational Safety and Health Act of 1970 (29 USC 651-678), and to the Safety and Health Regulations for Ship Repairing (29 CFR 1915), promulgated under Public Law 85-742, amending Section 41 of the Longshoremen's and Harbor Workers' Compensation Act (33 USC 941), and adopted by the Department of Labor as occupational safety or health standards under Section 6(a) of the Occupational Safety and Health Act of 1970 (See 29 CFR 1910.15). These regulations apply to all ship repair and related work, as defined in the regulations performed under this contract on the navigable waters of the United States including any dry dock and marine railway. Nothing contained in this contract shall be construed as relieving the Contractor from any obligations which it may have for compliance with the aforesaid regulations.

HQ C-2-0023 EXCLUSION OF MERCURY (NAVSEA) (MAY 1998)

Mercury or mercury containing compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract.

HQ C-2-0034 MINIMUM INSURANCE REQUIREMENTS (NAVSEA) (SEP 1990)

In accordance with the clause of this contract entitled "INSURANCE--WORK ON A GOVERNMENT INSTALLATION" (FAR 52.228-5), the Contractor shall procure and maintain insurance, of at least the kinds and minimum amounts set forth below:

(a) Workers' Compensation and Employer's Liability coverage shall be at least $100,000, except as provided in FAR 28.307(a).

(b) Bodily injury liability insurance coverage shall be written on the comprehensive form of policy of at least $500,000 per occurrence.

(c) Automobile Liability policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

SECTION D

Item(s) 0001-0002 - The supplies furnished hereunder shall be packaged in accordance with best commercial practice.

HQ D-2-0006 MARKING AND PACKING LIST(S) (NAVSEA) (NOV 1996)

(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with best commercial practice.

(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.

Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.

(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.

SECTION E

Item(s) 0001-0002 - Inspection and acceptance shall be made at destination by a representative of the Government.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government

SECTION F

QA-4

CLAUSES INCORPORATED BY REFERENCE

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 23-SEP-2018 TO

22-SEP-2019

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206 FOB: Destination

N39040

0002 POP 23-SEP-2018 TO

22-SEP-2019

N/A (SAME AS PREVIOUS LOCATION)

FOB: Destination N39040

HQ F-2-0004 F.O.B. DESTINATION (APR 2015)

All supplies hereunder shall be delivered with all transportation charges prepaid, in accordance with the clause hereof entitled "F.O.B. DESTINATION" (FAR 52.247-34) in accordance with the delivery instructions specified herein.

The Contractor shall not ship directly to a military air or water port terminal without authorization by the cognizant Contract Administration Office.

Except when the Material Inspection and Receiving Report (MIRR) (DD 250) is used as an invoice, the Contractor shall enter unit prices on all MIRR copies. Contract line items shall be priced using actual prices, or if not available, estimated prices. When the price is estimated, an "E" shall be entered after the price.

All data to be furnished under this contract shall be delivered prepaid to destination(s) at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.

SECTION G

CONTRACTING OFFICER’S

REPRESENTATIVE: TBD

Rick Toracinta Portsmouth Naval Shipyard Kittery, ME 03904 Telephone: 207-438-2992 Email Address: rick.toracinta@navy.mil

HQ G-2-0009 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (APR 2015)

(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the technical instruction (TI), sub line item number (SLIN), or contract line item number (CLIN) level, rather than on a total contract/TO basis, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by TI, SLIN, or CLIN level. For other than firm fixed price subcontractors, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer (CO) and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the CO and COR; or other method as agreed to by the CO.

(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and CO on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and CO email notification as required herein.

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order: N3904018P0346

(1) Document type. The Contractor shall use the following document type(s).

COMBO

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

N/A

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC N68732 Issue By DoDAAC N39040 Admin DoDAAC N39040 Inspect By DoDAAC ____ Ship To Code N39040 Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____

Accept at Other DoDAAC ____ LPO DoDAAC N39040 DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

N39040_Accts_Payable@nmci-isf.com rick.toracinta@navy.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

NAVSEA HQ WAWF Helpdesk: WAWFHQ@navy.mil PNS WAWF Helpdesk: WAWF_N39040@navy.mil

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

SECTION I

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights

APR 2014

52.204-2 Security Requirements AUG 1996 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.211-15 Defense Priority And Allocation Requirements APR 2008 52.222-17 Nondisplacement of Qualified Workers MAY 2014 52.223-22 Public Disclosure of Greenhouse Gas Emissions and

Reduction Goals -- Representation.

DEC 2016

52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.246-25 Limitation Of Liability--Services FEB 1997 52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7005 Oral Attestation of Security Responsibilities NOV 2001 252.204-7006 Billing Instructions OCT 2005 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.213-7000 Notice to Prospective Suppliers on Use of Supplier Performance Risk System in Past Performance Evaluations

MAR 2018

252.215-7007 Notice of Intent to Resolicit JUN 2012 252.215-7008 Only One Offer OCT 2013 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors.

JAN 2018

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.225-7001 Alt I Buy American and Balance of Payments Program --Alternate

I (Dec 2017)

DEC 2017

252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000 252.247-7025 Reflagging or Repair Work JUN 2005

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)

(a) Definitions. As used in this clause--

Covered contractor…